000A00 ~ Non Training Items |
Group 1 |
000A00 | 1 ~ Training Launch Introduction | Mon 29-May 08:30 ~ 09:30 | | Classroom 4 | ShowEditDestroy |
Group 2 |
000A00 | 1 ~ Training Launch Introduction | Mon 29-May 08:30 ~ 09:30 | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | Classroom 2 | ShowEditDestroy |
Group 3 |
000A00 | 1 ~ Training Launch Introduction | Fri 25-Aug 09:30 ~ 10:30 | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | Classroom 3 | ShowEditDestroy |
Group 4 |
000A00 | 1 ~ Training Launch Introduction | Sat 12-Aug 09:30 ~ 10:30 | Caterpillar System | Classroom 4 | ShowEditDestroy |
000F01 ~ OPV 1800: Performance |
Group 1 |
000F01 | 1 ~ Introduction OPV 1800. | Mon 29-May 08:30 ~ 09:30 | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | Classroom 4 | ShowEditDestroy |
000F01 | 2 ~ Ship's Operational Capabilities. | Mon 29-May 09:30 ~ 10:30 | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | Classroom 4 | ShowEditDestroy |
000F01 | 3 ~ Vessel Layout. | Mon 29-May 11:00 ~ 13:00 | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | Classroom 4 | ShowEditDestroy |
000F01 | 4 ~ Deck Arrangements. | Tue 30-May 14:00 ~ 15:00 | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | Classroom 4 | ShowEditDestroy |
000F01 | 5 ~ Emergency Station. | Mon 29-May 14:00 ~ 15:00 | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | Classroom 4 | ShowEditDestroy |
000F01 | 6 ~ SOLAS Equipment and Fire Fighting Onboard. | Mon 29-May 14:00 ~ 15:00 | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | Classroom 4 | ShowEditDestroy |
Group 2 |
000F01 | 1 ~ Introduction OPV 1800. | Mon 29-May 08:30 ~ 09:30 | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | Classroom 2 | ShowEditDestroy |
000F01 | 2 ~ Ship's Operational Capabilities. | Mon 29-May 09:30 ~ 10:30 | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | Classroom 2 | ShowEditDestroy |
000F01 | 3 ~ Vessel Layout. | Mon 29-May 11:00 ~ 13:00 | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | Classroom 2 | ShowEditDestroy |
000F01 | 4 ~ Deck Arrangements. | Tue 30-May 14:00 ~ 15:00 | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | Classroom 2 | ShowEditDestroy |
000F01 | 5 ~ Emergency Station. | Mon 29-May 14:00 ~ 15:00 | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | Classroom 4 | ShowEditDestroy |
000F01 | 6 ~ SOLAS Equipment and Fire Fighting Onboard. | Mon 29-May 14:00 ~ 15:00 | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | Classroom 4 | ShowEditDestroy |
Group 3 |
000F01 | 1 ~ Introduction OPV 1800. | Fri 25-Aug 10:45 ~ 11:45 | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | Classroom 3 | ShowEditDestroy |
000F01 | 2 ~ Ship's Operational Capabilities. | Fri 25-Aug 11:45 ~ 12:45 | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | Classroom 3 | ShowEditDestroy |
000F01 | 3 ~ Vessel Layout. | Fri 25-Aug 13:45 ~ 15:45 | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | Classroom 3 | ShowEditDestroy |
000F01 | 4 ~ Deck Arrangements. | Fri 25-Aug 16:00 ~ 17:00 | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | Classroom 3 | ShowEditDestroy |
000F01 | 5 ~ Emergency Station. | Mon 07-Aug 09:45 ~ 10:45 | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | Classroom 3 | ShowEditDestroy |
000F01 | 6 ~ SOLAS Equipment and Fire Fighting Onboard. | Mon 07-Aug 11:00 ~ 12:00 | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | Classroom 3 | ShowEditDestroy |
Group 4 |
000F01 | 1 ~ Introduction OPV 1800. | Sat 12-Aug 10:45 ~ 11:45 | Caterpillar System | Classroom 4 | ShowEditDestroy |
000F01 | 2 ~ Ship's Operational Capabilities. | Sat 12-Aug 11:45 ~ 12:45 | Caterpillar System | Classroom 4 | ShowEditDestroy |
000F01 | 4 ~ Deck Arrangements. | Sat 12-Aug 14:30 ~ 15:30 | Caterpillar System | Classroom 4 | ShowEditDestroy |
000F01 | 5 ~ Emergency Station. | Fri 09-Jun 08:30 ~ 09:30 | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | Classroom 4 | ShowEditDestroy |
000F01 | 6 ~ SOLAS Equipment and Fire Fighting Onboard. | Fri 09-Jun 11:00 ~ 12:00 | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | Classroom 4 | ShowEditDestroy |
000F02 ~ OPV 1800: Major System & Equipment |
Group 1 |
000F02 | 1 ~ Safety Systems and Lifesaving Equipment. | Mon 29-May 16:00 ~ 17:00 | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | Classroom 4 | ShowEditDestroy |
000F02 | 2 ~ The Ship's Major System and Equipments. | Mon 29-May 11:00 ~ 13:00 | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | Classroom 4 | ShowEditDestroy |
000F02 | 3 ~ The Ship's Auxiliary System. | Tue 30-May 11:00 ~ 12:00 | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | Classroom 4 | ShowEditDestroy |
000F02 | 4 ~ Deck Machineries. | Tue 30-May 14:00 ~ 15:00 | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | Classroom 4 | ShowEditDestroy |
000F02 | 5 ~ Other Electronics Equipments and systems Onboard. | Tue 30-May 16:00 ~ 17:00 | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | Classroom 4 | ShowEditDestroy |
000F02 | 6 ~ Bilges, Ballast and Internal Fi-Fi System. | Thu 01-Jun 16:00 ~ 17:00 | Khairul Azuadi Bin Ariffin | Classroom 4 | ShowEditDestroy |
Group 2 |
000F02 | 1 ~ Safety Systems and Lifesaving Equipment. | Mon 29-May 16:00 ~ 17:00 | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | Classroom 4 | ShowEditDestroy |
000F02 | 2 ~ The Ship's Major System and Equipments. | Mon 29-May 11:00 ~ 13:00 | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | Classroom 4 | ShowEditDestroy |
000F02 | 3 ~ The Ship's Auxiliary System. | Tue 30-May 11:00 ~ 12:00 | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | Classroom 4 | ShowEditDestroy |
000F02 | 4 ~ Deck Machineries. | Tue 30-May 14:00 ~ 15:00 | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | Classroom 4 | ShowEditDestroy |
000F02 | 5 ~ Other Electronics Equipments and systems Onboard. | Tue 30-May 16:00 ~ 17:00 | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | Classroom 4 | ShowEditDestroy |
000F02 | 6 ~ Bilges, Ballast and Internal Fi-Fi System. | Thu 01-Jun 16:00 ~ 17:00 | Khairul Azuadi Bin Ariffin | Classroom 4 | ShowEditDestroy |
Group 3 |
000F02 | 1 ~ Safety Systems and Lifesaving Equipment. | Sun 27-Aug 09:30 ~ 10:30 | TP TBD | Classroom 3 | ShowEditDestroy |
000F02 | 2 ~ The Ship's Major System and Equipments. | Sun 27-Aug 10:45 ~ 12:45 | TP TBD | Classroom 3 | ShowEditDestroy |
000F02 | 3 ~ The Ship's Auxiliary System. | Sun 27-Aug 12:45 ~ 13:45 | TP TBD | Classroom 3 | ShowEditDestroy |
000F02 | 4 ~ Deck Machineries. | Sun 27-Aug 14:45 ~ 15:45 | TP TBD | Classroom 3 | ShowEditDestroy |
000F02 | 5 ~ Other Electronics Equipments and systems Onboard. | Mon 28-Aug 09:30 ~ 10:30 | TP TBD | Classroom 3 | ShowEditDestroy |
000F02 | 6 ~ Bilges, Ballast and Internal Fi-Fi System. | Mon 28-Aug 10:45 ~ 11:45 | TP TBD | Classroom 3 | ShowEditDestroy |
Group 4 |
000F02 | 1 ~ Safety Systems and Lifesaving Equipment. | Wed 12-Jul 09:15 ~ 10:15 | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | Classroom 4 | ShowEditDestroy |
000F02 | 2 ~ The Ship's Major System and Equipments. | Wed 12-Jul 10:30 ~ 12:30 | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | Classroom 4 | ShowEditDestroy |
000F02 | 3 ~ The Ship's Auxiliary System. | Wed 12-Jul 12:30 ~ 13:30 | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | Classroom 4 | ShowEditDestroy |
000F02 | 4 ~ Deck Machineries. | Wed 12-Jul 14:30 ~ 15:30 | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | Classroom 4 | ShowEditDestroy |
000F02 | 5 ~ Other Electronics Equipments and systems Onboard. | Thu 13-Jul 09:15 ~ 10:15 | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | Classroom 2 | ShowEditDestroy |
000F02 | 6 ~ Bilges, Ballast and Internal Fi-Fi System. | Thu 13-Jul 10:30 ~ 11:30 | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | Classroom 4 | ShowEditDestroy |
000F11 ~ OPV 1800: Performance - Practical On Board |
Group 1 |
000F11 | 1 ~ Familiarization Onboard. | Thu 07-Sep 11:45 ~ 15:45 | TP TBD | On Board | ShowEditDestroy |
Group 2 |
000F11 | 1 ~ Familiarization Onboard. | Mon 04-Sep 13:00 ~ 17:00 | TP TBD | On Board | ShowEditDestroy |
Group 3 |
000F11 | 1 ~ Familiarization Onboard. | Sat 26-Aug 13:30 ~ 17:30 | TP TBD | On Board | ShowEditDestroy |
Group 4 |
000F11 | 1 ~ Familiarization Onboard. | Tue 11-Jul 13:45 ~ 17:45 | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | Classroom 4 | ShowEditDestroy |
000F12 ~ OPV 1800: Major System & Equipment - Practical On Board |
Group 1 |
000F12 | 1 ~ Familiarization Onboard. | Thu 07-Sep 13:30 ~ 17:30 | TP TBD | On Board | ShowEditDestroy |
Group 2 |
000F12 | 1 ~ Familiarization Onboard. | Sun 06-Aug 11:45 ~ 15:45 | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | On Board | ShowEditDestroy |
Group 3 |
000F12 | 1 ~ Familiarization Onboard. | Mon 28-Aug 13:45 ~ 17:45 | TP TBD | On Board | ShowEditDestroy |
Group 4 |
000F12 | 1 ~ Familiarization Onboard. | Thu 13-Jul 13:30 ~ 17:30 | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | On Board | ShowEditDestroy |
110F01 ~ Sub-system of Hull Structure - 164 ICAF |
Group 1 |
110F01 | 1 ~ ICAF - Perform maintenance tasks which are specified under “Daily”. | Tue 30-May 15:00 ~ 15:15 | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | Classroom 4 | ShowEditDestroy |
110F01 | 2 ~ Clean and upkeep the Control Panel and cabinet. | Tue 30-May 15:15 ~ 15:30 | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | Classroom 4 | ShowEditDestroy |
110F01 | 3 ~ ICAF - Check the condition and functionality of Control Panel Unit and display. | Tue 30-May 15:00 ~ 15:30 | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | Classroom 4 | ShowEditDestroy |
110F01 | 4 ~ Check cables connection on terminals for tightness and damage. | Tue 30-May 16:00 ~ 16:30 | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | Classroom 4 | ShowEditDestroy |
110F01 | 5 ~ Electrical Checks on Protective devices and safety circuit. | Tue 30-May 16:00 ~ 16:20 | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | Classroom 4 | ShowEditDestroy |
Group 2 |
110F01 | 1 ~ ICAF - Perform maintenance tasks which are specified under “Daily”. | Tue 30-May 15:00 ~ 15:15 | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | Classroom 4 | ShowEditDestroy |
110F01 | 2 ~ Clean and upkeep the Control Panel and cabinet. | Tue 30-May 15:15 ~ 15:30 | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | Classroom 4 | ShowEditDestroy |
110F01 | 3 ~ ICAF - Check the condition and functionality of Control Panel Unit and display. | Tue 30-May 15:00 ~ 15:30 | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | Classroom 4 | ShowEditDestroy |
110F01 | 4 ~ Check cables connection on terminals for tightness and damage. | Tue 30-May 16:00 ~ 16:30 | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | Classroom 4 | ShowEditDestroy |
110F01 | 5 ~ Electrical Checks on Protective devices and safety circuit. | Tue 30-May 16:00 ~ 16:20 | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | Classroom 4 | ShowEditDestroy |
Group 3 |
110F01 | 1 ~ ICAF - Perform maintenance tasks which are specified under “Daily”. | Sat 30-Sep 09:30 ~ 09:45 | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | Classroom 3 | ShowEditDestroy |
110F01 | 2 ~ Clean and upkeep the Control Panel and cabinet. | Sat 30-Sep 09:45 ~ 10:00 | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | Classroom 3 | ShowEditDestroy |
110F01 | 3 ~ ICAF - Check the condition and functionality of Control Panel Unit and display. | Sat 30-Sep 10:00 ~ 10:30 | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | Classroom 3 | ShowEditDestroy |
110F01 | 4 ~ Check cables connection on terminals for tightness and damage. | Sat 30-Sep 10:45 ~ 11:15 | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | Classroom 3 | ShowEditDestroy |
110F01 | 5 ~ Electrical Checks on Protective devices and safety circuit. | Sat 30-Sep 11:15 ~ 11:35 | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | Classroom 3 | ShowEditDestroy |
Group 4 |
110F01 | 1 ~ ICAF - Perform maintenance tasks which are specified under “Daily”. | Fri 14-Jul 09:15 ~ 09:30 | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | Classroom 4 | ShowEditDestroy |
110F01 | 2 ~ Clean and upkeep the Control Panel and cabinet. | Fri 14-Jul 09:30 ~ 09:45 | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | Classroom 4 | ShowEditDestroy |
110F01 | 3 ~ ICAF - Check the condition and functionality of Control Panel Unit and display. | Fri 14-Jul 09:45 ~ 10:15 | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | Classroom 4 | ShowEditDestroy |
110F01 | 4 ~ Check cables connection on terminals for tightness and damage. | Fri 14-Jul 10:15 ~ 10:45 | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | Classroom 4 | ShowEditDestroy |
110F01 | 5 ~ Electrical Checks on Protective devices and safety circuit. | Fri 14-Jul 11:00 ~ 11:20 | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | Classroom 4 | ShowEditDestroy |
110F11 ~ Sub-system of Hull Structure - 164 ICAF - Practical On Board |
Group 1 |
110F11 | 1 ~ Perform Site Survey and familiarization with the ICAF system layout and operation | Thu 03-Aug 11:35 ~ 12:35 | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | | ShowEditDestroy |
110F11 | 2 ~ Visually check cables inside power controller unit for damage and tightness. | Thu 03-Aug 12:35 ~ 13:05 | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | | ShowEditDestroy |
110F11 | 3 ~ Perform checks and inspections and identify fault conditions. | Thu 03-Aug 14:05 ~ 15:05 | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | | ShowEditDestroy |
Group 2 |
110F11 | 1 ~ Perform Site Survey and familiarization with the ICAF system layout and operation | Tue 22-Aug 11:35 ~ 12:35 | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | On Board | ShowEditDestroy |
110F11 | 2 ~ Visually check cables inside power controller unit for damage and tightness. | Tue 22-Aug 14:35 ~ 15:05 | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | On Board | ShowEditDestroy |
110F11 | 3 ~ Perform checks and inspections and identify fault conditions. | Tue 22-Aug 15:05 ~ 16:05 | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | On Board | ShowEditDestroy |
Group 3 |
110F11 | 1 ~ Perform Site Survey and familiarization with the ICAF system layout and operation | Sat 30-Sep 11:35 ~ 12:35 | TP TBD | On Board | ShowEditDestroy |
110F11 | 2 ~ Visually check cables inside power controller unit for damage and tightness. | Sat 30-Sep 14:35 ~ 15:05 | TP TBD | On Board | ShowEditDestroy |
110F11 | 3 ~ Perform checks and inspections and identify fault conditions. | Sat 30-Sep 15:05 ~ 16:05 | TP TBD | On Board | ShowEditDestroy |
Group 4 |
110F11 | 1 ~ Perform Site Survey and familiarization with the ICAF system layout and operation | Fri 14-Jul 11:20 ~ 12:20 | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | On Board | ShowEditDestroy |
110F11 | 2 ~ Visually check cables inside power controller unit for damage and tightness. | Fri 14-Jul 14:20 ~ 14:50 | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | On Board | ShowEditDestroy |
110F11 | 3 ~ Perform checks and inspections and identify fault conditions. | Fri 14-Jul 14:50 ~ 15:50 | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | On Board | ShowEditDestroy |
110P01 ~ Anchors |
Group 4 |
110P01 | 1 ~ Establish the arrangements - Anchor Chain and the Windlass. | Mon 12-Jun 11:00 ~ 11:40 | Damen 1 | Classroom 1 | ShowEditDestroy |
110P01 | 2 ~ The Windlass - Functions and Operations. | Mon 12-Jun 16:10 ~ 16:25 | Damen 1 | On Board | ShowEditDestroy |
110P01 | 3 ~ The Control Panel and Controlling the speed. | Mon 12-Jun 11:40 ~ 12:00 | Damen 1 | Classroom 1 | ShowEditDestroy |
110P01 | 4 ~ Inspect - The Braking Mechanism and Brake Pad. | Mon 12-Jun 12:00 ~ 12:15 | Damen 1 | Classroom 1 | ShowEditDestroy |
110P01 | 5 ~ Operate - Let Go, Heaving Anchor & Chain Stopper. | Mon 12-Jun 12:15 ~ 12:30 | Damen 1 | Classroom 1 | ShowEditDestroy |
110P01 | 6 ~ Washing Anchor and Chain – The process. | Mon 12-Jun 12:30 ~ 12:45 | Damen 1 | Classroom 1 | ShowEditDestroy |
110P01 | 7 ~ Oiling and Greasing the Windlass – The Procedure. | Mon 12-Jun 12:45 ~ 12:55 | Damen 1 | Classroom 1 | ShowEditDestroy |
110P01 | 8 ~ Adherence to Safety Precautions. | Mon 12-Jun 16:00 ~ 16:10 | Damen 1 | On Board | ShowEditDestroy |
110P01 | 9 ~ On Board Familiarisation | Mon 12-Jun 16:45 ~ 18:45 | Damen 1 | On Board | ShowEditDestroy |
210M01 ~ CPP |
Group 3 |
210M01 | 1 ~ CPP - Examine the general layout conditions and system operation prior to perform the task. | Fri 23-Jun 09:30 ~ 10:30 | Caterpillar 1 | On Board | ShowEditDestroy |
210M01 | 2 ~ Perform Daily Checks: Walk around and survey visually to examine the general conditions and system operation. | Fri 23-Jun 10:45 ~ 11:05 | Caterpillar 1 | Classroom 3 | ShowEditDestroy |
210M01 | 3 ~ Check operation from Remote and Local and Emergency Positions. | Fri 23-Jun 11:05 ~ 11:25 | Caterpillar 1 | On Board | ShowEditDestroy |
210M01 | 4 ~ Check and maintain the oil level in the hydraulic tank of the system. | Fri 23-Jun 11:25 ~ 11:45 | Caterpillar 1 | On Board | ShowEditDestroy |
210M01 | 5 ~ CPP - Observe safety precaution,practices and clealiness in performing the work at all time. | Fri 23-Jun 11:45 ~ 12:05 | Caterpillar 1 | On Board | ShowEditDestroy |
210M01 | 6 ~ Keep all electrical connections and mechanical fastenings tight according to right torque. and the fastenings are dry, clean and rust free. | Fri 23-Jun 12:05 ~ 12:25 | Caterpillar 1 | Classroom 3 | ShowEditDestroy |
210M01 | 7 ~ Power Supply and Services: Check power services are available before start the operation. | Fri 23-Jun 14:30 ~ 14:50 | Caterpillar 1 | Classroom 3 | ShowEditDestroy |
210M01 | 8 ~ Inspect and test the equipment at sufficient intervals to make sure that the equipment is in operating condition. | Fri 23-Jun 14:50 ~ 15:10 | Caterpillar 1 | Classroom 3 | ShowEditDestroy |
210M01 | 9 ~ Perform Practical Site Survey and inspection of the system and components onboard. | Fri 23-Jun 15:25 ~ 17:25 | Caterpillar 1 | On Board | ShowEditDestroy |
210S01 ~ Propulsion Systems |
Group 1 |
210S01 | 1 ~ Propulsion engine - Perform Daily Checks. | Thu 13-Jul 08:30 ~ 08:45 | Caterpillar System | | ShowEditDestroy |
210S01 | 2 ~ Propulsion Diesel Engines (PDE) - Inspect PDE Instrument Panel. | Thu 13-Jul 08:45 ~ 09:00 | Caterpillar System | | ShowEditDestroy |
210S01 | 3 ~ PDE - Inspect for leaks and loose connection. | Thu 13-Jul 09:00 ~ 09:15 | Caterpillar System | | ShowEditDestroy |
210S01 | 4 ~ PDE- Engine Oil Filter - Change. | Thu 13-Jul 09:15 ~ 09:45 | Caterpillar System | | ShowEditDestroy |
210S01 | 5 ~ Reduction gear system-Perform an oil change and replace oil filter. | Thu 13-Jul 09:45 ~ 10:15 | Caterpillar System | | ShowEditDestroy |
210S01 | 6 ~ Reduction gear system - Clean heat exchanger. | Thu 13-Jul 10:15 ~ 10:30 | Caterpillar System | | ShowEditDestroy |
210S01 | 7 ~ Clean heat exchanger. | Thu 13-Jul 11:00 ~ 11:15 | Caterpillar System | | ShowEditDestroy |
210S01 | 8 ~ Flexible couplings - Visual inspection for sign of damage and vulcanised. | Thu 13-Jul 11:15 ~ 11:30 | Caterpillar System | | ShowEditDestroy |
210S01 | 9 ~ Propeller Shaft - Check lubrication system and temperature. | Thu 13-Jul 11:30 ~ 11:45 | Caterpillar System | | ShowEditDestroy |
210S01 | 10 ~ Propeller shaft sealing - Visual check for leaking. | Thu 13-Jul 11:45 ~ 12:00 | Caterpillar System | | ShowEditDestroy |
210S01 | 11 ~ Propeller shaft Bearing - Check propeller shaft lubrication operation and bearing temperature (when shaft is turning). | Thu 13-Jul 12:00 ~ 12:15 | Caterpillar System | | ShowEditDestroy |
210S01 | 12 ~ Control system propulsion - Check cooling fan operation. | Thu 13-Jul 12:15 ~ 12:30 | Caterpillar System | | ShowEditDestroy |
210S01 | 13 ~ Propulsion Control - Check condition of Electronic devices and LRUs. | Thu 13-Jul 12:30 ~ 13:00 | Caterpillar System | | ShowEditDestroy |
210S01 | 14 ~ Propulsion Control - Check cooling fan operation. | Thu 13-Jul 14:00 ~ 14:15 | Caterpillar System | | ShowEditDestroy |
210S01 | 15 ~ Propulsion Control - Visually inspect the Circuit Board (Line Replaceable Unit - LRU. | Thu 13-Jul 14:15 ~ 14:30 | Caterpillar System | | ShowEditDestroy |
210S01 | 16 ~ Propulsion Control - Check condition and functionality of Display Panel and Indicating Lights including LED. | Thu 13-Jul 14:30 ~ 14:45 | Caterpillar System | | ShowEditDestroy |
210S01 | 17 ~ Propulsion control- Inspect terminal blocks. Inspect circuit breakers. | Thu 13-Jul 14:45 ~ 15:00 | Caterpillar System | | ShowEditDestroy |
210S01 | 18 ~ Propulsion Control - Check fan operation. | Thu 13-Jul 15:00 ~ 15:15 | Caterpillar System | | ShowEditDestroy |
211M01 ~ Main Engines |
Group 3 |
211M01 | 1 ~ Engine - Inspect for leaks and loose connection. | Mon 26-Jun 09:30 ~ 10:00 | Caterpillar 1 | On Board | ShowEditDestroy |
211M01 | 2 ~ Inspect PDE Instrument Panel. | Mon 26-Jun 10:00 ~ 10:15 | Caterpillar 1 | Classroom 3 | ShowEditDestroy |
211M01 | 4 ~ Zinc Rod - Inspect. | Mon 26-Jun 10:30 ~ 10:45 | Caterpillar 1 | On Board | ShowEditDestroy |
211M01 | 5 ~ Engine Mounts - Inspect. | Mon 26-Jun 11:00 ~ 11:15 | Caterpillar 1 | On Board | ShowEditDestroy |
211M01 | 6 ~ Cooling Syst. Supplemental Cool. Additive (SCA) - Test. | Mon 26-Jun 11:15 ~ 11:45 | Caterpillar 1 | On Board | ShowEditDestroy |
211M01 | 7 ~ Obtain PDE Engine Oil Sample. | Mon 26-Jun 11:45 ~ 12:00 | Caterpillar 1 | On Board | ShowEditDestroy |
211M01 | 8 ~ Engine Protection devices - Check. | Mon 26-Jun 12:00 ~ 12:30 | Caterpillar 1 | On Board | ShowEditDestroy |
211M01 | 9 ~ Perform Daily Checks. | Mon 26-Jun 12:30 ~ 12:45 | Caterpillar 1 | On Board | ShowEditDestroy |
211M01 | 10 ~ Magnetic Pick Ups - Clean and Inspect. | Mon 26-Jun 13:45 ~ 14:00 | Caterpillar 1 | On Board | ShowEditDestroy |
211M01 | 11 ~ Prelube Pump - Lubricate. | Mon 26-Jun 14:00 ~ 14:15 | Caterpillar 1 | On Board | ShowEditDestroy |
211M01 | 12 ~ Governor Actuator Linkage - Check. | Mon 26-Jun 14:15 ~ 14:45 | Caterpillar 1 | On Board | ShowEditDestroy |
211M01 | 13 ~ Inspect Exhaust Piping | Mon 26-Jun 14:45 ~ 15:05 | Caterpillar 1 | On Board | ShowEditDestroy |
211M01 | 14 ~ Fuel System Primary Filter - Clean. | Mon 26-Jun 15:05 ~ 15:25 | Caterpillar 1 | On Board | ShowEditDestroy |
211M01 | 15 ~ Fuel System Secondary Filter - Change Element. | Mon 26-Jun 15:25 ~ 15:40 | Caterpillar 1 | On Board | ShowEditDestroy |
212M01 ~ Transmission Systems |
Group 3 |
212M01 | 1 ~ Transmission Systems - Clean heat exchanger. | Tue 18-Jul 11:00 ~ 11:15 | Caterpillar 1 | On Board | ShowEditDestroy |
212M01 | 3 ~ Transmission System - Perform an oil change and replace oil filter. | Tue 18-Jul 11:30 ~ 11:45 | Caterpillar 1 | On Board | ShowEditDestroy |
212M01 | 4 ~ Check and clean Earth bonding straps tightness and free from dirt and corrosion. | Tue 18-Jul 08:30 ~ 08:50 | Caterpillar 1 | Classroom 3 | ShowEditDestroy |
212M01 | 5 ~ Keep all electrical connections and mechanical fastenings tight according to right torque and the fastenings are dry, clean and rust free. | Tue 18-Jul 08:50 ~ 09:10 | Caterpillar 1 | Classroom 3 | ShowEditDestroy |
212M01 | 6 ~ Inspect and test the equipment at sufficient intervals to make sure that the equipment is in operating condition. | Tue 18-Jul 09:10 ~ 09:30 | Caterpillar 1 | Classroom 3 | ShowEditDestroy |
212M01 | 7 ~ Observe safety precautions, practices and handling of hazardous material in performing the work. | Tue 18-Jul 09:30 ~ 09:50 | Caterpillar 1 | Classroom 3 | ShowEditDestroy |
212M01 | 8 ~ Perform Practical Site Survey and inspection of the system and components onboard. | Tue 18-Jul 11:45 ~ 13:45 | Caterpillar 1 | On Board | ShowEditDestroy |
212M01 | 99 ~ 1. Topic Code 212M01 is also 212M02 ~ c) Reduction Gears: Notation: The Transmission and Reduction Gear is same System but by different terminology. | Mon 24-Jul 15:50 ~ 15:50 | Caterpillar 1 | Classroom 3 | ShowEditDestroy |
212M02 ~ Reduction Gears |
Group 3 |
212M01 | 2 ~ Transmission Systems - Check threaded connections. | Tue 18-Jul 11:15 ~ 11:30 | Caterpillar 1 | On Board | ShowEditDestroy |
212M02 | 1 ~ Reduction Gears: Examine the general conditions and system operation of Reduction Gears prior to perform the task. | Tue 27-Jun 13:05 ~ 13:25 | Caterpillar 1 | Classroom 3 | ShowEditDestroy |
212M02 | 2 ~ Reduction gear system - Clean heat exchanger. | Tue 27-Jun 13:25 ~ 13:40 | Caterpillar 1 | On Board | ShowEditDestroy |
212M02 | 3 ~ Reduction gear system- Check threaded connections. | Tue 27-Jun 13:40 ~ 13:55 | Caterpillar 1 | On Board | ShowEditDestroy |
212M02 | 4 ~ Reduction gear system - Perform an oil change and replace oil filter. | Tue 27-Jun 13:55 ~ 14:10 | Caterpillar 1 | On Board | ShowEditDestroy |
212M02 | 5 ~ Reduction Gears: Visual Check for pipes and hoses connections for leaks. | Tue 27-Jun 14:10 ~ 14:30 | Caterpillar 1 | Classroom 3 | ShowEditDestroy |
212M02 | 6 ~ Examine the conditions of the external parts are free from dirt, oil leaks and any sign of corrosion. | Tue 27-Jun 14:30 ~ 14:50 | Caterpillar 1 | Classroom 3 | ShowEditDestroy |
212M02 | 7 ~ Reduction Gears - Pre checks and Safety Procedures before, during and after performing the task. | Tue 27-Jun 14:50 ~ 15:10 | Caterpillar 1 | Classroom 3 | ShowEditDestroy |
212M02 | 8 ~ Reduction Gears: Safety and Handling - Observe safety precaution and practices, handling of hazardous materials when performing the work. | Tue 27-Jun 15:25 ~ 15:45 | Caterpillar 1 | Classroom 3 | ShowEditDestroy |
212M02 | 9 ~ Reduction Gears: Practical Site Survey and Inspection on the Reduction Gears System and Components onboard. | Tue 27-Jun 15:45 ~ 17:15 | Caterpillar 1 | On Board | ShowEditDestroy |
212M03 ~ Clutches and Couplings |
Group 3 |
212M03 | 1 ~ Perform Site Survey and to familiarise with the overall system and examine general conditions including to be acquainted system operation prior to perform the task. | Wed 28-Jun 09:30 ~ 10:30 | Caterpillar 1 | On Board | ShowEditDestroy |
212M03 | 2 ~ Flexible Coupling - Inspect on the fasteners and coupling Elements for signs of cracks or stiffness. | Wed 28-Jun 10:45 ~ 11:15 | Caterpillar 1 | Classroom 3 | ShowEditDestroy |
212M03 | 3 ~ Flexible Coupling - Perform visual check and inspection prior to sailing and after sailing for signs of leaks or abnormalities. | Wed 28-Jun 11:15 ~ 11:35 | Caterpillar 1 | Classroom 3 | ShowEditDestroy |
212M03 | 4 ~ Visual inspection for sign of damage and vulcanised | Wed 28-Jun 11:35 ~ 11:50 | Caterpillar 1 | Classroom 3 | ShowEditDestroy |
212M03 | 5 ~ Coupling - Examine general layout and system installation and operation. | Wed 28-Jun 11:50 ~ 12:10 | Caterpillar 1 | Classroom 3 | ShowEditDestroy |
212M03 | 6 ~ Keep all electrical connections and mechanical fastenings tight according to right torque. and the fastenings are dry, clean and rust free. | Wed 28-Jun 12:10 ~ 12:40 | Caterpillar 1 | Classroom 3 | ShowEditDestroy |
212M03 | 7 ~ Inspect and test the equipment at sufficient intervals to make sure that the equipment is in operating condition. | Wed 28-Jun 13:40 ~ 14:00 | Caterpillar 1 | Classroom 3 | ShowEditDestroy |
212M03 | 8 ~ Practical Survey and Inspection on the UAV System and Components onboard. | Wed 28-Jun 14:00 ~ 16:00 | Caterpillar 1 | On Board | ShowEditDestroy |
213M01 ~ Propulsion Plant - Shaft, shaft bearing and seals |
Group 3 |
213M01 | 1 ~ Perform Site Survey to familiarise with the overall system layout and examine general conditions, initiation of the standard operating instruction prior to perform the task. | Thu 29-Jun 09:30 ~ 10:30 | Caterpillar 1 | On Board | ShowEditDestroy |
213M01 | 2 ~ Check oil level in the thrust bearing header tank. | Thu 29-Jun 10:45 ~ 11:05 | Caterpillar 1 | Classroom 1 | ShowEditDestroy |
213M01 | 3 ~ Check and clean Earth bonding straps tightness and free from dirt and corrosion. | Thu 29-Jun 11:05 ~ 11:25 | Caterpillar 1 | Classroom 1 | ShowEditDestroy |
213M01 | 4 ~ Check water level in the tank. | Thu 29-Jun 11:25 ~ 11:45 | Caterpillar 1 | Classroom 1 | ShowEditDestroy |
213M01 | 5 ~ Shaft Bonding Device: Keep equipment clean and dry free from dirt, salt deposit, and corrosion. | Thu 29-Jun 11:45 ~ 12:05 | Caterpillar 1 | Classroom 1 | ShowEditDestroy |
213M01 | 6 ~ Keep all electrical connections and mechanical fastenings tight according to right torque. and the fastenings are dry, clean and rust free. | Thu 29-Jun 12:05 ~ 12:25 | Caterpillar 1 | Classroom 1 | ShowEditDestroy |
213M01 | 7 ~ Inspect and test the equipment at sufficient intervals to make sure that the equipment is in operating condition. | Thu 29-Jun 12:25 ~ 12:45 | Caterpillar 1 | Classroom 1 | ShowEditDestroy |
213M01 | 8 ~ Observe safety precautions, practices and handling of hazardous material in performing the work , particularly in shaft confined space and oily. | Thu 29-Jun 13:45 ~ 14:05 | Caterpillar 1 | Classroom 1 | ShowEditDestroy |
213M01 | 9 ~ Perform Practical Site Survey and inspection of the system and components onboard. | Thu 29-Jun 14:05 ~ 16:05 | Caterpillar 1 | On Board | ShowEditDestroy |
222M01 ~ Steering Gear |
Group 3 |
222M01 | 1 ~ Steering Gear: Examine the general conditions of steering gear and system functional prior to perform the task. | Fri 23-Jun 08:30 ~ 09:00 | Van Der Velden | Classroom 3 | ShowEditDestroy |
222M01 | 2 ~ Steering Gear: Inspect Steering Gear System for leaks, loose connection and any sign of corrosions or damage. | Fri 23-Jun 09:00 ~ 09:30 | Van Der Velden | Classroom 3 | ShowEditDestroy |
222M01 | 3 ~ Steering Gear System: Perform Functional test and operation using emergency hand pump. | Fri 23-Jun 09:30 ~ 10:00 | Van Der Velden | Classroom 3 | ShowEditDestroy |
222M01 | 4 ~ Steering Gear System: Obtain Hydraulic Oil Sample for analysis and screening. | Fri 23-Jun 10:00 ~ 10:30 | Van Der Velden | Classroom 3 | ShowEditDestroy |
222M01 | 5 ~ Measure the wear of journal bearing. | Fri 23-Jun 14:00 ~ 14:15 | Van Der Velden | On Board | ShowEditDestroy |
222M01 | 6 ~ Inspect Electrical Components. | Fri 23-Jun 14:15 ~ 14:30 | Van Der Velden | On Board | ShowEditDestroy |
222M01 | 7 ~ Steering Gear System: Check fluid levels is sufficient and acceptable limit refill or replace if necessary iaw OEM manual. | Fri 23-Jun 14:30 ~ 15:00 | Van Der Velden | Classroom 3 | ShowEditDestroy |
222M01 | 8 ~ Steering Gear: Inspect Steering Gear System for any signs of abnormalities and undue noise and vibration. | Fri 23-Jun 15:00 ~ 15:30 | Van Der Velden | Classroom 3 | ShowEditDestroy |
222M01 | 9 ~ Steering Gear: Examine Pre starting and shut down checks and Safety Procedures before, during and after performing the task. | Fri 23-Jun 16:00 ~ 16:30 | Van Der Velden | Classroom 3 | ShowEditDestroy |
222M01 | 10 ~ Steering Gear: Practical Site survey and Inspection on the System and Components onboard. | Fri 23-Jun 16:30 ~ 18:30 | Van Der Velden | On Board | ShowEditDestroy |
310M01 ~ Fire main, Bilge & Ballast |
Group 3 |
310M01 | 1 ~ Bilge System: Clean and Inspect ( Motors & Starter) – Motors and starters, cables and termination, mounting and fastenings. | Wed 21-Jun 08:30 ~ 08:50 | Damen 1 | Classroom 3 | ShowEditDestroy |
310M01 | 2 ~ Bilge System: Functional Checks: Pumps, motors, pneumatic valve, ejectors; Prestarting checks, Control panel performance and abnormalities | Wed 21-Jun 08:50 ~ 09:30 | Damen 1 | Classroom 3 | ShowEditDestroy |
310M01 | 3 ~ Bilge System (pumps): Clean and Inspect – Pumps, strainer and filters, valves. | Wed 21-Jun 09:30 ~ 09:50 | Damen 1 | Classroom 3 | ShowEditDestroy |
310M01 | 4 ~ Clean, inspect and check Insulation (Motors & Starters): Control panel, cables and termination, Insulation tester. | Wed 21-Jun 09:50 ~ 10:00 | Damen 1 | Classroom 3 | ShowEditDestroy |
310M01 | 5 ~ Inspect Earth Bonding (Motors & Starters): Control Panel, Continuity Tester. | Wed 21-Jun 10:00 ~ 10:05 | Damen 1 | Classroom 3 | ShowEditDestroy |
310M01 | 6 ~ Stripping (oily-bilge) system (S oily-bilge S): Clean &Inspect (Stripping oily-bilge pump) – Pumps, strainers, hoses. | Wed 21-Jun 10:05 ~ 10:25 | Damen 1 | Classroom 3 | ShowEditDestroy |
310M01 | 7 ~ Clean and Inspect (Air line) – Control air, valves, air line, and gauges. | Wed 21-Jun 08:30 ~ 08:40 | Damen 1 | Classroom 3 | ShowEditDestroy |
310M01 | 8 ~ Stripping (oily-bilge) system (S oily-bilge S): Functional checks – Control Panel, Pre starting checks, Suction and discharge valves. | Wed 21-Jun 08:30 ~ 09:00 | Damen 1 | Classroom 3 | ShowEditDestroy |
310M01 | 9 ~ Functional checks – Control Panel, Pre starting checks, Suction and discharge valves. | Wed 21-Jun 08:30 ~ 08:40 | Damen 1 | On Board | ShowEditDestroy |
310M01 | 10 ~ Bilge water separator: Clean Y filters – Remove and re-reinstall. | Wed 21-Jun 08:30 ~ 08:40 | Damen 1 | Classroom 3 | ShowEditDestroy |
310M01 | 11 ~ Drip Trays: Clean & Inspect – Hose and tray | Wed 21-Jun 08:30 ~ 08:35 | Damen 1 | Classroom 3 | ShowEditDestroy |
310M01 | 12 ~ BWS Pumps and outfit: Clean and Inspect – Pumps, motors, Control Panel, valves. | Wed 21-Jun 14:00 ~ 14:10 | Damen 1 | On Board | ShowEditDestroy |
310M01 | 12 ~ BWS Pumps and outfit: Clean and Inspect – Pumps, motors, Control Panel, valves. | Mon 07-Aug 18:15 ~ 18:25 | Damen 1 | On Board | ShowEditDestroy |
310M01 | 13 ~ BWS Functional Checks – Pre starting checks and safety procedures, managing ballast water. | Wed 21-Jun 14:10 ~ 14:40 | Damen 1 | Classroom 3 | ShowEditDestroy |
310M01 | 14 ~ BWS – Clean, inspect and check insulation – Control panel,motors, cables and terminations, Insulation tester. | Wed 21-Jun 14:40 ~ 14:50 | Damen 1 | Classroom 3 | ShowEditDestroy |
310M01 | 15 ~ BWS – Inspect earth bonding : Earthing straps, fastenings, continuity tester. | Wed 21-Jun 14:50 ~ 14:55 | Damen 1 | Classroom 3 | ShowEditDestroy |
310M01 | 15 ~ BWS – Inspect earth bonding : Earthing straps, fastenings, continuity tester. | Mon 07-Aug 15:45 ~ 15:50 | Damen 1 | Classroom 3 | ShowEditDestroy |
310M01 | 16 ~ GS Pumps & Outfit: Clean and inspect – Pumps, motors, Control Panel, valves, associated fittings. | Mon 07-Aug 16:05 ~ 17:05 | Damen 1 | Classroom 3 | ShowEditDestroy |
310M01 | 16 ~ GS Pumps & Outfit: Clean and inspect – Pumps, motors, Control Panel, valves, associated fittings. | Wed 21-Jun 14:55 ~ 15:55 | Damen 1 | Classroom 3 | ShowEditDestroy |
310M01 | 17 ~ GS Pumps and Outfit: Functional checks – Pre starting checks and safety procedures, performance, bilge and ballast functions. | Mon 07-Aug 17:05 ~ 17:35 | Damen 1 | Classroom 3 | ShowEditDestroy |
310M01 | 17 ~ GS Pumps and Outfit: Functional checks – Pre starting checks and safety procedures, performance, bilge and ballast functions. | Wed 21-Jun 15:50 ~ 16:20 | Damen 1 | Classroom 3 | ShowEditDestroy |
310M01 | 18 ~ Emergency FF pumps: Functional Checks with GS Pumps – Pre starting checks and safety procedures, performance of GS pumps with Emergency FF pumps. | Wed 21-Jun 11:00 ~ 11:10 | Damen 1 | On Board | ShowEditDestroy |
310M01 | 18 ~ Emergency FF pumps: Functional Checks with GS Pumps – Pre starting checks and safety procedures, performance of GS pumps with Emergency FF pumps. | Mon 07-Aug 18:25 ~ 18:35 | Damen 1 | On Board | ShowEditDestroy |
310M01 | 19 ~ GS Pumps and outfit: Clean, insect and check insulation – Electrical Equipment, Cables and terminations, Insulation Tester. | Wed 21-Jun 16:20 ~ 16:30 | Damen 1 | Classroom 1 | ShowEditDestroy |
310M01 | 19 ~ GS Pumps and outfit: Clean, insect and check insulation – Electrical Equipment, Cables and terminations, Insulation Tester. | Mon 07-Aug 17:35 ~ 17:45 | Damen 1 | Classroom 3 | ShowEditDestroy |
310M01 | 20 ~ Fire hydrant and spray: Clean and inspect – Hydrant, spray, nozzles, hoses, loose fittings. | Wed 21-Jun 16:30 ~ 17:00 | Damen 1 | Classroom 3 | ShowEditDestroy |
310M01 | 20 ~ Fire hydrant and spray: Clean and inspect – Hydrant, spray, nozzles, hoses, loose fittings. | Mon 07-Aug 17:45 ~ 18:15 | Damen 1 | Classroom 3 | ShowEditDestroy |
310M01 | 21 ~ GS Pumps (Motors & Starters): Inspect earth bonding – Earthing straps and fastenings. | Wed 21-Jun 14:15 ~ 14:20 | Damen 1 | On Board | ShowEditDestroy |
310M01 | 22 ~ On Board Familiarisation. | Wed 21-Jun 16:00 ~ 20:00 | Damen 1 | On Board | ShowEditDestroy |
310S01 ~ Fire Main, Flushing, Draining and Ballasting |
Group 1 |
310S01 | 1 ~ Fire Main and the ships FF system-Establish system arrangements. | Tue 30-May 08:30 ~ 09:00 | Khairul Azuadi Bin Ariffin | Classroom 1 | ShowEditDestroy |
310S01 | 2 ~ Connectivity of the fire Main to the Sprinkler & the Foam system- General characteristics, functions, operations and the utilisation. | Tue 30-May 09:00 ~ 09:40 | Khairul Azuadi Bin Ariffin | Classroom 1 | ShowEditDestroy |
310S01 | 3 ~ CO2 and the Watermist system- General characteristics, functions, operations, and utilisation. | Tue 30-May 09:40 ~ 10:40 | Khairul Azuadi Bin Ariffin | Classroom 1 | ShowEditDestroy |
310S01 | 4 ~ Operation of the Bilge System- System arrangements of the bilges. | Thu 01-Jun 16:00 ~ 16:30 | Khairul Azuadi Bin Ariffin | Classroom 1 | ShowEditDestroy |
310S01 | 5 ~ Operation of the Ballast system- System arrangements. | Thu 01-Jun 16:00 ~ 16:30 | Khairul Azuadi Bin Ariffin | Classroom 1 | ShowEditDestroy |
310S01 | 6 ~ Performance of the Ballast pumps- Rate of filling the tanks and tank capacities, the resulting trim. | Thu 01-Jun 16:00 ~ 17:00 | Khairul Azuadi Bin Ariffin | Classroom 1 | ShowEditDestroy |
Group 2 |
310S01 | 1 ~ Fire Main and the ships FF system-Establish system arrangements. | Tue 22-Aug 16:20 ~ 16:50 | Khairul Azuadi Bin Ariffin | Classroom 2 | ShowEditDestroy |
310S01 | 2 ~ Connectivity of the fire Main to the Sprinkler & the Foam system- General characteristics, functions, operations and the utilisation. | Tue 22-Aug 16:50 ~ 17:30 | Khairul Azuadi Bin Ariffin | Classroom 2 | ShowEditDestroy |
310S01 | 3 ~ CO2 and the Watermist system- General characteristics, functions, operations, and utilisation. | Tue 22-Aug 17:30 ~ 18:30 | Khairul Azuadi Bin Ariffin | Classroom 2 | ShowEditDestroy |
310S01 | 4 ~ Operation of the Bilge System- System arrangements of the bilges. | Fri 25-Aug 09:15 ~ 09:45 | Khairul Azuadi Bin Ariffin | Classroom 2 | ShowEditDestroy |
310S01 | 5 ~ Operation of the Ballast system- System arrangements. | Fri 25-Aug 09:45 ~ 10:15 | Khairul Azuadi Bin Ariffin | Classroom 2 | ShowEditDestroy |
310S01 | 6 ~ Performance of the Ballast pumps- Rate of filling the tanks and tank capacities, the resulting trim. | Fri 25-Aug 10:30 ~ 11:30 | Khairul Azuadi Bin Ariffin | | ShowEditDestroy |
310S11 ~ Fire Main, Flushing, Draining and Ballasting - Practical On Board |
Group 1 |
310S11 | 1 ~ The FF arrangements – Utilise for Deck Wash, Spray, Flushing and Draining. | Tue 30-May 09:40 ~ 10:00 | Khairul Azuadi Bin Ariffin | On Board | ShowEditDestroy |
310S11 | 2 ~ On Board Familiarisation. | Fri 09-Jun 16:35 ~ 17:35 | Khairul Azuadi Bin Ariffin | | ShowEditDestroy |
Group 2 |
310S11 | 1 ~ The FF arrangements – Utilise for Deck Wash, Spray, Flushing and Draining. | Fri 25-Aug 11:30 ~ 11:50 | Khairul Azuadi Bin Ariffin | On Board | ShowEditDestroy |
310S11 | 2 ~ On Board Familiarisation. | Mon 07-Aug 10:05 ~ 11:05 | Khairul Azuadi Bin Ariffin | | ShowEditDestroy |
320M01 ~ Fuel System |
Group 2 |
320M01 | 1 ~ Fuel Oil Transfer System: Clean and inspect – Pumps, valves, motors, control panel. | Mon 12-Jun 08:30 ~ 09:10 | Damen 1 | Classroom 1 | ShowEditDestroy |
320M01 | 2 ~ Fuel Oil Transfer System: Start/stop Local, auto & emergency – Transfer operations, performance of pumps. | Mon 12-Jun 09:10 ~ 10:10 | Damen 1 | Classroom 1 | ShowEditDestroy |
320M01 | 3 ~ Fuel Oil Transfer System: Clean, inspect and check insulation – Electrical equipment, Insulation tester. | Mon 12-Jun 10:10 ~ 10:20 | Damen 1 | Classroom 1 | ShowEditDestroy |
320M01 | 4 ~ Fuel Oil Purifier: Clean and inspect – Control panel, pump, motor, valve. | Wed 14-Jun 08:30 ~ 09:00 | Damen 1 | Classroom 1 | ShowEditDestroy |
320M01 | 5 ~ Fuel Oil Purifier: Functional checks – Health checks using the Control panel. | Wed 14-Jun 14:00 ~ 14:15 | Damen 1 | On Board | ShowEditDestroy |
320M01 | 6 ~ Fuel Oil Purifier: Clean, inspect and check insulation – Electrical equipment, cables and termination, Insulation tester. | Wed 14-Jun 14:15 ~ 14:25 | Damen 1 | On Board | ShowEditDestroy |
320M01 | 7 ~ Fuel Oil Purifier: Inspect earth bonding – Earthing strap, Continuity tester. | Wed 14-Jun 09:00 ~ 09:05 | Damen 1 | Classroom 1 | ShowEditDestroy |
320M01 | 8 ~ Fuel Oil Supply System: Day tanks, purified FO to consumers, water and sludge line, valves, overflow line. | Wed 14-Jun 09:05 ~ 09:35 | Damen 1 | Classroom 1 | ShowEditDestroy |
320M01 | 9 ~ Cargo Handling Fuel Oil System: Clean and Inspect – Bunkering points, Control panel. | Wed 14-Jun 09:35 ~ 10:05 | Damen 1 | Classroom 1 | ShowEditDestroy |
320M01 | 10 ~ Cargo Handling Fuel Oil System: Inspect after use – Safety procedures, and procedure after after use. | Wed 14-Jun 10:05 ~ 10:20 | Damen 1 | Classroom 1 | ShowEditDestroy |
320M01 | 11 ~ Check and inspect: Day tank and water trap – sight glass, alarms an activation. | Wed 14-Jun 10:20 ~ 10:35 | Damen 1 | Classroom 1 | ShowEditDestroy |
320M01 | 12 ~ On Board Familiarisation. | Wed 14-Jun 14:25 ~ 18:25 | Damen 1 | On Board | ShowEditDestroy |
320S01 ~ Fuel System |
Group 1 |
320S01 | 1 ~ The Fuel Transfer and Supply System – Establish the system arrangements for the Transfer and Supply of fuel. | Wed 31-May 14:00 ~ 14:40 | Khairul Azuadi Bin Ariffin | Classroom 1 | ShowEditDestroy |
320S01 | 2 ~ Process of filling/transfer of FO tanks - Tanks capacities, Flow rate and time period of filling or transfer. | Wed 31-May 14:00 ~ 14:40 | Khairul Azuadi Bin Ariffin | Classroom 1 | ShowEditDestroy |
320S01 | 3 ~ Establish the overflow line and tanks. | Wed 31-May 14:40 ~ 14:55 | Khairul Azuadi Bin Ariffin | Classroom 1 | ShowEditDestroy |
320S01 | 4 ~ Utilising the Day Tanks – Rate of consumption. | Wed 31-May 14:55 ~ 15:15 | Khairul Azuadi Bin Ariffin | Classroom 1 | ShowEditDestroy |
320S01 | 5 ~ Cargo Handling System for FO – Establish the system arrangements and operations, for the FO Transfer onboard and discharge ashore. | Wed 31-May 16:00 ~ 16:20 | Khairul Azuadi Bin Ariffin | Classroom 1 | ShowEditDestroy |
320S01 | 6 ~ Administer oil sampling. | Thu 01-Jun 14:00 ~ 14:20 | Khairul Azuadi Bin Ariffin | Classroom 1 | ShowEditDestroy |
320S11 ~ Fuel System - Practical On Board |
Group 1 |
320S11 | 1 ~ The Low and High Level Alarm – Activation and height levels. | Thu 01-Jun 14:20 ~ 14:35 | Khairul Azuadi Bin Ariffin | Classroom 1 | ShowEditDestroy |
320S11 | 2 ~ On Board Familiarisation. | Thu 01-Jun 14:30 ~ 15:30 | Khairul Azuadi Bin Ariffin | Classroom 1 | ShowEditDestroy |
330M01 ~ Circulating & Sea Water Cooling |
Group 3 |
330M01 | 1 ~ Clean and Inspect – Motors, air vents, cable & guards, mountings and fastenings. | Tue 13-Jun 08:30 ~ 08:50 | Damen 1 | Classroom 3 | ShowEditDestroy |
330M01 | 2 ~ Clean and Inspect – Starters, switches, alarms and indications, mountings and cables. | Tue 13-Jun 08:50 ~ 09:10 | Damen 1 | Classroom 3 | ShowEditDestroy |
330M01 | 3 ~ Clean and Inspect – Aux SW Pumps, valves and couplings, mountings and fastenings, indicators and alarm. | Tue 13-Jun 09:10 ~ 09:40 | Damen 1 | Classroom 3 | ShowEditDestroy |
330M01 | 4 ~ Functional Checks – Motors and Starters, switches, Pre starting checks and safety procedures, performance checks. | Tue 13-Jun 09:40 ~ 10:10 | Damen 1 | Classroom 3 | ShowEditDestroy |
330M01 | 5 ~ Run Pumps (SW) if not in regular use – Pre starting checks and safety procedures; performance; check operating pressures, leaks and abnormalities. | Tue 13-Jun 10:10 ~ 10:30 | Damen 1 | Classroom 3 | ShowEditDestroy |
330M01 | 6 ~ Clean and Inspect Heat exchangers – Thermostic control valves, temperature gauges. | Tue 13-Jun 11:00 ~ 11:20 | Damen 1 | Classroom 3 | ShowEditDestroy |
330M01 | 7 ~ Clean and Inspect – Pump couplings, pipes and joints. | Tue 13-Jun 11:20 ~ 11:25 | Damen 1 | Classroom 3 | ShowEditDestroy |
330M01 | 8 ~ Inspect, Clean and Check Insulation - electrical equipment cables and terminations, use of Insulation Tester. | Tue 13-Jun 11:25 ~ 11:40 | Damen 1 | Classroom 3 | ShowEditDestroy |
330M01 | 9 ~ Inspect Earth Bonding – Motors and Starters, earthing straps and fastenings, use of Continuity tester. | Tue 13-Jun 11:40 ~ 11:50 | Damen 1 | Classroom 3 | ShowEditDestroy |
330M01 | 10 ~ Functional Checks – SW Cooling System, system operation and performance, check temperatures and pressures, check for abnormalities. | Tue 13-Jun 11:50 ~ 12:30 | Damen 1 | Classroom 3 | ShowEditDestroy |
330M01 | 11 ~ On Board Familiarisation. | Tue 13-Jun 14:00 ~ 16:00 | Damen 1 | On Board | ShowEditDestroy |
333P01 ~ Fresh Water Cooling System |
Group 2 |
333P01 | 1 ~ Establish the Fresh Water Cooling System. | Fri 28-Jul 15:10 ~ 15:50 | Damen 1 | Classroom 1 | ShowEditDestroy |
333P01 | 2 ~ The Circulating Pumps and the Circulating FW. | Fri 28-Jul 15:50 ~ 16:10 | Damen 1 | Classroom 1 | ShowEditDestroy |
333P01 | 3 ~ The Heat Exchangers - Cooling process. | Fri 28-Jul 16:10 ~ 16:20 | Damen 1 | Classroom 1 | ShowEditDestroy |
333P01 | 4 ~ Equipments and systems cooled. | Fri 28-Jul 16:35 ~ 16:55 | Damen 1 | Classroom 1 | ShowEditDestroy |
333P01 | 5 ~ Pre-Starting Checks and Safety Procedures. | Fri 28-Jul 16:55 ~ 17:05 | Damen 1 | Classroom 1 | ShowEditDestroy |
333P01 | 6 ~ Running the System - verify System Pressures and Temperatures and state of Alarm. | Fri 28-Jul 17:05 ~ 17:20 | Damen 1 | Classroom 1 | ShowEditDestroy |
333P01 | 7 ~ On Board Familiarisation. | Fri 28-Jul 17:20 ~ 18:20 | Damen 1 | On Board | ShowEditDestroy |
333S01 ~ Cooling Water System |
Group 1 |
333S01 | 1 ~ SW Cooling System – Establish system arrangements, the suction and overboard discharge. | Wed 28-Jun 14:45 ~ 15:25 | Damen 1 | On Board | ShowEditDestroy |
333S01 | 2 ~ Operation of the SW Cooling and the Heat Exchangers, the Low Temp and High Temp Coolers. | Wed 28-Jun 15:25 ~ 15:40 | Damen 1 | On Board | ShowEditDestroy |
333S01 | 3 ~ System Performance – Temperature and Pressures. | Wed 28-Jun 15:55 ~ 16:05 | Damen 1 | On Board | ShowEditDestroy |
333S01 | 4 ~ Fresh Cooling Water System – Establish system arrangements, the FW circulation and Heat Exchangers. | Wed 28-Jun 16:05 ~ 16:35 | Damen 1 | On Board | ShowEditDestroy |
333S01 | 5 ~ System Operation - The Circulation Pumps and the system operation. | Wed 28-Jun 16:35 ~ 16:50 | Damen 1 | On Board | ShowEditDestroy |
333S01 | 6 ~ Circulating Pumps – Controlling the pumps. | Wed 28-Jun 16:50 ~ 17:00 | Damen 1 | On Board | ShowEditDestroy |
333S01 | 7 ~ System performance – Temperature and pressures. | Wed 28-Jun 17:00 ~ 17:10 | Damen 1 | On Board | ShowEditDestroy |
333S01 | 8 ~ On Board Familiarisation | Wed 12-Jul 13:30 ~ 15:40 | Damen 1 | On Board | ShowEditDestroy |
340S01 ~ Fresh Water Supply System |
Group 1 |
340S01 | 1 ~ The FW Supply & FW Supply System Accommodation – Establish the system arrangements. | Wed 14-Jun 11:00 ~ 11:30 | Damen 1 | On Board | ShowEditDestroy |
340S01 | 2 ~ Process of filling/Supply to FW tanks – The FW Cargo Handling system, the Reverse Osmosis Systems and the Hydrophore, their functions and operations. | Wed 14-Jun 11:30 ~ 12:00 | Damen 1 | On Board | ShowEditDestroy |
340S01 | 3 ~ RO systems – Production rate, managing the Chemicals and the Backwash. | Wed 14-Jun 12:00 ~ 12:30 | Damen 1 | On Board | ShowEditDestroy |
340S01 | 4 ~ Administer water sampling. | Wed 14-Jun 12:30 ~ 12:40 | Damen 1 | On Board | ShowEditDestroy |
340S01 | 5 ~ FW Supply System Accommodation – FW circulation and pumps, Distribution to consumers and Equipment on board | Wed 14-Jun 12:40 ~ 13:00 | Damen 1 | On Board | ShowEditDestroy |
340S01 | 6 ~ Establish Tanks capacities, Flow rate and time period of filling or transfer. | Wed 14-Jun 16:00 ~ 16:20 | Damen 1 | On Board | ShowEditDestroy |
340S01 | 7 ~ The Hot Water System – Production, circulation, temperature control and distribution to consumers. | Wed 14-Jun 16:20 ~ 16:50 | Damen 1 | On Board | ShowEditDestroy |
340S01 | 8 ~ On Board Familiarisation. | Wed 14-Jun 16:50 ~ 17:50 | Damen 1 | On Board | ShowEditDestroy |
340S02 ~ Sewage System |
Group 1 |
340S02 | 1 ~ The Sanitary Discharge Grey Water System - System arrangements, functions and operations. | Tue 11-Jul 14:20 ~ 14:40 | Damen 1 | On Board | ShowEditDestroy |
340S02 | 2 ~ Sewage collecting Tank 16, Sewage tank 17 - Arrangement, Functions. | Tue 11-Jul 14:40 ~ 14:55 | Damen 1 | On Board | ShowEditDestroy |
340S02 | 3 ~ STP: Clean and Inspect- External Feed Pump, vacuum pumps, valves, Local operator panel, ventilation lines – functions, operations. | Tue 11-Jul 14:55 ~ 15:25 | Damen 1 | On Board | ShowEditDestroy |
340S02 | 4 ~ STP: Functional Checks- The LOP- Health checks, auto start/stop. Alarms, pre starting checks, safety procedures, operation and Performance. | Tue 11-Jul 15:40 ~ 16:00 | Damen 1 | On Board | ShowEditDestroy |
340S02 | 5 ~ STP: Replenish disinfectant- Procedures when handling disinfectant, Safety precautions. | Tue 11-Jul 16:00 ~ 16:15 | Damen 1 | On Board | ShowEditDestroy |
340S02 | 6 ~ Discharge of Sanitary Grey and Black Water. | Tue 11-Jul 16:15 ~ 16:25 | Damen 1 | On Board | ShowEditDestroy |
340S02 | 7 ~ On Board Familiarisation. | Tue 11-Jul 16:25 ~ 17:25 | Damen 1 | On Board | ShowEditDestroy |
341M01 ~ Fresh Water System |
Group 2 |
341M01 | 1 ~ Fresh Water Supply System: Clean & Inspect - Motors, starters, cables and terminations, mountings and fastenings. | Wed 14-Jun 11:00 ~ 11:15 | Damen 1 | Classroom 1 | ShowEditDestroy |
341M01 | 2 ~ Fresh Water Supply System: Functional Checks Motors & Starters - Pre starting checks, performance and abnormalities. | Wed 14-Jun 11:15 ~ 11:55 | Damen 1 | Classroom 1 | ShowEditDestroy |
341M01 | 3 ~ Fresh Water Supply System: Clean & Inspect - Pumps & Outfits; couplings, valves, filters, gauges, pipes and fastenings. | Wed 14-Jun 11:55 ~ 12:35 | Damen 1 | Classroom 1 | ShowEditDestroy |
341M01 | 4 ~ Fresh Water Supply System: Clean, Inspect and Check Insulation – cables & terminations | Wed 14-Jun 12:35 ~ 12:45 | Damen 1 | Classroom 1 | ShowEditDestroy |
341M01 | 5 ~ Fresh Water Supply System: Inspect - Earth Bonding. | Wed 14-Jun 12:45 ~ 12:50 | Damen 1 | Classroom 1 | ShowEditDestroy |
341M01 | 6 ~ Fresh Water Supply System: Clean & Inspect - Pressure Control Switch. | Wed 14-Jun 16:00 ~ 16:15 | Damen 1 | On Board | ShowEditDestroy |
341M01 | 7 ~ Fresh Water Supply System: Run Pump if not in regular use – Pre starting checks, check performance, leaks, abnormalities. | Wed 14-Jun 12:50 ~ 13:10 | Damen 1 | Classroom 1 | ShowEditDestroy |
341M01 | 8 ~ Fresh Water Makers: Daily Checks Reverse Osmosis – Control panel, Filters, differential pressures, Oil level. | Tue 25-Jul 09:30 ~ 10:10 | Damen 1 | Classroom 1 | ShowEditDestroy |
341M01 | 9 ~ Fresh Water Makers: Check Filling heights – Deacidification Filter heights | Tue 25-Jul 10:10 ~ 10:25 | Damen 1 | Classroom 1 | ShowEditDestroy |
341M01 | 10 ~ Fresh Water Makers: Stop Rinse – Module Membrane. | Tue 25-Jul 10:40 ~ 10:50 | Damen 1 | Classroom 1 | ShowEditDestroy |
341M01 | 11 ~ Fresh Water Makers: Clean – Module Membrane. | Tue 25-Jul 10:50 ~ 11:00 | Damen 1 | Classroom 1 | ShowEditDestroy |
341M01 | 12 ~ Fresh Water Makers: Check Torque – Module Membrane. | Tue 25-Jul 11:00 ~ 11:10 | Damen 1 | Classroom 1 | ShowEditDestroy |
341M01 | 13 ~ Fresh Water Makers: RO unit - Change Lub Oil | Tue 25-Jul 11:10 ~ 11:25 | Damen 1 | Classroom 1 | ShowEditDestroy |
341M01 | 14 ~ Hot Water Circuit: Run Pump if not in regular use – Pre starting checks, Control panel, check performance, leaks, and abnormalities. | Tue 25-Jul 11:25 ~ 11:55 | Damen 1 | Classroom 1 | ShowEditDestroy |
341M01 | 15 ~ Hot Water Circuit: Clean & Inspect – Control Panel, HW Circulating Pump and motors, Valves, cables and terminations | Tue 25-Jul 11:55 ~ 12:15 | Damen 1 | Classroom 1 | ShowEditDestroy |
341M01 | 16 ~ Hot Water Circuit: Functional Checks- Control panel | Tue 25-Jul 12:15 ~ 12:25 | Damen 1 | Classroom 1 | ShowEditDestroy |
341M01 | 17 ~ Hot Water Circuit: Clean, Inspect and Check Insulation – Motors & Control Panel. | Tue 25-Jul 12:25 ~ 12:35 | Damen 1 | Classroom 1 | ShowEditDestroy |
341M01 | 18 ~ Hot Water Circuit: Inspect Earth Bonding – Motors, control Panel. | Tue 25-Jul 12:35 ~ 12:40 | Damen 1 | Classroom 1 | ShowEditDestroy |
341M01 | 19 ~ Hot Water Circuit: Clean and Inspect – Pressure Control Switch. | Tue 25-Jul 12:50 ~ 13:00 | Damen 1 | Classroom 1 | ShowEditDestroy |
341M01 | 20 ~ On Board Familiarisation | Tue 25-Jul 14:00 ~ 16:00 | Damen 1 | On Board | ShowEditDestroy |
360M01 ~ Lubrication System |
Group 3 |
360M01 | 1 ~ Lubrication System: Clean and Inspect – Motor & Starters, control panel, level switches | Tue 20-Jun 08:30 ~ 08:40 | Damen 1 | Classroom 3 | ShowEditDestroy |
360M01 | 2 ~ Lubrication System: Clean and Inspect – Pumps and outfits, valves, filters, pipes, gauges. | Tue 20-Jun 08:40 ~ 09:10 | Damen 1 | Classroom 3 | ShowEditDestroy |
360M01 | 3 ~ Lubrication System: Functional Checks – Motors and Starters, Pre starting checks and safety procedures, Control Panel and Alarm settings. | Tue 20-Jun 09:10 ~ 09:30 | Damen 1 | On Board | ShowEditDestroy |
360M01 | 4 ~ Lubrication System: Functional Checks – Pumps and outfits, Pre starting checks and safety procedures, Filling point, Supply to consumers, check functionalities at control positions | Tue 20-Jun 09:30 ~ 10:10 | Damen 1 | Classroom 3 | ShowEditDestroy |
360M01 | 5 ~ Lubrication System: LO Filter and Drainage – Clean, inspect for good operations. | Tue 20-Jun 10:10 ~ 10:20 | Damen 1 | Classroom 3 | ShowEditDestroy |
360M01 | 6 ~ Lubrication System: Clean, inspect and check insulation - Motor Starters Control Panel , cables and terminations. | Tue 20-Jun 10:20 ~ 10:25 | Damen 1 | Classroom 3 | ShowEditDestroy |
360M01 | 7 ~ Lubrication System: Inspect earth bonding - Motor and starters, Earthing straps and fastening. | Tue 20-Jun 10:25 ~ 10:30 | Damen 1 | Classroom 3 | ShowEditDestroy |
360M01 | 8 ~ Dirty-Oil System: Clean and Inspect - Pump, Motor and starter, Safety valves, Filters, Drain plug, Level switches. | Tue 20-Jun 11:45 ~ 12:05 | Damen 1 | Classroom 3 | ShowEditDestroy |
360M01 | 9 ~ Dirty - Oil System: DO Pump – Run pump if not in regular use: Pre starting checks and safety procedures, Inspect various operations, Check performance, abnormalities. | Tue 20-Jun 11:00 ~ 11:20 | Damen 1 | Classroom 3 | ShowEditDestroy |
360M01 | 10 ~ Dirty-Oil System: Functional Checks - DO Pump motor: Pre starting checks, and safety procedures, Check FW valves, inspect for various operations. | Tue 20-Jun 11:20 ~ 11:40 | Damen 1 | Classroom 3 | ShowEditDestroy |
360M01 | 11 ~ Dirty-Oil System: Clean, Inspect and insulation - DO Pump (Motor and starters), Control Panel, cables and termination, Insulation Tester. | Tue 20-Jun 11:40 ~ 11:50 | Damen 1 | Classroom 3 | ShowEditDestroy |
360M01 | 12 ~ Dirty-Oil System: Inspect Earth Bonding- DO Pump (Motor and starters), Earthing straps and fastening, Continuity Tester. | Tue 20-Jun 11:50 ~ 11:55 | Damen 1 | Classroom 3 | ShowEditDestroy |
360M01 | 13 ~ On Board Familiarisation | Tue 20-Jun 11:55 ~ 13:55 | Damen 1 | On Board | ShowEditDestroy |
360S01 ~ Lubricating System |
Group 1 |
360S01 | 1 ~ The LO Bunker Station and LO Supply System – Establish the system arrangements for the Transfer and Supply of LO to consumers. | Wed 31-May 08:30 ~ 09:10 | Khairul Azuadi Bin Ariffin | Classroom 1 | ShowEditDestroy |
360S01 | 2 ~ Process of filling/transfer of LO tanks - Tanks capacities, Flow rate and time period of filling or transfer. | Wed 31-May 09:10 ~ 09:30 | Khairul Azuadi Bin Ariffin | Classroom 1 | ShowEditDestroy |
360S01 | 3 ~ Establish the Overflow line and tanks. | Wed 31-May 09:30 ~ 09:45 | Khairul Azuadi Bin Ariffin | Classroom 1 | ShowEditDestroy |
360S01 | 4 ~ The High Level Alarm – Activation and height levels. | Wed 31-May 09:45 ~ 10:00 | Khairul Azuadi Bin Ariffin | Classroom 1 | ShowEditDestroy |
360S01 | 5 ~ The DO and Sludge System – Establish the system arrangements, functions and operations. | Wed 31-May 11:00 ~ 11:30 | Khairul Azuadi Bin Ariffin | Classroom 1 | ShowEditDestroy |
360S01 | 6 ~ Suction, Collecting, of DO and Sludge – Transfer into the Sludge Tank or Shore facilities. | Wed 31-May 11:30 ~ 12:00 | Khairul Azuadi Bin Ariffin | Classroom 1 | ShowEditDestroy |
360S01 | 7 ~ Health Safety & Environment Protection | Wed 31-May 12:00 ~ 12:15 | Khairul Azuadi Bin Ariffin | Classroom 1 | ShowEditDestroy |
360S01 | 8 ~ Administer Oil Sampling | Wed 31-May 12:15 ~ 12:35 | Khairul Azuadi Bin Ariffin | Classroom 1 | ShowEditDestroy |
360S11 ~ Lubricating System - Practical On Board |
Group 1 |
360S11 | 1 ~ On Board Familiarisation | Wed 31-May 12:00 ~ 13:00 | Khairul Azuadi Bin Ariffin | Classroom 1 | ShowEditDestroy |
370P01 ~ Air Conditioning Equipment |
Group 4 |
370P01 | 1 ~ Visual Check and inspect for leaks in HVAC system | Mon 05-Jun 09:30 ~ 09:50 | Damen 1 | Classroom 1 | ShowEditDestroy |
370P01 | 2 ~ Air conditioning system: Check pressure regulator for correct operations | Mon 05-Jun 09:50 ~ 10:10 | Damen 1 | On Board | ShowEditDestroy |
370P01 | 3 ~ Air conditioning : Clean grease separator in hoods galley and pantry | Mon 05-Jun 10:10 ~ 10:25 | Damen 1 | On Board | ShowEditDestroy |
370P01 | 4 ~ Air conditioning: Check pneumatic relays | Mon 05-Jun 10:25 ~ 10:40 | Damen 1 | On Board | ShowEditDestroy |
370P01 | 5 ~ Air conditioning: Check fire protection flap with electro magnet device. | Mon 05-Jun 10:55 ~ 11:10 | Damen 1 | On Board | ShowEditDestroy |
370P01 | 6 ~ Air Conditioning: Check, clean dust filter Air handling units,- Bridge, small arms store | Mon 05-Jun 11:10 ~ 11:25 | Damen 1 | On Board | ShowEditDestroy |
370P01 | 7 ~ Air Conditioning Equipment: Check, clean dust filter Air handling units, - Ammunition, MCSR and small arms store | Mon 05-Jun 11:25 ~ 11:40 | Damen 1 | On Board | ShowEditDestroy |
370P01 | 8 ~ Air Conditioning Equipment: Check electric motor and centrifugal fan - Various location | Mon 05-Jun 11:40 ~ 11:55 | Damen 1 | On Board | ShowEditDestroy |
370P01 | 9 ~ Air Conditioning Equipment: Check sensors and controllers. | Mon 05-Jun 11:55 ~ 12:10 | Damen 1 | On Board | ShowEditDestroy |
370P01 | 10 ~ Air Conditioning Equipment: Check, clean ventilation flap with pneumatic actuators. | Mon 05-Jun 12:10 ~ 12:30 | Damen 1 | On Board | ShowEditDestroy |
370P01 | 11 ~ Air Conditioning Equipment: Check, clean non-return flap type- mechanically operated. | Mon 05-Jun 13:30 ~ 13:45 | Damen 1 | On Board | ShowEditDestroy |
370P01 | 12 ~ Chilled water system: "Walk-Around visual Inspection ( Perform Daily Check & VI)" | Mon 05-Jun 13:45 ~ 14:00 | Damen 1 | On Board | ShowEditDestroy |
370P01 | 13 ~ Chilled Unit: Check electrical motor and radial fan for regular operation. | Mon 05-Jun 14:00 ~ 14:15 | Damen 1 | On Board | ShowEditDestroy |
370P01 | 14 ~ Chilled water system: Check air intakes and outlets for dirt deposits, clean if necessary. | Mon 05-Jun 14:15 ~ 14:35 | Damen 1 | On Board | ShowEditDestroy |
370P01 | 15 ~ Emergency air-conditioning: Check for refrigerant leaks. | Mon 05-Jun 14:35 ~ 14:50 | Damen 1 | On Board | ShowEditDestroy |
370P01 | 16 ~ Chilled water system: Check dust filter, replace if necessary. | Mon 05-Jun 14:50 ~ 15:05 | Damen 1 | On Board | ShowEditDestroy |
370S01 ~ Heating & Ventilation |
Group 1 |
370S01 | 1 ~ Functional check of various protective and overload devices and type of controllers employed. | Sat 26-Aug 13:15 ~ 13:45 | TP TBD | Classroom 1 | ShowEditDestroy |
370S01 | 2 ~ Ventilation Fan Motor: Check Motor conditions such as Air Flow,Temperature, RPM, noise and vibration. | Sat 26-Aug 13:45 ~ 14:15 | TP TBD | Classroom 1 | ShowEditDestroy |
370S01 | 3 ~ Vent. Flaps, covers and trunking-inspect - Clean as necessary. | Sat 26-Aug 14:15 ~ 14:35 | TP TBD | Classroom 1 | ShowEditDestroy |
370S01 | 4 ~ Measure Earth Bonding strap and fastenings Continuity and keep the fastenings are tight, clean, dry and free from rust. | Sat 26-Aug 14:35 ~ 15:05 | TP TBD | Classroom 1 | ShowEditDestroy |
370S01 | 5 ~ Vent.flaps & covers-inspect perfom chalk test. | Sat 26-Aug 15:05 ~ 15:25 | TP TBD | Classroom 1 | ShowEditDestroy |
370S01 | 6 ~ Functional check the functionalities of various protective and overload devices on mlotor and starters-controllers | Sat 26-Aug 15:40 ~ 16:10 | TP TBD | Classroom 1 | ShowEditDestroy |
370S01 | 7 ~ Inspect the earth bonding straps and mechnical fastening are tight free fom dirt, moisture and rust | Sat 26-Aug 16:10 ~ 16:30 | TP TBD | Classroom 1 | ShowEditDestroy |
370S01 | 8 ~ Inspect and test the equipment at sufficient intervals to make sure that the equipment is in operating condition. | Sat 26-Aug 16:30 ~ 16:50 | TP TBD | Classroom 1 | ShowEditDestroy |
370S01 | 9 ~ Observe cleanliness, corrosion control and preservation at all time when performing the task | Sat 26-Aug 16:50 ~ 17:10 | TP TBD | Classroom 1 | ShowEditDestroy |
370S01 | 10 ~ Observe safety precautions, practices and handling of hazadous material in performing the work. | Sun 27-Aug 09:15 ~ 09:35 | TP TBD | Classroom 1 | ShowEditDestroy |
Group 2 |
370S01 | 1 ~ Functional check of various protective and overload devices and type of controllers employed. | Mon 07-Aug 11:20 ~ 11:50 | Ahmad Bin Abdul Rahim | | ShowEditDestroy |
370S01 | 2 ~ Ventilation Fan Motor: Check Motor conditions such as Air Flow,Temperature, RPM, noise and vibration. | Mon 07-Aug 11:50 ~ 12:20 | Ahmad Bin Abdul Rahim | | ShowEditDestroy |
370S01 | 3 ~ Vent. Flaps, covers and trunking-inspect - Clean as necessary. | Mon 07-Aug 12:20 ~ 12:40 | Ahmad Bin Abdul Rahim | | ShowEditDestroy |
370S01 | 4 ~ Measure Earth Bonding strap and fastenings Continuity and keep the fastenings are tight, clean, dry and free from rust. | Mon 07-Aug 12:40 ~ 13:10 | Ahmad Bin Abdul Rahim | | ShowEditDestroy |
370S01 | 5 ~ Vent.flaps & covers-inspect perfom chalk test. | Sat 26-Aug 12:55 ~ 13:15 | Ahmad Bin Abdul Rahim | | ShowEditDestroy |
370S01 | 6 ~ Functional check the functionalities of various protective and overload devices on mlotor and starters-controllers | Sat 26-Aug 13:15 ~ 13:45 | TP TBD | | ShowEditDestroy |
370S01 | 7 ~ Inspect the earth bonding straps and mechnical fastening are tight free fom dirt, moisture and rust | Sat 26-Aug 14:45 ~ 15:05 | TP TBD | | ShowEditDestroy |
370S01 | 8 ~ Inspect and test the equipment at sufficient intervals to make sure that the equipment is in operating condition. | Sat 26-Aug 15:05 ~ 15:25 | TP TBD | | ShowEditDestroy |
370S01 | 9 ~ Observe cleanliness, corrosion control and preservation at all time when performing the task | Sat 26-Aug 15:25 ~ 15:45 | TP TBD | | ShowEditDestroy |
370S01 | 10 ~ Observe safety precautions, practices and handling of hazadous material in performing the work. | Sat 26-Aug 15:45 ~ 16:05 | TP TBD | | ShowEditDestroy |
370S11 ~ Heating & Ventilation - Practical On Board |
Group 1 |
370S11 | 1 ~ Initial Walk around: Examine the general conditions and system operationn prior to perform the task. | Sun 27-Aug 09:35 ~ 10:35 | TP TBD | On Board | ShowEditDestroy |
370S11 | 2 ~ Ensure the filter mat are clean and dry. | Sun 27-Aug 10:50 ~ 11:50 | TP TBD | On Board | ShowEditDestroy |
370S11 | 3 ~ Practical Site Survey and inspection on the system and components onboard. | Sun 27-Aug 11:50 ~ 13:50 | TP TBD | On Board | ShowEditDestroy |
Group 2 |
370S11 | 1 ~ Initial Walk around: Examine the general conditions and system operationn prior to perform the task. | Sun 27-Aug 09:30 ~ 10:30 | TP TBD | | ShowEditDestroy |
370S11 | 2 ~ Ensure the filter mat are clean and dry. | Sun 27-Aug 10:45 ~ 11:45 | TP TBD | | ShowEditDestroy |
370S11 | 3 ~ Practical Site Survey and inspection on the system and components onboard. | Sun 27-Aug 14:45 ~ 16:45 | TP TBD | | ShowEditDestroy |
371M01 ~ Air Conditioning and Ventilation |
Group 3 |
371M01 | 1 ~ Air Conditioning and Ventilation: Examine the general conditions and system operation prior to perform the task. | Wed 05-Jul 08:30 ~ 08:50 | Damen 1 | Classroom 3 | ShowEditDestroy |
371M01 | 2 ~ Ventilation system: Check Motor Temperature, revolution and noise and vibration. | Wed 05-Jul 08:50 ~ 09:05 | Damen 1 | Classroom 3 | ShowEditDestroy |
371M01 | 3 ~ Ventilation system: Earthing Arrangement - Inspect Earth Bonding. | Wed 05-Jul 09:05 ~ 09:20 | Damen 1 | Classroom 3 | ShowEditDestroy |
371M01 | 4 ~ Ventilation system: Filters - Clean the Dust Filter Mat. | Wed 05-Jul 16:00 ~ 16:15 | Damen 1 | On Board | ShowEditDestroy |
371M01 | 5 ~ Ventilation system: Motors Controllers functional check of various protective and overload devices and type of controllers employed. | Wed 05-Jul 09:20 ~ 09:35 | Damen 1 | Classroom 3 | ShowEditDestroy |
371M01 | 6 ~ Air Conditioning and Ventilation: Visual Check and inspect for leaks in HVAC system. | Wed 05-Jul 09:35 ~ 09:55 | Damen 1 | Classroom 3 | ShowEditDestroy |
371M01 | 7 ~ Ventilation system: Vent. Flaps, covers and trunking-inspect & Clean. | Wed 05-Jul 09:55 ~ 10:10 | Damen 1 | Classroom 3 | ShowEditDestroy |
371M01 | 8 ~ Air Conditioning and Ventilation: Pre checks and safety instruction before, during and after performing the task. | Wed 05-Jul 10:10 ~ 10:30 | Damen 1 | Classroom 3 | ShowEditDestroy |
371M01 | 9 ~ Ventilation system: Functional check of various protective and overload devices and type of controllers employed. | Wed 05-Jul 11:00 ~ 11:15 | Damen 1 | Classroom 3 | ShowEditDestroy |
371M01 | 10 ~ Air conditioning system: Check SW side of heat exchanger flow and pressure. | Wed 05-Jul 11:15 ~ 11:35 | Damen 1 | Classroom 3 | ShowEditDestroy |
371M01 | 11 ~ Air conditioning system: Check control valve and actuator heat exchanger. | Wed 05-Jul 11:35 ~ 11:55 | Damen 1 | Classroom 3 | ShowEditDestroy |
371M01 | 12 ~ Air Conditioning and Ventilation: Equipment and Test Procedures for Electrical Circuit Components. | Wed 05-Jul 11:55 ~ 12:25 | Damen 1 | Classroom 3 | ShowEditDestroy |
371M01 | 13 ~ Air conditioning system: Check, clean dust filter Air handling units, - Ammunition, MCSR and small arms store. | Wed 05-Jul 12:25 ~ 12:55 | Damen 1 | Classroom 3 | ShowEditDestroy |
371M01 | 14 ~ Air conditioning system: Check heat exchanger air conditioning unit at various locations and station in working order. | Wed 05-Jul 12:35 ~ 13:05 | Damen 1 | Classroom 3 | ShowEditDestroy |
371M01 | 15 ~ Air conditioning system: Check the chilled water control valves for leaks, stiffness and corrosion. | Wed 05-Jul 13:05 ~ 13:35 | Damen 1 | Classroom 3 | ShowEditDestroy |
371M01 | 16 ~ Ventilation system: Check electric motor and centrifugal fan - Various locations. | Wed 05-Jul 14:00 ~ 14:30 | Damen 1 | Classroom 3 | ShowEditDestroy |
371M01 | 17 ~ Ventilation system: Check electric motor and Ventilation fan- (Accommodation) spaces and Switchboard room. | Wed 05-Jul 14:30 ~ 14:50 | Damen 1 | Classroom 3 | ShowEditDestroy |
371M01 | 18 ~ Ventilation system: Check fire protection flap with electro magnet device. | Wed 05-Jul 14:50 ~ 15:10 | Damen 1 | Classroom 3 | ShowEditDestroy |
371M01 | 19 ~ Ventilation system: Clean and disinfect air duct of the Sick Bay and treatment room. | Wed 05-Jul 15:10 ~ 15:30 | Damen 1 | Classroom 3 | ShowEditDestroy |
371M01 | 20 ~ Emergency air-conditioning: Check condenser water drain valve. | Wed 14-Jun 09:30 ~ 09:50 | Damen 1 | Classroom 3 | ShowEditDestroy |
371M01 | 21 ~ Emergency air-conditioning: Check wetness indicator of sight glass. | Wed 14-Jun 09:50 ~ 10:10 | Damen 1 | Classroom 3 | ShowEditDestroy |
371M01 | 22 ~ Check cooling seawater regulating valve. | Wed 14-Jun 10:10 ~ 10:30 | Damen 1 | Classroom 3 | ShowEditDestroy |
371M01 | 23 ~ Emergency air-conditioning: Check all shut-off valves. | Wed 14-Jun 13:00 ~ 13:20 | Damen 1 | On Board | ShowEditDestroy |
371M01 | 24 ~ Emergency air-conditioning: Check dust filter, replace if necessary. | Wed 14-Jun 10:45 ~ 11:05 | Damen 1 | Classroom 3 | ShowEditDestroy |
371M01 | 25 ~ Emergency air-conditioning: Check centrifugal fan motor and all electrical connections. | Wed 14-Jun 11:05 ~ 11:25 | Damen 1 | Classroom 3 | ShowEditDestroy |
371M01 | 26 ~ Safety and Handling - Observe safety precaution and practices, handling of hazadous materials when performing the work. | Wed 14-Jun 11:25 ~ 11:45 | Damen 1 | Classroom 3 | ShowEditDestroy |
371M01 | 27 ~ Air Conditioning and Ventilation: Practical Site Survey and Inspection on the System and Components onboard. | Wed 14-Jun 13:20 ~ 15:20 | Damen 1 | On Board | ShowEditDestroy |
371P01 ~ Galley |
Group 4 |
371P01 | 1 ~ Administer the Range of Galley Equipment. | Tue 15-Aug 09:15 ~ 09:45 | Staco 1 | Classroom 1 | ShowEditDestroy |
371P01 | 2 ~ Establish the Fuse Boxes, Control panel. | Tue 15-Aug 09:45 ~ 09:50 | Staco 1 | Classroom 1 | ShowEditDestroy |
371P01 | 3 ~ Switching On Procedures and operating the Range of equipment. | Tue 15-Aug 09:50 ~ 10:30 | Staco 1 | Classroom 1 | ShowEditDestroy |
371P01 | 4 ~ Establish the ventilation and exhaust system and Switching on procedures. | Tue 15-Aug 10:45 ~ 11:15 | Staco 1 | Classroom 1 | ShowEditDestroy |
371P01 | 5 ~ Safety Procedures - operating the Foam and CO2 system before, during and after use. | Tue 15-Aug 11:15 ~ 11:35 | Staco 1 | Classroom 1 | ShowEditDestroy |
371P01 | 6 ~ Daily maintenance of equipment after use. | Tue 15-Aug 11:35 ~ 11:55 | Staco 1 | Classroom 1 | ShowEditDestroy |
371P01 | 7 ~ On Board Familiarisation | Tue 15-Aug 11:55 ~ 12:55 | Staco 1 | On Board | ShowEditDestroy |
400M01 ~ Electrical Plant |
Group 2 |
400M01 | 1 ~ Initial Step- Examine the general conditions and operational status prior to perform the tasks. | Fri 16-Jun 09:30 ~ 10:00 | Caterpillar 1 | Classroom 1 | ShowEditDestroy |
400M01 | 2 ~ Diesel Generator - Visual inspection for leaks and signs of loose connections. | Fri 16-Jun 10:00 ~ 10:20 | Caterpillar 1 | Classroom 1 | ShowEditDestroy |
400M01 | 3 ~ Diesel generators - Perform Daily Checks and Inspection iaw PMS and service routine. | Fri 16-Jun 10:20 ~ 10:50 | Caterpillar 1 | Classroom 1 | ShowEditDestroy |
400M01 | 4 ~ Diesel generators: Check Fuel System Primary Filter and drain as necessary. | Fri 16-Jun 11:05 ~ 11:25 | Caterpillar 1 | Classroom 1 | ShowEditDestroy |
400M01 | 5 ~ Diesel generators: Inspect the condition of Zinc Rod | Fri 16-Jun 16:30 ~ 16:50 | Caterpillar 1 | On Board | ShowEditDestroy |
400M01 | 6 ~ Diesel generators: Check the Governor Actuator Linkage | Fri 16-Jun 11:25 ~ 11:45 | Caterpillar 1 | Classroom 1 | ShowEditDestroy |
400M01 | 7 ~ Diesel generators: Check the condition of Governor Actuator Linkage. | Fri 16-Jun 11:45 ~ 12:05 | Caterpillar 1 | Classroom 1 | ShowEditDestroy |
400M01 | 8 ~ Diesel generators: Test the Cooling Syst. Supplemental Cool. Additive (SCA) | Fri 16-Jun 12:05 ~ 12:35 | Caterpillar 1 | Classroom 1 | ShowEditDestroy |
400M01 | 9 ~ Diesel generators: Check starting Motor conditions and clean as necessary. | Fri 16-Jun 16:50 ~ 17:10 | Caterpillar 1 | On Board | ShowEditDestroy |
400M01 | 10 ~ Diesel generators: Check and examine DG Protection devices. | Fri 16-Jun 14:35 ~ 15:05 | Caterpillar 1 | Classroom 1 | ShowEditDestroy |
400M01 | 11 ~ Diesel generators: Examine and clean the Oil Mist Detector free from dirt and corrosion | Fri 16-Jun 15:05 ~ 15:25 | Caterpillar 1 | Classroom 1 | ShowEditDestroy |
400M01 | 12 ~ Diesel generators : Clean and Inspect. the Magnetic Pick Ups | Fri 16-Jun 15:25 ~ 15:45 | Caterpillar 1 | Classroom 1 | ShowEditDestroy |
400M01 | 13 ~ Diesel generators: Examine and replacement of DG Oil Filters | Fri 16-Jun 16:00 ~ 16:30 | Caterpillar 1 | Classroom 1 | ShowEditDestroy |
400M01 | 14 ~ Diesel generators: Inspect the DG mountings for signs of damage and vulcanised | Fri 16-Jun 17:10 ~ 17:40 | Caterpillar 1 | On Board | ShowEditDestroy |
400M01 | 15 ~ Diesel Generators: Examine and clean the Fuel System Primary Filter. | Mon 19-Jun 09:30 ~ 09:50 | Caterpillar 1 | Classroom 1 | ShowEditDestroy |
400M01 | 16 ~ DG - Check and lubricate Barring device | Mon 19-Jun 09:50 ~ 10:10 | Caterpillar 1 | Classroom 1 | ShowEditDestroy |
400M01 | 17 ~ DG: Examine and lubricate Prelube Pump | Mon 19-Jun 10:10 ~ 10:30 | Caterpillar 1 | Classroom 1 | ShowEditDestroy |
400M01 | 18 ~ DG: Examine Fuel System Secondary Filter - Change Element. | Mon 19-Jun 10:45 ~ 11:15 | Caterpillar 1 | Classroom 1 | ShowEditDestroy |
400M01 | 19 ~ DG: Inspect the Exhaust Piping and system. | Mon 19-Jun 16:05 ~ 16:25 | Caterpillar 1 | On Board | ShowEditDestroy |
400M01 | 20 ~ Emergency Diesel Generator ( EDG): Inspect Electrical EDG Instrument Panel. | Mon 19-Jun 11:15 ~ 11:45 | Caterpillar 1 | Classroom 1 | ShowEditDestroy |
400M01 | 21 ~ EDG: Perform daily checks i.a.w PMS and Checklist | Mon 19-Jun 11:45 ~ 12:15 | Caterpillar 1 | Classroom 1 | ShowEditDestroy |
400M01 | 22 ~ EDG: Walk-around and visual inspection | Mon 19-Jun 16:25 ~ 16:55 | Caterpillar 1 | On Board | ShowEditDestroy |
400M01 | 23 ~ EDG: Fuel System Primary Filter - Drain. | Mon 19-Jun 12:15 ~ 12:35 | Caterpillar 1 | Classroom 1 | ShowEditDestroy |
400M01 | 24 ~ EDG: Check the EDG Lube Oil Level within the tolerence. | Mon 19-Jun 12:35 ~ 12:55 | Caterpillar 1 | Classroom 1 | ShowEditDestroy |
400M01 | 25 ~ EDG: Fuel System Primary Filter/Water Separator Drain | Mon 19-Jun 13:55 ~ 14:15 | Caterpillar 1 | Classroom 1 | ShowEditDestroy |
400M01 | 26 ~ EDG: Engine - Inspect for leaks and loose connection. | Mon 19-Jun 14:15 ~ 14:35 | Caterpillar 1 | Classroom 1 | ShowEditDestroy |
400M01 | 27 ~ EDG: Inspect Hoses and Clamps for leaks and tightness | Mon 19-Jun 14:35 ~ 14:55 | Caterpillar 1 | Classroom 1 | ShowEditDestroy |
400M01 | 28 ~ EDG: Fuel Tank Water and Sediment - Drain | Mon 19-Jun 14:55 ~ 15:15 | Caterpillar 1 | Classroom 1 | ShowEditDestroy |
400M01 | 29 ~ EDG: Check Fan clearence and no obstructions | Mon 19-Jun 16:55 ~ 17:15 | Caterpillar 1 | On Board | ShowEditDestroy |
400M01 | 30 ~ EDG: Governor Actuator Linkage - Check the conditions.. | Mon 19-Jun 15:15 ~ 15:35 | Caterpillar 1 | Classroom 1 | ShowEditDestroy |
400M01 | 31 ~ EDG - Check electrolyte level within acceptable limit. | Mon 19-Jun 15:35 ~ 15:50 | Caterpillar 1 | Classroom 1 | ShowEditDestroy |
400M01 | 32 ~ EDG: Obtain or collect coolant sample (level1) | Tue 20-Jun 09:30 ~ 09:45 | Caterpillar 1 | Classroom 1 | ShowEditDestroy |
400M01 | 33 ~ EDG: Check EDG Protection devices. | Tue 20-Jun 10:30 ~ 10:45 | Caterpillar 1 | On Board | ShowEditDestroy |
400M01 | 34 ~ EDG: Test Cooling Syst. Supplemental Cool. Additive (SCA) | Tue 20-Jun 09:45 ~ 10:00 | Caterpillar 1 | Classroom 1 | ShowEditDestroy |
400M01 | 35 ~ EDG H500: Check, or replace Filters and Elements: Engine Oil - Fuel Filter,Fuel System primary and Secondary and Engine Air Cleaner Element (Single Element) | Tue 20-Jun 10:45 ~ 11:15 | Caterpillar 1 | On Board | ShowEditDestroy |
400M01 | 36 ~ EDG: Check EDG moutings for crack, vulcanised and sign of damage | Tue 20-Jun 10:00 ~ 10:15 | Caterpillar 1 | Classroom 1 | ShowEditDestroy |
400M01 | 37 ~ DG & EDG: Practical Site Survey and Inspection on the System and Components onboard. | Tue 20-Jun 11:15 ~ 13:15 | Caterpillar 1 | On Board | ShowEditDestroy |
400M02 ~ Power Conversion Systems |
Group 2 |
400M02 | 1 ~ Transformers: Examine the general conditions of the transformer Units and functional status prior to perform any task. | Tue 01-Aug 09:30 ~ 09:50 | Damen 1 | Classroom 1 | ShowEditDestroy |
400M02 | 2 ~ Transformer: Examine for signs of abnormalities, dirt, dust and corrosion. Clean as necessary. | Tue 01-Aug 09:50 ~ 10:10 | Damen 1 | Classroom 1 | ShowEditDestroy |
400M02 | 3 ~ Transfomers: Examine and check the input voltage from 415VAC Panels and Output voltage 230VAC at DB panels. | Tue 01-Aug 10:10 ~ 10:30 | Damen 1 | Classroom 1 | ShowEditDestroy |
400M02 | 4 ~ Transformers: Clean, inspect and check insulation and earthing straps connections for tightness and corrosion. | Tue 01-Aug 10:45 ~ 11:05 | Damen 1 | Classroom 1 | ShowEditDestroy |
400M02 | 5 ~ Transformer: Check the ambient temperature and air flow cooling requirements, sign of noise and vibration. | Tue 01-Aug 11:05 ~ 11:25 | Damen 1 | Classroom 1 | ShowEditDestroy |
400M02 | 6 ~ Safety and Handling - Observe safety precaution and practices, handling of hazadous materials when performing the work. | Tue 01-Aug 11:25 ~ 11:45 | Damen 1 | Classroom 1 | ShowEditDestroy |
400M02 | 7 ~ Transformers: Practical Site Survey and Inspection on the System and Components onboard. | Tue 01-Aug 14:50 ~ 16:20 | Damen 1 | On Board | ShowEditDestroy |
400M02 | 8 ~ Battery and Charging Units: :Examine the general conditions of the Units and functional status prior to perform any task. | Tue 01-Aug 11:45 ~ 12:00 | Damen 1 | Classroom 1 | ShowEditDestroy |
400M02 | 9 ~ Battery and Charging Units: Check the physical conditions for any sign of defect and damage and check insulation cables and units. | Tue 01-Aug 12:00 ~ 12:15 | Damen 1 | Classroom 1 | ShowEditDestroy |
400M02 | 10 ~ Battery and Charging Unit: Measure and record electrolyte SG reading in Battery Log Book. | Tue 01-Aug 12:15 ~ 12:30 | Damen 1 | Classroom 1 | ShowEditDestroy |
400M02 | 11 ~ Battery sets and Charging Units : Check and record the overall float voltage at the battery terminals. | Tue 01-Aug 12:30 ~ 12:50 | Damen 1 | Classroom 1 | ShowEditDestroy |
400M02 | 12 ~ Battery sets and Charging Units: Check ventilation cooling fan in battery spaces for correct operation. | Tue 01-Aug 12:50 ~ 13:05 | Damen 1 | Classroom 1 | ShowEditDestroy |
400M02 | 13 ~ Uninterrupted Power Supply (UPS) for the 230 V systems: Examine the general conditions of the UPS Units and functional status prior to perform task. | Tue 01-Aug 16:35 ~ 16:50 | Damen 1 | On Board | ShowEditDestroy |
400M02 | 14 ~ UPS: Visual check the cells cleanliness, cracks, electrolyte leakage and signs of damage. | Tue 01-Aug 13:05 ~ 13:20 | Damen 1 | Classroom 1 | ShowEditDestroy |
400M02 | 15 ~ UPS: Check the ventilation system in the UPS spaces in good operating conditions. | Tue 01-Aug 16:50 ~ 17:05 | Damen 1 | On Board | ShowEditDestroy |
400M02 | 16 ~ UPS: Check and record the overall float voltage at the battery terminals. | Tue 01-Aug 14:20 ~ 14:35 | Damen 1 | Classroom 1 | ShowEditDestroy |
400M02 | 17 ~ UPS: Check grounding and earthing straps for tightness and sign of corrosion. | Tue 01-Aug 17:05 ~ 17:20 | Damen 1 | On Board | ShowEditDestroy |
400M02 | 18 ~ UPS: Run self Check or BITE and record results. | Tue 01-Aug 17:20 ~ 17:35 | Damen 1 | On Board | ShowEditDestroy |
400M02 | 19 ~ UPS Safety and Handling: Observe safety precaution and practices, handling of hazadous materials when performing the work. | Tue 01-Aug 14:35 ~ 14:50 | Damen 1 | Classroom 1 | ShowEditDestroy |
400M02 | 20 ~ UPS: Practical Site Survey and Inspection on the System and Components onboard. | Wed 02-Aug 09:15 ~ 10:15 | Damen 1 | On Board | ShowEditDestroy |
400S01 ~ Electrical Plant |
Group 1 |
400S01 | 1 ~ Introduction to Diesel Generation System | Tue 06-Jun 08:30 ~ 08:45 | Akmal Hidayat | Classroom 1 | ShowEditDestroy |
400S01 | 2 ~ Emergency Generators: Daily Checklist | Tue 06-Jun 11:00 ~ 11:15 | Akmal Hidayat | Classroom 1 | ShowEditDestroy |
400S01 | 3 ~ Emergency Generators: Instrument Panel Overview. | Tue 06-Jun 11:15 ~ 11:30 | Akmal Hidayat | Classroom 1 | ShowEditDestroy |
400S01 | 4 ~ Emergency Generators: Oil Sampling | Tue 06-Jun 11:30 ~ 11:45 | Akmal Hidayat | Classroom 1 | ShowEditDestroy |
400S01 | 5 ~ Emergency Generators: Visual Inspection & Troubleshooting | Tue 06-Jun 11:45 ~ 12:00 | Akmal Hidayat | Classroom 1 | ShowEditDestroy |
400S01 | 6 ~ Emergency Generators: Check the function of Protection Panel and check protection device. | Tue 06-Jun 12:00 ~ 12:15 | Akmal Hidayat | Classroom 1 | ShowEditDestroy |
400S01 | 7 ~ Emergency Generators - Inspect Electrical Diesel Engine Instrument Panel. | Tue 06-Jun 12:15 ~ 12:30 | Akmal Hidayat | Classroom 1 | ShowEditDestroy |
400S01 | 8 ~ Shore connection - Shore Supply (SS)cables and stowage reels. | Tue 06-Jun 10:15 ~ 10:30 | Akmal Hidayat | Classroom 1 | ShowEditDestroy |
400S01 | 9 ~ Shore Connection: SS Panels & Connection Box | Tue 06-Jun 12:30 ~ 12:45 | Akmal Hidayat | Classroom 1 | ShowEditDestroy |
400S01 | 10 ~ Shore Connection:SOP SS connections ( Before/ After) | Tue 06-Jun 12:45 ~ 13:00 | Akmal Hidayat | Classroom 1 | ShowEditDestroy |
400S01 | 11 ~ Battery Sets: Visual Inspection & Troubleshooting | Tue 06-Jun 14:00 ~ 14:15 | Akmal Hidayat | Classroom 1 | ShowEditDestroy |
400S01 | 12 ~ Battery Sets - Functional check of charging units and check cable any sign of damage. | Tue 06-Jun 14:15 ~ 14:30 | Akmal Hidayat | Classroom 1 | ShowEditDestroy |
400S01 | 13 ~ UPS: Visual Check on ventilation system | Tue 06-Jun 14:30 ~ 14:45 | Akmal Hidayat | Classroom 1 | ShowEditDestroy |
400S01 | 14 ~ UPS: Run Self Check (BITE) | Tue 06-Jun 14:45 ~ 15:00 | Akmal Hidayat | Classroom 1 | ShowEditDestroy |
400S01 | 15 ~ UPS: Clean and Inspect | Tue 06-Jun 15:00 ~ 15:15 | Akmal Hidayat | Classroom 1 | ShowEditDestroy |
400S01 | 16 ~ UPS:Check Insulation and earthing. | Tue 06-Jun 15:15 ~ 15:30 | Akmal Hidayat | Classroom 1 | ShowEditDestroy |
400S01 | 17 ~ Emergency switchboard: Visual check and clean | Tue 06-Jun 16:00 ~ 16:15 | Akmal Hidayat | Classroom 1 | ShowEditDestroy |
400S01 | 18 ~ Transformers:: Visual check and clean | Thu 08-Jun 14:00 ~ 14:15 | Akmal Hidayat | Classroom 1 | ShowEditDestroy |
400S01 | 19 ~ Transformers: Visual and functional check. | Thu 08-Jun 14:15 ~ 14:30 | Akmal Hidayat | Classroom 1 | ShowEditDestroy |
400S11 ~ Electrical Plant - Practical On Board |
Group 1 |
400S11 | 1 ~ Fuel System Primary Filter - Drain and check conditions | Wed 31-May 15:15 ~ 15:35 | Akmal Hidayat | On Board | ShowEditDestroy |
400S11 | 2 ~ Perform Practical Site Survey and inspection on the system and components onboard. | Wed 31-May 14:00 ~ 15:30 | Akmal Hidayat | On Board | ShowEditDestroy |
410S01 ~ HP & LP Power Generation |
Group 1 |
410S01 | 1 ~ Perform Site Survey and to familirise with the overall system layout examine general conditions including to be acquinted system operating instruction prior to perform the task. | Fri 14-Jul 16:00 ~ 17:00 | Caterpillar System | On Board | ShowEditDestroy |
410S01 | 2 ~ HP & LP Power Generation - | Fri 14-Jul 08:30 ~ 08:50 | Caterpillar System | Classroom 1 | ShowEditDestroy |
410S01 | 3 ~ Diesel Generators and Emergency Generators - Perform Daily Checks. | Fri 14-Jul 08:50 ~ 09:10 | Caterpillar System | Classroom 1 | ShowEditDestroy |
410S01 | 4 ~ Diesel Generators and Emergency Generators - Inspect DE Instrument Panel. | Fri 14-Jul 09:10 ~ 09:30 | Caterpillar System | Classroom 1 | ShowEditDestroy |
410S01 | 5 ~ Diesel Generators and Emergency Generators - Inspect for leaks and loose connection. | Fri 14-Jul 09:30 ~ 09:50 | Caterpillar System | Classroom 1 | ShowEditDestroy |
410S01 | 6 ~ Emergency Generators - Inspect Electrical component Diesel Engine Instrument Panel. | Fri 14-Jul 09:50 ~ 10:10 | Caterpillar System | Classroom 1 | ShowEditDestroy |
410S01 | 7 ~ Diesel Generators and Emergency Generators - Protection devices - Check. | Fri 14-Jul 10:10 ~ 10:30 | Caterpillar System | Classroom 1 | ShowEditDestroy |
410S01 | 8 ~ Main Switchboard (MSB) and Emergency switchboard (ESB) 415V Panels - Clean, inspect and check insulation and continuity. | Fri 14-Jul 11:00 ~ 11:20 | Caterpillar System | Classroom 1 | ShowEditDestroy |
410S01 | 9 ~ Main Switchboard (MSB) and Emergency switchboard (ESB) 415V Panels Inspect earth bonding. | Fri 14-Jul 11:20 ~ 11:40 | Caterpillar System | Classroom 1 | ShowEditDestroy |
410S01 | 10 ~ Main Switchboard (MSB) and Emergency switchboard (ESB) 415V Panels - Clean And Inspect Front end panel free from dirt, moisture and corrosion free. | Fri 14-Jul 11:40 ~ 12:10 | Caterpillar System | Classroom 1 | ShowEditDestroy |
410S01 | 11 ~ Shore connection - Visual inspection of Shore supply connection panel and box. | Fri 14-Jul 12:10 ~ 12:30 | Caterpillar System | Classroom 1 | ShowEditDestroy |
410S01 | 12 ~ Shore connection - Visual Inspection the Shore Supply cables and stowage reels. | Fri 14-Jul 12:30 ~ 12:50 | Caterpillar System | Classroom 1 | ShowEditDestroy |
410S01 | 13 ~ Shore connection : Functional Check of the Control Panel, meters, gauges, phase sequence meter prior ship shore connections prior to connection and termination. | Fri 14-Jul 12:50 ~ 13:10 | Caterpillar System | Classroom 1 | ShowEditDestroy |
410S01 | 14 ~ Battery sets - Visual inspection and check the terminals tightness. | Fri 14-Jul 14:00 ~ 14:30 | Caterpillar System | Classroom 1 | ShowEditDestroy |
410S01 | 15 ~ Battery Sets - Functional check of charging units and check cable any sign of damage. | Fri 14-Jul 14:30 ~ 14:50 | Caterpillar System | Classroom 1 | ShowEditDestroy |
410S01 | 16 ~ ransformers - Clean, inspect and check insulation and continuity | Fri 14-Jul 14:50 ~ 15:10 | Caterpillar System | Classroom 1 | ShowEditDestroy |
410S01 | 17 ~ Transformers - Clean And Inspect for temperature, noise and vibration. | Fri 14-Jul 15:10 ~ 15:30 | Caterpillar System | Classroom 1 | ShowEditDestroy |
410S01 | 18 ~ UPS) for the 230 V systems - Check the ventilation system in the UPS spaces in good operating conditions. | Fri 14-Jul 16:00 ~ 16:20 | Caterpillar System | Classroom 1 | ShowEditDestroy |
411M01 ~ Electrical Plant - Generators |
Group 2 |
411M01 | 1 ~ Diesel Generators (DG) and Emergency (EDG): Examine the general conditions and system operation before start to perform the task. | Tue 20-Jun 14:15 ~ 14:35 | Caterpillar 1 | Classroom 1 | ShowEditDestroy |
411M01 | 2 ~ DG and EDG: Check Fuel System Primary Filter and Drain. | Tue 20-Jun 14:35 ~ 14:55 | Caterpillar 1 | Classroom 1 | ShowEditDestroy |
411M01 | 3 ~ DG and EDG: Perform Daily Checks as stipulated in PMS and service instruction. | Tue 20-Jun 14:55 ~ 15:15 | Caterpillar 1 | Classroom 1 | ShowEditDestroy |
411M01 | 4 ~ DG and EDG: Check Oil Mist Detector for operation and cleanliness. | Tue 20-Jun 15:15 ~ 15:35 | Caterpillar 1 | Classroom 1 | ShowEditDestroy |
411M01 | 5 ~ DG and EDG: Inspect DE Instrument Panel for cleanliness, functionalities and any signs of abnormilities. | Tue 20-Jun 15:50 ~ 16:05 | Caterpillar 1 | Classroom 1 | ShowEditDestroy |
411M01 | 6 ~ DG and EDG: Examine and Inspect for leaks and loose connection. | Tue 20-Jun 16:05 ~ 16:25 | Caterpillar 1 | Classroom 1 | ShowEditDestroy |
411M01 | 7 ~ DG and EDG: Cooling Syst. Supplemental Cool. Additive (SCA) - Test. | Tue 20-Jun 16:25 ~ 16:45 | Caterpillar 1 | Classroom 1 | ShowEditDestroy |
411M01 | 8 ~ DG and EDG: Check and examine Governor Actuator Linkage for looseness, misalignment and stiffness. | Tue 20-Jun 16:45 ~ 17:05 | Caterpillar 1 | Classroom 1 | ShowEditDestroy |
411M01 | 9 ~ DG and EDG: : Inspect crankshaft vibration damper. | Tue 20-Jun 17:05 ~ 17:20 | Caterpillar 1 | Classroom 1 | ShowEditDestroy |
411M01 | 10 ~ DG and EDG: Engine Oil Filter - Change. | Wed 21-Jun 09:30 ~ 10:00 | Caterpillar 1 | Classroom 1 | ShowEditDestroy |
411M01 | 11 ~ DG and EDG: Inspect DG Instrument Panel. | Wed 21-Jun 10:00 ~ 10:30 | Caterpillar 1 | Classroom 1 | ShowEditDestroy |
411M01 | 12 ~ DG and EDG: Cooling Syst. Supplemental Cool. Additive (SCA) - Test. | Wed 21-Jun 10:45 ~ 11:15 | Caterpillar 1 | Classroom 1 | ShowEditDestroy |
411M01 | 13 ~ DG and EDG: Engine Protection devices - Check. | Wed 21-Jun 11:15 ~ 11:30 | Caterpillar 1 | Classroom 1 | ShowEditDestroy |
411M01 | 14 ~ DG and EDG: Obtain Diesel Generators Oil Sample. | Wed 21-Jun 11:30 ~ 11:45 | Caterpillar 1 | Classroom 1 | ShowEditDestroy |
411M01 | 15 ~ DG and EDG: Check Starting Motor connections tightness and signs of abnormilities. | Wed 21-Jun 11:45 ~ 12:00 | Caterpillar 1 | Classroom 1 | ShowEditDestroy |
411M01 | 16 ~ DG and EDG: Check Battery and charging unit charging current and float voltage in good working condition. Battery are fully charged. | Wed 21-Jun 12:00 ~ 12:15 | Caterpillar 1 | Classroom 1 | ShowEditDestroy |
411M01 | 17 ~ DG and EDG: Examine and check Engine Mounts for signs of abnormilities damage and vulcanised. | Wed 21-Jun 12:15 ~ 12:35 | Caterpillar 1 | Classroom 1 | ShowEditDestroy |
411M01 | 18 ~ Electrical Plant - Generators: Practical Site Survey and inspection on the system and components onboard. | Wed 21-Jun 13:35 ~ 15:35 | Caterpillar 1 | On Board | ShowEditDestroy |
411M02 ~ Ships Batteries and UPS |
Group 3 |
411M02 | 1 ~ Ships Batteries and UPS: Perform Site Survey and to familirise with the overall system layout examine general conditions including to be acquinted system operating instruction prior to perform the task. | Mon 05-Jun 09:30 ~ 10:30 | Damen 1 | On Board | ShowEditDestroy |
411M02 | 2 ~ Battery Sets: Check Charging cable insulation and physical properties. | Mon 05-Jun 10:45 ~ 11:15 | Damen 1 | Classroom 3 | ShowEditDestroy |
411M02 | 3 ~ Ships Batteries and UPS - Measure and record electrolyte SG reading. | Mon 05-Jun 11:15 ~ 11:35 | Damen 1 | On Board | ShowEditDestroy |
411M02 | 4 ~ Ships Batteries and UPS -Check battery voltage and charging current. | Mon 05-Jun 11:35 ~ 11:55 | Damen 1 | On Board | ShowEditDestroy |
411M02 | 5 ~ Ships Batteries and UPS: Visual inspection and keep electrical connections and mechanical fastenings tight. | Mon 05-Jun 11:55 ~ 12:15 | Damen 1 | On Board | ShowEditDestroy |
411M02 | 6 ~ Batteries and UPS: Check Earth bonding straps tightness and free from dirt and corrosion. | Mon 05-Jun 14:30 ~ 15:00 | Damen 1 | Classroom 3 | ShowEditDestroy |
411M02 | 7 ~ Ships Batteries and UPS: Keep electrical connections and mechanical fastenings tight. | Mon 05-Jun 15:00 ~ 15:30 | Damen 1 | Classroom 3 | ShowEditDestroy |
411M02 | 8 ~ Batteries and UPS: Check the ventilation and air flow in working order in both Battery spaces and UPS Cabinet-rack. | Mon 05-Jun 15:45 ~ 16:15 | Damen 1 | Classroom 3 | ShowEditDestroy |
411M02 | 9 ~ Batteries and UPS: Observe safety precautions, practices and handling of hazadous material in performing the work. | Mon 05-Jun 16:15 ~ 16:45 | Damen 1 | Classroom 3 | ShowEditDestroy |
411M02 | 10 ~ Batteries and UPS: Check and eximine the power supplies input both AC and DC are available and operational. | Mon 05-Jun 16:45 ~ 17:15 | Damen 1 | Classroom 3 | ShowEditDestroy |
411P01 ~ Shore Supply |
Group 2 |
411P01 | 1 ~ Shore Supply: Perform Site Survey and to familirise with the overall system layout examine general conditions including to be acquinted system operating instruction prior to perform the task. | Mon 31-Jul 09:30 ~ 10:30 | Damen 1 | On Board | ShowEditDestroy |
411P01 | 2 ~ Shore Supply -Check and clean Earth bonding straps tightness and free from dirt and corrosion. | Mon 31-Jul 12:00 ~ 12:30 | Damen 1 | Classroom 1 | ShowEditDestroy |
411P01 | 3 ~ Shore Supply - Check periodically the Phase Sequence Meter. | Mon 31-Jul 10:45 ~ 11:00 | Damen 1 | On Board | ShowEditDestroy |
411P01 | 4 ~ Shore Supply - Functional Check of the Control Panel, meters, gauges, phase sequence meter prior ship shore connections prior to connection and termination. | Mon 31-Jul 11:00 ~ 11:30 | Damen 1 | On Board | ShowEditDestroy |
411P01 | 5 ~ Visual inspection of Shore supply connection panel and box. | Mon 31-Jul 12:00 ~ 12:15 | Damen 1 | Classroom 1 | ShowEditDestroy |
411P01 | 6 ~ Shore Supply Safety Handling: Observe safety precaution and practices, handling of hazardous substance in performing the work. | Mon 31-Jul 11:30 ~ 12:00 | Damen 1 | On Board | ShowEditDestroy |
411P01 | 7 ~ Shore Supply: Practical Survey and Inspection on the Shore Supply System and Components onboard. | Mon 31-Jul 12:30 ~ 13:30 | Damen 1 | Classroom 1 | ShowEditDestroy |
411P01 | 8 ~ Shore Supply - Visual Inspection the Shore Supply cables and stowage reels. | Mon 31-Jul 14:30 ~ 14:45 | Damen 1 | Classroom 1 | ShowEditDestroy |
411P01 | 9 ~ Keep all electrical connections and mechanical fastenings tight according to right torque and the fastenings are dry, clean and rust free. | Mon 31-Jul 14:45 ~ 15:05 | Damen 1 | Classroom 1 | ShowEditDestroy |
411P01 | 10 ~ Perform Practical Site Survey and inspection of the system and components onboard. | Mon 31-Jul 15:20 ~ 17:20 | Damen 1 | On Board | ShowEditDestroy |
430M01 ~ Electrical Plants - Switchboard and switch gears |
Group 2 |
430M01 | 1 ~ Perform Site Survey and to familirise with the overall system layout examine general conditions including to be acquainted system operating instruction prior to perform the task. | Wed 02-Aug 10:30 ~ 11:30 | Damen 1 | On Board | ShowEditDestroy |
430M01 | 2 ~ Switchboard (415V 50Hz) Panels 230 V 50Hz Switchboard Panels - Perform Inspection on loose electrical connections or mechanical fastenings and tighten them as necessary iaw required torque. | Wed 02-Aug 11:30 ~ 12:00 | Damen 1 | Classroom 1 | ShowEditDestroy |
430M01 | 3 ~ Switchboard (415V 50Hz) Panels 230 V 50Hz Switchboard Panels - Check and visual inspection and all bus/ bus are clean and dry. To perform cleaning ensure the Switchboard /panel are de-energised. | Wed 02-Aug 12:00 ~ 12:10 | Damen 1 | Classroom 1 | ShowEditDestroy |
430M01 | 4 ~ Switchboard (415V 50Hz) Panels 230 V 50Hz Panel - The front panels of dead front switchboards: Visual inspection of the front panels of dead front switchboards frre from dirt and moiture and corrosion, Clean as necessary without de-energizing (Switch Off). | Wed 02-Aug 12:10 ~ 12:40 | Damen 1 | Classroom 1 | ShowEditDestroy |
430M01 | 5 ~ Switchboard (415V 50Hz) Panels 230 V 50Hz Switchboard Panels - Check and examine he front panels of dead front switchboards Instruments and metering display analog pointers and digital are zero(when Static) and calibrated. | Wed 02-Aug 12:40 ~ 12:55 | Damen 1 | Classroom 1 | ShowEditDestroy |
430M01 | 6 ~ Run self check on the instrument and display with BITE facilities. | Wed 02-Aug 12:55 ~ 13:25 | Damen 1 | On Board | ShowEditDestroy |
430M01 | 7 ~ Switchboard (415V 50Hz), 230 V 50Hz Panels Protective circuits - Visually check and, over current or reverse current circuits, overload relays, and protective circuit performs its desired functions for fuses. | Wed 02-Aug 14:25 ~ 14:55 | Damen 1 | On Board | ShowEditDestroy |
430M01 | 8 ~ Switchboard (415V 50Hz) Panels Bus Transfer Equipment - (Interconnecting Breakers, Supply Breakers,Shore Supply Breakers): Visually check are for operation at desired functions (When testing bus transfer equipment, should follow the safety precautions given for testing circuit breakers). | Wed 02-Aug 14:55 ~ 15:25 | Damen 1 | Classroom 1 | ShowEditDestroy |
430M01 | 9 ~ Switchboard (415V 50Hz), 230 V 50Hz Panels Fuses - Check and examine the right size and that they make firm contact with fuse clips. Ensure that lock-in devices (if provided) are properly fitted and that all fuse wiring connections are tight. | Wed 02-Aug 15:25 ~ 15:40 | Damen 1 | Classroom 1 | ShowEditDestroy |
430M01 | 10 ~ Switchboard (415V 50Hz), 230 V 50Hz Panels Distribution Boxes - Check the function of wiring distribution boxes (fused), with and without switches, feed circuits fuse clip barrel nuts and terminal connections tightness. | Wed 02-Aug 15:40 ~ 16:10 | Damen 1 | Classroom 1 | ShowEditDestroy |
430M01 | 11 ~ Emergency Switchboard Panel - Check and examine he front panels of dead front switchboards Instruments and metering display analog pointers and digital are zero (when Static) and calibrated. | Wed 02-Aug 16:25 ~ 16:55 | Damen 1 | Classroom 1 | ShowEditDestroy |
430M01 | 12 ~ Emergency Switchboard Panel - Run self check on the instrument and display with BITE facilities and log the result in switchboard log book or computer system. | Wed 02-Aug 16:50 ~ 17:20 | Damen 1 | Classroom 1 | ShowEditDestroy |
430M01 | 13 ~ Switchboard (415V 50Hz), 230 V 50Hz Panels Protective circuits - Visually check and, over current or reverse current circuits, overload relays, and protective circuit performs its desired functions for fuses. | Thu 03-Aug 09:15 ~ 09:45 | Damen 1 | Classroom 1 | ShowEditDestroy |
430M01 | 14 ~ Transformers - Visual inspection of the external parts are free from dirt and moisture and corrosion, clean as necessary without de-energizing (Switch Off). | Thu 03-Aug 09:45 ~ 10:15 | Damen 1 | Classroom 1 | ShowEditDestroy |
430M01 | 15 ~ Transformers check and clean earth bonding straps tightness and free from dirt and corrosion. | Thu 03-Aug 10:15 ~ 10:45 | Damen 1 | Classroom 1 | ShowEditDestroy |
430M01 | 16 ~ Transformers - Check and examine the electrical properties continuity, insulation are within the acceptable limits. | Thu 03-Aug 11:00 ~ 11:30 | Damen 1 | | ShowEditDestroy |
430M01 | 17 ~ Observe safety precautions, practices and handling of hazardous material in performing the work. | Thu 03-Aug 11:30 ~ 12:00 | Damen 1 | | ShowEditDestroy |
430M01 | 18 ~ Perform Practical Site Survey and inspection on the system and components onboard. | Thu 03-Aug 13:30 ~ 15:30 | Damen 1 | On Board | ShowEditDestroy |
430S01 ~ LP Switchboards and Distributions |
Group 1 |
430S01 | 1 ~ 230V 50Hz Panels : Visual inspection on connections | Wed 07-Jun 08:30 ~ 08:50 | Akmal Hidayat | Classroom 1 | ShowEditDestroy |
430S01 | 2 ~ 230V 50Hz Panels : Visual inspection on Bus/Bus Layout | Wed 07-Jun 08:50 ~ 09:10 | Akmal Hidayat | Classroom 1 | ShowEditDestroy |
430S01 | 3 ~ 230 V 50Hz Panels : Front panels of dead front switchboards: Visual inspection & clean. | Wed 07-Jun 09:10 ~ 09:30 | Akmal Hidayat | Classroom 1 | ShowEditDestroy |
430S01 | 4 ~ 230 V 50Hz Panels : Check Front panels of dead front switchboards: gauges and display Instruments for correct function and calibrated. | Wed 07-Jun 09:45 ~ 10:05 | Akmal Hidayat | Classroom 1 | ShowEditDestroy |
430S01 | 5 ~ 230 V 50Hz Panels - Run self check on BITE facilities. | Wed 07-Jun 10:05 ~ 10:25 | Akmal Hidayat | Classroom 1 | ShowEditDestroy |
430S01 | 6 ~ 230V 50Hz Panels protective circuits : Visual inspection on all protective devices and relays. | Wed 07-Jun 11:00 ~ 11:20 | Akmal Hidayat | Classroom 1 | ShowEditDestroy |
430S01 | 7 ~ 230 V 50Hz Panels : Check earth bonding connection and conditions | Wed 07-Jun 11:20 ~ 11:40 | Akmal Hidayat | Classroom 1 | ShowEditDestroy |
430S01 | 8 ~ 230 V 50Hz Panels - Visual and functional check the protective devices on Distribution Boxes | Wed 07-Jun 11:40 ~ 12:00 | Akmal Hidayat | Classroom 1 | ShowEditDestroy |
430S01 | 9 ~ Transformers -, Visual Inspection and check for corrosion and cleanliness. | Thu 08-Jun 14:30 ~ 15:00 | Akmal Hidayat | Classroom 1 | ShowEditDestroy |
430S01 | 10 ~ Transformers - Electrical checks and troubleshooting | Thu 08-Jun 16:00 ~ 16:20 | Akmal Hidayat | Classroom 1 | ShowEditDestroy |
430S01 | 11 ~ Transformers - Check and clean Earth bonding straps tightness and free from dirt and corrosion. | Thu 08-Jun 14:15 ~ 14:45 | Akmal Hidayat | Classroom 1 | ShowEditDestroy |
430S01 | 12 ~ Transformers - Check and examine the electrical properties continuity, insulation are within the acceptable limits. | Thu 08-Jun 16:00 ~ 16:30 | Akmal Hidayat | Classroom 1 | ShowEditDestroy |
430S01 | 13 ~ Transformers - Keep all electrical connections and mechanical fastenings tight according to right torque and the fastenings are dry, clean and rust free. | Thu 08-Jun 16:00 ~ 16:30 | Akmal Hidayat | Classroom 1 | ShowEditDestroy |
430S01 | 14 ~ Ships Batteries and UPS - Check battery capacity and charging current rating | Tue 06-Jun 14:00 ~ 14:30 | Akmal Hidayat | Classroom 1 | ShowEditDestroy |
430S01 | 15 ~ Ships Batteries and UPS - Visual Inspection and Identifying components and common faults | Tue 06-Jun 14:30 ~ 14:50 | Akmal Hidayat | Classroom 1 | ShowEditDestroy |
430S01 | 16 ~ Ships Batteries and UPS - Check and clean Earth bonding straps tightness and free from dirt and corrosion. | Tue 06-Jun 14:50 ~ 15:10 | Akmal Hidayat | Classroom 1 | ShowEditDestroy |
430S01 | 17 ~ Batteries and UPS - Check Ventilations layout and arrangement. | Tue 06-Jun 14:10 ~ 14:40 | Akmal Hidayat | Classroom 1 | ShowEditDestroy |
430S11 ~ LP Switchboards and Distributions - Practical On Board |
Group 1 |
430S11 | 1 ~ Maintain - Propose” Perform Site survey, identify system layout and operating instructions. | Wed 07-Jun 09:30 ~ 10:30 | Akmal Hidayat | On Board | ShowEditDestroy |
430S11 | 2 ~ Perform Practical Site Survey and inspection on the system and components onboard. | Wed 07-Jun 10:45 ~ 12:45 | Akmal Hidayat | On Board | ShowEditDestroy |
450S01 ~ Power Distribution and Lighting Systems |
Group 1 |
450S01 | 1 ~ General Lighting - Lighting general layout and functional checks.. | Thu 08-Jun 08:30 ~ 08:45 | Akmal Hidayat | Classroom 1 | ShowEditDestroy |
450S01 | 2 ~ General Lighting - Check earth fault and continuity. | Thu 08-Jun 08:45 ~ 09:00 | Akmal Hidayat | Classroom 1 | ShowEditDestroy |
450S01 | 3 ~ Transitional Lighting - Visual inspection, check sign of corrosion and moisture. | Wed 07-Jun 13:15 ~ 13:30 | Akmal Hidayat | Classroom 1 | ShowEditDestroy |
450S01 | 4 ~ Transitional Lighting - Functional check the lighting by compartments and system. | Thu 22-Jun 14:30 ~ 14:45 | Akmal Hidayat | Classroom 1 | ShowEditDestroy |
450S01 | 5 ~ Emergency Lighting - Check Emergency Lighting Layout and fittings. | Wed 07-Jun 14:00 ~ 14:15 | Akmal Hidayat | Classroom 1 | ShowEditDestroy |
450S01 | 6 ~ Emergency lighting - Functional check the lighting by compartments and system for normal and alternative supplies. | Wed 07-Jun 14:15 ~ 14:30 | Akmal Hidayat | Classroom 1 | ShowEditDestroy |
450S01 | 7 ~ External Lighting - Visual check on fittings and general layout. | Wed 07-Jun 15:15 ~ 15:30 | Akmal Hidayat | Classroom 1 | ShowEditDestroy |
450S01 | 8 ~ External lighting - Check watertight integrity at cable entry and cable gland. | Wed 07-Jun 15:45 ~ 16:00 | Akmal Hidayat | Classroom 1 | ShowEditDestroy |
450S01 | 9 ~ Portable Lighting - Functional check on lighting system and General Layout. | Wed 07-Jun 16:00 ~ 17:00 | Akmal Hidayat | Classroom 1 | ShowEditDestroy |
450S01 | 10 ~ Portable Lighting - Visual check on fittings | Wed 07-Jun 16:00 ~ 16:15 | Akmal Hidayat | Classroom 1 | ShowEditDestroy |
450S01 | 11 ~ Portable lighting - Earth Fault Insulation and Continuity Check. | Wed 07-Jun 16:00 ~ 16:15 | Akmal Hidayat | Classroom 1 | ShowEditDestroy |
450S01 | 12 ~ Portable lighting - Check for watertight integrity at flab entry and switches. | Wed 07-Jun 16:00 ~ 16:15 | Akmal Hidayat | Classroom 1 | ShowEditDestroy |
450S11 ~ Power Distribution and Lighting Systems - Practical On Board |
Group 1 |
450S11 | 1 ~ General Lighting Visual inspection and general Layout: and arrangement | Thu 08-Jun 09:00 ~ 09:15 | Akmal Hidayat | On Board | ShowEditDestroy |
450S11 | 2 ~ Transitional lighting - Functional check and inspection. | Thu 08-Jun 10:45 ~ 11:00 | Akmal Hidayat | On Board | ShowEditDestroy |
450S11 | 3 ~ Emergency lighting - Functional check and inspection. | Wed 07-Jun 14:00 ~ 14:15 | Akmal Hidayat | On Board | ShowEditDestroy |
450S11 | 4 ~ External lighting - Functional check and inspection. | Thu 08-Jun 11:15 ~ 11:30 | Akmal Hidayat | On Board | ShowEditDestroy |
450S11 | 5 ~ Perform Practical Site Survey and inspection on the system and components onboard of Power Distribution and Lighting Systems. | Thu 08-Jun 11:30 ~ 12:30 | Akmal Hidayat | On Board | ShowEditDestroy |
570P01 ~ Davits Rescue Boat |
Group 4 |
570P01 | 1 ~ Perform Site Survey to familirise with the overall system layout and examine general conditions, initiation of the standard operating instruction prior to perform the task. | Wed 16-Aug 09:15 ~ 10:15 | Vestdavit 1 | On Board | ShowEditDestroy |
570P01 | 2 ~ Davits - Check hydraulic system for damage and leaks. | Wed 16-Aug 10:15 ~ 10:35 | Vestdavit 1 | Classroom 1 | ShowEditDestroy |
570P01 | 3 ~ Davits - Check the davit for visible damages free from dirt, rust and damage. | Wed 16-Aug 10:50 ~ 11:10 | Vestdavit 1 | Classroom 1 | ShowEditDestroy |
570P01 | 4 ~ Davit - Functional check that the davit can move freely in its operation area. Switch “ON” MCCB on starter panel. | Wed 16-Aug 11:10 ~ 11:25 | Vestdavit 1 | On Board | ShowEditDestroy |
570P01 | 5 ~ Davits - Apply grease to necessary points as specified in Operation Manual or PMS. | Wed 16-Aug 11:25 ~ 11:40 | Vestdavit 1 | Classroom 1 | ShowEditDestroy |
570P01 | 6 ~ Check hydraulic system clean and dry free from dirt, salt deposit, and corrosion free. | Wed 16-Aug 11:40 ~ 12:00 | Vestdavit 1 | Classroom 1 | ShowEditDestroy |
570P01 | 7 ~ Keep all electrical connections and mechanical fastenings tight according to right torque. and the fastenings are dry, clean and rust free. | Wed 16-Aug 12:00 ~ 12:20 | Vestdavit 1 | Classroom 1 | ShowEditDestroy |
570P01 | 8 ~ Check and clean Earth bonding straps tightness and free from dirt and corrosion. | Wed 16-Aug 12:20 ~ 12:40 | Vestdavit 1 | Classroom 1 | ShowEditDestroy |
570P01 | 9 ~ Inspect and test the equipment at sufficient intervals to make sure that the equipment is in operating condition. | Wed 16-Aug 12:40 ~ 13:00 | Vestdavit 1 | Classroom 1 | ShowEditDestroy |
570P01 | 10 ~ Observe cleanliness, corrosion control and preservation at all time when performing the task. | Wed 16-Aug 13:00 ~ 13:20 | Vestdavit 1 | Classroom 1 | ShowEditDestroy |
570P01 | 11 ~ Power Supply Services - Check power ON and Off of the system prior to start operation. | Wed 16-Aug 14:20 ~ 14:40 | Vestdavit 1 | Classroom 1 | ShowEditDestroy |
570P01 | 12 ~ Inspect and test the equipment at sufficient intervals to make sure that the equipment is in operating condition. | Wed 16-Aug 14:40 ~ 15:00 | Vestdavit 1 | Classroom 1 | ShowEditDestroy |
570P01 | 13 ~ Perform Practical Site Survey and inspection of the system and components onboard. | Wed 16-Aug 15:15 ~ 17:15 | Vestdavit 1 | On Board | ShowEditDestroy |
570P02 ~ Emergency Equipment |
Group 4 |
570P02 | 1 ~ Rescue Boat - Check and verify the inventory list as fitted. | Thu 17-Aug 09:15 ~ 09:30 | Vestdavit 1 | On Board | ShowEditDestroy |
570P02 | 2 ~ Rescue Boat - Check propulsion or outboard engine start and stop function and bilge pump. | Thu 17-Aug 09:30 ~ 09:45 | Vestdavit 1 | On Board | ShowEditDestroy |
570P02 | 3 ~ Rescue Boat - Visual condition of stowage and releasing and recovery mechanism. | Thu 17-Aug 09:45 ~ 10:00 | Vestdavit 1 | On Board | ShowEditDestroy |
570P02 | 4 ~ Rescue Boat - Condition of hull inside & outside any sign of damage or corrosion. | Thu 17-Aug 10:00 ~ 10:15 | Vestdavit 1 | On Board | ShowEditDestroy |
570P02 | 5 ~ Rescue Boat - Check the Bilge keel and hull appendages on both sides in good order. | Thu 17-Aug 10:30 ~ 10:45 | Vestdavit 1 | On Board | ShowEditDestroy |
570P02 | 6 ~ Davit - Check the davit for visible damages free from dirt, rust and damage. | Thu 17-Aug 10:45 ~ 11:00 | Vestdavit 1 | On Board | ShowEditDestroy |
570P02 | 7 ~ Davit - Apply grease to necessary points as specfied in Operation Manual or PMS. | Thu 17-Aug 11:00 ~ 11:15 | Vestdavit 1 | On Board | ShowEditDestroy |
570P02 | 8 ~ Davit - Functional check that the davit can move freely in its operation area. Switch “ON” MCCB on starter panel. | Thu 17-Aug 11:15 ~ 11:30 | Vestdavit 1 | On Board | ShowEditDestroy |
570P02 | 9 ~ Davit -Check wire rope of the hoist is in perfect condition and good order. | Thu 17-Aug 11:30 ~ 11:45 | Vestdavit 1 | On Board | ShowEditDestroy |
570P02 | 10 ~ Life Rafts - Self-protection of with cover from direct heat. | Thu 17-Aug 11:45 ~ 12:00 | Vestdavit 1 | On Board | ShowEditDestroy |
570P02 | 11 ~ Life Raft - Keep clean the life raft from salt deposit and moisture. | Thu 17-Aug 12:00 ~ 12:15 | Vestdavit 1 | On Board | ShowEditDestroy |
570P02 | 12 ~ Life Raft - Check Condition of stowage and releasing mechanism. | Thu 17-Aug 12:15 ~ 12:30 | Vestdavit 1 | On Board | ShowEditDestroy |
570P02 | 13 ~ Life Raft - Visual Inspection the external condition for any sign of damage. | Thu 17-Aug 12:30 ~ 12:45 | Vestdavit 1 | On Board | ShowEditDestroy |
570P02 | 14 ~ Life Raft - Check and record the Service interval date and next periodic service. | Thu 17-Aug 12:45 ~ 13:00 | Vestdavit 1 | On Board | ShowEditDestroy |
620M01 ~ Compressed Air System |
Group 3 |
620M01 | 1 ~ Compressors Check Oil Level (Working and Control Air ) – Types and characteristics, Oil flow, the type of LO, sight glass. | Fri 30-Jun 09:30 ~ 10:00 | Atlas Copco 1 | Classroom 3 | ShowEditDestroy |
620M01 | 2 ~ Clean and Inspect ( Electrical sub-systems) – Motors and starters types, cables and terminations, mountings and fastenings. | Fri 30-Jun 10:00 ~ 10:20 | Atlas Copco 1 | Classroom 3 | ShowEditDestroy |
620M01 | 3 ~ Functional Checks (Motors and Compressors) – Pre starting checks, performance and meter readings (Working and Control Air), abnormalities. | Fri 30-Jun 10:35 ~ 11:15 | Atlas Copco 1 | Classroom 3 | ShowEditDestroy |
620M01 | 4 ~ Pressure Sensors - Clean and Inspect: Cables and terminations, alarm and settings. | Fri 30-Jun 11:15 ~ 11:30 | Atlas Copco 1 | Classroom 3 | ShowEditDestroy |
620M01 | 5 ~ Change Lubrication Oil – Safety procedures, procedure for oil change. | Fri 30-Jun 11:30 ~ 11:45 | Atlas Copco 1 | Classroom 3 | ShowEditDestroy |
620M01 | 6 ~ Test Safety Valve - Pre starting checks, Procedure of test. | Fri 30-Jun 11:45 ~ 12:00 | Atlas Copco 1 | Classroom 3 | ShowEditDestroy |
620M01 | 7 ~ Grease Bearing (Compressor Motors) – Grease and types, procedure of greasing, using the grease gun. | Fri 30-Jun 12:00 ~ 12:10 | Atlas Copco 1 | Classroom 3 | ShowEditDestroy |
620M01 | 8 ~ Clean and Inspect Compressors - Types and characteristics; safety procedures, cleaning procedures. | Fri 30-Jun 12:10 ~ 12:40 | Atlas Copco 1 | Classroom 3 | ShowEditDestroy |
620M01 | 9 ~ Clean Air Filter – Types and functions, Safety procedures when cleaning. | Fri 30-Jun 14:40 ~ 14:50 | Atlas Copco 1 | Classroom 3 | ShowEditDestroy |
620M01 | 10 ~ Check Drainage – Formation and draining the Condensate, safety precautions. | Fri 30-Jun 14:50 ~ 15:00 | Atlas Copco 1 | Classroom 3 | ShowEditDestroy |
620M01 | 11 ~ Clean, Inspect and Check Insulation – Motors and control panels, cables and terminations, insulating properties, Insulation Tester. | Fri 30-Jun 15:00 ~ 15:10 | Atlas Copco 1 | Classroom 3 | ShowEditDestroy |
620M01 | 12 ~ Check Earth Bonding – Motors and control panels, Continuity Tester. | Fri 30-Jun 15:10 ~ 15:15 | Atlas Copco 1 | Classroom 3 | ShowEditDestroy |
620M01 | 13 ~ On Board Familiarisation | Fri 30-Jun 15:30 ~ 17:30 | Atlas Copco 1 | On Board | ShowEditDestroy |
620S01 ~ Compressed Air System |
Group 1 |
620S01 | 1 ~ Working and Control Air System – Establish the Compressors and the system arrangements, for Working and Control Air. | Fri 02-Jun 08:30 ~ 09:30 | Khairul Azuadi Bin Ariffin | Classroom 1 | ShowEditDestroy |
620S01 | 2 ~ System Operations – The Air Bottles and Driers and Distribution of the Working and the Control Air. | Fri 02-Jun 11:00 ~ 11:40 | Khairul Azuadi Bin Ariffin | Classroom 1 | ShowEditDestroy |
620S01 | 3 ~ Connectivity - Working Air System and Control Air System. | Fri 02-Jun 11:40 ~ 11:55 | Khairul Azuadi Bin Ariffin | Classroom 1 | ShowEditDestroy |
620S01 | 4 ~ System performance – Charging the bottles, the Air pressures. | Fri 02-Jun 11:55 ~ 12:10 | Khairul Azuadi Bin Ariffin | Classroom 1 | ShowEditDestroy |
620S01 | 5 ~ Controlling the Air Pressures. | Fri 02-Jun 14:00 ~ 14:15 | Khairul Azuadi Bin Ariffin | Classroom 1 | ShowEditDestroy |
620S01 | 6 ~ Alarm activation – Low pressure. | Fri 02-Jun 14:15 ~ 14:30 | Khairul Azuadi Bin Ariffin | Classroom 1 | ShowEditDestroy |
620S11 ~ Compressed Air System - Practical On Board |
Group 1 |
620S11 | 1 ~ On Board Familiarisation | Fri 02-Jun 16:00 ~ 17:00 | Khairul Azuadi Bin Ariffin | Classroom 1 | ShowEditDestroy |
640P01 ~ Oil Spill Response |
Group 4 |
640P01 | 1 ~ Dispersant Pumps & Boom - Clean & Inspect: Pumps, control panel, motor, valves, spray booms, hoses, loose fittings. | Thu 01-Jun 08:30 ~ 09:10 | UMW 1 | Classroom 1 | ShowEditDestroy |
640P01 | 2 ~ Dispersant Pumps & Boom: Functional checks – Setting up the system, pre starting checks and safety procedures, performance. | Thu 01-Jun 09:10 ~ 09:40 | UMW 1 | Classroom 2 | ShowEditDestroy |
640P01 | 3 ~ Dispersant Pumps & Boom - Clean, Inspect, Check Insulation – Motors, control panel, cables and termination, Insulation Tester. | Thu 01-Jun 09:40 ~ 09:50 | UMW 1 | Classroom 1 | ShowEditDestroy |
640P01 | 4 ~ Dispersant Pumps & Boom:Earthing straps, fastenings, Continuity tester. | Thu 01-Jun 09:50 ~ 09:55 | UMW 1 | Classroom 1 | ShowEditDestroy |
640P01 | 5 ~ Skimmer System - Operational Test – Setting up, pre starting checks, safety procedures, performance. | Thu 01-Jun 11:00 ~ 13:00 | UMW 1 | On Board | ShowEditDestroy |
640P01 | 6 ~ On Board Familiarisation | Thu 01-Jun 11:00 ~ 13:00 | UMW 1 | On Board | ShowEditDestroy |
650M01 ~ External Fire-Fighting System |
Group 3 |
650M01 | 1 ~ Flight Deck FF System (Foam System) - Clean and Inspect Externally: Hydrants, monitors, foam tank and applicator, fire man suits, Hoses, and loose fittings. | Thu 22-Jun 14:30 ~ 15:10 | Damen 1 | On Board | ShowEditDestroy |
650M01 | 2 ~ Flight Deck FF System (Foam System) - Functional checks: Pre-starting checks and safety procedures. | Thu 22-Jun 15:10 ~ 15:25 | Damen 1 | On Board | ShowEditDestroy |
650M01 | 3 ~ Flight Deck FF System (Foam System) - Operational Checks: Pre starting checks, safety and operational procedures, performance | Thu 22-Jun 15:25 ~ 15:55 | Damen 1 | On Board | ShowEditDestroy |
650M01 | 4 ~ Clean And Inspect: Engine driven pump,monitors, valves, hoses, nozzles, control panel | Thu 22-Jun 16:10 ~ 16:50 | Damen 1 | On Board | ShowEditDestroy |
650M01 | 5 ~ Operational Check: Pre starting checks and safety procedures, Running with s’tbd ME | Thu 22-Jun 16:50 ~ 17:05 | Damen 1 | On Board | ShowEditDestroy |
650M01 | 6 ~ Fire Hoses-Clean, Inspect and Pressure Testing: Setting up pressure test, procedure after use. | Thu 22-Jun 17:05 ~ 17:25 | Damen 1 | On Board | ShowEditDestroy |
650P01 ~ Damage Control and Fire Fighting |
Group 2 |
650P01 | 1 ~ The ship’s Fire Fighting System arrangements – Fire Main line. | Fri 28-Jul 09:30 ~ 10:10 | Damen 1 | Classroom 1 | ShowEditDestroy |
650P01 | 2 ~ Fire Hydrants and the Locations. | Fri 28-Jul 10:10 ~ 10:25 | Damen 1 | Classroom 1 | ShowEditDestroy |
650P01 | 3 ~ Operating the system using the Hoses, Nozzles and sprays. | Fri 28-Jul 10:40 ~ 11:40 | Damen 1 | Classroom 1 | ShowEditDestroy |
650P01 | 4 ~ The Sprinkler, CO2, Foam and the Water Mist system-General arrangements, general characteristics and operations. | Fri 28-Jul 11:40 ~ 12:40 | Damen 1 | Classroom 1 | ShowEditDestroy |
650P01 | 5 ~ The External FF system - The general arrangements, general characteristics and operations. | Fri 28-Jul 14:40 ~ 15:10 | Damen 1 | Classroom 1 | ShowEditDestroy |
670M01 ~ Fixed Internal Fire fighting System |
Group 2 |
670M01 | 1 ~ Sprinkler System - Clean and inspect: Compressed air pipe coupling, test valves, sprinklers head. | Thu 27-Jul 09:30 ~ 10:00 | Damen 1 | Classroom 1 | ShowEditDestroy |
670M01 | 2 ~ Sprinkler System - Check Audibles & Visual Alarm & Water Pressure: Check audibles & visual alarm and water pressure. | Thu 27-Jul 10:00 ~ 10:20 | Damen 1 | Classroom 1 | ShowEditDestroy |
670M01 | 3 ~ Water Mist System (Control Panel) - Inspect externally: Control panel, water pump, valve, nozzles. | Thu 27-Jul 10:20 ~ 11:00 | Damen 1 | Classroom 1 | ShowEditDestroy |
670M01 | 4 ~ Water Mist System - Clean and inspect water pump and outfit: Clean and inspect water pump and outfit, manual and auto operation. | Thu 27-Jul 11:15 ~ 11:35 | Damen 1 | Classroom 1 | ShowEditDestroy |
670M01 | 5 ~ Water Mist System (Control Panel): Clean and inspect internally. | Thu 27-Jul 11:35 ~ 11:50 | Damen 1 | Classroom 1 | ShowEditDestroy |
670M01 | 6 ~ Water Mist System - Alarm Checks: Control panel self tests and Alarm activation. | Thu 27-Jul 11:50 ~ 12:05 | Damen 1 | Classroom 1 | ShowEditDestroy |
670M01 | 7 ~ Foam System - Clean externally: Foam and fire pumps, valves, monitors, hoses, nozzles. | Thu 27-Jul 12:05 ~ 12:45 | Damen 1 | Classroom 1 | ShowEditDestroy |
670M01 | 8 ~ Foam System - Functional Checks: Pre starting checks, procedure when running the fire pump. | Thu 27-Jul 12:45 ~ 13:00 | Damen 1 | Classroom 1 | ShowEditDestroy |
670M01 | 9 ~ Foam System - Operational Check: Pre starting check, Operational procedures, performance. | Thu 27-Jul 13:00 ~ 13:15 | Damen 1 | Classroom 1 | ShowEditDestroy |
670M01 | 10 ~ CO2 System - Clean & Check Pipes, Nozzles & associated Components, Clean and check pipes, Nozzles and associated components. | Thu 27-Jul 13:15 ~ 13:55 | Damen 1 | Classroom 1 | ShowEditDestroy |
670M01 | 11 ~ CO2 System - Weight the cylinder: Weight the cylinder. | Thu 27-Jul 14:55 ~ 15:10 | Damen 1 | Classroom 1 | ShowEditDestroy |
670M01 | 12 ~ On Board Familiarisation | Thu 27-Jul 15:10 ~ 18:10 | Damen 1 | On Board | ShowEditDestroy |
680M01 ~ 680 Cold Store/ Freezing Room System |
Group 4 |
680M01 | 1 ~ Check Oil Level – PCU Compressor. | Mon 21-Aug 09:15 ~ 09:30 | Staco 1 | On Board | ShowEditDestroy |
680M01 | 2 ~ PCU SW Pump - Run pump if not in regular use: Pre starting checks, check performance, leaks and abnormalities. | Mon 21-Aug 09:30 ~ 09:50 | Staco 1 | Classroom 1 | ShowEditDestroy |
680M01 | 3 ~ Clean & Inspect – PCU SW Pump, pipes ,couplings, valves mountings, fastenings. | Mon 21-Aug 09:50 ~ 10:20 | Staco 1 | Classroom 1 | ShowEditDestroy |
680M01 | 4 ~ PCU - Check Refrigerant, Procedure of checks. | Mon 21-Aug 10:35 ~ 10:55 | Staco 1 | Classroom 1 | ShowEditDestroy |
680M01 | 5 ~ PCU - Checks for Leaks, Procedure of checks. | Mon 21-Aug 10:55 ~ 11:10 | Staco 1 | Classroom 1 | ShowEditDestroy |
680M01 | 6 ~ PCU Compressor Motor - Functional checks: Pre starting checks, check performance and abnormalities. | Mon 21-Aug 11:10 ~ 11:40 | Staco 1 | Classroom 1 | ShowEditDestroy |
680M01 | 7 ~ PCU SW Pump Motor - Functional checks: Pre starting checks, performance and abnormalities. | Mon 21-Aug 11:40 ~ 12:10 | Staco 1 | Classroom 1 | ShowEditDestroy |
680M01 | 8 ~ PCU Control Panel - Functional checks: Check system operation, performance and abnormalities. | Mon 21-Aug 12:10 ~ 12:40 | Staco 1 | Classroom 1 | ShowEditDestroy |
680M01 | 9 ~ Clean & Inspect – PCU Control Panel, switches and indicators, cables and terminations. | Mon 21-Aug 12:40 ~ 13:00 | Staco 1 | Classroom 1 | ShowEditDestroy |
680M01 | 10 ~ PCU Compressor Motor - Clean Inspect & Check Insulation Pre starting checks, Cables and terminations, Insulation tester. | Mon 21-Aug 13:00 ~ 13:10 | Staco 1 | Classroom 1 | ShowEditDestroy |
680M01 | 11 ~ PCU SW Pump Motor - Clean Inspect & Check Insulation – Pre starting checks, cables and terminations, Insulation tester. | Mon 21-Aug 13:10 ~ 13:20 | Staco 1 | Classroom 1 | ShowEditDestroy |
680M01 | 12 ~ Clean Inspect & Check Insulation – Pre starting checks, cables and terminations, Insulation Tester. | Mon 21-Aug 13:20 ~ 13:25 | Staco 1 | Classroom 1 | ShowEditDestroy |
680M01 | 13 ~ Check Combined High-Low Pressure Switch – Procedure of setting the Pressure switches. | Mon 21-Aug 13:25 ~ 13:40 | Staco 1 | Classroom 1 | ShowEditDestroy |
680M01 | 14 ~ PCU Compressor - Change LO– Pre starting checks, clean strainers. | Mon 21-Aug 14:40 ~ 14:55 | Staco 1 | Classroom 1 | ShowEditDestroy |
680M01 | 15 ~ PCU Compressor Motor - Inspect earth bonding: Earthing straps, fastenings, Continuity Tester. | Mon 21-Aug 14:55 ~ 15:05 | Staco 1 | On Board | ShowEditDestroy |
680M01 | 16 ~ PCU SW Pump Motor - Inspect earth bonding: Earthing straps, fastenings, Continuity tester. | Mon 21-Aug 15:05 ~ 15:10 | Staco 1 | Classroom 2 | ShowEditDestroy |
680M01 | 17 ~ PCU Control Panel - Inspect earth bonding: Earthing straps, fastenings, Continuity Tester. | Mon 21-Aug 15:10 ~ 15:15 | Staco 1 | Classroom 1 | ShowEditDestroy |
680M01 | 18 ~ On Board Familiarisation | Mon 21-Aug 15:30 ~ 17:30 | Staco 1 | On Board | ShowEditDestroy |
691S01 ~ Fin Stabilizer |
Group 1 |
691S01 | 1 ~ Fin Stabilizer - Examine the general conditions, and system functional prior to performing the task. | Mon 19-Jun 08:30 ~ 09:00 | Kongsberg 1 | Classroom 1 | ShowEditDestroy |
691S01 | 2 ~ Fin Stabilizer - Check Fluid Levels are in acceptable limits and utilise correct grade of fluids. | Mon 19-Jun 09:00 ~ 09:30 | Kongsberg 1 | Classroom 1 | ShowEditDestroy |
691S01 | 3 ~ Fin Stabilizer - Perform Lubricating Oil Test using test kit and hydraulic fluids crackle and cleanliness test. | Mon 19-Jun 09:30 ~ 10:00 | Kongsberg 1 | Classroom 1 | ShowEditDestroy |
691S01 | 4 ~ Fin Stabilizer - Inspect Fins Stabiliser System operation and functions. | Mon 19-Jun 10:00 ~ 10:30 | Kongsberg 1 | Classroom 1 | ShowEditDestroy |
691S01 | 5 ~ Fin Stabilizer - Perform Functional test and operation using of manual hand pump for maintenance and emergency. | Mon 19-Jun 14:00 ~ 14:30 | Kongsberg 1 | On Board | ShowEditDestroy |
691S01 | 6 ~ Fin Stabilizer - Visual check and Inspections of the electrical components of Steering Gear HPU motor and controller. | Mon 19-Jun 11:00 ~ 12:00 | Kongsberg 1 | Classroom 1 | ShowEditDestroy |
691S01 | 7 ~ Fin Stabilizer - Visual inspection on Control valves and instruments for sign of defects and abnormalities. | Mon 19-Jun 12:00 ~ 12:30 | Kongsberg 1 | Classroom 1 | ShowEditDestroy |
691S01 | 8 ~ Fin Stabilizer - Obtain Lubricating Oil Sample for analysis and diagnostic - for CBM. | Mon 19-Jun 12:30 ~ 13:00 | Kongsberg 1 | Classroom 1 | ShowEditDestroy |
691S01 | 9 ~ Fin Stabilizer - Safety and Handling - Observe safety precaution and practices, handling of hazardous materials when performing the work. | Mon 19-Jun 14:30 ~ 15:00 | Kongsberg 1 | On Board | ShowEditDestroy |
691S01 | 10 ~ Fin Stabilizer - Practical Site Survey and Inspection on the System and Components onboard. | Mon 19-Jun 16:00 ~ 17:30 | Kongsberg 1 | On Board | ShowEditDestroy |
710M01 ~ SOLAS Equipment in DGPS |
Group 2 |
710M01 | 1 ~ Examine the general physical conditions of the system/Equipment and Principle of operation prior to perform any task. | Wed 12-Jul 14:20 ~ 15:20 | Sinor Marine Technologies 1 | On Board | ShowEditDestroy |
710M01 | 2 ~ SOLAS Equipment in DGPS - Perform Daily Checks including Start up, running and shutdown procedures. | Wed 12-Jul 08:30 ~ 08:50 | Sinor Marine Technologies 1 | Classroom 2 | ShowEditDestroy |
710M01 | 3 ~ Above Deck Equipment Antennas: - Visual inspection for any signs of salt deposit, dirt and water. Clean and preserve. | Wed 12-Jul 08:50 ~ 09:10 | Sinor Marine Technologies 1 | Classroom 2 | ShowEditDestroy |
710M01 | 4 ~ Check operation from Remote (ICS and INS Network) and Local Positions. | Wed 12-Jul 09:10 ~ 09:30 | Sinor Marine Technologies 1 | Classroom 2 | ShowEditDestroy |
710M01 | 5 ~ Connectors: Check that connectors on the rear panel are firmly tightened and free of rust. | Wed 12-Jul 09:30 ~ 09:50 | Sinor Marine Technologies 1 | Classroom 2 | ShowEditDestroy |
710M01 | 6 ~ Earth bonding Straps - Check that the ground system is free of rust and the ground wire is tightly fastened. | Wed 12-Jul 09:50 ~ 10:20 | Sinor Marine Technologies 1 | Classroom 2 | ShowEditDestroy |
710M01 | 7 ~ Check that battery voltage is sufficient and fully charged and terminal are clean and free from rust. | Wed 12-Jul 10:20 ~ 10:40 | Sinor Marine Technologies 1 | Classroom 2 | ShowEditDestroy |
710M01 | 8 ~ Antenna Unit - Keep all electrical connections and mechanical fastenings tight according to right torque, and the fastenings are dry, clean and rust free. | Wed 12-Jul 11:00 ~ 11:30 | Sinor Marine Technologies 1 | Classroom 2 | ShowEditDestroy |
710M01 | 9 ~ Antenna Unit - Perform cleaning and remove dust, dirt and rust with detergent, do not use chemical cleaner or solvent. | Wed 12-Jul 11:30 ~ 11:50 | Sinor Marine Technologies 1 | Classroom 2 | ShowEditDestroy |
710M01 | 10 ~ LCD Display - Clean and wipe the LCD display with soft cloth to remove dirt salt deposit. | Wed 12-Jul 11:50 ~ 12:10 | Sinor Marine Technologies 1 | Classroom 2 | ShowEditDestroy |
710M01 | 11 ~ LCD ambient temperature and humidity - Maintain cooling and ventilation for ambient temperature and humidity. | Wed 12-Jul 12:10 ~ 12:30 | Sinor Marine Technologies 1 | Classroom 2 | ShowEditDestroy |
710M01 | 12 ~ Protective Device - Fuse is to protect over voltage and short circuit current and may be replaced with specified rating and size. | Wed 12-Jul 12:30 ~ 12:50 | Sinor Marine Technologies 1 | Classroom 2 | ShowEditDestroy |
710M01 | 13 ~ Self check and BITE - Check the ROM, RAM, input /output data, GPS Core, Beacon, Keyboard and LCD performance. | Wed 12-Jul 12:10 ~ 12:30 | Sinor Marine Technologies 1 | Classroom 2 | ShowEditDestroy |
710M01 | 14 ~ Inspect and test the equipment at sufficient intervals to make sure that the equipment is in operating condition. | Wed 12-Jul 14:00 ~ 14:20 | Sinor Marine Technologies 1 | Classroom 2 | ShowEditDestroy |
710M01 | 15 ~ Perform Practical Site Survey and inspection of the system and components onboard. | Wed 12-Jul 16:00 ~ 17:00 | Sinor Marine Technologies 1 | On Board | ShowEditDestroy |
734S01 ~ Computer Support System |
Group 1 |
734S01 | 1 ~ Daily users check: ILS modules and configurations, Password and Data entry. | Thu 15-Jun 08:30 ~ 09:50 | Enigma 1 | Classroom 1 | ShowEditDestroy |
734S01 | 2 ~ Data Cleansing. | Thu 15-Jun 09:50 ~ 10:10 | Enigma 1 | Classroom 1 | ShowEditDestroy |
734S01 | 3 ~ Clean and Inspect: Monitor, keyboard, server, UPS, power plugs. | Thu 15-Jun 10:10 ~ 10:25 | Enigma 1 | Classroom 1 | ShowEditDestroy |
734S01 | 4 ~ Types of templates, Data Generation, Data Analysis. | Thu 15-Jun 11:00 ~ 11:40 | Enigma 1 | Classroom 1 | ShowEditDestroy |
734S01 | 5 ~ Clean, inspect and check insulation: Insulation properties, Set up Insulation testing, Insulation tester. | Thu 15-Jun 11:40 ~ 11:50 | Enigma 1 | Classroom 1 | ShowEditDestroy |
734S01 | 6 ~ On Board Familiarisation | Thu 15-Jun 14:00 ~ 15:00 | Enigma 1 | On Board | ShowEditDestroy |
745M01 ~ Machinery Control and Propulsion Control Systems |
Group 2 |
745M01 | 1 ~ MC & PCS - Examine the general conditions, and system functional prior to performing any task. | Wed 21-Jun 15:50 ~ 16:20 | Caterpillar 1 | Classroom 1 | ShowEditDestroy |
745M01 | 2 ~ Machinery Control and Propulsion Control Systems (MC & PCS): Check condition and functionality of Display Panel and Indicating Lights including LED. | Wed 21-Jun 16:20 ~ 16:50 | Caterpillar 1 | Classroom 1 | ShowEditDestroy |
745M01 | 3 ~ MC & PCS - Check condition of Electronic devices and LRUs. | Wed 21-Jun 16:50 ~ 17:20 | Caterpillar 1 | Classroom 1 | ShowEditDestroy |
745M01 | 4 ~ MC & PCS - Check cooling or ventilation fan operation and no obstruction of air flow. | Thu 22-Jun 09:30 ~ 10:00 | Caterpillar 1 | Classroom 1 | ShowEditDestroy |
745M01 | 5 ~ MC & PCS - Check sensing, audible and visual devices fitted and installed in the alarm, safety, and warning systems. | Thu 22-Jun 10:00 ~ 10:30 | Caterpillar 1 | Classroom 1 | ShowEditDestroy |
745M01 | 6 ~ MC & PCS - Clean external and Internal surfaces of console free from dirt, moisture and sign of corrosion for the console cabinet. | Thu 22-Jun 10:45 ~ 11:15 | Caterpillar 1 | Classroom 1 | ShowEditDestroy |
745M01 | 7 ~ MC & PCS - Check input main and back-up power supply. Inspect terminal blocks,circuit breakers and protective devices. | Thu 22-Jun 11:15 ~ 11:45 | Caterpillar 1 | Classroom 1 | ShowEditDestroy |
745M01 | 8 ~ MC & PCS - Clean panel free from dust, dirt and corrosion. Perform cleanliness and preservation as necessary. | Thu 22-Jun 11:45 ~ 12:15 | Caterpillar 1 | Classroom 1 | ShowEditDestroy |
745M01 | 9 ~ MC & PCS - Inspect cable installation for loose connections and clean cable bundles free from dirt, duct and moisture. | Thu 22-Jun 13:45 ~ 14:15 | Caterpillar 1 | Classroom 1 | ShowEditDestroy |
745M01 | 10 ~ MC & PCS - Check earth grounding straps for continuity and tightness. | Thu 22-Jun 12:15 ~ 12:45 | Caterpillar 1 | Classroom 1 | ShowEditDestroy |
745M01 | 11 ~ PC-PCS Safety and Handling - Observe Pre checks, safety procedures and practices, handling of hazardous materials when performing the work before, during and after performing the task. | Thu 22-Jun 14:15 ~ 14:45 | Caterpillar 1 | Classroom 1 | ShowEditDestroy |
745M01 | 12 ~ MC-PCS - Practical Site Survey and inspection on the system and components onboard. | Thu 22-Jun 15:00 ~ 17:00 | Caterpillar 1 | On Board | ShowEditDestroy |
745S01 ~ Machinery Control and Propulsion Control Systems |
Group 1 |
745S01 | 1 ~ Machinery Control (MC) and Propulsion Control Systems (PCS): MC & PCS - Examine the general conditions, and system functional prior to performing any task. | Mon 17-Jul 08:30 ~ 09:00 | Caterpillar System | Classroom 1 | ShowEditDestroy |
745S01 | 2 ~ Machinery Control and Propulsion Control Systems (MC & PCS) - Check condition and functionality of Display Panel and Indicating Lights including LED. | Mon 17-Jul 09:00 ~ 09:30 | Caterpillar System | Classroom 1 | ShowEditDestroy |
745S01 | 3 ~ AMS workstations - Check fan and ventilation cooling operation. | Mon 17-Jul 09:30 ~ 10:00 | Caterpillar System | Classroom 1 | ShowEditDestroy |
745S01 | 4 ~ AMS workstations configuration - Visually inspect the consoles. | Mon 17-Jul 10:00 ~ 10:30 | Caterpillar System | Classroom 1 | ShowEditDestroy |
745S01 | 5 ~ AMS workstations: Check Earth Grounding strap to the Hull structures | Mon 17-Jul 11:00 ~ 11:30 | Caterpillar System | Classroom 1 | ShowEditDestroy |
745S01 | 6 ~ AMS workstations - Run AMS system self checks or BITE. | Mon 17-Jul 11:30 ~ 12:00 | Caterpillar System | Classroom 1 | ShowEditDestroy |
745S01 | 7 ~ AMS Local operation panel (LOP): Check Power Supply AC & DC to the AMS | Mon 17-Jul 12:00 ~ 12:30 | Caterpillar System | Classroom 1 | ShowEditDestroy |
745S01 | 8 ~ AMS workstations - Inspect terminal blocks and Inspect circuit breakers MCB & MCCP or sign of corrosion and cleanliness and dust free. | Mon 17-Jul 12:30 ~ 13:00 | Caterpillar System | Classroom 1 | ShowEditDestroy |
745S01 | 9 ~ AMS Local operation panel (LOP) - Check fan / cooling operation and air flow. | Mon 17-Jul 14:00 ~ 14:30 | Caterpillar System | Classroom 1 | ShowEditDestroy |
745S01 | 10 ~ MC-PCS Safety and Handling - Observe Pre checks, safety procedures and practices, handling of hazardous materials when performing the work before, during and after performing the task. | Mon 17-Jul 14:30 ~ 15:00 | Caterpillar System | Classroom 1 | ShowEditDestroy |
800S01 ~ Communication System |
Group 1 |
800S01 | 1 ~ Examine the general conditions and of SAAB Integrated Communication System (ICS) - TactiCall system networks functional status prior to perform the tasks ( Physical and dynamic). | Tue 27-Jun 08:30 ~ 09:00 | Morten Jepsen | Classroom 1 | ShowEditDestroy |
800S01 | 2 ~ Functional check of the overall External Communication system networks and sub-system. | Tue 27-Jun 09:00 ~ 09:30 | Morten Jepsen | Classroom 1 | ShowEditDestroy |
800S01 | 3 ~ HF Radio System - Functional check of the from Local (Communication Room) and various remote positions. | Tue 27-Jun 09:30 ~ 10:00 | Morten Jepsen | Classroom 1 | ShowEditDestroy |
800S01 | 4 ~ Fleet Broadband FFB - Functional check both Local (Communication Room) and various remote positions. | Tue 27-Jun 10:00 ~ 10:30 | Morten Jepsen | Classroom 1 | ShowEditDestroy |
800S01 | 5 ~ V/UHF Radio System - Functional check of the from Local (Communication Room) and various remote positions. | Tue 27-Jun 11:00 ~ 11:30 | Morten Jepsen | Classroom 1 | ShowEditDestroy |
800S01 | 6 ~ V/HF Radio System - Perform Routine test with BITE (Built In Test Equipment) without radiating signals in Transmitter TX, Receiver, Power and Antennas modules accordance with relevant IMO circulars. | Tue 27-Jun 11:30 ~ 12:00 | Morten Jepsen | Classroom 1 | ShowEditDestroy |
800S01 | 7 ~ HF Transceiver System - Perform Weekly routine check on The Antenna Tuning Unit. | Tue 27-Jun 12:00 ~ 12:30 | Morten Jepsen | On Board | ShowEditDestroy |
800S01 | 8 ~ MF/HF radio’s display - GPS is connected, check the position and time in the MF/HF radio’s display. | Tue 27-Jun 12:30 ~ 13:00 | Morten Jepsen | Classroom 1 | ShowEditDestroy |
800S01 | 9 ~ MF/HF DSC Live test call with a Maritime Communications Station Send a DSC call to the appropriate coast station. The acknowledgement from the coast station is received by the 2187.5 kHz watch receiver if the call was sent on that frequency. If the call is sent on HF only the audio signal output from the 2187.5 kHz watch receiver should be checked. | Tue 27-Jun 14:00 ~ 14:30 | Morten Jepsen | Classroom 1 | ShowEditDestroy |
800S01 | 10 ~ DSC routine testing - Check the DSC function regularly. Verify the complete DSC installation, with antennas, by transmitting a Safety Test call to another station (coast or ship). The test call is generated using the DSC call flow via menu. | Tue 27-Jun 14:30 ~ 15:00 | Morten Jepsen | Classroom 1 | ShowEditDestroy |
800S01 | 11 ~ Internal Communication - Intercom: Visual Check the terminal and display. Free from dirt and dust. | Tue 27-Jun 15:00 ~ 15:30 | Morten Jepsen | Classroom 1 | ShowEditDestroy |
800S01 | 12 ~ Internal Communication Intercom - User level system Check for functionality. | Tue 27-Jun 16:00 ~ 16:30 | Morten Jepsen | Classroom 1 | ShowEditDestroy |
800S01 | 13 ~ Internal Communication - Public Address system: Visual Check and Cleaning of Units. | Tue 27-Jun 16:30 ~ 17:00 | Morten Jepsen | Classroom 1 | ShowEditDestroy |
800S01 | 14 ~ Internal Communication - Public Address system (PAGA - Visual Check, Inspect earth bonding Units and clean as necessary. | Wed 28-Jun 08:30 ~ 09:00 | Morten Jepsen | On Board | ShowEditDestroy |
800S01 | 15 ~ Internal Communication - Public Address system:- Inspect earth bondingand straps, fasterners tightness and corrosion free. | Wed 28-Jun 09:00 ~ 09:30 | Morten Jepsen | Classroom 1 | ShowEditDestroy |
800S01 | 16 ~ Internal Communication - Wireless VHF Communication: Check the system visually and check correct function of charger unit. | Wed 28-Jun 09:30 ~ 10:00 | Morten Jepsen | Classroom 1 | ShowEditDestroy |
800S01 | 17 ~ Internal Communication - Wireless VHF Communication: Visual Check RBS Panel and clean as necessary. | Wed 28-Jun 10:00 ~ 10:30 | Morten Jepsen | Classroom 1 | ShowEditDestroy |
800S01 | 18 ~ Internal Communication - Wireless VHF Communication: Check Earth bonding at RBS. | Wed 28-Jun 11:00 ~ 11:30 | Morten Jepsen | Classroom 1 | ShowEditDestroy |
800S01 | 19 ~ Internal Communication - Internal telephone system: Visually Check control panel / Front panel free from dirt and moisture and corrosion. | Wed 28-Jun 11:30 ~ 12:00 | Morten Jepsen | Classroom 1 | ShowEditDestroy |
800S01 | 20 ~ Internal Communication - Internal telephone system - Visual Check for loose connection and free from dirt. | Wed 28-Jun 12:00 ~ 12:30 | Morten Jepsen | Classroom 1 | ShowEditDestroy |
800S01 | 21 ~ Internal Communication - CCTV system: Visual Check and free from dust and ingress of water. | Wed 28-Jun 12:30 ~ 13:00 | Morten Jepsen | Classroom 1 | ShowEditDestroy |
800S01 | 22 ~ Internal Communication - CCTV system: Check earth bonding and cable gland. | Wed 28-Jun 14:00 ~ 14:30 | Morten Jepsen | Classroom 1 | ShowEditDestroy |
800S01 | 23 ~ Internal Communication - Sound Powered Telephone: Check the installation completeness and functional check. | Wed 28-Jun 14:30 ~ 15:00 | Morten Jepsen | Classroom 1 | ShowEditDestroy |
800S01 | 24 ~ Internal Communication - Sound Powered Telephone: Check earth bonding and cable gland watertightness integrity. | Wed 28-Jun 15:00 ~ 15:30 | Morten Jepsen | Classroom 1 | ShowEditDestroy |
800S01 | 25 ~ Internal Communication - Homing Beacon: Visual inspection and clean and inspect externally. | Wed 28-Jun 16:30 ~ 17:00 | Morten Jepsen | Classroom 1 | ShowEditDestroy |
800S01 | 26 ~ Internal Communication - Flight Deck Communication Station: Visual inspect and clean wireless station. From ingress of dust and moisture. | Tue 25-Jul 09:15 ~ 09:45 | Morten Jepsen | Classroom 1 | ShowEditDestroy |
800S01 | 27 ~ Internal Communication - Flight Deck Communication Station - Carry out self check of BITE on station control panel and portable sets. | Tue 25-Jul 09:45 ~ 10:15 | Morten Jepsen | Classroom 1 | ShowEditDestroy |
800S01 | 28 ~ External and Internal Communication system networks: Visual check the exposed surface hardware and panel for signs of damage,loose connections and free from dust and moisture. | Tue 25-Jul 10:30 ~ 11:00 | Morten Jepsen | Classroom 1 | ShowEditDestroy |
800S01 | 29 ~ System BITE Failures and corrective actions: Using Self check and BITE (Built In Test Equipment) the transmitter or the receiver units able to detects a failure, the Alarm and Alert LED on the front panel. | Tue 25-Jul 11:00 ~ 11:30 | Morten Jepsen | Classroom 1 | ShowEditDestroy |
800S01 | 30 ~ System Power Supply - Check and examine power supply input and connections for the network are in good order including Power Back-Up system. | Tue 25-Jul 11:30 ~ 12:00 | Morten Jepsen | Classroom 1 | ShowEditDestroy |
800S01 | 31 ~ Communication System which is an Integrated Communication System (ICS) consists of External Communication system and Internal Communication System Networks. | Tue 25-Jul 12:00 ~ 12:30 | Morten Jepsen | Classroom 1 | ShowEditDestroy |
800S01 | 32 ~ Power supplies: Check Circuit breakers and fuses of in DB panel for correct operation. | Tue 25-Jul 12:30 ~ 13:00 | Morten Jepsen | Classroom 1 | ShowEditDestroy |
800S01 | 33 ~ Power supplies - Check Circuit breakers and fuses of in DB panel for correct operation and fault free. | Tue 25-Jul 13:00 ~ 13:30 | Morten Jepsen | Classroom 1 | ShowEditDestroy |
800S01 | 34 ~ External and Internal Communication System Components - Check Earth bonding straps and connections to ship structure are intact and free from dust and corrosion. | Tue 25-Jul 14:30 ~ 15:00 | Morten Jepsen | On Board | ShowEditDestroy |
800S01 | 35 ~ Antennas and coupling unit - Visual check Antenna Units free from obstruction and moisture and salt deposit and corrosion. | Tue 25-Jul 15:00 ~ 15:30 | Morten Jepsen | Classroom 1 | ShowEditDestroy |
800S01 | 36 ~ Practical Site survey and inspection on the ICS ( External & Internal Comm. Networks System and components onboard. | Tue 25-Jul 15:30 ~ 18:30 | Morten Jepsen | On Board | ShowEditDestroy |
810M01 ~ Navigation Light |
Group 2 |
810M01 | 1 ~ Navigation Light - Daily User functional check. | Mon 07-Aug 09:15 ~ 09:35 | Damen 1 | On Board | ShowEditDestroy |
810M01 | 2 ~ Navigation Light - Check and test BITE functionalities. | Mon 07-Aug 09:35 ~ 10:05 | Damen 1 | On Board | ShowEditDestroy |
810M01 | 3 ~ Navigation Light - Visual inspection of the control panel free from dust and dirt. | Mon 07-Aug 10:05 ~ 10:25 | Damen 1 | On Board | ShowEditDestroy |
810M01 | 4 ~ Navigation Light - Clean and inspect the navigation light fitting. | Mon 07-Aug 10:40 ~ 11:00 | Damen 1 | On Board | ShowEditDestroy |
810M01 | 5 ~ Navigation Light - Control Panel, Navigation and Signal Light System Check. | Mon 07-Aug 11:00 ~ 11:20 | Damen 1 | On Board | ShowEditDestroy |
810M01 | 6 ~ Navigation Light - Clean, inspect and check insulation Control Panel. | Mon 07-Aug 11:20 ~ 11:40 | Damen 1 | On Board | ShowEditDestroy |
810M01 | 7 ~ Searchlight system - Visual and functional check. | Mon 07-Aug 11:40 ~ 12:00 | Damen 1 | On Board | ShowEditDestroy |
810M01 | 8 ~ Searchlight system - Check the cable connection fittings and continuity and insulation. | Mon 07-Aug 12:00 ~ 12:20 | Damen 1 | On Board | ShowEditDestroy |
810M01 | 9 ~ Acoustical signalling equipment - Visual and functional check. | Mon 07-Aug 12:20 ~ 12:40 | Damen 1 | On Board | ShowEditDestroy |
810M01 | 10 ~ Acoustical signalling equipment - Clean and inspect the devices for its correct operation. | Mon 07-Aug 12:40 ~ 13:00 | Damen 1 | On Board | ShowEditDestroy |
821S01 ~ Navigation System. |
Group 1 |
821S01 | 1 ~ Perform Site Survey and to familiarise with the overall system layout examine general conditions including to be acquinted system operating instruction prior to perform the task. | Mon 10-Jul 14:00 ~ 15:30 | Sinor Marine Technologies 1 | On Board | ShowEditDestroy |
821S01 | 2 ~ Integrated navigation system - Visual Check on loose connection on workstations and interfacing units. | Mon 10-Jul 16:00 ~ 16:20 | Sinor Marine Technologies 1 | On Board | ShowEditDestroy |
821S01 | 3 ~ Integrated navigation system - Visual check on control panel - terminal block. | Mon 10-Jul 16:20 ~ 16:40 | Sinor Marine Technologies 1 | On Board | ShowEditDestroy |
821S01 | 4 ~ Integrated navigation system - All electrical connections and mechanical fastenings tight according to right torque and the fastenings are dry, clean and rust free. | Mon 10-Jul 16:40 ~ 17:00 | Sinor Marine Technologies 1 | On Board | ShowEditDestroy |
821S01 | 5 ~ Integrated navigation system - IBS System check at User Level with BITE facilities. | Mon 10-Jul 17:00 ~ 17:30 | Sinor Marine Technologies 1 | On Board | ShowEditDestroy |
821S01 | 6 ~ Keep equipment and console panels are clean and dry free from dirt, salt deposit, and corrosion. | Mon 10-Jul 08:30 ~ 08:50 | Sinor Marine Technologies 1 | Classroom 1 | ShowEditDestroy |
821S01 | 7 ~ Power Supply - Check the condition of power supplies input AC and DC supplies quality are available and connected to the IBS system. | Mon 10-Jul 08:50 ~ 09:10 | Sinor Marine Technologies 1 | Classroom 1 | ShowEditDestroy |
821S01 | 8 ~ IBS - Inspect and test the system and equipment at sufficient intervals to make sure that the equipment is in operating conditions. | Mon 10-Jul 09:10 ~ 09:40 | Sinor Marine Technologies 1 | Classroom 1 | ShowEditDestroy |
821S01 | 9 ~ Keep earthing straps connections and mechanical fastenings tight according to right torque. Measure the insulation and continuity. | Mon 10-Jul 09:40 ~ 10:10 | Sinor Marine Technologies 1 | Classroom 1 | ShowEditDestroy |
821S01 | 10 ~ IBS - Check and examine the IBS components and peripherals connectivity/ interface between IBS to other sub- system are functioning seamlessly. | Mon 10-Jul 10:10 ~ 10:40 | Sinor Marine Technologies 1 | Classroom 1 | ShowEditDestroy |
821S01 | 11 ~ IBS - Check and examine the Power Back supply AC and DC thourg back-up battery bank and UPS are in good working order. | Mon 10-Jul 11:00 ~ 11:30 | Sinor Marine Technologies 1 | Classroom 1 | ShowEditDestroy |
821S01 | 12 ~ IBS - Practical Site Survey and Inspection on the System and Components onboard. | Mon 10-Jul 14:00 ~ 16:00 | Sinor Marine Technologies 1 | On Board | ShowEditDestroy |
822M01 ~ Navigation Radar |
Group 4 |
822M01 | 1 ~ Perform Site Survey to familirise with the overall system layout and examine general conditions, initiation of the standard operating instruction prior to perform the task. | Tue 11-Jul 14:00 ~ 15:00 | Sinor Marine Technologies 1 | On Board | ShowEditDestroy |
822M01 | 2 ~ Navigation Radar - Functional checks and run Self Test or BITE to monitor starting , running and shutting down. | Tue 11-Jul 08:30 ~ 09:00 | Sinor Marine Technologies 1 | Classroom 4 | ShowEditDestroy |
822M01 | 3 ~ Navigation Radar - Antenna Gearbox-Inspect V-Belt. | Tue 11-Jul 15:00 ~ 15:15 | Sinor Marine Technologies 1 | On Board | ShowEditDestroy |
822M01 | 4 ~ Visual check for any sign of dirt and corrosion. | Tue 11-Jul 09:00 ~ 09:15 | Sinor Marine Technologies 1 | Classroom 4 | ShowEditDestroy |
822M01 | 5 ~ Navigation Radar - Visual check Antenna Gearbox or drive unit for sign of corrosion and dirt. Clean if necessary. | Tue 11-Jul 15:15 ~ 15:30 | Sinor Marine Technologies 1 | On Board | ShowEditDestroy |
822M01 | 6 ~ Clean and inspect consoles from dirt and dust. | Tue 11-Jul 16:00 ~ 16:15 | Sinor Marine Technologies 1 | On Board | ShowEditDestroy |
822M01 | 7 ~ Navigation Radar - Check and clean Earth bonding straps tightness and free from dirt and corrosion and measure Earth Bonding Continuity within tolerance. | Tue 11-Jul 09:15 ~ 09:35 | Sinor Marine Technologies 1 | Classroom 4 | ShowEditDestroy |
822M01 | 8 ~ Ground Terminal on Display unit - Check for tight connections. | Tue 11-Jul 09:35 ~ 09:55 | Sinor Marine Technologies 1 | Classroom 4 | ShowEditDestroy |
822M01 | 9 ~ LCD - Remove dust, dirt and salt deposit from LCD display. | Tue 11-Jul 09:55 ~ 10:15 | Sinor Marine Technologies 1 | Classroom 4 | ShowEditDestroy |
822M01 | 10 ~ Keep all electrical connections and mechanical fastenings tight according to right torque. and the fastenings are dry, clean and rust free. | Tue 11-Jul 10:15 ~ 10:35 | Sinor Marine Technologies 1 | Classroom 4 | ShowEditDestroy |
822M01 | 11 ~ Radar power switching On/Off from control unit or remote through BS station. | Tue 11-Jul 11:00 ~ 11:20 | Sinor Marine Technologies 1 | Classroom 4 | ShowEditDestroy |
822M01 | 12 ~ Power Supply and Services - Check power services are available before start the operation. | Tue 11-Jul 11:20 ~ 11:35 | Sinor Marine Technologies 1 | Classroom 4 | ShowEditDestroy |
822M01 | 13 ~ Processor Unit - Inspect and clean the external unit free from dirt, dust and rust. | Tue 11-Jul 11:35 ~ 11:50 | Sinor Marine Technologies 1 | Classroom 4 | ShowEditDestroy |
822M01 | 14 ~ Processor Unit - Check and examine Terminal Strips, sockets, earth terminals on processor unit for loose connection and proper seating of the plug. | Tue 11-Jul 16:15 ~ 16:30 | Sinor Marine Technologies 1 | On Board | ShowEditDestroy |
822M01 | 15 ~ Antenna Unit - Check the exposed nuts and bolts corroded and loose connection. Tighten and preserved accordingly. | Tue 11-Jul 11:50 ~ 12:05 | Sinor Marine Technologies 1 | Classroom 4 | ShowEditDestroy |
822M01 | 16 ~ Antenna Radiator - Check for dirt and cracks on the radiator surface clean and repair as necessary. | Tue 11-Jul 16:30 ~ 16:50 | Sinor Marine Technologies 1 | On Board | ShowEditDestroy |
822M01 | 17 ~ Antenna Unit - Keep all electrical connections and mechanical fastenings tight according to right torque, and the fastenings are dry, clean and rust free. | Tue 11-Jul 12:05 ~ 12:20 | Sinor Marine Technologies 1 | Classroom 4 | ShowEditDestroy |
822M01 | 18 ~ Perform Practical Site Survey and inspection of the system and components onboard. | Tue 11-Jul 16:50 ~ 17:50 | Sinor Marine Technologies 1 | Classroom 4 | ShowEditDestroy |
822M01 | 96 ~ 18 .Antenna Radiator - Check for dirt and cracks on the radiator surface clean and repair as necessary. | Mon 19-Jun 15:15 ~ 15:35 | Sinor Marine Technologies 1 | Classroom 4 | ShowEditDestroy |
824M01 ~ DGPS |
Group 4 |
824M01 | 1 ~ Examine the general physical conditions of the system/Equipment and Principle of operation prior to perform any task. | Tue 20-Jun 09:30 ~ 10:30 | Sinor Marine Technologies 1 | On Board | ShowEditDestroy |
824M01 | 2 ~ Perform daily checks including Start up, running and shutdown procedures. | Tue 20-Jun 10:45 ~ 11:15 | Sinor Marine Technologies 1 | Classroom 4 | ShowEditDestroy |
824M01 | 3 ~ Antennas - Check, Inspection and clean and preserve. | Tue 20-Jun 15:55 ~ 16:15 | Sinor Marine Technologies 1 | On Board | ShowEditDestroy |
824M01 | 4 ~ Clean and inspect panel from dirt and dust. | Tue 20-Jun 11:15 ~ 11:45 | Sinor Marine Technologies 1 | Classroom 4 | ShowEditDestroy |
824M01 | 5 ~ Battery System Inspect and replace backup battery should the battery capacity falls below limits. | Tue 20-Jun 11:45 ~ 12:15 | Sinor Marine Technologies 1 | Classroom 4 | ShowEditDestroy |
824M01 | 6 ~ Above Deck Equipment Antennas - Visual inspection for any signs of salt deposit, dirt and water. clean and preserve. | Tue 20-Jun 12:15 ~ 12:30 | Sinor Marine Technologies 1 | Classroom 4 | ShowEditDestroy |
824M01 | 7 ~ Check operation from Remote (ICS and INS Network) and Local Positions. | Tue 20-Jun 13:35 ~ 13:55 | Sinor Marine Technologies 1 | Classroom 4 | ShowEditDestroy |
824M01 | 8 ~ Connectors - Check that connectors on the rear panel are firmly tightened and free of rust. | Tue 20-Jun 13:55 ~ 14:10 | Sinor Marine Technologies 1 | Classroom 4 | ShowEditDestroy |
824M01 | 9 ~ Earth bonding Straps - Check that the ground system is free of rust and the ground wire is tightly fastened. | Tue 20-Jun 16:15 ~ 16:30 | Sinor Marine Technologies 1 | On Board | ShowEditDestroy |
824M01 | 10 ~ Check that battery voltage is sufficient and fully charged and terminal are clean and free from rust. | Tue 20-Jun 14:10 ~ 14:40 | Sinor Marine Technologies 1 | Classroom 4 | ShowEditDestroy |
824M01 | 11 ~ Antenna Unit - Keep all electrical connections and mechanical fastenings tight according to right torque, and the fastenings are dry, clean and rust free. | Tue 20-Jun 14:40 ~ 14:55 | Sinor Marine Technologies 1 | Classroom 4 | ShowEditDestroy |
824M01 | 12 ~ Antenna Unit - Perform cleaning and remove dust, dirt and rust with detergent, do not use chemical cleaner or solvent. | Tue 20-Jun 16:30 ~ 16:50 | Sinor Marine Technologies 1 | On Board | ShowEditDestroy |
824M01 | 13 ~ LCD ambient temperature and humidity - Maintain cooling and ventilation for ambient temperature and humidity. | Tue 20-Jun 14:55 ~ 15:10 | Sinor Marine Technologies 1 | Classroom 4 | ShowEditDestroy |
824M01 | 14 ~ LCD Display - Clean and wipe the LCD display with soft cloth to remove dirt salt deposit. | Tue 20-Jun 15:10 ~ 15:25 | Sinor Marine Technologies 1 | Classroom 4 | ShowEditDestroy |
824M01 | 15 ~ Protective Device - Fuse is to protect over voltage and short circuit current and may be replaced with specified rating and size. | Tue 20-Jun 15:25 ~ 15:40 | Sinor Marine Technologies 1 | Classroom 4 | ShowEditDestroy |
824M01 | 16 ~ Self check and BITE - Check the ROM, RAM, input /output data, GPS Core, Beacon, Keyboard and LCD performance. | Tue 20-Jun 16:50 ~ 17:05 | Sinor Marine Technologies 1 | On Board | ShowEditDestroy |
824M01 | 17 ~ Inspect and test the equipment at sufficient intervals to make sure that the equipment is in operating condition. | Tue 20-Jun 17:05 ~ 17:20 | Sinor Marine Technologies 1 | On Board | ShowEditDestroy |
824M01 | 18 ~ Perform Practical Site Survey and inspection of the system and components onboard. | Tue 20-Jun 17:20 ~ 18:20 | Sinor Marine Technologies 1 | On Board | ShowEditDestroy |
825M01 ~ Gyros |
Group 4 |
825M01 | 1 ~ Examine the general layout conditions of Gyro Units and operation prior to perform the task. | Wed 21-Jun 09:30 ~ 10:00 | Sinor Marine Technologies 1 | Classroom 4 | ShowEditDestroy |
825M01 | 2 ~ Operator unit - functional checks free from dirt, dust and sign of corrosion including the pelorous position. | Wed 21-Jun 10:00 ~ 10:20 | Sinor Marine Technologies 1 | Classroom 4 | ShowEditDestroy |
825M01 | 3 ~ Operator unit - functional checks including starting up- running and shut-down. | Wed 21-Jun 10:20 ~ 10:40 | Sinor Marine Technologies 1 | Classroom 4 | ShowEditDestroy |
825M01 | 4 ~ Perform visual check on the Master Unit for sign of noise, vibration and failure. Clean the external unit free from dust and moisture. | Wed 21-Jun 10:55 ~ 11:25 | Sinor Marine Technologies 1 | Classroom 4 | ShowEditDestroy |
825M01 | 5 ~ Run self check and BITE at control panel and check Gyro Failure alarm. | Wed 21-Jun 11:25 ~ 11:55 | Sinor Marine Technologies 1 | Classroom 4 | ShowEditDestroy |
825M01 | 6 ~ Check the the main power supply and back up input to the Gyro Units are in good order. | Wed 21-Jun 11:55 ~ 12:10 | Sinor Marine Technologies 1 | Classroom 4 | ShowEditDestroy |
825M01 | 7 ~ Functional checks the electrical part of the Gyro repeater units and check sign of corrosion and watertight integrity. | Wed 21-Jun 12:10 ~ 12:30 | Sinor Marine Technologies 1 | Classroom 4 | ShowEditDestroy |
825M01 | 8 ~ Visual check ventilation and cooling facility maintaining ambient temperature in Gyro room in good order. | Wed 21-Jun 13:30 ~ 13:50 | Sinor Marine Technologies 1 | Classroom 4 | ShowEditDestroy |
825M01 | 9 ~ Observe safety precautions and practices cleanliness, corrosion control and preservation at all time when performing the task. | Wed 21-Jun 13:50 ~ 14:10 | Sinor Marine Technologies 1 | Classroom 4 | ShowEditDestroy |
825M01 | 10 ~ Practical Site Survey and inspection on the system and components onboard. | Wed 21-Jun 14:10 ~ 15:40 | Sinor Marine Technologies 1 | On Board | ShowEditDestroy |
828M01 ~ Echo Sounder |
Group 4 |
828M01 | 1 ~ Examine the general layout conditions and system operation prior to perform the task. | Thu 22-Jun 09:30 ~ 10:00 | Sinor Marine Technologies 1 | On Board | ShowEditDestroy |
828M01 | 2 ~ Visual Check of Echo sounder cable connections between Display unit, Transmitter/Receiver (TX/RX) are intact and are not kink. | Thu 22-Jun 10:00 ~ 10:30 | Sinor Marine Technologies 1 | On Board | ShowEditDestroy |
828M01 | 3 ~ Display Unit - Clean and remove dust, dirt, moisture on the Display Unit. | Thu 22-Jun 10:45 ~ 11:05 | Sinor Marine Technologies 1 | Classroom 4 | ShowEditDestroy |
828M01 | 4 ~ Run Self Test or BITE to monitor starting , running and shutting down. | Thu 22-Jun 13:35 ~ 14:05 | Sinor Marine Technologies 1 | On Board | ShowEditDestroy |
828M01 | 5 ~ Power Supply - Check the condition of power supplies input AC and DC supplies are available and connected to the system. | Thu 22-Jun 11:05 ~ 11:35 | Sinor Marine Technologies 1 | Classroom 4 | ShowEditDestroy |
828M01 | 6 ~ Battery - Check function of the LP of AC and DC supplies are good working order free from defect. | Thu 22-Jun 11:35 ~ 12:05 | Sinor Marine Technologies 1 | Classroom 4 | ShowEditDestroy |
828M01 | 7 ~ Observe cleanliness, corrosion control and preservation at all time when performing the task. | Thu 22-Jun 14:05 ~ 14:35 | Sinor Marine Technologies 1 | On Board | ShowEditDestroy |
828M01 | 8 ~ Replacing the Fuse. The fuse in the power cable protects the system from reverse polarity of the power supply and equipment fault. | Thu 22-Jun 12:05 ~ 12:35 | Sinor Marine Technologies 1 | Classroom 4 | ShowEditDestroy |
828M01 | 9 ~ Practical Site Survey and inspection on the system and components onboard. | Thu 22-Jun 14:35 ~ 16:05 | Sinor Marine Technologies 1 | On Board | ShowEditDestroy |
829M01 ~ Speed Log |
Group 4 |
829M01 | 1 ~ Control and Display Unit- Clean and inspect externally | Wed 21-Jun 15:55 ~ 16:10 | Sinor Marine Technologies 1 | Classroom 4 | ShowEditDestroy |
829M01 | 2 ~ Speed Log - Self test the system with BITE. | Wed 21-Jun 16:10 ~ 16:30 | Sinor Marine Technologies 1 | Classroom 4 | ShowEditDestroy |
829M01 | 3 ~ Speed Log - Clean and inspect EM Log Sensor free from corrosion and dirt. | Wed 21-Jun 16:30 ~ 16:50 | Sinor Marine Technologies 1 | Classroom 4 | ShowEditDestroy |
870S01 ~ Wind & Metererological System |
Group 1 |
870S01 | 1 ~ Barometer/hermometer/hygrometer - Examine the general conditions and system functional prior to performing the task. | Tue 27-Jun 13:15 ~ 13:45 | Damen 1 | On Board | ShowEditDestroy |
870S01 | 2 ~ Barometer/hermometer/hygrometer - Visual inspection of the unit and clean as necessary. | Tue 27-Jun 13:45 ~ 14:15 | Damen 1 | On Board | ShowEditDestroy |
870S01 | 3 ~ Barometer/hermometer/hygrometer - Check and clean the exposed part and sight glass as necessary. | Tue 27-Jun 14:15 ~ 14:45 | Damen 1 | On Board | ShowEditDestroy |
870S01 | 4 ~ Barometer/hermometer/hygrometer - Check and clean the station annually. | Tue 27-Jun 14:45 ~ 15:15 | Damen 1 | On Board | ShowEditDestroy |
870S01 | 5 ~ Barometer/hermometer/hygrometer - Visual inspection of the unit and clean as necessary. | Tue 27-Jun 15:15 ~ 15:45 | Damen 1 | On Board | ShowEditDestroy |
870S01 | 6 ~ Anemometer - Check cabling and cable support for any sign of damage and corrosion. | Tue 27-Jun 16:00 ~ 16:30 | Damen 1 | On Board | ShowEditDestroy |
870S01 | 7 ~ Anemometer - Check mounting conditions and earthing strap connection, re tighten if necessary. | Tue 27-Jun 16:30 ~ 17:00 | Damen 1 | On Board | ShowEditDestroy |
870S01 | 8 ~ Anemometer - Run self test or BITE for normal operation. | Tue 27-Jun 17:30 ~ 18:00 | Damen 1 | On Board | ShowEditDestroy |
870S01 | 9 ~ Anemometer - Check mounting for sign of corrosion and re tighten fasteners if necessary. | Tue 27-Jun 17:00 ~ 17:30 | Damen 1 | On Board | ShowEditDestroy |
870S01 | 10 ~ Weather fax - Functional check power supply connection in good working order. | Wed 28-Jun 09:30 ~ 10:00 | Damen 1 | On Board | ShowEditDestroy |
870S01 | 11 ~ Weather fax - Check above deck unit -pre- amp is clean and free form dirt and salt deposit. | Wed 28-Jun 10:00 ~ 10:30 | Damen 1 | On Board | ShowEditDestroy |
870S01 | 12 ~ Weather fax - Run system check using BITE facility or self test. | Wed 28-Jun 10:45 ~ 11:15 | Damen 1 | On Board | ShowEditDestroy |
870S01 | 13 ~ Weather fax - Ensure the cable interconnection between receiver unit, pre-amp and connection hub are correctly terminated. | Wed 28-Jun 11:15 ~ 11:45 | Damen 1 | On Board | ShowEditDestroy |
870S01 | 14 ~ Wind & Meteorological System - Practical Site Survey and inspection on the system and components onboard. | Wed 28-Jun 11:45 ~ 13:45 | Damen 1 | On Board | ShowEditDestroy |