Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah |
Mon 29-May |
08:30 ~ 09:30 | Group 2 | Classroom 2 | 000F01 | OPV 1800: Performance | 1 ~ Introduction OPV 1800. |
08:30 ~ 09:30 | Group 1 | Classroom 4 | 000F01 | OPV 1800: Performance | 1 ~ Introduction OPV 1800. |
08:30 ~ 09:30 | Group 2 | Classroom 2 | 000A00 | Non Training Items | 1 ~ Training Launch Introduction |
09:30 ~ 10:30 | Group 1 | Classroom 4 | 000F01 | OPV 1800: Performance | 2 ~ Ship's Operational Capabilities. |
09:30 ~ 10:30 | Group 2 | Classroom 2 | 000F01 | OPV 1800: Performance | 2 ~ Ship's Operational Capabilities. |
11:00 ~ 13:00 | Group 2 | Classroom 4 | 000F02 | OPV 1800: Major System & Equipment | 2 ~ The Ship's Major System and Equipments. |
11:00 ~ 13:00 | Group 1 | Classroom 4 | 000F01 | OPV 1800: Performance | 3 ~ Vessel Layout. |
11:00 ~ 13:00 | Group 2 | Classroom 2 | 000F01 | OPV 1800: Performance | 3 ~ Vessel Layout. |
11:00 ~ 13:00 | Group 1 | Classroom 4 | 000F02 | OPV 1800: Major System & Equipment | 2 ~ The Ship's Major System and Equipments. |
14:00 ~ 15:00 | Group 1 | Classroom 4 | 000F01 | OPV 1800: Performance | 6 ~ SOLAS Equipment and Fire Fighting Onboard. |
14:00 ~ 15:00 | Group 2 | Classroom 4 | 000F01 | OPV 1800: Performance | 5 ~ Emergency Station. |
14:00 ~ 15:00 | Group 2 | Classroom 4 | 000F01 | OPV 1800: Performance | 6 ~ SOLAS Equipment and Fire Fighting Onboard. |
14:00 ~ 15:00 | Group 1 | Classroom 4 | 000F01 | OPV 1800: Performance | 5 ~ Emergency Station. |
16:00 ~ 17:00 | Group 1 | Classroom 4 | 000F02 | OPV 1800: Major System & Equipment | 1 ~ Safety Systems and Lifesaving Equipment. |
16:00 ~ 17:00 | Group 2 | Classroom 4 | 000F02 | OPV 1800: Major System & Equipment | 1 ~ Safety Systems and Lifesaving Equipment. |
Tue 30-May |
11:00 ~ 12:00 | Group 2 | Classroom 4 | 000F02 | OPV 1800: Major System & Equipment | 3 ~ The Ship's Auxiliary System. |
11:00 ~ 12:00 | Group 1 | Classroom 4 | 000F02 | OPV 1800: Major System & Equipment | 3 ~ The Ship's Auxiliary System. |
14:00 ~ 15:00 | Group 2 | Classroom 4 | 000F02 | OPV 1800: Major System & Equipment | 4 ~ Deck Machineries. |
14:00 ~ 15:00 | Group 1 | Classroom 4 | 000F02 | OPV 1800: Major System & Equipment | 4 ~ Deck Machineries. |
14:00 ~ 15:00 | Group 1 | Classroom 4 | 000F01 | OPV 1800: Performance | 4 ~ Deck Arrangements. |
14:00 ~ 15:00 | Group 2 | Classroom 2 | 000F01 | OPV 1800: Performance | 4 ~ Deck Arrangements. |
15:00 ~ 15:30 | Group 1 | Classroom 4 | 110F01 | Sub-system of Hull Structure - 164 ICAF | 3 ~ ICAF - Check the condition and functionality of Control Panel Unit and display. |
15:00 ~ 15:15 | Group 2 | Classroom 4 | 110F01 | Sub-system of Hull Structure - 164 ICAF | 1 ~ ICAF - Perform maintenance tasks which are specified under “Daily”. |
15:00 ~ 15:30 | Group 2 | Classroom 4 | 110F01 | Sub-system of Hull Structure - 164 ICAF | 3 ~ ICAF - Check the condition and functionality of Control Panel Unit and display. |
15:00 ~ 15:15 | Group 1 | Classroom 4 | 110F01 | Sub-system of Hull Structure - 164 ICAF | 1 ~ ICAF - Perform maintenance tasks which are specified under “Daily”. |
15:15 ~ 15:30 | Group 2 | Classroom 4 | 110F01 | Sub-system of Hull Structure - 164 ICAF | 2 ~ Clean and upkeep the Control Panel and cabinet. |
15:15 ~ 15:30 | Group 1 | Classroom 4 | 110F01 | Sub-system of Hull Structure - 164 ICAF | 2 ~ Clean and upkeep the Control Panel and cabinet. |
16:00 ~ 16:30 | Group 1 | Classroom 4 | 110F01 | Sub-system of Hull Structure - 164 ICAF | 4 ~ Check cables connection on terminals for tightness and damage. |
16:00 ~ 17:00 | Group 2 | Classroom 4 | 000F02 | OPV 1800: Major System & Equipment | 5 ~ Other Electronics Equipments and systems Onboard. |
16:00 ~ 16:20 | Group 1 | Classroom 4 | 110F01 | Sub-system of Hull Structure - 164 ICAF | 5 ~ Electrical Checks on Protective devices and safety circuit. |
16:00 ~ 16:20 | Group 2 | Classroom 4 | 110F01 | Sub-system of Hull Structure - 164 ICAF | 5 ~ Electrical Checks on Protective devices and safety circuit. |
16:00 ~ 16:30 | Group 2 | Classroom 4 | 110F01 | Sub-system of Hull Structure - 164 ICAF | 4 ~ Check cables connection on terminals for tightness and damage. |
16:00 ~ 17:00 | Group 1 | Classroom 4 | 000F02 | OPV 1800: Major System & Equipment | 5 ~ Other Electronics Equipments and systems Onboard. |
Fri 09-Jun |
08:30 ~ 09:30 | Group 4 | Classroom 4 | 000F01 | OPV 1800: Performance | 5 ~ Emergency Station. |
11:00 ~ 12:00 | Group 4 | Classroom 4 | 000F01 | OPV 1800: Performance | 6 ~ SOLAS Equipment and Fire Fighting Onboard. |
Tue 11-Jul |
13:45 ~ 17:45 | Group 4 | Classroom 4 | 000F11 | OPV 1800: Performance - Practical On Board | 1 ~ Familiarization Onboard. |
Wed 12-Jul |
09:15 ~ 10:15 | Group 4 | Classroom 4 | 000F02 | OPV 1800: Major System & Equipment | 1 ~ Safety Systems and Lifesaving Equipment. |
10:30 ~ 12:30 | Group 4 | Classroom 4 | 000F02 | OPV 1800: Major System & Equipment | 2 ~ The Ship's Major System and Equipments. |
12:30 ~ 13:30 | Group 4 | Classroom 4 | 000F02 | OPV 1800: Major System & Equipment | 3 ~ The Ship's Auxiliary System. |
14:30 ~ 15:30 | Group 4 | Classroom 4 | 000F02 | OPV 1800: Major System & Equipment | 4 ~ Deck Machineries. |
Thu 13-Jul |
09:15 ~ 10:15 | Group 4 | Classroom 2 | 000F02 | OPV 1800: Major System & Equipment | 5 ~ Other Electronics Equipments and systems Onboard. |
10:30 ~ 11:30 | Group 4 | Classroom 4 | 000F02 | OPV 1800: Major System & Equipment | 6 ~ Bilges, Ballast and Internal Fi-Fi System. |
13:30 ~ 17:30 | Group 4 | On Board | 000F12 | OPV 1800: Major System & Equipment - Practical On Board | 1 ~ Familiarization Onboard. |
Fri 14-Jul |
09:15 ~ 09:30 | Group 4 | Classroom 4 | 110F01 | Sub-system of Hull Structure - 164 ICAF | 1 ~ ICAF - Perform maintenance tasks which are specified under “Daily”. |
09:30 ~ 09:45 | Group 4 | Classroom 4 | 110F01 | Sub-system of Hull Structure - 164 ICAF | 2 ~ Clean and upkeep the Control Panel and cabinet. |
09:45 ~ 10:15 | Group 4 | Classroom 4 | 110F01 | Sub-system of Hull Structure - 164 ICAF | 3 ~ ICAF - Check the condition and functionality of Control Panel Unit and display. |
10:15 ~ 10:45 | Group 4 | Classroom 4 | 110F01 | Sub-system of Hull Structure - 164 ICAF | 4 ~ Check cables connection on terminals for tightness and damage. |
11:00 ~ 11:20 | Group 4 | Classroom 4 | 110F01 | Sub-system of Hull Structure - 164 ICAF | 5 ~ Electrical Checks on Protective devices and safety circuit. |
11:20 ~ 12:20 | Group 4 | On Board | 110F11 | Sub-system of Hull Structure - 164 ICAF - Practical On Board | 1 ~ Perform Site Survey and familiarization with the ICAF system layout and operation |
14:20 ~ 14:50 | Group 4 | On Board | 110F11 | Sub-system of Hull Structure - 164 ICAF - Practical On Board | 2 ~ Visually check cables inside power controller unit for damage and tightness. |
14:50 ~ 15:50 | Group 4 | On Board | 110F11 | Sub-system of Hull Structure - 164 ICAF - Practical On Board | 3 ~ Perform checks and inspections and identify fault conditions. |
Thu 03-Aug |
11:35 ~ 12:35 | Group 1 | | 110F11 | Sub-system of Hull Structure - 164 ICAF - Practical On Board | 1 ~ Perform Site Survey and familiarization with the ICAF system layout and operation |
12:35 ~ 13:05 | Group 1 | | 110F11 | Sub-system of Hull Structure - 164 ICAF - Practical On Board | 2 ~ Visually check cables inside power controller unit for damage and tightness. |
14:05 ~ 15:05 | Group 1 | | 110F11 | Sub-system of Hull Structure - 164 ICAF - Practical On Board | 3 ~ Perform checks and inspections and identify fault conditions. |
Sun 06-Aug |
11:45 ~ 15:45 | Group 2 | On Board | 000F12 | OPV 1800: Major System & Equipment - Practical On Board | 1 ~ Familiarization Onboard. |
Mon 07-Aug |
09:45 ~ 10:45 | Group 3 | Classroom 3 | 000F01 | OPV 1800: Performance | 5 ~ Emergency Station. |
11:00 ~ 12:00 | Group 3 | Classroom 3 | 000F01 | OPV 1800: Performance | 6 ~ SOLAS Equipment and Fire Fighting Onboard. |
Tue 22-Aug |
11:35 ~ 12:35 | Group 2 | On Board | 110F11 | Sub-system of Hull Structure - 164 ICAF - Practical On Board | 1 ~ Perform Site Survey and familiarization with the ICAF system layout and operation |
14:35 ~ 15:05 | Group 2 | On Board | 110F11 | Sub-system of Hull Structure - 164 ICAF - Practical On Board | 2 ~ Visually check cables inside power controller unit for damage and tightness. |
15:05 ~ 16:05 | Group 2 | On Board | 110F11 | Sub-system of Hull Structure - 164 ICAF - Practical On Board | 3 ~ Perform checks and inspections and identify fault conditions. |
Fri 25-Aug |
09:30 ~ 10:30 | Group 3 | Classroom 3 | 000A00 | Non Training Items | 1 ~ Training Launch Introduction |
10:45 ~ 11:45 | Group 3 | Classroom 3 | 000F01 | OPV 1800: Performance | 1 ~ Introduction OPV 1800. |
11:45 ~ 12:45 | Group 3 | Classroom 3 | 000F01 | OPV 1800: Performance | 2 ~ Ship's Operational Capabilities. |
13:45 ~ 15:45 | Group 3 | Classroom 3 | 000F01 | OPV 1800: Performance | 3 ~ Vessel Layout. |
16:00 ~ 17:00 | Group 3 | Classroom 3 | 000F01 | OPV 1800: Performance | 4 ~ Deck Arrangements. |
Sat 30-Sep |
09:30 ~ 09:45 | Group 3 | Classroom 3 | 110F01 | Sub-system of Hull Structure - 164 ICAF | 1 ~ ICAF - Perform maintenance tasks which are specified under “Daily”. |
09:45 ~ 10:00 | Group 3 | Classroom 3 | 110F01 | Sub-system of Hull Structure - 164 ICAF | 2 ~ Clean and upkeep the Control Panel and cabinet. |
10:00 ~ 10:30 | Group 3 | Classroom 3 | 110F01 | Sub-system of Hull Structure - 164 ICAF | 3 ~ ICAF - Check the condition and functionality of Control Panel Unit and display. |
10:45 ~ 11:15 | Group 3 | Classroom 3 | 110F01 | Sub-system of Hull Structure - 164 ICAF | 4 ~ Check cables connection on terminals for tightness and damage. |
11:15 ~ 11:35 | Group 3 | Classroom 3 | 110F01 | Sub-system of Hull Structure - 164 ICAF | 5 ~ Electrical Checks on Protective devices and safety circuit. |
Khairul Azuadi Bin Ariffin |
Tue 30-May |
08:30 ~ 09:00 | Group 1 | Classroom 1 | 310S01 | Fire Main, Flushing, Draining and Ballasting | 1 ~ Fire Main and the ships FF system-Establish system arrangements. |
09:00 ~ 09:40 | Group 1 | Classroom 1 | 310S01 | Fire Main, Flushing, Draining and Ballasting | 2 ~ Connectivity of the fire Main to the Sprinkler & the Foam system- General characteristics, functions, operations and the utilisation. |
09:40 ~ 10:40 | Group 1 | Classroom 1 | 310S01 | Fire Main, Flushing, Draining and Ballasting | 3 ~ CO2 and the Watermist system- General characteristics, functions, operations, and utilisation. |
09:40 ~ 10:00 | Group 1 | On Board | 310S11 | Fire Main, Flushing, Draining and Ballasting - Practical On Board | 1 ~ The FF arrangements – Utilise for Deck Wash, Spray, Flushing and Draining. |
Wed 31-May |
08:30 ~ 09:10 | Group 1 | Classroom 1 | 360S01 | Lubricating System | 1 ~ The LO Bunker Station and LO Supply System – Establish the system arrangements for the Transfer and Supply of LO to consumers. |
09:10 ~ 09:30 | Group 1 | Classroom 1 | 360S01 | Lubricating System | 2 ~ Process of filling/transfer of LO tanks - Tanks capacities, Flow rate and time period of filling or transfer. |
09:30 ~ 09:45 | Group 1 | Classroom 1 | 360S01 | Lubricating System | 3 ~ Establish the Overflow line and tanks. |
09:45 ~ 10:00 | Group 1 | Classroom 1 | 360S01 | Lubricating System | 4 ~ The High Level Alarm – Activation and height levels. |
11:00 ~ 11:30 | Group 1 | Classroom 1 | 360S01 | Lubricating System | 5 ~ The DO and Sludge System – Establish the system arrangements, functions and operations. |
11:30 ~ 12:00 | Group 1 | Classroom 1 | 360S01 | Lubricating System | 6 ~ Suction, Collecting, of DO and Sludge – Transfer into the Sludge Tank or Shore facilities. |
12:00 ~ 13:00 | Group 1 | Classroom 1 | 360S11 | Lubricating System - Practical On Board | 1 ~ On Board Familiarisation |
12:00 ~ 12:15 | Group 1 | Classroom 1 | 360S01 | Lubricating System | 7 ~ Health Safety & Environment Protection |
12:15 ~ 12:35 | Group 1 | Classroom 1 | 360S01 | Lubricating System | 8 ~ Administer Oil Sampling |
14:00 ~ 14:40 | Group 1 | Classroom 1 | 320S01 | Fuel System | 2 ~ Process of filling/transfer of FO tanks - Tanks capacities, Flow rate and time period of filling or transfer. |
14:00 ~ 14:40 | Group 1 | Classroom 1 | 320S01 | Fuel System | 1 ~ The Fuel Transfer and Supply System – Establish the system arrangements for the Transfer and Supply of fuel. |
14:40 ~ 14:55 | Group 1 | Classroom 1 | 320S01 | Fuel System | 3 ~ Establish the overflow line and tanks. |
14:55 ~ 15:15 | Group 1 | Classroom 1 | 320S01 | Fuel System | 4 ~ Utilising the Day Tanks – Rate of consumption. |
16:00 ~ 16:20 | Group 1 | Classroom 1 | 320S01 | Fuel System | 5 ~ Cargo Handling System for FO – Establish the system arrangements and operations, for the FO Transfer onboard and discharge ashore. |
Thu 01-Jun |
14:00 ~ 14:20 | Group 1 | Classroom 1 | 320S01 | Fuel System | 6 ~ Administer oil sampling. |
14:20 ~ 14:35 | Group 1 | Classroom 1 | 320S11 | Fuel System - Practical On Board | 1 ~ The Low and High Level Alarm – Activation and height levels. |
14:30 ~ 15:30 | Group 1 | Classroom 1 | 320S11 | Fuel System - Practical On Board | 2 ~ On Board Familiarisation. |
16:00 ~ 17:00 | Group 1 | Classroom 4 | 000F02 | OPV 1800: Major System & Equipment | 6 ~ Bilges, Ballast and Internal Fi-Fi System. |
16:00 ~ 16:30 | Group 1 | Classroom 1 | 310S01 | Fire Main, Flushing, Draining and Ballasting | 5 ~ Operation of the Ballast system- System arrangements. |
16:00 ~ 17:00 | Group 1 | Classroom 1 | 310S01 | Fire Main, Flushing, Draining and Ballasting | 6 ~ Performance of the Ballast pumps- Rate of filling the tanks and tank capacities, the resulting trim. |
16:00 ~ 16:30 | Group 1 | Classroom 1 | 310S01 | Fire Main, Flushing, Draining and Ballasting | 4 ~ Operation of the Bilge System- System arrangements of the bilges. |
16:00 ~ 17:00 | Group 2 | Classroom 4 | 000F02 | OPV 1800: Major System & Equipment | 6 ~ Bilges, Ballast and Internal Fi-Fi System. |
Fri 02-Jun |
08:30 ~ 09:30 | Group 1 | Classroom 1 | 620S01 | Compressed Air System | 1 ~ Working and Control Air System – Establish the Compressors and the system arrangements, for Working and Control Air. |
11:00 ~ 11:40 | Group 1 | Classroom 1 | 620S01 | Compressed Air System | 2 ~ System Operations – The Air Bottles and Driers and Distribution of the Working and the Control Air. |
11:40 ~ 11:55 | Group 1 | Classroom 1 | 620S01 | Compressed Air System | 3 ~ Connectivity - Working Air System and Control Air System. |
11:55 ~ 12:10 | Group 1 | Classroom 1 | 620S01 | Compressed Air System | 4 ~ System performance – Charging the bottles, the Air pressures. |
14:00 ~ 14:15 | Group 1 | Classroom 1 | 620S01 | Compressed Air System | 5 ~ Controlling the Air Pressures. |
14:15 ~ 14:30 | Group 1 | Classroom 1 | 620S01 | Compressed Air System | 6 ~ Alarm activation – Low pressure. |
16:00 ~ 17:00 | Group 1 | Classroom 1 | 620S11 | Compressed Air System - Practical On Board | 1 ~ On Board Familiarisation |
Fri 09-Jun |
16:35 ~ 17:35 | Group 1 | | 310S11 | Fire Main, Flushing, Draining and Ballasting - Practical On Board | 2 ~ On Board Familiarisation. |
Mon 07-Aug |
10:05 ~ 11:05 | Group 2 | | 310S11 | Fire Main, Flushing, Draining and Ballasting - Practical On Board | 2 ~ On Board Familiarisation. |
Tue 22-Aug |
16:20 ~ 16:50 | Group 2 | Classroom 2 | 310S01 | Fire Main, Flushing, Draining and Ballasting | 1 ~ Fire Main and the ships FF system-Establish system arrangements. |
16:50 ~ 17:30 | Group 2 | Classroom 2 | 310S01 | Fire Main, Flushing, Draining and Ballasting | 2 ~ Connectivity of the fire Main to the Sprinkler & the Foam system- General characteristics, functions, operations and the utilisation. |
17:30 ~ 18:30 | Group 2 | Classroom 2 | 310S01 | Fire Main, Flushing, Draining and Ballasting | 3 ~ CO2 and the Watermist system- General characteristics, functions, operations, and utilisation. |
Fri 25-Aug |
09:15 ~ 09:45 | Group 2 | Classroom 2 | 310S01 | Fire Main, Flushing, Draining and Ballasting | 4 ~ Operation of the Bilge System- System arrangements of the bilges. |
09:45 ~ 10:15 | Group 2 | Classroom 2 | 310S01 | Fire Main, Flushing, Draining and Ballasting | 5 ~ Operation of the Ballast system- System arrangements. |
10:30 ~ 11:30 | Group 2 | | 310S01 | Fire Main, Flushing, Draining and Ballasting | 6 ~ Performance of the Ballast pumps- Rate of filling the tanks and tank capacities, the resulting trim. |
11:30 ~ 11:50 | Group 2 | On Board | 310S11 | Fire Main, Flushing, Draining and Ballasting - Practical On Board | 1 ~ The FF arrangements – Utilise for Deck Wash, Spray, Flushing and Draining. |
Akmal Hidayat |
Wed 31-May |
14:00 ~ 15:30 | Group 1 | On Board | 400S11 | Electrical Plant - Practical On Board | 2 ~ Perform Practical Site Survey and inspection on the system and components onboard. |
15:15 ~ 15:35 | Group 1 | On Board | 400S11 | Electrical Plant - Practical On Board | 1 ~ Fuel System Primary Filter - Drain and check conditions |
Tue 06-Jun |
08:30 ~ 08:45 | Group 1 | Classroom 1 | 400S01 | Electrical Plant | 1 ~ Introduction to Diesel Generation System |
10:15 ~ 10:30 | Group 1 | Classroom 1 | 400S01 | Electrical Plant | 8 ~ Shore connection - Shore Supply (SS)cables and stowage reels. |
11:00 ~ 11:15 | Group 1 | Classroom 1 | 400S01 | Electrical Plant | 2 ~ Emergency Generators: Daily Checklist |
11:15 ~ 11:30 | Group 1 | Classroom 1 | 400S01 | Electrical Plant | 3 ~ Emergency Generators: Instrument Panel Overview. |
11:30 ~ 11:45 | Group 1 | Classroom 1 | 400S01 | Electrical Plant | 4 ~ Emergency Generators: Oil Sampling |
11:45 ~ 12:00 | Group 1 | Classroom 1 | 400S01 | Electrical Plant | 5 ~ Emergency Generators: Visual Inspection & Troubleshooting |
12:00 ~ 12:15 | Group 1 | Classroom 1 | 400S01 | Electrical Plant | 6 ~ Emergency Generators: Check the function of Protection Panel and check protection device. |
12:15 ~ 12:30 | Group 1 | Classroom 1 | 400S01 | Electrical Plant | 7 ~ Emergency Generators - Inspect Electrical Diesel Engine Instrument Panel. |
12:30 ~ 12:45 | Group 1 | Classroom 1 | 400S01 | Electrical Plant | 9 ~ Shore Connection: SS Panels & Connection Box |
12:45 ~ 13:00 | Group 1 | Classroom 1 | 400S01 | Electrical Plant | 10 ~ Shore Connection:SOP SS connections ( Before/ After) |
14:00 ~ 14:30 | Group 1 | Classroom 1 | 430S01 | LP Switchboards and Distributions | 14 ~ Ships Batteries and UPS - Check battery capacity and charging current rating |
14:00 ~ 14:15 | Group 1 | Classroom 1 | 400S01 | Electrical Plant | 11 ~ Battery Sets: Visual Inspection & Troubleshooting |
14:10 ~ 14:40 | Group 1 | Classroom 1 | 430S01 | LP Switchboards and Distributions | 17 ~ Batteries and UPS - Check Ventilations layout and arrangement. |
14:15 ~ 14:30 | Group 1 | Classroom 1 | 400S01 | Electrical Plant | 12 ~ Battery Sets - Functional check of charging units and check cable any sign of damage. |
14:30 ~ 14:45 | Group 1 | Classroom 1 | 400S01 | Electrical Plant | 13 ~ UPS: Visual Check on ventilation system |
14:30 ~ 14:50 | Group 1 | Classroom 1 | 430S01 | LP Switchboards and Distributions | 15 ~ Ships Batteries and UPS - Visual Inspection and Identifying components and common faults |
14:45 ~ 15:00 | Group 1 | Classroom 1 | 400S01 | Electrical Plant | 14 ~ UPS: Run Self Check (BITE) |
14:50 ~ 15:10 | Group 1 | Classroom 1 | 430S01 | LP Switchboards and Distributions | 16 ~ Ships Batteries and UPS - Check and clean Earth bonding straps tightness and free from dirt and corrosion. |
15:00 ~ 15:15 | Group 1 | Classroom 1 | 400S01 | Electrical Plant | 15 ~ UPS: Clean and Inspect |
15:15 ~ 15:30 | Group 1 | Classroom 1 | 400S01 | Electrical Plant | 16 ~ UPS:Check Insulation and earthing. |
16:00 ~ 16:15 | Group 1 | Classroom 1 | 400S01 | Electrical Plant | 17 ~ Emergency switchboard: Visual check and clean |
Wed 07-Jun |
08:30 ~ 08:50 | Group 1 | Classroom 1 | 430S01 | LP Switchboards and Distributions | 1 ~ 230V 50Hz Panels : Visual inspection on connections |
08:50 ~ 09:10 | Group 1 | Classroom 1 | 430S01 | LP Switchboards and Distributions | 2 ~ 230V 50Hz Panels : Visual inspection on Bus/Bus Layout |
09:10 ~ 09:30 | Group 1 | Classroom 1 | 430S01 | LP Switchboards and Distributions | 3 ~ 230 V 50Hz Panels : Front panels of dead front switchboards: Visual inspection & clean. |
09:30 ~ 10:30 | Group 1 | On Board | 430S11 | LP Switchboards and Distributions - Practical On Board | 1 ~ Maintain - Propose” Perform Site survey, identify system layout and operating instructions. |
09:45 ~ 10:05 | Group 1 | Classroom 1 | 430S01 | LP Switchboards and Distributions | 4 ~ 230 V 50Hz Panels : Check Front panels of dead front switchboards: gauges and display Instruments for correct function and calibrated. |
10:05 ~ 10:25 | Group 1 | Classroom 1 | 430S01 | LP Switchboards and Distributions | 5 ~ 230 V 50Hz Panels - Run self check on BITE facilities. |
10:45 ~ 12:45 | Group 1 | On Board | 430S11 | LP Switchboards and Distributions - Practical On Board | 2 ~ Perform Practical Site Survey and inspection on the system and components onboard. |
11:00 ~ 11:20 | Group 1 | Classroom 1 | 430S01 | LP Switchboards and Distributions | 6 ~ 230V 50Hz Panels protective circuits : Visual inspection on all protective devices and relays. |
11:20 ~ 11:40 | Group 1 | Classroom 1 | 430S01 | LP Switchboards and Distributions | 7 ~ 230 V 50Hz Panels : Check earth bonding connection and conditions |
11:40 ~ 12:00 | Group 1 | Classroom 1 | 430S01 | LP Switchboards and Distributions | 8 ~ 230 V 50Hz Panels - Visual and functional check the protective devices on Distribution Boxes |
13:15 ~ 13:30 | Group 1 | Classroom 1 | 450S01 | Power Distribution and Lighting Systems | 3 ~ Transitional Lighting - Visual inspection, check sign of corrosion and moisture. |
14:00 ~ 14:15 | Group 1 | On Board | 450S11 | Power Distribution and Lighting Systems - Practical On Board | 3 ~ Emergency lighting - Functional check and inspection. |
14:00 ~ 14:15 | Group 1 | Classroom 1 | 450S01 | Power Distribution and Lighting Systems | 5 ~ Emergency Lighting - Check Emergency Lighting Layout and fittings. |
14:15 ~ 14:30 | Group 1 | Classroom 1 | 450S01 | Power Distribution and Lighting Systems | 6 ~ Emergency lighting - Functional check the lighting by compartments and system for normal and alternative supplies. |
15:15 ~ 15:30 | Group 1 | Classroom 1 | 450S01 | Power Distribution and Lighting Systems | 7 ~ External Lighting - Visual check on fittings and general layout. |
15:45 ~ 16:00 | Group 1 | Classroom 1 | 450S01 | Power Distribution and Lighting Systems | 8 ~ External lighting - Check watertight integrity at cable entry and cable gland. |
16:00 ~ 17:00 | Group 1 | Classroom 1 | 450S01 | Power Distribution and Lighting Systems | 9 ~ Portable Lighting - Functional check on lighting system and General Layout. |
16:00 ~ 16:15 | Group 1 | Classroom 1 | 450S01 | Power Distribution and Lighting Systems | 11 ~ Portable lighting - Earth Fault Insulation and Continuity Check. |
16:00 ~ 16:15 | Group 1 | Classroom 1 | 450S01 | Power Distribution and Lighting Systems | 10 ~ Portable Lighting - Visual check on fittings |
16:00 ~ 16:15 | Group 1 | Classroom 1 | 450S01 | Power Distribution and Lighting Systems | 12 ~ Portable lighting - Check for watertight integrity at flab entry and switches. |
Thu 08-Jun |
08:30 ~ 08:45 | Group 1 | Classroom 1 | 450S01 | Power Distribution and Lighting Systems | 1 ~ General Lighting - Lighting general layout and functional checks.. |
08:45 ~ 09:00 | Group 1 | Classroom 1 | 450S01 | Power Distribution and Lighting Systems | 2 ~ General Lighting - Check earth fault and continuity. |
09:00 ~ 09:15 | Group 1 | On Board | 450S11 | Power Distribution and Lighting Systems - Practical On Board | 1 ~ General Lighting Visual inspection and general Layout: and arrangement |
10:45 ~ 11:00 | Group 1 | On Board | 450S11 | Power Distribution and Lighting Systems - Practical On Board | 2 ~ Transitional lighting - Functional check and inspection. |
11:15 ~ 11:30 | Group 1 | On Board | 450S11 | Power Distribution and Lighting Systems - Practical On Board | 4 ~ External lighting - Functional check and inspection. |
11:30 ~ 12:30 | Group 1 | On Board | 450S11 | Power Distribution and Lighting Systems - Practical On Board | 5 ~ Perform Practical Site Survey and inspection on the system and components onboard of Power Distribution and Lighting Systems. |
14:00 ~ 14:15 | Group 1 | Classroom 1 | 400S01 | Electrical Plant | 18 ~ Transformers:: Visual check and clean |
14:15 ~ 14:30 | Group 1 | Classroom 1 | 400S01 | Electrical Plant | 19 ~ Transformers: Visual and functional check. |
14:15 ~ 14:45 | Group 1 | Classroom 1 | 430S01 | LP Switchboards and Distributions | 11 ~ Transformers - Check and clean Earth bonding straps tightness and free from dirt and corrosion. |
14:30 ~ 15:00 | Group 1 | Classroom 1 | 430S01 | LP Switchboards and Distributions | 9 ~ Transformers -, Visual Inspection and check for corrosion and cleanliness. |
16:00 ~ 16:20 | Group 1 | Classroom 1 | 430S01 | LP Switchboards and Distributions | 10 ~ Transformers - Electrical checks and troubleshooting |
16:00 ~ 16:30 | Group 1 | Classroom 1 | 430S01 | LP Switchboards and Distributions | 12 ~ Transformers - Check and examine the electrical properties continuity, insulation are within the acceptable limits. |
16:00 ~ 16:30 | Group 1 | Classroom 1 | 430S01 | LP Switchboards and Distributions | 13 ~ Transformers - Keep all electrical connections and mechanical fastenings tight according to right torque and the fastenings are dry, clean and rust free. |
Thu 22-Jun |
14:30 ~ 14:45 | Group 1 | Classroom 1 | 450S01 | Power Distribution and Lighting Systems | 4 ~ Transitional Lighting - Functional check the lighting by compartments and system. |
UMW 1 |
Thu 01-Jun |
08:30 ~ 09:10 | Group 4 | Classroom 1 | 640P01 | Oil Spill Response | 1 ~ Dispersant Pumps & Boom - Clean & Inspect: Pumps, control panel, motor, valves, spray booms, hoses, loose fittings. |
09:10 ~ 09:40 | Group 4 | Classroom 2 | 640P01 | Oil Spill Response | 2 ~ Dispersant Pumps & Boom: Functional checks – Setting up the system, pre starting checks and safety procedures, performance. |
09:40 ~ 09:50 | Group 4 | Classroom 1 | 640P01 | Oil Spill Response | 3 ~ Dispersant Pumps & Boom - Clean, Inspect, Check Insulation – Motors, control panel, cables and termination, Insulation Tester. |
09:50 ~ 09:55 | Group 4 | Classroom 1 | 640P01 | Oil Spill Response | 4 ~ Dispersant Pumps & Boom:Earthing straps, fastenings, Continuity tester. |
11:00 ~ 13:00 | Group 4 | On Board | 640P01 | Oil Spill Response | 5 ~ Skimmer System - Operational Test – Setting up, pre starting checks, safety procedures, performance. |
11:00 ~ 13:00 | Group 4 | On Board | 640P01 | Oil Spill Response | 6 ~ On Board Familiarisation |
Fri 18-Aug |
10:25 ~ 10:40 | Group 4 | Classroom 1 | 000000 | Break Times | 1 ~ Morning Tea Break |
Damen 1 |
Mon 05-Jun |
09:30 ~ 09:50 | Group 4 | Classroom 1 | 370P01 | Air Conditioning Equipment | 1 ~ Visual Check and inspect for leaks in HVAC system |
09:30 ~ 10:30 | Group 3 | On Board | 411M02 | Ships Batteries and UPS | 1 ~ Ships Batteries and UPS: Perform Site Survey and to familirise with the overall system layout examine general conditions including to be acquinted system operating instruction prior to perform the task. |
09:50 ~ 10:10 | Group 4 | On Board | 370P01 | Air Conditioning Equipment | 2 ~ Air conditioning system: Check pressure regulator for correct operations |
10:10 ~ 10:25 | Group 4 | On Board | 370P01 | Air Conditioning Equipment | 3 ~ Air conditioning : Clean grease separator in hoods galley and pantry |
10:25 ~ 10:40 | Group 4 | On Board | 370P01 | Air Conditioning Equipment | 4 ~ Air conditioning: Check pneumatic relays |
10:45 ~ 11:15 | Group 3 | Classroom 3 | 411M02 | Ships Batteries and UPS | 2 ~ Battery Sets: Check Charging cable insulation and physical properties. |
10:55 ~ 11:10 | Group 4 | On Board | 370P01 | Air Conditioning Equipment | 5 ~ Air conditioning: Check fire protection flap with electro magnet device. |
11:10 ~ 11:25 | Group 4 | On Board | 370P01 | Air Conditioning Equipment | 6 ~ Air Conditioning: Check, clean dust filter Air handling units,- Bridge, small arms store |
11:15 ~ 11:35 | Group 3 | On Board | 411M02 | Ships Batteries and UPS | 3 ~ Ships Batteries and UPS - Measure and record electrolyte SG reading. |
11:25 ~ 11:40 | Group 4 | On Board | 370P01 | Air Conditioning Equipment | 7 ~ Air Conditioning Equipment: Check, clean dust filter Air handling units, - Ammunition, MCSR and small arms store |
11:35 ~ 11:55 | Group 3 | On Board | 411M02 | Ships Batteries and UPS | 4 ~ Ships Batteries and UPS -Check battery voltage and charging current. |
11:40 ~ 11:55 | Group 4 | On Board | 370P01 | Air Conditioning Equipment | 8 ~ Air Conditioning Equipment: Check electric motor and centrifugal fan - Various location |
11:55 ~ 12:15 | Group 3 | On Board | 411M02 | Ships Batteries and UPS | 5 ~ Ships Batteries and UPS: Visual inspection and keep electrical connections and mechanical fastenings tight. |
11:55 ~ 12:10 | Group 4 | On Board | 370P01 | Air Conditioning Equipment | 9 ~ Air Conditioning Equipment: Check sensors and controllers. |
12:10 ~ 12:30 | Group 4 | On Board | 370P01 | Air Conditioning Equipment | 10 ~ Air Conditioning Equipment: Check, clean ventilation flap with pneumatic actuators. |
13:30 ~ 13:45 | Group 4 | On Board | 370P01 | Air Conditioning Equipment | 11 ~ Air Conditioning Equipment: Check, clean non-return flap type- mechanically operated. |
13:45 ~ 14:00 | Group 4 | On Board | 370P01 | Air Conditioning Equipment | 12 ~ Chilled water system: "Walk-Around visual Inspection ( Perform Daily Check & VI)" |
14:00 ~ 14:15 | Group 4 | On Board | 370P01 | Air Conditioning Equipment | 13 ~ Chilled Unit: Check electrical motor and radial fan for regular operation. |
14:15 ~ 14:35 | Group 4 | On Board | 370P01 | Air Conditioning Equipment | 14 ~ Chilled water system: Check air intakes and outlets for dirt deposits, clean if necessary. |
14:30 ~ 15:00 | Group 3 | Classroom 3 | 411M02 | Ships Batteries and UPS | 6 ~ Batteries and UPS: Check Earth bonding straps tightness and free from dirt and corrosion. |
14:35 ~ 14:50 | Group 4 | On Board | 370P01 | Air Conditioning Equipment | 15 ~ Emergency air-conditioning: Check for refrigerant leaks. |
14:50 ~ 15:05 | Group 4 | On Board | 370P01 | Air Conditioning Equipment | 16 ~ Chilled water system: Check dust filter, replace if necessary. |
15:00 ~ 15:30 | Group 3 | Classroom 3 | 411M02 | Ships Batteries and UPS | 7 ~ Ships Batteries and UPS: Keep electrical connections and mechanical fastenings tight. |
15:45 ~ 16:15 | Group 3 | Classroom 3 | 411M02 | Ships Batteries and UPS | 8 ~ Batteries and UPS: Check the ventilation and air flow in working order in both Battery spaces and UPS Cabinet-rack. |
16:15 ~ 16:45 | Group 3 | Classroom 3 | 411M02 | Ships Batteries and UPS | 9 ~ Batteries and UPS: Observe safety precautions, practices and handling of hazadous material in performing the work. |
16:45 ~ 17:15 | Group 3 | Classroom 3 | 411M02 | Ships Batteries and UPS | 10 ~ Batteries and UPS: Check and eximine the power supplies input both AC and DC are available and operational. |
Mon 12-Jun |
08:30 ~ 09:10 | Group 2 | Classroom 1 | 320M01 | Fuel System | 1 ~ Fuel Oil Transfer System: Clean and inspect – Pumps, valves, motors, control panel. |
09:10 ~ 10:10 | Group 2 | Classroom 1 | 320M01 | Fuel System | 2 ~ Fuel Oil Transfer System: Start/stop Local, auto & emergency – Transfer operations, performance of pumps. |
10:10 ~ 10:20 | Group 2 | Classroom 1 | 320M01 | Fuel System | 3 ~ Fuel Oil Transfer System: Clean, inspect and check insulation – Electrical equipment, Insulation tester. |
11:00 ~ 11:40 | Group 4 | Classroom 1 | 110P01 | Anchors | 1 ~ Establish the arrangements - Anchor Chain and the Windlass. |
11:40 ~ 12:00 | Group 4 | Classroom 1 | 110P01 | Anchors | 3 ~ The Control Panel and Controlling the speed. |
12:00 ~ 12:15 | Group 4 | Classroom 1 | 110P01 | Anchors | 4 ~ Inspect - The Braking Mechanism and Brake Pad. |
12:15 ~ 12:30 | Group 4 | Classroom 1 | 110P01 | Anchors | 5 ~ Operate - Let Go, Heaving Anchor & Chain Stopper. |
12:30 ~ 12:45 | Group 4 | Classroom 1 | 110P01 | Anchors | 6 ~ Washing Anchor and Chain – The process. |
12:45 ~ 12:55 | Group 4 | Classroom 1 | 110P01 | Anchors | 7 ~ Oiling and Greasing the Windlass – The Procedure. |
16:00 ~ 16:10 | Group 4 | On Board | 110P01 | Anchors | 8 ~ Adherence to Safety Precautions. |
16:10 ~ 16:25 | Group 4 | On Board | 110P01 | Anchors | 2 ~ The Windlass - Functions and Operations. |
16:45 ~ 18:45 | Group 4 | On Board | 110P01 | Anchors | 9 ~ On Board Familiarisation |
Tue 13-Jun |
08:30 ~ 08:50 | Group 3 | Classroom 3 | 330M01 | Circulating & Sea Water Cooling | 1 ~ Clean and Inspect – Motors, air vents, cable & guards, mountings and fastenings. |
08:50 ~ 09:10 | Group 3 | Classroom 3 | 330M01 | Circulating & Sea Water Cooling | 2 ~ Clean and Inspect – Starters, switches, alarms and indications, mountings and cables. |
09:10 ~ 09:40 | Group 3 | Classroom 3 | 330M01 | Circulating & Sea Water Cooling | 3 ~ Clean and Inspect – Aux SW Pumps, valves and couplings, mountings and fastenings, indicators and alarm. |
09:40 ~ 10:10 | Group 3 | Classroom 3 | 330M01 | Circulating & Sea Water Cooling | 4 ~ Functional Checks – Motors and Starters, switches, Pre starting checks and safety procedures, performance checks. |
10:10 ~ 10:30 | Group 3 | Classroom 3 | 330M01 | Circulating & Sea Water Cooling | 5 ~ Run Pumps (SW) if not in regular use – Pre starting checks and safety procedures; performance; check operating pressures, leaks and abnormalities. |
11:00 ~ 11:20 | Group 3 | Classroom 3 | 330M01 | Circulating & Sea Water Cooling | 6 ~ Clean and Inspect Heat exchangers – Thermostic control valves, temperature gauges. |
11:20 ~ 11:25 | Group 3 | Classroom 3 | 330M01 | Circulating & Sea Water Cooling | 7 ~ Clean and Inspect – Pump couplings, pipes and joints. |
11:25 ~ 11:40 | Group 3 | Classroom 3 | 330M01 | Circulating & Sea Water Cooling | 8 ~ Inspect, Clean and Check Insulation - electrical equipment cables and terminations, use of Insulation Tester. |
11:40 ~ 11:50 | Group 3 | Classroom 3 | 330M01 | Circulating & Sea Water Cooling | 9 ~ Inspect Earth Bonding – Motors and Starters, earthing straps and fastenings, use of Continuity tester. |
11:50 ~ 12:30 | Group 3 | Classroom 3 | 330M01 | Circulating & Sea Water Cooling | 10 ~ Functional Checks – SW Cooling System, system operation and performance, check temperatures and pressures, check for abnormalities. |
14:00 ~ 16:00 | Group 3 | On Board | 330M01 | Circulating & Sea Water Cooling | 11 ~ On Board Familiarisation. |
Wed 14-Jun |
08:30 ~ 09:00 | Group 2 | Classroom 1 | 320M01 | Fuel System | 4 ~ Fuel Oil Purifier: Clean and inspect – Control panel, pump, motor, valve. |
09:00 ~ 09:05 | Group 2 | Classroom 1 | 320M01 | Fuel System | 7 ~ Fuel Oil Purifier: Inspect earth bonding – Earthing strap, Continuity tester. |
09:05 ~ 09:35 | Group 2 | Classroom 1 | 320M01 | Fuel System | 8 ~ Fuel Oil Supply System: Day tanks, purified FO to consumers, water and sludge line, valves, overflow line. |
09:30 ~ 09:50 | Group 3 | Classroom 3 | 371M01 | Air Conditioning and Ventilation | 20 ~ Emergency air-conditioning: Check condenser water drain valve. |
09:35 ~ 10:05 | Group 2 | Classroom 1 | 320M01 | Fuel System | 9 ~ Cargo Handling Fuel Oil System: Clean and Inspect – Bunkering points, Control panel. |
09:50 ~ 10:10 | Group 3 | Classroom 3 | 371M01 | Air Conditioning and Ventilation | 21 ~ Emergency air-conditioning: Check wetness indicator of sight glass. |
10:05 ~ 10:20 | Group 2 | Classroom 1 | 320M01 | Fuel System | 10 ~ Cargo Handling Fuel Oil System: Inspect after use – Safety procedures, and procedure after after use. |
10:10 ~ 10:30 | Group 3 | Classroom 3 | 371M01 | Air Conditioning and Ventilation | 22 ~ Check cooling seawater regulating valve. |
10:20 ~ 10:35 | Group 2 | Classroom 1 | 320M01 | Fuel System | 11 ~ Check and inspect: Day tank and water trap – sight glass, alarms an activation. |
10:30 ~ 10:45 | Group 3 | | 000000 | Break Times | 1 ~ Morning Tea Break |
10:45 ~ 11:05 | Group 3 | Classroom 3 | 371M01 | Air Conditioning and Ventilation | 24 ~ Emergency air-conditioning: Check dust filter, replace if necessary. |
11:00 ~ 11:15 | Group 2 | Classroom 1 | 341M01 | Fresh Water System | 1 ~ Fresh Water Supply System: Clean & Inspect - Motors, starters, cables and terminations, mountings and fastenings. |
11:00 ~ 11:30 | Group 1 | On Board | 340S01 | Fresh Water Supply System | 1 ~ The FW Supply & FW Supply System Accommodation – Establish the system arrangements. |
11:05 ~ 11:25 | Group 3 | Classroom 3 | 371M01 | Air Conditioning and Ventilation | 25 ~ Emergency air-conditioning: Check centrifugal fan motor and all electrical connections. |
11:15 ~ 11:55 | Group 2 | Classroom 1 | 341M01 | Fresh Water System | 2 ~ Fresh Water Supply System: Functional Checks Motors & Starters - Pre starting checks, performance and abnormalities. |
11:25 ~ 11:45 | Group 3 | Classroom 3 | 371M01 | Air Conditioning and Ventilation | 26 ~ Safety and Handling - Observe safety precaution and practices, handling of hazadous materials when performing the work. |
11:30 ~ 12:00 | Group 1 | On Board | 340S01 | Fresh Water Supply System | 2 ~ Process of filling/Supply to FW tanks – The FW Cargo Handling system, the Reverse Osmosis Systems and the Hydrophore, their functions and operations. |
11:55 ~ 12:35 | Group 2 | Classroom 1 | 341M01 | Fresh Water System | 3 ~ Fresh Water Supply System: Clean & Inspect - Pumps & Outfits; couplings, valves, filters, gauges, pipes and fastenings. |
12:00 ~ 12:30 | Group 1 | On Board | 340S01 | Fresh Water Supply System | 3 ~ RO systems – Production rate, managing the Chemicals and the Backwash. |
12:30 ~ 12:40 | Group 1 | On Board | 340S01 | Fresh Water Supply System | 4 ~ Administer water sampling. |
12:35 ~ 12:45 | Group 2 | Classroom 1 | 341M01 | Fresh Water System | 4 ~ Fresh Water Supply System: Clean, Inspect and Check Insulation – cables & terminations |
12:40 ~ 13:00 | Group 1 | On Board | 340S01 | Fresh Water Supply System | 5 ~ FW Supply System Accommodation – FW circulation and pumps, Distribution to consumers and Equipment on board |
12:45 ~ 12:50 | Group 2 | Classroom 1 | 341M01 | Fresh Water System | 5 ~ Fresh Water Supply System: Inspect - Earth Bonding. |
12:50 ~ 13:10 | Group 2 | Classroom 1 | 341M01 | Fresh Water System | 7 ~ Fresh Water Supply System: Run Pump if not in regular use – Pre starting checks, check performance, leaks, abnormalities. |
13:00 ~ 13:20 | Group 3 | On Board | 371M01 | Air Conditioning and Ventilation | 23 ~ Emergency air-conditioning: Check all shut-off valves. |
13:20 ~ 15:20 | Group 3 | On Board | 371M01 | Air Conditioning and Ventilation | 27 ~ Air Conditioning and Ventilation: Practical Site Survey and Inspection on the System and Components onboard. |
14:00 ~ 14:15 | Group 2 | On Board | 320M01 | Fuel System | 5 ~ Fuel Oil Purifier: Functional checks – Health checks using the Control panel. |
14:15 ~ 14:25 | Group 2 | On Board | 320M01 | Fuel System | 6 ~ Fuel Oil Purifier: Clean, inspect and check insulation – Electrical equipment, cables and termination, Insulation tester. |
14:25 ~ 18:25 | Group 2 | On Board | 320M01 | Fuel System | 12 ~ On Board Familiarisation. |
16:00 ~ 16:15 | Group 2 | On Board | 341M01 | Fresh Water System | 6 ~ Fresh Water Supply System: Clean & Inspect - Pressure Control Switch. |
16:00 ~ 16:20 | Group 1 | On Board | 340S01 | Fresh Water Supply System | 6 ~ Establish Tanks capacities, Flow rate and time period of filling or transfer. |
16:20 ~ 16:50 | Group 1 | On Board | 340S01 | Fresh Water Supply System | 7 ~ The Hot Water System – Production, circulation, temperature control and distribution to consumers. |
16:50 ~ 17:50 | Group 1 | On Board | 340S01 | Fresh Water Supply System | 8 ~ On Board Familiarisation. |
Thu 15-Jun |
15:05 ~ 15:20 | Group 4 | | 000000 | Break Times | 3 ~ Tea Break |
Tue 20-Jun |
08:30 ~ 08:40 | Group 3 | Classroom 3 | 360M01 | Lubrication System | 1 ~ Lubrication System: Clean and Inspect – Motor & Starters, control panel, level switches |
08:40 ~ 09:10 | Group 3 | Classroom 3 | 360M01 | Lubrication System | 2 ~ Lubrication System: Clean and Inspect – Pumps and outfits, valves, filters, pipes, gauges. |
09:10 ~ 09:30 | Group 3 | On Board | 360M01 | Lubrication System | 3 ~ Lubrication System: Functional Checks – Motors and Starters, Pre starting checks and safety procedures, Control Panel and Alarm settings. |
09:30 ~ 10:10 | Group 3 | Classroom 3 | 360M01 | Lubrication System | 4 ~ Lubrication System: Functional Checks – Pumps and outfits, Pre starting checks and safety procedures, Filling point, Supply to consumers, check functionalities at control positions |
10:10 ~ 10:20 | Group 3 | Classroom 3 | 360M01 | Lubrication System | 5 ~ Lubrication System: LO Filter and Drainage – Clean, inspect for good operations. |
10:20 ~ 10:25 | Group 3 | Classroom 3 | 360M01 | Lubrication System | 6 ~ Lubrication System: Clean, inspect and check insulation - Motor Starters Control Panel , cables and terminations. |
10:25 ~ 10:30 | Group 3 | Classroom 3 | 360M01 | Lubrication System | 7 ~ Lubrication System: Inspect earth bonding - Motor and starters, Earthing straps and fastening. |
11:00 ~ 11:20 | Group 3 | Classroom 3 | 360M01 | Lubrication System | 9 ~ Dirty - Oil System: DO Pump – Run pump if not in regular use: Pre starting checks and safety procedures, Inspect various operations, Check performance, abnormalities. |
11:20 ~ 11:40 | Group 3 | Classroom 3 | 360M01 | Lubrication System | 10 ~ Dirty-Oil System: Functional Checks - DO Pump motor: Pre starting checks, and safety procedures, Check FW valves, inspect for various operations. |
11:40 ~ 11:50 | Group 3 | Classroom 3 | 360M01 | Lubrication System | 11 ~ Dirty-Oil System: Clean, Inspect and insulation - DO Pump (Motor and starters), Control Panel, cables and termination, Insulation Tester. |
11:45 ~ 12:05 | Group 3 | Classroom 3 | 360M01 | Lubrication System | 8 ~ Dirty-Oil System: Clean and Inspect - Pump, Motor and starter, Safety valves, Filters, Drain plug, Level switches. |
11:50 ~ 11:55 | Group 3 | Classroom 3 | 360M01 | Lubrication System | 12 ~ Dirty-Oil System: Inspect Earth Bonding- DO Pump (Motor and starters), Earthing straps and fastening, Continuity Tester. |
11:55 ~ 13:55 | Group 3 | On Board | 360M01 | Lubrication System | 13 ~ On Board Familiarisation |
Wed 21-Jun |
08:30 ~ 09:00 | Group 3 | Classroom 3 | 310M01 | Fire main, Bilge & Ballast | 8 ~ Stripping (oily-bilge) system (S oily-bilge S): Functional checks – Control Panel, Pre starting checks, Suction and discharge valves. |
08:30 ~ 08:50 | Group 3 | Classroom 3 | 310M01 | Fire main, Bilge & Ballast | 1 ~ Bilge System: Clean and Inspect ( Motors & Starter) – Motors and starters, cables and termination, mounting and fastenings. |
08:30 ~ 08:40 | Group 3 | Classroom 3 | 310M01 | Fire main, Bilge & Ballast | 7 ~ Clean and Inspect (Air line) – Control air, valves, air line, and gauges. |
08:30 ~ 08:40 | Group 3 | Classroom 3 | 310M01 | Fire main, Bilge & Ballast | 10 ~ Bilge water separator: Clean Y filters – Remove and re-reinstall. |
08:30 ~ 08:40 | Group 3 | On Board | 310M01 | Fire main, Bilge & Ballast | 9 ~ Functional checks – Control Panel, Pre starting checks, Suction and discharge valves. |
08:30 ~ 08:35 | Group 3 | Classroom 3 | 310M01 | Fire main, Bilge & Ballast | 11 ~ Drip Trays: Clean & Inspect – Hose and tray |
08:50 ~ 09:30 | Group 3 | Classroom 3 | 310M01 | Fire main, Bilge & Ballast | 2 ~ Bilge System: Functional Checks: Pumps, motors, pneumatic valve, ejectors; Prestarting checks, Control panel performance and abnormalities |
09:30 ~ 09:50 | Group 3 | Classroom 3 | 310M01 | Fire main, Bilge & Ballast | 3 ~ Bilge System (pumps): Clean and Inspect – Pumps, strainer and filters, valves. |
09:50 ~ 10:00 | Group 3 | Classroom 3 | 310M01 | Fire main, Bilge & Ballast | 4 ~ Clean, inspect and check Insulation (Motors & Starters): Control panel, cables and termination, Insulation tester. |
10:00 ~ 10:05 | Group 3 | Classroom 3 | 310M01 | Fire main, Bilge & Ballast | 5 ~ Inspect Earth Bonding (Motors & Starters): Control Panel, Continuity Tester. |
10:05 ~ 10:25 | Group 3 | Classroom 3 | 310M01 | Fire main, Bilge & Ballast | 6 ~ Stripping (oily-bilge) system (S oily-bilge S): Clean &Inspect (Stripping oily-bilge pump) – Pumps, strainers, hoses. |
11:00 ~ 11:10 | Group 3 | On Board | 310M01 | Fire main, Bilge & Ballast | 18 ~ Emergency FF pumps: Functional Checks with GS Pumps – Pre starting checks and safety procedures, performance of GS pumps with Emergency FF pumps. |
14:00 ~ 14:10 | Group 3 | On Board | 310M01 | Fire main, Bilge & Ballast | 12 ~ BWS Pumps and outfit: Clean and Inspect – Pumps, motors, Control Panel, valves. |
14:10 ~ 14:40 | Group 3 | Classroom 3 | 310M01 | Fire main, Bilge & Ballast | 13 ~ BWS Functional Checks – Pre starting checks and safety procedures, managing ballast water. |
14:15 ~ 14:20 | Group 3 | On Board | 310M01 | Fire main, Bilge & Ballast | 21 ~ GS Pumps (Motors & Starters): Inspect earth bonding – Earthing straps and fastenings. |
14:40 ~ 14:50 | Group 3 | Classroom 3 | 310M01 | Fire main, Bilge & Ballast | 14 ~ BWS – Clean, inspect and check insulation – Control panel,motors, cables and terminations, Insulation tester. |
14:50 ~ 14:55 | Group 3 | Classroom 3 | 310M01 | Fire main, Bilge & Ballast | 15 ~ BWS – Inspect earth bonding : Earthing straps, fastenings, continuity tester. |
14:55 ~ 15:55 | Group 3 | Classroom 3 | 310M01 | Fire main, Bilge & Ballast | 16 ~ GS Pumps & Outfit: Clean and inspect – Pumps, motors, Control Panel, valves, associated fittings. |
15:50 ~ 16:20 | Group 3 | Classroom 3 | 310M01 | Fire main, Bilge & Ballast | 17 ~ GS Pumps and Outfit: Functional checks – Pre starting checks and safety procedures, performance, bilge and ballast functions. |
16:00 ~ 20:00 | Group 3 | On Board | 310M01 | Fire main, Bilge & Ballast | 22 ~ On Board Familiarisation. |
16:20 ~ 16:30 | Group 3 | Classroom 1 | 310M01 | Fire main, Bilge & Ballast | 19 ~ GS Pumps and outfit: Clean, insect and check insulation – Electrical Equipment, Cables and terminations, Insulation Tester. |
16:30 ~ 17:00 | Group 3 | Classroom 3 | 310M01 | Fire main, Bilge & Ballast | 20 ~ Fire hydrant and spray: Clean and inspect – Hydrant, spray, nozzles, hoses, loose fittings. |
Thu 22-Jun |
14:30 ~ 15:10 | Group 3 | On Board | 650M01 | External Fire-Fighting System | 1 ~ Flight Deck FF System (Foam System) - Clean and Inspect Externally: Hydrants, monitors, foam tank and applicator, fire man suits, Hoses, and loose fittings. |
15:10 ~ 15:25 | Group 3 | On Board | 650M01 | External Fire-Fighting System | 2 ~ Flight Deck FF System (Foam System) - Functional checks: Pre-starting checks and safety procedures. |
15:25 ~ 15:55 | Group 3 | On Board | 650M01 | External Fire-Fighting System | 3 ~ Flight Deck FF System (Foam System) - Operational Checks: Pre starting checks, safety and operational procedures, performance |
16:10 ~ 16:50 | Group 3 | On Board | 650M01 | External Fire-Fighting System | 4 ~ Clean And Inspect: Engine driven pump,monitors, valves, hoses, nozzles, control panel |
16:50 ~ 17:05 | Group 3 | On Board | 650M01 | External Fire-Fighting System | 5 ~ Operational Check: Pre starting checks and safety procedures, Running with s’tbd ME |
17:05 ~ 17:25 | Group 3 | On Board | 650M01 | External Fire-Fighting System | 6 ~ Fire Hoses-Clean, Inspect and Pressure Testing: Setting up pressure test, procedure after use. |
Tue 27-Jun |
13:15 ~ 13:45 | Group 1 | On Board | 870S01 | Wind & Metererological System | 1 ~ Barometer/hermometer/hygrometer - Examine the general conditions and system functional prior to performing the task. |
13:45 ~ 14:15 | Group 1 | On Board | 870S01 | Wind & Metererological System | 2 ~ Barometer/hermometer/hygrometer - Visual inspection of the unit and clean as necessary. |
14:15 ~ 14:45 | Group 1 | On Board | 870S01 | Wind & Metererological System | 3 ~ Barometer/hermometer/hygrometer - Check and clean the exposed part and sight glass as necessary. |
14:45 ~ 15:15 | Group 1 | On Board | 870S01 | Wind & Metererological System | 4 ~ Barometer/hermometer/hygrometer - Check and clean the station annually. |
15:15 ~ 15:45 | Group 1 | On Board | 870S01 | Wind & Metererological System | 5 ~ Barometer/hermometer/hygrometer - Visual inspection of the unit and clean as necessary. |
16:00 ~ 16:30 | Group 1 | On Board | 870S01 | Wind & Metererological System | 6 ~ Anemometer - Check cabling and cable support for any sign of damage and corrosion. |
16:30 ~ 17:00 | Group 1 | On Board | 870S01 | Wind & Metererological System | 7 ~ Anemometer - Check mounting conditions and earthing strap connection, re tighten if necessary. |
17:00 ~ 17:30 | Group 1 | On Board | 870S01 | Wind & Metererological System | 9 ~ Anemometer - Check mounting for sign of corrosion and re tighten fasteners if necessary. |
17:30 ~ 18:00 | Group 1 | On Board | 870S01 | Wind & Metererological System | 8 ~ Anemometer - Run self test or BITE for normal operation. |
Wed 28-Jun |
09:30 ~ 10:00 | Group 1 | On Board | 870S01 | Wind & Metererological System | 10 ~ Weather fax - Functional check power supply connection in good working order. |
10:00 ~ 10:30 | Group 1 | On Board | 870S01 | Wind & Metererological System | 11 ~ Weather fax - Check above deck unit -pre- amp is clean and free form dirt and salt deposit. |
10:45 ~ 11:15 | Group 1 | On Board | 870S01 | Wind & Metererological System | 12 ~ Weather fax - Run system check using BITE facility or self test. |
11:15 ~ 11:45 | Group 1 | On Board | 870S01 | Wind & Metererological System | 13 ~ Weather fax - Ensure the cable interconnection between receiver unit, pre-amp and connection hub are correctly terminated. |
11:45 ~ 13:45 | Group 1 | On Board | 870S01 | Wind & Metererological System | 14 ~ Wind & Meteorological System - Practical Site Survey and inspection on the system and components onboard. |
14:45 ~ 15:25 | Group 1 | On Board | 333S01 | Cooling Water System | 1 ~ SW Cooling System – Establish system arrangements, the suction and overboard discharge. |
15:25 ~ 15:40 | Group 1 | On Board | 333S01 | Cooling Water System | 2 ~ Operation of the SW Cooling and the Heat Exchangers, the Low Temp and High Temp Coolers. |
15:55 ~ 16:05 | Group 1 | On Board | 333S01 | Cooling Water System | 3 ~ System Performance – Temperature and Pressures. |
16:05 ~ 16:35 | Group 1 | On Board | 333S01 | Cooling Water System | 4 ~ Fresh Cooling Water System – Establish system arrangements, the FW circulation and Heat Exchangers. |
16:35 ~ 16:50 | Group 1 | On Board | 333S01 | Cooling Water System | 5 ~ System Operation - The Circulation Pumps and the system operation. |
16:50 ~ 17:00 | Group 1 | On Board | 333S01 | Cooling Water System | 6 ~ Circulating Pumps – Controlling the pumps. |
17:00 ~ 17:10 | Group 1 | On Board | 333S01 | Cooling Water System | 7 ~ System performance – Temperature and pressures. |
Wed 05-Jul |
08:30 ~ 08:50 | Group 3 | Classroom 3 | 371M01 | Air Conditioning and Ventilation | 1 ~ Air Conditioning and Ventilation: Examine the general conditions and system operation prior to perform the task. |
08:50 ~ 09:05 | Group 3 | Classroom 3 | 371M01 | Air Conditioning and Ventilation | 2 ~ Ventilation system: Check Motor Temperature, revolution and noise and vibration. |
09:05 ~ 09:20 | Group 3 | Classroom 3 | 371M01 | Air Conditioning and Ventilation | 3 ~ Ventilation system: Earthing Arrangement - Inspect Earth Bonding. |
09:20 ~ 09:35 | Group 3 | Classroom 3 | 371M01 | Air Conditioning and Ventilation | 5 ~ Ventilation system: Motors Controllers functional check of various protective and overload devices and type of controllers employed. |
09:35 ~ 09:55 | Group 3 | Classroom 3 | 371M01 | Air Conditioning and Ventilation | 6 ~ Air Conditioning and Ventilation: Visual Check and inspect for leaks in HVAC system. |
09:55 ~ 10:10 | Group 3 | Classroom 3 | 371M01 | Air Conditioning and Ventilation | 7 ~ Ventilation system: Vent. Flaps, covers and trunking-inspect & Clean. |
10:10 ~ 10:30 | Group 3 | Classroom 3 | 371M01 | Air Conditioning and Ventilation | 8 ~ Air Conditioning and Ventilation: Pre checks and safety instruction before, during and after performing the task. |
11:00 ~ 11:15 | Group 3 | Classroom 3 | 371M01 | Air Conditioning and Ventilation | 9 ~ Ventilation system: Functional check of various protective and overload devices and type of controllers employed. |
11:15 ~ 11:35 | Group 3 | Classroom 3 | 371M01 | Air Conditioning and Ventilation | 10 ~ Air conditioning system: Check SW side of heat exchanger flow and pressure. |
11:35 ~ 11:55 | Group 3 | Classroom 3 | 371M01 | Air Conditioning and Ventilation | 11 ~ Air conditioning system: Check control valve and actuator heat exchanger. |
11:55 ~ 12:25 | Group 3 | Classroom 3 | 371M01 | Air Conditioning and Ventilation | 12 ~ Air Conditioning and Ventilation: Equipment and Test Procedures for Electrical Circuit Components. |
12:25 ~ 12:55 | Group 3 | Classroom 3 | 371M01 | Air Conditioning and Ventilation | 13 ~ Air conditioning system: Check, clean dust filter Air handling units, - Ammunition, MCSR and small arms store. |
12:35 ~ 13:05 | Group 3 | Classroom 3 | 371M01 | Air Conditioning and Ventilation | 14 ~ Air conditioning system: Check heat exchanger air conditioning unit at various locations and station in working order. |
13:05 ~ 13:35 | Group 3 | Classroom 3 | 371M01 | Air Conditioning and Ventilation | 15 ~ Air conditioning system: Check the chilled water control valves for leaks, stiffness and corrosion. |
14:00 ~ 14:30 | Group 3 | Classroom 3 | 371M01 | Air Conditioning and Ventilation | 16 ~ Ventilation system: Check electric motor and centrifugal fan - Various locations. |
14:30 ~ 14:50 | Group 3 | Classroom 3 | 371M01 | Air Conditioning and Ventilation | 17 ~ Ventilation system: Check electric motor and Ventilation fan- (Accommodation) spaces and Switchboard room. |
14:50 ~ 15:10 | Group 3 | Classroom 3 | 371M01 | Air Conditioning and Ventilation | 18 ~ Ventilation system: Check fire protection flap with electro magnet device. |
15:10 ~ 15:30 | Group 3 | Classroom 3 | 371M01 | Air Conditioning and Ventilation | 19 ~ Ventilation system: Clean and disinfect air duct of the Sick Bay and treatment room. |
16:00 ~ 16:15 | Group 3 | On Board | 371M01 | Air Conditioning and Ventilation | 4 ~ Ventilation system: Filters - Clean the Dust Filter Mat. |
Tue 11-Jul |
14:20 ~ 14:40 | Group 1 | On Board | 340S02 | Sewage System | 1 ~ The Sanitary Discharge Grey Water System - System arrangements, functions and operations. |
14:40 ~ 14:55 | Group 1 | On Board | 340S02 | Sewage System | 2 ~ Sewage collecting Tank 16, Sewage tank 17 - Arrangement, Functions. |
14:55 ~ 15:25 | Group 1 | On Board | 340S02 | Sewage System | 3 ~ STP: Clean and Inspect- External Feed Pump, vacuum pumps, valves, Local operator panel, ventilation lines – functions, operations. |
15:40 ~ 16:00 | Group 1 | On Board | 340S02 | Sewage System | 4 ~ STP: Functional Checks- The LOP- Health checks, auto start/stop. Alarms, pre starting checks, safety procedures, operation and Performance. |
16:00 ~ 16:15 | Group 1 | On Board | 340S02 | Sewage System | 5 ~ STP: Replenish disinfectant- Procedures when handling disinfectant, Safety precautions. |
16:15 ~ 16:25 | Group 1 | On Board | 340S02 | Sewage System | 6 ~ Discharge of Sanitary Grey and Black Water. |
16:25 ~ 17:25 | Group 1 | On Board | 340S02 | Sewage System | 7 ~ On Board Familiarisation. |
Wed 12-Jul |
13:30 ~ 15:40 | Group 1 | On Board | 333S01 | Cooling Water System | 8 ~ On Board Familiarisation |
Tue 25-Jul |
09:30 ~ 10:10 | Group 2 | Classroom 1 | 341M01 | Fresh Water System | 8 ~ Fresh Water Makers: Daily Checks Reverse Osmosis – Control panel, Filters, differential pressures, Oil level. |
10:10 ~ 10:25 | Group 2 | Classroom 1 | 341M01 | Fresh Water System | 9 ~ Fresh Water Makers: Check Filling heights – Deacidification Filter heights |
10:40 ~ 10:50 | Group 2 | Classroom 1 | 341M01 | Fresh Water System | 10 ~ Fresh Water Makers: Stop Rinse – Module Membrane. |
10:50 ~ 11:00 | Group 2 | Classroom 1 | 341M01 | Fresh Water System | 11 ~ Fresh Water Makers: Clean – Module Membrane. |
11:00 ~ 11:10 | Group 2 | Classroom 1 | 341M01 | Fresh Water System | 12 ~ Fresh Water Makers: Check Torque – Module Membrane. |
11:10 ~ 11:25 | Group 2 | Classroom 1 | 341M01 | Fresh Water System | 13 ~ Fresh Water Makers: RO unit - Change Lub Oil |
11:25 ~ 11:55 | Group 2 | Classroom 1 | 341M01 | Fresh Water System | 14 ~ Hot Water Circuit: Run Pump if not in regular use – Pre starting checks, Control panel, check performance, leaks, and abnormalities. |
11:55 ~ 12:15 | Group 2 | Classroom 1 | 341M01 | Fresh Water System | 15 ~ Hot Water Circuit: Clean & Inspect – Control Panel, HW Circulating Pump and motors, Valves, cables and terminations |
12:15 ~ 12:25 | Group 2 | Classroom 1 | 341M01 | Fresh Water System | 16 ~ Hot Water Circuit: Functional Checks- Control panel |
12:25 ~ 12:35 | Group 2 | Classroom 1 | 341M01 | Fresh Water System | 17 ~ Hot Water Circuit: Clean, Inspect and Check Insulation – Motors & Control Panel. |
12:35 ~ 12:40 | Group 2 | Classroom 1 | 341M01 | Fresh Water System | 18 ~ Hot Water Circuit: Inspect Earth Bonding – Motors, control Panel. |
12:50 ~ 13:00 | Group 2 | Classroom 1 | 341M01 | Fresh Water System | 19 ~ Hot Water Circuit: Clean and Inspect – Pressure Control Switch. |
14:00 ~ 16:00 | Group 2 | On Board | 341M01 | Fresh Water System | 20 ~ On Board Familiarisation |
Thu 27-Jul |
09:30 ~ 10:00 | Group 2 | Classroom 1 | 670M01 | Fixed Internal Fire fighting System | 1 ~ Sprinkler System - Clean and inspect: Compressed air pipe coupling, test valves, sprinklers head. |
10:00 ~ 10:20 | Group 2 | Classroom 1 | 670M01 | Fixed Internal Fire fighting System | 2 ~ Sprinkler System - Check Audibles & Visual Alarm & Water Pressure: Check audibles & visual alarm and water pressure. |
10:20 ~ 11:00 | Group 2 | Classroom 1 | 670M01 | Fixed Internal Fire fighting System | 3 ~ Water Mist System (Control Panel) - Inspect externally: Control panel, water pump, valve, nozzles. |
11:15 ~ 11:35 | Group 2 | Classroom 1 | 670M01 | Fixed Internal Fire fighting System | 4 ~ Water Mist System - Clean and inspect water pump and outfit: Clean and inspect water pump and outfit, manual and auto operation. |
11:35 ~ 11:50 | Group 2 | Classroom 1 | 670M01 | Fixed Internal Fire fighting System | 5 ~ Water Mist System (Control Panel): Clean and inspect internally. |
11:50 ~ 12:05 | Group 2 | Classroom 1 | 670M01 | Fixed Internal Fire fighting System | 6 ~ Water Mist System - Alarm Checks: Control panel self tests and Alarm activation. |
12:05 ~ 12:45 | Group 2 | Classroom 1 | 670M01 | Fixed Internal Fire fighting System | 7 ~ Foam System - Clean externally: Foam and fire pumps, valves, monitors, hoses, nozzles. |
12:45 ~ 13:00 | Group 2 | Classroom 1 | 670M01 | Fixed Internal Fire fighting System | 8 ~ Foam System - Functional Checks: Pre starting checks, procedure when running the fire pump. |
13:00 ~ 13:15 | Group 2 | Classroom 1 | 670M01 | Fixed Internal Fire fighting System | 9 ~ Foam System - Operational Check: Pre starting check, Operational procedures, performance. |
13:15 ~ 13:55 | Group 2 | Classroom 1 | 670M01 | Fixed Internal Fire fighting System | 10 ~ CO2 System - Clean & Check Pipes, Nozzles & associated Components, Clean and check pipes, Nozzles and associated components. |
14:55 ~ 15:10 | Group 2 | Classroom 1 | 670M01 | Fixed Internal Fire fighting System | 11 ~ CO2 System - Weight the cylinder: Weight the cylinder. |
15:10 ~ 18:10 | Group 2 | On Board | 670M01 | Fixed Internal Fire fighting System | 12 ~ On Board Familiarisation |
Fri 28-Jul |
09:30 ~ 10:10 | Group 2 | Classroom 1 | 650P01 | Damage Control and Fire Fighting | 1 ~ The ship’s Fire Fighting System arrangements – Fire Main line. |
10:10 ~ 10:25 | Group 2 | Classroom 1 | 650P01 | Damage Control and Fire Fighting | 2 ~ Fire Hydrants and the Locations. |
10:40 ~ 11:40 | Group 2 | Classroom 1 | 650P01 | Damage Control and Fire Fighting | 3 ~ Operating the system using the Hoses, Nozzles and sprays. |
11:40 ~ 12:40 | Group 2 | Classroom 1 | 650P01 | Damage Control and Fire Fighting | 4 ~ The Sprinkler, CO2, Foam and the Water Mist system-General arrangements, general characteristics and operations. |
14:40 ~ 15:10 | Group 2 | Classroom 1 | 650P01 | Damage Control and Fire Fighting | 5 ~ The External FF system - The general arrangements, general characteristics and operations. |
15:10 ~ 15:50 | Group 2 | Classroom 1 | 333P01 | Fresh Water Cooling System | 1 ~ Establish the Fresh Water Cooling System. |
15:50 ~ 16:10 | Group 2 | Classroom 1 | 333P01 | Fresh Water Cooling System | 2 ~ The Circulating Pumps and the Circulating FW. |
16:10 ~ 16:20 | Group 2 | Classroom 1 | 333P01 | Fresh Water Cooling System | 3 ~ The Heat Exchangers - Cooling process. |
16:35 ~ 16:55 | Group 2 | Classroom 1 | 333P01 | Fresh Water Cooling System | 4 ~ Equipments and systems cooled. |
16:55 ~ 17:05 | Group 2 | Classroom 1 | 333P01 | Fresh Water Cooling System | 5 ~ Pre-Starting Checks and Safety Procedures. |
17:05 ~ 17:20 | Group 2 | Classroom 1 | 333P01 | Fresh Water Cooling System | 6 ~ Running the System - verify System Pressures and Temperatures and state of Alarm. |
17:20 ~ 18:20 | Group 2 | On Board | 333P01 | Fresh Water Cooling System | 7 ~ On Board Familiarisation. |
Mon 31-Jul |
09:30 ~ 10:30 | Group 2 | On Board | 411P01 | Shore Supply | 1 ~ Shore Supply: Perform Site Survey and to familirise with the overall system layout examine general conditions including to be acquinted system operating instruction prior to perform the task. |
10:45 ~ 11:00 | Group 2 | On Board | 411P01 | Shore Supply | 3 ~ Shore Supply - Check periodically the Phase Sequence Meter. |
11:00 ~ 11:30 | Group 2 | On Board | 411P01 | Shore Supply | 4 ~ Shore Supply - Functional Check of the Control Panel, meters, gauges, phase sequence meter prior ship shore connections prior to connection and termination. |
11:30 ~ 12:00 | Group 2 | On Board | 411P01 | Shore Supply | 6 ~ Shore Supply Safety Handling: Observe safety precaution and practices, handling of hazardous substance in performing the work. |
12:00 ~ 12:30 | Group 2 | Classroom 1 | 411P01 | Shore Supply | 2 ~ Shore Supply -Check and clean Earth bonding straps tightness and free from dirt and corrosion. |
12:00 ~ 12:15 | Group 2 | Classroom 1 | 411P01 | Shore Supply | 5 ~ Visual inspection of Shore supply connection panel and box. |
12:30 ~ 13:30 | Group 2 | Classroom 1 | 411P01 | Shore Supply | 7 ~ Shore Supply: Practical Survey and Inspection on the Shore Supply System and Components onboard. |
14:30 ~ 14:45 | Group 2 | Classroom 1 | 411P01 | Shore Supply | 8 ~ Shore Supply - Visual Inspection the Shore Supply cables and stowage reels. |
14:45 ~ 15:05 | Group 2 | Classroom 1 | 411P01 | Shore Supply | 9 ~ Keep all electrical connections and mechanical fastenings tight according to right torque and the fastenings are dry, clean and rust free. |
15:20 ~ 17:20 | Group 2 | On Board | 411P01 | Shore Supply | 10 ~ Perform Practical Site Survey and inspection of the system and components onboard. |
Tue 01-Aug |
09:30 ~ 09:50 | Group 2 | Classroom 1 | 400M02 | Power Conversion Systems | 1 ~ Transformers: Examine the general conditions of the transformer Units and functional status prior to perform any task. |
09:50 ~ 10:10 | Group 2 | Classroom 1 | 400M02 | Power Conversion Systems | 2 ~ Transformer: Examine for signs of abnormalities, dirt, dust and corrosion. Clean as necessary. |
10:10 ~ 10:30 | Group 2 | Classroom 1 | 400M02 | Power Conversion Systems | 3 ~ Transfomers: Examine and check the input voltage from 415VAC Panels and Output voltage 230VAC at DB panels. |
10:45 ~ 11:05 | Group 2 | Classroom 1 | 400M02 | Power Conversion Systems | 4 ~ Transformers: Clean, inspect and check insulation and earthing straps connections for tightness and corrosion. |
11:05 ~ 11:25 | Group 2 | Classroom 1 | 400M02 | Power Conversion Systems | 5 ~ Transformer: Check the ambient temperature and air flow cooling requirements, sign of noise and vibration. |
11:25 ~ 11:45 | Group 2 | Classroom 1 | 400M02 | Power Conversion Systems | 6 ~ Safety and Handling - Observe safety precaution and practices, handling of hazadous materials when performing the work. |
11:45 ~ 12:00 | Group 2 | Classroom 1 | 400M02 | Power Conversion Systems | 8 ~ Battery and Charging Units: :Examine the general conditions of the Units and functional status prior to perform any task. |
12:00 ~ 12:15 | Group 2 | Classroom 1 | 400M02 | Power Conversion Systems | 9 ~ Battery and Charging Units: Check the physical conditions for any sign of defect and damage and check insulation cables and units. |
12:15 ~ 12:30 | Group 2 | Classroom 1 | 400M02 | Power Conversion Systems | 10 ~ Battery and Charging Unit: Measure and record electrolyte SG reading in Battery Log Book. |
12:30 ~ 12:50 | Group 2 | Classroom 1 | 400M02 | Power Conversion Systems | 11 ~ Battery sets and Charging Units : Check and record the overall float voltage at the battery terminals. |
12:50 ~ 13:05 | Group 2 | Classroom 1 | 400M02 | Power Conversion Systems | 12 ~ Battery sets and Charging Units: Check ventilation cooling fan in battery spaces for correct operation. |
13:05 ~ 13:20 | Group 2 | Classroom 1 | 400M02 | Power Conversion Systems | 14 ~ UPS: Visual check the cells cleanliness, cracks, electrolyte leakage and signs of damage. |
14:20 ~ 14:35 | Group 2 | Classroom 1 | 400M02 | Power Conversion Systems | 16 ~ UPS: Check and record the overall float voltage at the battery terminals. |
14:35 ~ 14:50 | Group 2 | Classroom 1 | 400M02 | Power Conversion Systems | 19 ~ UPS Safety and Handling: Observe safety precaution and practices, handling of hazadous materials when performing the work. |
14:50 ~ 16:20 | Group 2 | On Board | 400M02 | Power Conversion Systems | 7 ~ Transformers: Practical Site Survey and Inspection on the System and Components onboard. |
16:35 ~ 16:50 | Group 2 | On Board | 400M02 | Power Conversion Systems | 13 ~ Uninterrupted Power Supply (UPS) for the 230 V systems: Examine the general conditions of the UPS Units and functional status prior to perform task. |
16:50 ~ 17:05 | Group 2 | On Board | 400M02 | Power Conversion Systems | 15 ~ UPS: Check the ventilation system in the UPS spaces in good operating conditions. |
17:05 ~ 17:20 | Group 2 | On Board | 400M02 | Power Conversion Systems | 17 ~ UPS: Check grounding and earthing straps for tightness and sign of corrosion. |
17:20 ~ 17:35 | Group 2 | On Board | 400M02 | Power Conversion Systems | 18 ~ UPS: Run self Check or BITE and record results. |
Wed 02-Aug |
09:15 ~ 10:15 | Group 2 | On Board | 400M02 | Power Conversion Systems | 20 ~ UPS: Practical Site Survey and Inspection on the System and Components onboard. |
10:30 ~ 11:30 | Group 2 | On Board | 430M01 | Electrical Plants - Switchboard and switch gears | 1 ~ Perform Site Survey and to familirise with the overall system layout examine general conditions including to be acquainted system operating instruction prior to perform the task. |
11:30 ~ 12:00 | Group 2 | Classroom 1 | 430M01 | Electrical Plants - Switchboard and switch gears | 2 ~ Switchboard (415V 50Hz) Panels 230 V 50Hz Switchboard Panels - Perform Inspection on loose electrical connections or mechanical fastenings and tighten them as necessary iaw required torque. |
12:00 ~ 12:10 | Group 2 | Classroom 1 | 430M01 | Electrical Plants - Switchboard and switch gears | 3 ~ Switchboard (415V 50Hz) Panels 230 V 50Hz Switchboard Panels - Check and visual inspection and all bus/ bus are clean and dry. To perform cleaning ensure the Switchboard /panel are de-energised. |
12:10 ~ 12:40 | Group 2 | Classroom 1 | 430M01 | Electrical Plants - Switchboard and switch gears | 4 ~ Switchboard (415V 50Hz) Panels 230 V 50Hz Panel - The front panels of dead front switchboards: Visual inspection of the front panels of dead front switchboards frre from dirt and moiture and corrosion, Clean as necessary without de-energizing (Switch Off). |
12:40 ~ 12:55 | Group 2 | Classroom 1 | 430M01 | Electrical Plants - Switchboard and switch gears | 5 ~ Switchboard (415V 50Hz) Panels 230 V 50Hz Switchboard Panels - Check and examine he front panels of dead front switchboards Instruments and metering display analog pointers and digital are zero(when Static) and calibrated. |
12:55 ~ 13:25 | Group 2 | On Board | 430M01 | Electrical Plants - Switchboard and switch gears | 6 ~ Run self check on the instrument and display with BITE facilities. |
14:25 ~ 14:55 | Group 2 | On Board | 430M01 | Electrical Plants - Switchboard and switch gears | 7 ~ Switchboard (415V 50Hz), 230 V 50Hz Panels Protective circuits - Visually check and, over current or reverse current circuits, overload relays, and protective circuit performs its desired functions for fuses. |
14:55 ~ 15:25 | Group 2 | Classroom 1 | 430M01 | Electrical Plants - Switchboard and switch gears | 8 ~ Switchboard (415V 50Hz) Panels Bus Transfer Equipment - (Interconnecting Breakers, Supply Breakers,Shore Supply Breakers): Visually check are for operation at desired functions (When testing bus transfer equipment, should follow the safety precautions given for testing circuit breakers). |
15:25 ~ 15:40 | Group 2 | Classroom 1 | 430M01 | Electrical Plants - Switchboard and switch gears | 9 ~ Switchboard (415V 50Hz), 230 V 50Hz Panels Fuses - Check and examine the right size and that they make firm contact with fuse clips. Ensure that lock-in devices (if provided) are properly fitted and that all fuse wiring connections are tight. |
15:40 ~ 16:10 | Group 2 | Classroom 1 | 430M01 | Electrical Plants - Switchboard and switch gears | 10 ~ Switchboard (415V 50Hz), 230 V 50Hz Panels Distribution Boxes - Check the function of wiring distribution boxes (fused), with and without switches, feed circuits fuse clip barrel nuts and terminal connections tightness. |
16:25 ~ 16:55 | Group 2 | Classroom 1 | 430M01 | Electrical Plants - Switchboard and switch gears | 11 ~ Emergency Switchboard Panel - Check and examine he front panels of dead front switchboards Instruments and metering display analog pointers and digital are zero (when Static) and calibrated. |
16:50 ~ 17:20 | Group 2 | Classroom 1 | 430M01 | Electrical Plants - Switchboard and switch gears | 12 ~ Emergency Switchboard Panel - Run self check on the instrument and display with BITE facilities and log the result in switchboard log book or computer system. |
Thu 03-Aug |
09:15 ~ 09:45 | Group 2 | Classroom 1 | 430M01 | Electrical Plants - Switchboard and switch gears | 13 ~ Switchboard (415V 50Hz), 230 V 50Hz Panels Protective circuits - Visually check and, over current or reverse current circuits, overload relays, and protective circuit performs its desired functions for fuses. |
09:45 ~ 10:15 | Group 2 | Classroom 1 | 430M01 | Electrical Plants - Switchboard and switch gears | 14 ~ Transformers - Visual inspection of the external parts are free from dirt and moisture and corrosion, clean as necessary without de-energizing (Switch Off). |
10:15 ~ 10:45 | Group 2 | Classroom 1 | 430M01 | Electrical Plants - Switchboard and switch gears | 15 ~ Transformers check and clean earth bonding straps tightness and free from dirt and corrosion. |
11:00 ~ 11:30 | Group 2 | | 430M01 | Electrical Plants - Switchboard and switch gears | 16 ~ Transformers - Check and examine the electrical properties continuity, insulation are within the acceptable limits. |
11:30 ~ 12:00 | Group 2 | | 430M01 | Electrical Plants - Switchboard and switch gears | 17 ~ Observe safety precautions, practices and handling of hazardous material in performing the work. |
13:30 ~ 15:30 | Group 2 | On Board | 430M01 | Electrical Plants - Switchboard and switch gears | 18 ~ Perform Practical Site Survey and inspection on the system and components onboard. |
Mon 07-Aug |
09:15 ~ 09:35 | Group 2 | On Board | 810M01 | Navigation Light | 1 ~ Navigation Light - Daily User functional check. |
09:35 ~ 10:05 | Group 2 | On Board | 810M01 | Navigation Light | 2 ~ Navigation Light - Check and test BITE functionalities. |
10:05 ~ 10:25 | Group 2 | On Board | 810M01 | Navigation Light | 3 ~ Navigation Light - Visual inspection of the control panel free from dust and dirt. |
10:40 ~ 11:00 | Group 2 | On Board | 810M01 | Navigation Light | 4 ~ Navigation Light - Clean and inspect the navigation light fitting. |
11:00 ~ 11:20 | Group 2 | On Board | 810M01 | Navigation Light | 5 ~ Navigation Light - Control Panel, Navigation and Signal Light System Check. |
11:20 ~ 11:40 | Group 2 | On Board | 810M01 | Navigation Light | 6 ~ Navigation Light - Clean, inspect and check insulation Control Panel. |
11:40 ~ 12:00 | Group 2 | On Board | 810M01 | Navigation Light | 7 ~ Searchlight system - Visual and functional check. |
12:00 ~ 12:20 | Group 2 | On Board | 810M01 | Navigation Light | 8 ~ Searchlight system - Check the cable connection fittings and continuity and insulation. |
12:20 ~ 12:40 | Group 2 | On Board | 810M01 | Navigation Light | 9 ~ Acoustical signalling equipment - Visual and functional check. |
12:40 ~ 13:00 | Group 2 | On Board | 810M01 | Navigation Light | 10 ~ Acoustical signalling equipment - Clean and inspect the devices for its correct operation. |
15:45 ~ 15:50 | Group 3 | Classroom 3 | 310M01 | Fire main, Bilge & Ballast | 15 ~ BWS – Inspect earth bonding : Earthing straps, fastenings, continuity tester. |
16:05 ~ 17:05 | Group 3 | Classroom 3 | 310M01 | Fire main, Bilge & Ballast | 16 ~ GS Pumps & Outfit: Clean and inspect – Pumps, motors, Control Panel, valves, associated fittings. |
17:05 ~ 17:35 | Group 3 | Classroom 3 | 310M01 | Fire main, Bilge & Ballast | 17 ~ GS Pumps and Outfit: Functional checks – Pre starting checks and safety procedures, performance, bilge and ballast functions. |
17:35 ~ 17:45 | Group 3 | Classroom 3 | 310M01 | Fire main, Bilge & Ballast | 19 ~ GS Pumps and outfit: Clean, insect and check insulation – Electrical Equipment, Cables and terminations, Insulation Tester. |
17:45 ~ 18:15 | Group 3 | Classroom 3 | 310M01 | Fire main, Bilge & Ballast | 20 ~ Fire hydrant and spray: Clean and inspect – Hydrant, spray, nozzles, hoses, loose fittings. |
18:15 ~ 18:25 | Group 3 | On Board | 310M01 | Fire main, Bilge & Ballast | 12 ~ BWS Pumps and outfit: Clean and Inspect – Pumps, motors, Control Panel, valves. |
18:25 ~ 18:35 | Group 3 | On Board | 310M01 | Fire main, Bilge & Ballast | 18 ~ Emergency FF pumps: Functional Checks with GS Pumps – Pre starting checks and safety procedures, performance of GS pumps with Emergency FF pumps. |
Caterpillar System |
Tue 13-Jun |
10:30 ~ 10:45 | Group 1 | | 000000 | Break Times | 1 ~ Morning Tea Break |
12:45 ~ 13:45 | Group 1 | | 000000 | Break Times | 2 ~ Lunch Break |
Thu 13-Jul |
08:30 ~ 08:45 | Group 1 | | 210S01 | Propulsion Systems | 1 ~ Propulsion engine - Perform Daily Checks. |
08:45 ~ 09:00 | Group 1 | | 210S01 | Propulsion Systems | 2 ~ Propulsion Diesel Engines (PDE) - Inspect PDE Instrument Panel. |
09:00 ~ 09:15 | Group 1 | | 210S01 | Propulsion Systems | 3 ~ PDE - Inspect for leaks and loose connection. |
09:15 ~ 09:45 | Group 1 | | 210S01 | Propulsion Systems | 4 ~ PDE- Engine Oil Filter - Change. |
09:45 ~ 10:15 | Group 1 | | 210S01 | Propulsion Systems | 5 ~ Reduction gear system-Perform an oil change and replace oil filter. |
10:15 ~ 10:30 | Group 1 | | 210S01 | Propulsion Systems | 6 ~ Reduction gear system - Clean heat exchanger. |
11:00 ~ 11:15 | Group 1 | | 210S01 | Propulsion Systems | 7 ~ Clean heat exchanger. |
11:15 ~ 11:30 | Group 1 | | 210S01 | Propulsion Systems | 8 ~ Flexible couplings - Visual inspection for sign of damage and vulcanised. |
11:30 ~ 11:45 | Group 1 | | 210S01 | Propulsion Systems | 9 ~ Propeller Shaft - Check lubrication system and temperature. |
11:45 ~ 12:00 | Group 1 | | 210S01 | Propulsion Systems | 10 ~ Propeller shaft sealing - Visual check for leaking. |
12:00 ~ 12:15 | Group 1 | | 210S01 | Propulsion Systems | 11 ~ Propeller shaft Bearing - Check propeller shaft lubrication operation and bearing temperature (when shaft is turning). |
12:15 ~ 12:30 | Group 1 | | 210S01 | Propulsion Systems | 12 ~ Control system propulsion - Check cooling fan operation. |
12:30 ~ 13:00 | Group 1 | | 210S01 | Propulsion Systems | 13 ~ Propulsion Control - Check condition of Electronic devices and LRUs. |
14:00 ~ 14:15 | Group 1 | | 210S01 | Propulsion Systems | 14 ~ Propulsion Control - Check cooling fan operation. |
14:15 ~ 14:30 | Group 1 | | 210S01 | Propulsion Systems | 15 ~ Propulsion Control - Visually inspect the Circuit Board (Line Replaceable Unit - LRU. |
14:30 ~ 14:45 | Group 1 | | 210S01 | Propulsion Systems | 16 ~ Propulsion Control - Check condition and functionality of Display Panel and Indicating Lights including LED. |
14:45 ~ 15:00 | Group 1 | | 210S01 | Propulsion Systems | 17 ~ Propulsion control- Inspect terminal blocks. Inspect circuit breakers. |
15:00 ~ 15:15 | Group 1 | | 210S01 | Propulsion Systems | 18 ~ Propulsion Control - Check fan operation. |
Fri 14-Jul |
08:30 ~ 08:50 | Group 1 | Classroom 1 | 410S01 | HP & LP Power Generation | 2 ~ HP & LP Power Generation - |
08:50 ~ 09:10 | Group 1 | Classroom 1 | 410S01 | HP & LP Power Generation | 3 ~ Diesel Generators and Emergency Generators - Perform Daily Checks. |
09:10 ~ 09:30 | Group 1 | Classroom 1 | 410S01 | HP & LP Power Generation | 4 ~ Diesel Generators and Emergency Generators - Inspect DE Instrument Panel. |
09:30 ~ 09:50 | Group 1 | Classroom 1 | 410S01 | HP & LP Power Generation | 5 ~ Diesel Generators and Emergency Generators - Inspect for leaks and loose connection. |
09:50 ~ 10:10 | Group 1 | Classroom 1 | 410S01 | HP & LP Power Generation | 6 ~ Emergency Generators - Inspect Electrical component Diesel Engine Instrument Panel. |
10:10 ~ 10:30 | Group 1 | Classroom 1 | 410S01 | HP & LP Power Generation | 7 ~ Diesel Generators and Emergency Generators - Protection devices - Check. |
11:00 ~ 11:20 | Group 1 | Classroom 1 | 410S01 | HP & LP Power Generation | 8 ~ Main Switchboard (MSB) and Emergency switchboard (ESB) 415V Panels - Clean, inspect and check insulation and continuity. |
11:20 ~ 11:40 | Group 1 | Classroom 1 | 410S01 | HP & LP Power Generation | 9 ~ Main Switchboard (MSB) and Emergency switchboard (ESB) 415V Panels Inspect earth bonding. |
11:40 ~ 12:10 | Group 1 | Classroom 1 | 410S01 | HP & LP Power Generation | 10 ~ Main Switchboard (MSB) and Emergency switchboard (ESB) 415V Panels - Clean And Inspect Front end panel free from dirt, moisture and corrosion free. |
12:10 ~ 12:30 | Group 1 | Classroom 1 | 410S01 | HP & LP Power Generation | 11 ~ Shore connection - Visual inspection of Shore supply connection panel and box. |
12:30 ~ 12:50 | Group 1 | Classroom 1 | 410S01 | HP & LP Power Generation | 12 ~ Shore connection - Visual Inspection the Shore Supply cables and stowage reels. |
12:50 ~ 13:10 | Group 1 | Classroom 1 | 410S01 | HP & LP Power Generation | 13 ~ Shore connection : Functional Check of the Control Panel, meters, gauges, phase sequence meter prior ship shore connections prior to connection and termination. |
14:00 ~ 14:30 | Group 1 | Classroom 1 | 410S01 | HP & LP Power Generation | 14 ~ Battery sets - Visual inspection and check the terminals tightness. |
14:30 ~ 14:50 | Group 1 | Classroom 1 | 410S01 | HP & LP Power Generation | 15 ~ Battery Sets - Functional check of charging units and check cable any sign of damage. |
14:50 ~ 15:10 | Group 1 | Classroom 1 | 410S01 | HP & LP Power Generation | 16 ~ ransformers - Clean, inspect and check insulation and continuity |
15:10 ~ 15:30 | Group 1 | Classroom 1 | 410S01 | HP & LP Power Generation | 17 ~ Transformers - Clean And Inspect for temperature, noise and vibration. |
16:00 ~ 16:20 | Group 1 | Classroom 1 | 410S01 | HP & LP Power Generation | 18 ~ UPS) for the 230 V systems - Check the ventilation system in the UPS spaces in good operating conditions. |
16:00 ~ 17:00 | Group 1 | On Board | 410S01 | HP & LP Power Generation | 1 ~ Perform Site Survey and to familirise with the overall system layout examine general conditions including to be acquinted system operating instruction prior to perform the task. |
Mon 17-Jul |
08:30 ~ 09:00 | Group 1 | Classroom 1 | 745S01 | Machinery Control and Propulsion Control Systems | 1 ~ Machinery Control (MC) and Propulsion Control Systems (PCS): MC & PCS - Examine the general conditions, and system functional prior to performing any task. |
09:00 ~ 09:30 | Group 1 | Classroom 1 | 745S01 | Machinery Control and Propulsion Control Systems | 2 ~ Machinery Control and Propulsion Control Systems (MC & PCS) - Check condition and functionality of Display Panel and Indicating Lights including LED. |
09:30 ~ 10:00 | Group 1 | Classroom 1 | 745S01 | Machinery Control and Propulsion Control Systems | 3 ~ AMS workstations - Check fan and ventilation cooling operation. |
10:00 ~ 10:30 | Group 1 | Classroom 1 | 745S01 | Machinery Control and Propulsion Control Systems | 4 ~ AMS workstations configuration - Visually inspect the consoles. |
11:00 ~ 11:30 | Group 1 | Classroom 1 | 745S01 | Machinery Control and Propulsion Control Systems | 5 ~ AMS workstations: Check Earth Grounding strap to the Hull structures |
11:30 ~ 12:00 | Group 1 | Classroom 1 | 745S01 | Machinery Control and Propulsion Control Systems | 6 ~ AMS workstations - Run AMS system self checks or BITE. |
12:00 ~ 12:30 | Group 1 | Classroom 1 | 745S01 | Machinery Control and Propulsion Control Systems | 7 ~ AMS Local operation panel (LOP): Check Power Supply AC & DC to the AMS |
12:30 ~ 13:00 | Group 1 | Classroom 1 | 745S01 | Machinery Control and Propulsion Control Systems | 8 ~ AMS workstations - Inspect terminal blocks and Inspect circuit breakers MCB & MCCP or sign of corrosion and cleanliness and dust free. |
14:00 ~ 14:30 | Group 1 | Classroom 1 | 745S01 | Machinery Control and Propulsion Control Systems | 9 ~ AMS Local operation panel (LOP) - Check fan / cooling operation and air flow. |
14:30 ~ 15:00 | Group 1 | Classroom 1 | 745S01 | Machinery Control and Propulsion Control Systems | 10 ~ MC-PCS Safety and Handling - Observe Pre checks, safety procedures and practices, handling of hazardous materials when performing the work before, during and after performing the task. |
Sat 12-Aug |
09:30 ~ 10:30 | Group 4 | Classroom 4 | 000A00 | Non Training Items | 1 ~ Training Launch Introduction |
10:30 ~ 10:45 | Group 4 | | 000000 | Break Times | 1 ~ Morning Tea Break |
10:45 ~ 11:45 | Group 4 | Classroom 4 | 000F01 | OPV 1800: Performance | 1 ~ Introduction OPV 1800. |
11:45 ~ 12:45 | Group 4 | Classroom 4 | 000F01 | OPV 1800: Performance | 2 ~ Ship's Operational Capabilities. |
13:30 ~ 14:30 | Group 4 | | 000000 | Break Times | 2 ~ Lunch Break |
14:30 ~ 15:30 | Group 4 | Classroom 4 | 000F01 | OPV 1800: Performance | 4 ~ Deck Arrangements. |
Enigma 1 |
Thu 15-Jun |
08:30 ~ 09:50 | Group 1 | Classroom 1 | 734S01 | Computer Support System | 1 ~ Daily users check: ILS modules and configurations, Password and Data entry. |
09:50 ~ 10:10 | Group 1 | Classroom 1 | 734S01 | Computer Support System | 2 ~ Data Cleansing. |
10:10 ~ 10:25 | Group 1 | Classroom 1 | 734S01 | Computer Support System | 3 ~ Clean and Inspect: Monitor, keyboard, server, UPS, power plugs. |
11:00 ~ 11:40 | Group 1 | Classroom 1 | 734S01 | Computer Support System | 4 ~ Types of templates, Data Generation, Data Analysis. |
11:40 ~ 11:50 | Group 1 | Classroom 1 | 734S01 | Computer Support System | 5 ~ Clean, inspect and check insulation: Insulation properties, Set up Insulation testing, Insulation tester. |
14:00 ~ 15:00 | Group 1 | On Board | 734S01 | Computer Support System | 6 ~ On Board Familiarisation |
Caterpillar 1 |
Fri 16-Jun |
09:30 ~ 10:00 | Group 2 | Classroom 1 | 400M01 | Electrical Plant | 1 ~ Initial Step- Examine the general conditions and operational status prior to perform the tasks. |
10:00 ~ 10:20 | Group 2 | Classroom 1 | 400M01 | Electrical Plant | 2 ~ Diesel Generator - Visual inspection for leaks and signs of loose connections. |
10:20 ~ 10:50 | Group 2 | Classroom 1 | 400M01 | Electrical Plant | 3 ~ Diesel generators - Perform Daily Checks and Inspection iaw PMS and service routine. |
11:05 ~ 11:25 | Group 2 | Classroom 1 | 400M01 | Electrical Plant | 4 ~ Diesel generators: Check Fuel System Primary Filter and drain as necessary. |
11:25 ~ 11:45 | Group 2 | Classroom 1 | 400M01 | Electrical Plant | 6 ~ Diesel generators: Check the Governor Actuator Linkage |
11:45 ~ 12:05 | Group 2 | Classroom 1 | 400M01 | Electrical Plant | 7 ~ Diesel generators: Check the condition of Governor Actuator Linkage. |
12:05 ~ 12:35 | Group 2 | Classroom 1 | 400M01 | Electrical Plant | 8 ~ Diesel generators: Test the Cooling Syst. Supplemental Cool. Additive (SCA) |
14:35 ~ 15:05 | Group 2 | Classroom 1 | 400M01 | Electrical Plant | 10 ~ Diesel generators: Check and examine DG Protection devices. |
15:05 ~ 15:25 | Group 2 | Classroom 1 | 400M01 | Electrical Plant | 11 ~ Diesel generators: Examine and clean the Oil Mist Detector free from dirt and corrosion |
15:25 ~ 15:45 | Group 2 | Classroom 1 | 400M01 | Electrical Plant | 12 ~ Diesel generators : Clean and Inspect. the Magnetic Pick Ups |
16:00 ~ 16:30 | Group 2 | Classroom 1 | 400M01 | Electrical Plant | 13 ~ Diesel generators: Examine and replacement of DG Oil Filters |
16:30 ~ 16:50 | Group 2 | On Board | 400M01 | Electrical Plant | 5 ~ Diesel generators: Inspect the condition of Zinc Rod |
16:50 ~ 17:10 | Group 2 | On Board | 400M01 | Electrical Plant | 9 ~ Diesel generators: Check starting Motor conditions and clean as necessary. |
17:10 ~ 17:40 | Group 2 | On Board | 400M01 | Electrical Plant | 14 ~ Diesel generators: Inspect the DG mountings for signs of damage and vulcanised |
Mon 19-Jun |
09:30 ~ 09:50 | Group 2 | Classroom 1 | 400M01 | Electrical Plant | 15 ~ Diesel Generators: Examine and clean the Fuel System Primary Filter. |
09:50 ~ 10:10 | Group 2 | Classroom 1 | 400M01 | Electrical Plant | 16 ~ DG - Check and lubricate Barring device |
10:10 ~ 10:30 | Group 2 | Classroom 1 | 400M01 | Electrical Plant | 17 ~ DG: Examine and lubricate Prelube Pump |
10:45 ~ 11:15 | Group 2 | Classroom 1 | 400M01 | Electrical Plant | 18 ~ DG: Examine Fuel System Secondary Filter - Change Element. |
11:15 ~ 11:45 | Group 2 | Classroom 1 | 400M01 | Electrical Plant | 20 ~ Emergency Diesel Generator ( EDG): Inspect Electrical EDG Instrument Panel. |
11:45 ~ 12:15 | Group 2 | Classroom 1 | 400M01 | Electrical Plant | 21 ~ EDG: Perform daily checks i.a.w PMS and Checklist |
12:15 ~ 12:35 | Group 2 | Classroom 1 | 400M01 | Electrical Plant | 23 ~ EDG: Fuel System Primary Filter - Drain. |
12:35 ~ 12:55 | Group 2 | Classroom 1 | 400M01 | Electrical Plant | 24 ~ EDG: Check the EDG Lube Oil Level within the tolerence. |
13:55 ~ 14:15 | Group 2 | Classroom 1 | 400M01 | Electrical Plant | 25 ~ EDG: Fuel System Primary Filter/Water Separator Drain |
14:15 ~ 14:35 | Group 2 | Classroom 1 | 400M01 | Electrical Plant | 26 ~ EDG: Engine - Inspect for leaks and loose connection. |
14:35 ~ 14:55 | Group 2 | Classroom 1 | 400M01 | Electrical Plant | 27 ~ EDG: Inspect Hoses and Clamps for leaks and tightness |
14:55 ~ 15:15 | Group 2 | Classroom 1 | 400M01 | Electrical Plant | 28 ~ EDG: Fuel Tank Water and Sediment - Drain |
15:15 ~ 15:35 | Group 2 | Classroom 1 | 400M01 | Electrical Plant | 30 ~ EDG: Governor Actuator Linkage - Check the conditions.. |
15:35 ~ 15:50 | Group 2 | Classroom 1 | 400M01 | Electrical Plant | 31 ~ EDG - Check electrolyte level within acceptable limit. |
16:05 ~ 16:25 | Group 2 | On Board | 400M01 | Electrical Plant | 19 ~ DG: Inspect the Exhaust Piping and system. |
16:25 ~ 16:55 | Group 2 | On Board | 400M01 | Electrical Plant | 22 ~ EDG: Walk-around and visual inspection |
16:55 ~ 17:15 | Group 2 | On Board | 400M01 | Electrical Plant | 29 ~ EDG: Check Fan clearence and no obstructions |
Tue 20-Jun |
09:30 ~ 09:45 | Group 2 | Classroom 1 | 400M01 | Electrical Plant | 32 ~ EDG: Obtain or collect coolant sample (level1) |
09:45 ~ 10:00 | Group 2 | Classroom 1 | 400M01 | Electrical Plant | 34 ~ EDG: Test Cooling Syst. Supplemental Cool. Additive (SCA) |
10:00 ~ 10:15 | Group 2 | Classroom 1 | 400M01 | Electrical Plant | 36 ~ EDG: Check EDG moutings for crack, vulcanised and sign of damage |
10:30 ~ 10:45 | Group 2 | On Board | 400M01 | Electrical Plant | 33 ~ EDG: Check EDG Protection devices. |
10:45 ~ 11:15 | Group 2 | On Board | 400M01 | Electrical Plant | 35 ~ EDG H500: Check, or replace Filters and Elements: Engine Oil - Fuel Filter,Fuel System primary and Secondary and Engine Air Cleaner Element (Single Element) |
11:15 ~ 13:15 | Group 2 | On Board | 400M01 | Electrical Plant | 37 ~ DG & EDG: Practical Site Survey and Inspection on the System and Components onboard. |
14:15 ~ 14:35 | Group 2 | Classroom 1 | 411M01 | Electrical Plant - Generators | 1 ~ Diesel Generators (DG) and Emergency (EDG): Examine the general conditions and system operation before start to perform the task. |
14:35 ~ 14:55 | Group 2 | Classroom 1 | 411M01 | Electrical Plant - Generators | 2 ~ DG and EDG: Check Fuel System Primary Filter and Drain. |
14:55 ~ 15:15 | Group 2 | Classroom 1 | 411M01 | Electrical Plant - Generators | 3 ~ DG and EDG: Perform Daily Checks as stipulated in PMS and service instruction. |
15:15 ~ 15:35 | Group 2 | Classroom 1 | 411M01 | Electrical Plant - Generators | 4 ~ DG and EDG: Check Oil Mist Detector for operation and cleanliness. |
15:50 ~ 16:05 | Group 2 | Classroom 1 | 411M01 | Electrical Plant - Generators | 5 ~ DG and EDG: Inspect DE Instrument Panel for cleanliness, functionalities and any signs of abnormilities. |
16:05 ~ 16:25 | Group 2 | Classroom 1 | 411M01 | Electrical Plant - Generators | 6 ~ DG and EDG: Examine and Inspect for leaks and loose connection. |
16:25 ~ 16:45 | Group 2 | Classroom 1 | 411M01 | Electrical Plant - Generators | 7 ~ DG and EDG: Cooling Syst. Supplemental Cool. Additive (SCA) - Test. |
16:45 ~ 17:05 | Group 2 | Classroom 1 | 411M01 | Electrical Plant - Generators | 8 ~ DG and EDG: Check and examine Governor Actuator Linkage for looseness, misalignment and stiffness. |
17:05 ~ 17:20 | Group 2 | Classroom 1 | 411M01 | Electrical Plant - Generators | 9 ~ DG and EDG: : Inspect crankshaft vibration damper. |
Wed 21-Jun |
09:30 ~ 10:00 | Group 2 | Classroom 1 | 411M01 | Electrical Plant - Generators | 10 ~ DG and EDG: Engine Oil Filter - Change. |
10:00 ~ 10:30 | Group 2 | Classroom 1 | 411M01 | Electrical Plant - Generators | 11 ~ DG and EDG: Inspect DG Instrument Panel. |
10:45 ~ 11:15 | Group 2 | Classroom 1 | 411M01 | Electrical Plant - Generators | 12 ~ DG and EDG: Cooling Syst. Supplemental Cool. Additive (SCA) - Test. |
11:15 ~ 11:30 | Group 2 | Classroom 1 | 411M01 | Electrical Plant - Generators | 13 ~ DG and EDG: Engine Protection devices - Check. |
11:30 ~ 11:45 | Group 2 | Classroom 1 | 411M01 | Electrical Plant - Generators | 14 ~ DG and EDG: Obtain Diesel Generators Oil Sample. |
11:45 ~ 12:00 | Group 2 | Classroom 1 | 411M01 | Electrical Plant - Generators | 15 ~ DG and EDG: Check Starting Motor connections tightness and signs of abnormilities. |
12:00 ~ 12:15 | Group 2 | Classroom 1 | 411M01 | Electrical Plant - Generators | 16 ~ DG and EDG: Check Battery and charging unit charging current and float voltage in good working condition. Battery are fully charged. |
12:15 ~ 12:35 | Group 2 | Classroom 1 | 411M01 | Electrical Plant - Generators | 17 ~ DG and EDG: Examine and check Engine Mounts for signs of abnormilities damage and vulcanised. |
13:35 ~ 15:35 | Group 2 | On Board | 411M01 | Electrical Plant - Generators | 18 ~ Electrical Plant - Generators: Practical Site Survey and inspection on the system and components onboard. |
15:50 ~ 16:20 | Group 2 | Classroom 1 | 745M01 | Machinery Control and Propulsion Control Systems | 1 ~ MC & PCS - Examine the general conditions, and system functional prior to performing any task. |
16:20 ~ 16:50 | Group 2 | Classroom 1 | 745M01 | Machinery Control and Propulsion Control Systems | 2 ~ Machinery Control and Propulsion Control Systems (MC & PCS): Check condition and functionality of Display Panel and Indicating Lights including LED. |
16:50 ~ 17:20 | Group 2 | Classroom 1 | 745M01 | Machinery Control and Propulsion Control Systems | 3 ~ MC & PCS - Check condition of Electronic devices and LRUs. |
Thu 22-Jun |
09:30 ~ 10:00 | Group 2 | Classroom 1 | 745M01 | Machinery Control and Propulsion Control Systems | 4 ~ MC & PCS - Check cooling or ventilation fan operation and no obstruction of air flow. |
10:00 ~ 10:30 | Group 2 | Classroom 1 | 745M01 | Machinery Control and Propulsion Control Systems | 5 ~ MC & PCS - Check sensing, audible and visual devices fitted and installed in the alarm, safety, and warning systems. |
10:45 ~ 11:15 | Group 2 | Classroom 1 | 745M01 | Machinery Control and Propulsion Control Systems | 6 ~ MC & PCS - Clean external and Internal surfaces of console free from dirt, moisture and sign of corrosion for the console cabinet. |
11:15 ~ 11:45 | Group 2 | Classroom 1 | 745M01 | Machinery Control and Propulsion Control Systems | 7 ~ MC & PCS - Check input main and back-up power supply. Inspect terminal blocks,circuit breakers and protective devices. |
11:45 ~ 12:15 | Group 2 | Classroom 1 | 745M01 | Machinery Control and Propulsion Control Systems | 8 ~ MC & PCS - Clean panel free from dust, dirt and corrosion. Perform cleanliness and preservation as necessary. |
12:15 ~ 12:45 | Group 2 | Classroom 1 | 745M01 | Machinery Control and Propulsion Control Systems | 10 ~ MC & PCS - Check earth grounding straps for continuity and tightness. |
13:45 ~ 14:15 | Group 2 | Classroom 1 | 745M01 | Machinery Control and Propulsion Control Systems | 9 ~ MC & PCS - Inspect cable installation for loose connections and clean cable bundles free from dirt, duct and moisture. |
14:15 ~ 14:45 | Group 2 | Classroom 1 | 745M01 | Machinery Control and Propulsion Control Systems | 11 ~ PC-PCS Safety and Handling - Observe Pre checks, safety procedures and practices, handling of hazardous materials when performing the work before, during and after performing the task. |
15:00 ~ 17:00 | Group 2 | On Board | 745M01 | Machinery Control and Propulsion Control Systems | 12 ~ MC-PCS - Practical Site Survey and inspection on the system and components onboard. |
Fri 23-Jun |
09:30 ~ 10:30 | Group 3 | On Board | 210M01 | CPP | 1 ~ CPP - Examine the general layout conditions and system operation prior to perform the task. |
10:45 ~ 11:05 | Group 3 | Classroom 3 | 210M01 | CPP | 2 ~ Perform Daily Checks: Walk around and survey visually to examine the general conditions and system operation. |
11:05 ~ 11:25 | Group 3 | On Board | 210M01 | CPP | 3 ~ Check operation from Remote and Local and Emergency Positions. |
11:25 ~ 11:45 | Group 3 | On Board | 210M01 | CPP | 4 ~ Check and maintain the oil level in the hydraulic tank of the system. |
11:45 ~ 12:05 | Group 3 | On Board | 210M01 | CPP | 5 ~ CPP - Observe safety precaution,practices and clealiness in performing the work at all time. |
12:05 ~ 12:25 | Group 3 | Classroom 3 | 210M01 | CPP | 6 ~ Keep all electrical connections and mechanical fastenings tight according to right torque. and the fastenings are dry, clean and rust free. |
14:30 ~ 14:50 | Group 3 | Classroom 3 | 210M01 | CPP | 7 ~ Power Supply and Services: Check power services are available before start the operation. |
14:50 ~ 15:10 | Group 3 | Classroom 3 | 210M01 | CPP | 8 ~ Inspect and test the equipment at sufficient intervals to make sure that the equipment is in operating condition. |
15:25 ~ 17:25 | Group 3 | On Board | 210M01 | CPP | 9 ~ Perform Practical Site Survey and inspection of the system and components onboard. |
Mon 26-Jun |
09:30 ~ 10:00 | Group 3 | On Board | 211M01 | Main Engines | 1 ~ Engine - Inspect for leaks and loose connection. |
10:00 ~ 10:15 | Group 3 | Classroom 3 | 211M01 | Main Engines | 2 ~ Inspect PDE Instrument Panel. |
10:15 ~ 10:30 | Group 3 | On Board | 211M01 | Main Engines | 3 ~ Fuel System Primary Filter - Drain. |
10:30 ~ 10:45 | Group 3 | On Board | 211M01 | Main Engines | 4 ~ Zinc Rod - Inspect. |
11:00 ~ 11:15 | Group 3 | On Board | 211M01 | Main Engines | 5 ~ Engine Mounts - Inspect. |
11:15 ~ 11:45 | Group 3 | On Board | 211M01 | Main Engines | 6 ~ Cooling Syst. Supplemental Cool. Additive (SCA) - Test. |
11:45 ~ 12:00 | Group 3 | On Board | 211M01 | Main Engines | 7 ~ Obtain PDE Engine Oil Sample. |
12:00 ~ 12:30 | Group 3 | On Board | 211M01 | Main Engines | 8 ~ Engine Protection devices - Check. |
12:30 ~ 12:45 | Group 3 | On Board | 211M01 | Main Engines | 9 ~ Perform Daily Checks. |
13:45 ~ 14:00 | Group 3 | On Board | 211M01 | Main Engines | 10 ~ Magnetic Pick Ups - Clean and Inspect. |
14:00 ~ 14:15 | Group 3 | On Board | 211M01 | Main Engines | 11 ~ Prelube Pump - Lubricate. |
14:15 ~ 14:45 | Group 3 | On Board | 211M01 | Main Engines | 12 ~ Governor Actuator Linkage - Check. |
14:45 ~ 15:05 | Group 3 | On Board | 211M01 | Main Engines | 13 ~ Inspect Exhaust Piping |
15:05 ~ 15:25 | Group 3 | On Board | 211M01 | Main Engines | 14 ~ Fuel System Primary Filter - Clean. |
15:25 ~ 15:40 | Group 3 | On Board | 211M01 | Main Engines | 15 ~ Fuel System Secondary Filter - Change Element. |
Tue 27-Jun |
13:05 ~ 13:25 | Group 3 | Classroom 3 | 212M02 | Reduction Gears | 1 ~ Reduction Gears: Examine the general conditions and system operation of Reduction Gears prior to perform the task. |
13:25 ~ 13:40 | Group 3 | On Board | 212M02 | Reduction Gears | 2 ~ Reduction gear system - Clean heat exchanger. |
13:40 ~ 13:55 | Group 3 | On Board | 212M02 | Reduction Gears | 3 ~ Reduction gear system- Check threaded connections. |
13:55 ~ 14:10 | Group 3 | On Board | 212M02 | Reduction Gears | 4 ~ Reduction gear system - Perform an oil change and replace oil filter. |
14:10 ~ 14:30 | Group 3 | Classroom 3 | 212M02 | Reduction Gears | 5 ~ Reduction Gears: Visual Check for pipes and hoses connections for leaks. |
14:30 ~ 14:50 | Group 3 | Classroom 3 | 212M02 | Reduction Gears | 6 ~ Examine the conditions of the external parts are free from dirt, oil leaks and any sign of corrosion. |
14:50 ~ 15:10 | Group 3 | Classroom 3 | 212M02 | Reduction Gears | 7 ~ Reduction Gears - Pre checks and Safety Procedures before, during and after performing the task. |
15:25 ~ 15:45 | Group 3 | Classroom 3 | 212M02 | Reduction Gears | 8 ~ Reduction Gears: Safety and Handling - Observe safety precaution and practices, handling of hazardous materials when performing the work. |
15:45 ~ 17:15 | Group 3 | On Board | 212M02 | Reduction Gears | 9 ~ Reduction Gears: Practical Site Survey and Inspection on the Reduction Gears System and Components onboard. |
Wed 28-Jun |
09:30 ~ 10:30 | Group 3 | On Board | 212M03 | Clutches and Couplings | 1 ~ Perform Site Survey and to familiarise with the overall system and examine general conditions including to be acquainted system operation prior to perform the task. |
10:45 ~ 11:15 | Group 3 | Classroom 3 | 212M03 | Clutches and Couplings | 2 ~ Flexible Coupling - Inspect on the fasteners and coupling Elements for signs of cracks or stiffness. |
11:15 ~ 11:35 | Group 3 | Classroom 3 | 212M03 | Clutches and Couplings | 3 ~ Flexible Coupling - Perform visual check and inspection prior to sailing and after sailing for signs of leaks or abnormalities. |
11:35 ~ 11:50 | Group 3 | Classroom 3 | 212M03 | Clutches and Couplings | 4 ~ Visual inspection for sign of damage and vulcanised |
11:50 ~ 12:10 | Group 3 | Classroom 3 | 212M03 | Clutches and Couplings | 5 ~ Coupling - Examine general layout and system installation and operation. |
12:10 ~ 12:40 | Group 3 | Classroom 3 | 212M03 | Clutches and Couplings | 6 ~ Keep all electrical connections and mechanical fastenings tight according to right torque. and the fastenings are dry, clean and rust free. |
13:40 ~ 14:00 | Group 3 | Classroom 3 | 212M03 | Clutches and Couplings | 7 ~ Inspect and test the equipment at sufficient intervals to make sure that the equipment is in operating condition. |
14:00 ~ 16:00 | Group 3 | On Board | 212M03 | Clutches and Couplings | 8 ~ Practical Survey and Inspection on the UAV System and Components onboard. |
Thu 29-Jun |
09:30 ~ 10:30 | Group 3 | On Board | 213M01 | Propulsion Plant - Shaft, shaft bearing and seals | 1 ~ Perform Site Survey to familiarise with the overall system layout and examine general conditions, initiation of the standard operating instruction prior to perform the task. |
10:45 ~ 11:05 | Group 3 | Classroom 1 | 213M01 | Propulsion Plant - Shaft, shaft bearing and seals | 2 ~ Check oil level in the thrust bearing header tank. |
11:05 ~ 11:25 | Group 3 | Classroom 1 | 213M01 | Propulsion Plant - Shaft, shaft bearing and seals | 3 ~ Check and clean Earth bonding straps tightness and free from dirt and corrosion. |
11:25 ~ 11:45 | Group 3 | Classroom 1 | 213M01 | Propulsion Plant - Shaft, shaft bearing and seals | 4 ~ Check water level in the tank. |
11:45 ~ 12:05 | Group 3 | Classroom 1 | 213M01 | Propulsion Plant - Shaft, shaft bearing and seals | 5 ~ Shaft Bonding Device: Keep equipment clean and dry free from dirt, salt deposit, and corrosion. |
12:05 ~ 12:25 | Group 3 | Classroom 1 | 213M01 | Propulsion Plant - Shaft, shaft bearing and seals | 6 ~ Keep all electrical connections and mechanical fastenings tight according to right torque. and the fastenings are dry, clean and rust free. |
12:25 ~ 12:45 | Group 3 | Classroom 1 | 213M01 | Propulsion Plant - Shaft, shaft bearing and seals | 7 ~ Inspect and test the equipment at sufficient intervals to make sure that the equipment is in operating condition. |
13:45 ~ 14:05 | Group 3 | Classroom 1 | 213M01 | Propulsion Plant - Shaft, shaft bearing and seals | 8 ~ Observe safety precautions, practices and handling of hazardous material in performing the work , particularly in shaft confined space and oily. |
14:05 ~ 16:05 | Group 3 | On Board | 213M01 | Propulsion Plant - Shaft, shaft bearing and seals | 9 ~ Perform Practical Site Survey and inspection of the system and components onboard. |
Tue 18-Jul |
08:30 ~ 08:50 | Group 3 | Classroom 3 | 212M01 | Transmission Systems | 4 ~ Check and clean Earth bonding straps tightness and free from dirt and corrosion. |
08:50 ~ 09:10 | Group 3 | Classroom 3 | 212M01 | Transmission Systems | 5 ~ Keep all electrical connections and mechanical fastenings tight according to right torque and the fastenings are dry, clean and rust free. |
09:10 ~ 09:30 | Group 3 | Classroom 3 | 212M01 | Transmission Systems | 6 ~ Inspect and test the equipment at sufficient intervals to make sure that the equipment is in operating condition. |
09:30 ~ 09:50 | Group 3 | Classroom 3 | 212M01 | Transmission Systems | 7 ~ Observe safety precautions, practices and handling of hazardous material in performing the work. |
11:00 ~ 11:15 | Group 3 | On Board | 212M01 | Transmission Systems | 1 ~ Transmission Systems - Clean heat exchanger. |
11:15 ~ 11:30 | Group 3 | On Board | 212M01 | Transmission Systems | 2 ~ Transmission Systems - Check threaded connections. |
11:30 ~ 11:45 | Group 3 | On Board | 212M01 | Transmission Systems | 3 ~ Transmission System - Perform an oil change and replace oil filter. |
11:45 ~ 13:45 | Group 3 | On Board | 212M01 | Transmission Systems | 8 ~ Perform Practical Site Survey and inspection of the system and components onboard. |
Mon 24-Jul |
15:50 ~ 15:50 | Group 3 | Classroom 3 | 212M01 | Transmission Systems | 99 ~ 1. Topic Code 212M01 is also 212M02 ~ c) Reduction Gears: Notation: The Transmission and Reduction Gear is same System but by different terminology. |
Kongsberg 1 |
Mon 19-Jun |
08:30 ~ 09:00 | Group 1 | Classroom 1 | 691S01 | Fin Stabilizer | 1 ~ Fin Stabilizer - Examine the general conditions, and system functional prior to performing the task. |
09:00 ~ 09:30 | Group 1 | Classroom 1 | 691S01 | Fin Stabilizer | 2 ~ Fin Stabilizer - Check Fluid Levels are in acceptable limits and utilise correct grade of fluids. |
09:30 ~ 10:00 | Group 1 | Classroom 1 | 691S01 | Fin Stabilizer | 3 ~ Fin Stabilizer - Perform Lubricating Oil Test using test kit and hydraulic fluids crackle and cleanliness test. |
10:00 ~ 10:30 | Group 1 | Classroom 1 | 691S01 | Fin Stabilizer | 4 ~ Fin Stabilizer - Inspect Fins Stabiliser System operation and functions. |
11:00 ~ 12:00 | Group 1 | Classroom 1 | 691S01 | Fin Stabilizer | 6 ~ Fin Stabilizer - Visual check and Inspections of the electrical components of Steering Gear HPU motor and controller. |
12:00 ~ 12:30 | Group 1 | Classroom 1 | 691S01 | Fin Stabilizer | 7 ~ Fin Stabilizer - Visual inspection on Control valves and instruments for sign of defects and abnormalities. |
12:30 ~ 13:00 | Group 1 | Classroom 1 | 691S01 | Fin Stabilizer | 8 ~ Fin Stabilizer - Obtain Lubricating Oil Sample for analysis and diagnostic - for CBM. |
14:00 ~ 14:30 | Group 1 | On Board | 691S01 | Fin Stabilizer | 5 ~ Fin Stabilizer - Perform Functional test and operation using of manual hand pump for maintenance and emergency. |
14:30 ~ 15:00 | Group 1 | On Board | 691S01 | Fin Stabilizer | 9 ~ Fin Stabilizer - Safety and Handling - Observe safety precaution and practices, handling of hazardous materials when performing the work. |
16:00 ~ 17:30 | Group 1 | On Board | 691S01 | Fin Stabilizer | 10 ~ Fin Stabilizer - Practical Site Survey and Inspection on the System and Components onboard. |
Sinor Marine Technologies 1 |
Mon 19-Jun |
15:15 ~ 15:35 | Group 4 | Classroom 4 | 822M01 | Navigation Radar | 96 ~ 18 .Antenna Radiator - Check for dirt and cracks on the radiator surface clean and repair as necessary. |
Tue 20-Jun |
09:30 ~ 10:30 | Group 4 | On Board | 824M01 | DGPS | 1 ~ Examine the general physical conditions of the system/Equipment and Principle of operation prior to perform any task. |
10:45 ~ 11:15 | Group 4 | Classroom 4 | 824M01 | DGPS | 2 ~ Perform daily checks including Start up, running and shutdown procedures. |
11:15 ~ 11:45 | Group 4 | Classroom 4 | 824M01 | DGPS | 4 ~ Clean and inspect panel from dirt and dust. |
11:45 ~ 12:15 | Group 4 | Classroom 4 | 824M01 | DGPS | 5 ~ Battery System Inspect and replace backup battery should the battery capacity falls below limits. |
12:15 ~ 12:30 | Group 4 | Classroom 4 | 824M01 | DGPS | 6 ~ Above Deck Equipment Antennas - Visual inspection for any signs of salt deposit, dirt and water. clean and preserve. |
13:35 ~ 13:55 | Group 4 | Classroom 4 | 824M01 | DGPS | 7 ~ Check operation from Remote (ICS and INS Network) and Local Positions. |
13:55 ~ 14:10 | Group 4 | Classroom 4 | 824M01 | DGPS | 8 ~ Connectors - Check that connectors on the rear panel are firmly tightened and free of rust. |
14:10 ~ 14:40 | Group 4 | Classroom 4 | 824M01 | DGPS | 10 ~ Check that battery voltage is sufficient and fully charged and terminal are clean and free from rust. |
14:40 ~ 14:55 | Group 4 | Classroom 4 | 824M01 | DGPS | 11 ~ Antenna Unit - Keep all electrical connections and mechanical fastenings tight according to right torque, and the fastenings are dry, clean and rust free. |
14:55 ~ 15:10 | Group 4 | Classroom 4 | 824M01 | DGPS | 13 ~ LCD ambient temperature and humidity - Maintain cooling and ventilation for ambient temperature and humidity. |
15:10 ~ 15:25 | Group 4 | Classroom 4 | 824M01 | DGPS | 14 ~ LCD Display - Clean and wipe the LCD display with soft cloth to remove dirt salt deposit. |
15:25 ~ 15:40 | Group 4 | Classroom 4 | 824M01 | DGPS | 15 ~ Protective Device - Fuse is to protect over voltage and short circuit current and may be replaced with specified rating and size. |
15:55 ~ 16:15 | Group 4 | On Board | 824M01 | DGPS | 3 ~ Antennas - Check, Inspection and clean and preserve. |
16:15 ~ 16:30 | Group 4 | On Board | 824M01 | DGPS | 9 ~ Earth bonding Straps - Check that the ground system is free of rust and the ground wire is tightly fastened. |
16:30 ~ 16:50 | Group 4 | On Board | 824M01 | DGPS | 12 ~ Antenna Unit - Perform cleaning and remove dust, dirt and rust with detergent, do not use chemical cleaner or solvent. |
16:50 ~ 17:05 | Group 4 | On Board | 824M01 | DGPS | 16 ~ Self check and BITE - Check the ROM, RAM, input /output data, GPS Core, Beacon, Keyboard and LCD performance. |
17:05 ~ 17:20 | Group 4 | On Board | 824M01 | DGPS | 17 ~ Inspect and test the equipment at sufficient intervals to make sure that the equipment is in operating condition. |
17:20 ~ 18:20 | Group 4 | On Board | 824M01 | DGPS | 18 ~ Perform Practical Site Survey and inspection of the system and components onboard. |
Wed 21-Jun |
09:30 ~ 10:00 | Group 4 | Classroom 4 | 825M01 | Gyros | 1 ~ Examine the general layout conditions of Gyro Units and operation prior to perform the task. |
10:00 ~ 10:20 | Group 4 | Classroom 4 | 825M01 | Gyros | 2 ~ Operator unit - functional checks free from dirt, dust and sign of corrosion including the pelorous position. |
10:20 ~ 10:40 | Group 4 | Classroom 4 | 825M01 | Gyros | 3 ~ Operator unit - functional checks including starting up- running and shut-down. |
10:55 ~ 11:25 | Group 4 | Classroom 4 | 825M01 | Gyros | 4 ~ Perform visual check on the Master Unit for sign of noise, vibration and failure. Clean the external unit free from dust and moisture. |
11:25 ~ 11:55 | Group 4 | Classroom 4 | 825M01 | Gyros | 5 ~ Run self check and BITE at control panel and check Gyro Failure alarm. |
11:55 ~ 12:10 | Group 4 | Classroom 4 | 825M01 | Gyros | 6 ~ Check the the main power supply and back up input to the Gyro Units are in good order. |
12:10 ~ 12:30 | Group 4 | Classroom 4 | 825M01 | Gyros | 7 ~ Functional checks the electrical part of the Gyro repeater units and check sign of corrosion and watertight integrity. |
13:30 ~ 13:50 | Group 4 | Classroom 4 | 825M01 | Gyros | 8 ~ Visual check ventilation and cooling facility maintaining ambient temperature in Gyro room in good order. |
13:50 ~ 14:10 | Group 4 | Classroom 4 | 825M01 | Gyros | 9 ~ Observe safety precautions and practices cleanliness, corrosion control and preservation at all time when performing the task. |
14:10 ~ 15:40 | Group 4 | On Board | 825M01 | Gyros | 10 ~ Practical Site Survey and inspection on the system and components onboard. |
15:55 ~ 16:10 | Group 4 | Classroom 4 | 829M01 | Speed Log | 1 ~ Control and Display Unit- Clean and inspect externally |
16:10 ~ 16:30 | Group 4 | Classroom 4 | 829M01 | Speed Log | 2 ~ Speed Log - Self test the system with BITE. |
16:30 ~ 16:50 | Group 4 | Classroom 4 | 829M01 | Speed Log | 3 ~ Speed Log - Clean and inspect EM Log Sensor free from corrosion and dirt. |
Thu 22-Jun |
09:30 ~ 10:00 | Group 4 | On Board | 828M01 | Echo Sounder | 1 ~ Examine the general layout conditions and system operation prior to perform the task. |
10:00 ~ 10:30 | Group 4 | On Board | 828M01 | Echo Sounder | 2 ~ Visual Check of Echo sounder cable connections between Display unit, Transmitter/Receiver (TX/RX) are intact and are not kink. |
10:45 ~ 11:05 | Group 4 | Classroom 4 | 828M01 | Echo Sounder | 3 ~ Display Unit - Clean and remove dust, dirt, moisture on the Display Unit. |
11:05 ~ 11:35 | Group 4 | Classroom 4 | 828M01 | Echo Sounder | 5 ~ Power Supply - Check the condition of power supplies input AC and DC supplies are available and connected to the system. |
11:35 ~ 12:05 | Group 4 | Classroom 4 | 828M01 | Echo Sounder | 6 ~ Battery - Check function of the LP of AC and DC supplies are good working order free from defect. |
12:05 ~ 12:35 | Group 4 | Classroom 4 | 828M01 | Echo Sounder | 8 ~ Replacing the Fuse. The fuse in the power cable protects the system from reverse polarity of the power supply and equipment fault. |
13:35 ~ 14:05 | Group 4 | On Board | 828M01 | Echo Sounder | 4 ~ Run Self Test or BITE to monitor starting , running and shutting down. |
14:05 ~ 14:35 | Group 4 | On Board | 828M01 | Echo Sounder | 7 ~ Observe cleanliness, corrosion control and preservation at all time when performing the task. |
14:35 ~ 16:05 | Group 4 | On Board | 828M01 | Echo Sounder | 9 ~ Practical Site Survey and inspection on the system and components onboard. |
Mon 10-Jul |
08:30 ~ 08:50 | Group 1 | Classroom 1 | 821S01 | Navigation System. | 6 ~ Keep equipment and console panels are clean and dry free from dirt, salt deposit, and corrosion. |
08:50 ~ 09:10 | Group 1 | Classroom 1 | 821S01 | Navigation System. | 7 ~ Power Supply - Check the condition of power supplies input AC and DC supplies quality are available and connected to the IBS system. |
09:10 ~ 09:40 | Group 1 | Classroom 1 | 821S01 | Navigation System. | 8 ~ IBS - Inspect and test the system and equipment at sufficient intervals to make sure that the equipment is in operating conditions. |
09:40 ~ 10:10 | Group 1 | Classroom 1 | 821S01 | Navigation System. | 9 ~ Keep earthing straps connections and mechanical fastenings tight according to right torque. Measure the insulation and continuity. |
10:10 ~ 10:40 | Group 1 | Classroom 1 | 821S01 | Navigation System. | 10 ~ IBS - Check and examine the IBS components and peripherals connectivity/ interface between IBS to other sub- system are functioning seamlessly. |
11:00 ~ 11:30 | Group 1 | Classroom 1 | 821S01 | Navigation System. | 11 ~ IBS - Check and examine the Power Back supply AC and DC thourg back-up battery bank and UPS are in good working order. |
14:00 ~ 15:30 | Group 1 | On Board | 821S01 | Navigation System. | 1 ~ Perform Site Survey and to familiarise with the overall system layout examine general conditions including to be acquinted system operating instruction prior to perform the task. |
14:00 ~ 16:00 | Group 1 | On Board | 821S01 | Navigation System. | 12 ~ IBS - Practical Site Survey and Inspection on the System and Components onboard. |
16:00 ~ 16:20 | Group 1 | On Board | 821S01 | Navigation System. | 2 ~ Integrated navigation system - Visual Check on loose connection on workstations and interfacing units. |
16:20 ~ 16:40 | Group 1 | On Board | 821S01 | Navigation System. | 3 ~ Integrated navigation system - Visual check on control panel - terminal block. |
16:40 ~ 17:00 | Group 1 | On Board | 821S01 | Navigation System. | 4 ~ Integrated navigation system - All electrical connections and mechanical fastenings tight according to right torque and the fastenings are dry, clean and rust free. |
17:00 ~ 17:30 | Group 1 | On Board | 821S01 | Navigation System. | 5 ~ Integrated navigation system - IBS System check at User Level with BITE facilities. |
Tue 11-Jul |
08:30 ~ 09:00 | Group 4 | Classroom 4 | 822M01 | Navigation Radar | 2 ~ Navigation Radar - Functional checks and run Self Test or BITE to monitor starting , running and shutting down. |
09:00 ~ 09:15 | Group 4 | Classroom 4 | 822M01 | Navigation Radar | 4 ~ Visual check for any sign of dirt and corrosion. |
09:15 ~ 09:35 | Group 4 | Classroom 4 | 822M01 | Navigation Radar | 7 ~ Navigation Radar - Check and clean Earth bonding straps tightness and free from dirt and corrosion and measure Earth Bonding Continuity within tolerance. |
09:35 ~ 09:55 | Group 4 | Classroom 4 | 822M01 | Navigation Radar | 8 ~ Ground Terminal on Display unit - Check for tight connections. |
09:55 ~ 10:15 | Group 4 | Classroom 4 | 822M01 | Navigation Radar | 9 ~ LCD - Remove dust, dirt and salt deposit from LCD display. |
10:15 ~ 10:35 | Group 4 | Classroom 4 | 822M01 | Navigation Radar | 10 ~ Keep all electrical connections and mechanical fastenings tight according to right torque. and the fastenings are dry, clean and rust free. |
11:00 ~ 11:20 | Group 4 | Classroom 4 | 822M01 | Navigation Radar | 11 ~ Radar power switching On/Off from control unit or remote through BS station. |
11:20 ~ 11:35 | Group 4 | Classroom 4 | 822M01 | Navigation Radar | 12 ~ Power Supply and Services - Check power services are available before start the operation. |
11:35 ~ 11:50 | Group 4 | Classroom 4 | 822M01 | Navigation Radar | 13 ~ Processor Unit - Inspect and clean the external unit free from dirt, dust and rust. |
11:50 ~ 12:05 | Group 4 | Classroom 4 | 822M01 | Navigation Radar | 15 ~ Antenna Unit - Check the exposed nuts and bolts corroded and loose connection. Tighten and preserved accordingly. |
12:05 ~ 12:20 | Group 4 | Classroom 4 | 822M01 | Navigation Radar | 17 ~ Antenna Unit - Keep all electrical connections and mechanical fastenings tight according to right torque, and the fastenings are dry, clean and rust free. |
14:00 ~ 15:00 | Group 4 | On Board | 822M01 | Navigation Radar | 1 ~ Perform Site Survey to familirise with the overall system layout and examine general conditions, initiation of the standard operating instruction prior to perform the task. |
15:00 ~ 15:15 | Group 4 | On Board | 822M01 | Navigation Radar | 3 ~ Navigation Radar - Antenna Gearbox-Inspect V-Belt. |
15:15 ~ 15:30 | Group 4 | On Board | 822M01 | Navigation Radar | 5 ~ Navigation Radar - Visual check Antenna Gearbox or drive unit for sign of corrosion and dirt. Clean if necessary. |
16:00 ~ 16:15 | Group 4 | On Board | 822M01 | Navigation Radar | 6 ~ Clean and inspect consoles from dirt and dust. |
16:15 ~ 16:30 | Group 4 | On Board | 822M01 | Navigation Radar | 14 ~ Processor Unit - Check and examine Terminal Strips, sockets, earth terminals on processor unit for loose connection and proper seating of the plug. |
16:30 ~ 16:50 | Group 4 | On Board | 822M01 | Navigation Radar | 16 ~ Antenna Radiator - Check for dirt and cracks on the radiator surface clean and repair as necessary. |
16:50 ~ 17:50 | Group 4 | Classroom 4 | 822M01 | Navigation Radar | 18 ~ Perform Practical Site Survey and inspection of the system and components onboard. |
Wed 12-Jul |
08:30 ~ 08:50 | Group 2 | Classroom 2 | 710M01 | SOLAS Equipment in DGPS | 2 ~ SOLAS Equipment in DGPS - Perform Daily Checks including Start up, running and shutdown procedures. |
08:50 ~ 09:10 | Group 2 | Classroom 2 | 710M01 | SOLAS Equipment in DGPS | 3 ~ Above Deck Equipment Antennas: - Visual inspection for any signs of salt deposit, dirt and water. Clean and preserve. |
09:10 ~ 09:30 | Group 2 | Classroom 2 | 710M01 | SOLAS Equipment in DGPS | 4 ~ Check operation from Remote (ICS and INS Network) and Local Positions. |
09:30 ~ 09:50 | Group 2 | Classroom 2 | 710M01 | SOLAS Equipment in DGPS | 5 ~ Connectors: Check that connectors on the rear panel are firmly tightened and free of rust. |
09:50 ~ 10:20 | Group 2 | Classroom 2 | 710M01 | SOLAS Equipment in DGPS | 6 ~ Earth bonding Straps - Check that the ground system is free of rust and the ground wire is tightly fastened. |
10:20 ~ 10:40 | Group 2 | Classroom 2 | 710M01 | SOLAS Equipment in DGPS | 7 ~ Check that battery voltage is sufficient and fully charged and terminal are clean and free from rust. |
11:00 ~ 11:30 | Group 2 | Classroom 2 | 710M01 | SOLAS Equipment in DGPS | 8 ~ Antenna Unit - Keep all electrical connections and mechanical fastenings tight according to right torque, and the fastenings are dry, clean and rust free. |
11:30 ~ 11:50 | Group 2 | Classroom 2 | 710M01 | SOLAS Equipment in DGPS | 9 ~ Antenna Unit - Perform cleaning and remove dust, dirt and rust with detergent, do not use chemical cleaner or solvent. |
11:50 ~ 12:10 | Group 2 | Classroom 2 | 710M01 | SOLAS Equipment in DGPS | 10 ~ LCD Display - Clean and wipe the LCD display with soft cloth to remove dirt salt deposit. |
12:10 ~ 12:30 | Group 2 | Classroom 2 | 710M01 | SOLAS Equipment in DGPS | 13 ~ Self check and BITE - Check the ROM, RAM, input /output data, GPS Core, Beacon, Keyboard and LCD performance. |
12:10 ~ 12:30 | Group 2 | Classroom 2 | 710M01 | SOLAS Equipment in DGPS | 11 ~ LCD ambient temperature and humidity - Maintain cooling and ventilation for ambient temperature and humidity. |
12:30 ~ 12:50 | Group 2 | Classroom 2 | 710M01 | SOLAS Equipment in DGPS | 12 ~ Protective Device - Fuse is to protect over voltage and short circuit current and may be replaced with specified rating and size. |
14:00 ~ 14:20 | Group 2 | Classroom 2 | 710M01 | SOLAS Equipment in DGPS | 14 ~ Inspect and test the equipment at sufficient intervals to make sure that the equipment is in operating condition. |
14:20 ~ 15:20 | Group 2 | On Board | 710M01 | SOLAS Equipment in DGPS | 1 ~ Examine the general physical conditions of the system/Equipment and Principle of operation prior to perform any task. |
16:00 ~ 17:00 | Group 2 | On Board | 710M01 | SOLAS Equipment in DGPS | 15 ~ Perform Practical Site Survey and inspection of the system and components onboard. |
Van Der Velden |
Fri 23-Jun |
08:30 ~ 09:00 | Group 3 | Classroom 3 | 222M01 | Steering Gear | 1 ~ Steering Gear: Examine the general conditions of steering gear and system functional prior to perform the task. |
09:00 ~ 09:30 | Group 3 | Classroom 3 | 222M01 | Steering Gear | 2 ~ Steering Gear: Inspect Steering Gear System for leaks, loose connection and any sign of corrosions or damage. |
09:30 ~ 10:00 | Group 3 | Classroom 3 | 222M01 | Steering Gear | 3 ~ Steering Gear System: Perform Functional test and operation using emergency hand pump. |
10:00 ~ 10:30 | Group 3 | Classroom 3 | 222M01 | Steering Gear | 4 ~ Steering Gear System: Obtain Hydraulic Oil Sample for analysis and screening. |
14:00 ~ 14:15 | Group 3 | On Board | 222M01 | Steering Gear | 5 ~ Measure the wear of journal bearing. |
14:15 ~ 14:30 | Group 3 | On Board | 222M01 | Steering Gear | 6 ~ Inspect Electrical Components. |
14:30 ~ 15:00 | Group 3 | Classroom 3 | 222M01 | Steering Gear | 7 ~ Steering Gear System: Check fluid levels is sufficient and acceptable limit refill or replace if necessary iaw OEM manual. |
15:00 ~ 15:30 | Group 3 | Classroom 3 | 222M01 | Steering Gear | 8 ~ Steering Gear: Inspect Steering Gear System for any signs of abnormalities and undue noise and vibration. |
16:00 ~ 16:30 | Group 3 | Classroom 3 | 222M01 | Steering Gear | 9 ~ Steering Gear: Examine Pre starting and shut down checks and Safety Procedures before, during and after performing the task. |
16:30 ~ 18:30 | Group 3 | On Board | 222M01 | Steering Gear | 10 ~ Steering Gear: Practical Site survey and Inspection on the System and Components onboard. |
Morten Jepsen |
Tue 27-Jun |
08:30 ~ 09:00 | Group 1 | Classroom 1 | 800S01 | Communication System | 1 ~ Examine the general conditions and of SAAB Integrated Communication System (ICS) - TactiCall system networks functional status prior to perform the tasks ( Physical and dynamic). |
09:00 ~ 09:30 | Group 1 | Classroom 1 | 800S01 | Communication System | 2 ~ Functional check of the overall External Communication system networks and sub-system. |
09:30 ~ 10:00 | Group 1 | Classroom 1 | 800S01 | Communication System | 3 ~ HF Radio System - Functional check of the from Local (Communication Room) and various remote positions. |
10:00 ~ 10:30 | Group 1 | Classroom 1 | 800S01 | Communication System | 4 ~ Fleet Broadband FFB - Functional check both Local (Communication Room) and various remote positions. |
11:00 ~ 11:30 | Group 1 | Classroom 1 | 800S01 | Communication System | 5 ~ V/UHF Radio System - Functional check of the from Local (Communication Room) and various remote positions. |
11:30 ~ 12:00 | Group 1 | Classroom 1 | 800S01 | Communication System | 6 ~ V/HF Radio System - Perform Routine test with BITE (Built In Test Equipment) without radiating signals in Transmitter TX, Receiver, Power and Antennas modules accordance with relevant IMO circulars. |
12:00 ~ 12:30 | Group 1 | On Board | 800S01 | Communication System | 7 ~ HF Transceiver System - Perform Weekly routine check on The Antenna Tuning Unit. |
12:30 ~ 13:00 | Group 1 | Classroom 1 | 800S01 | Communication System | 8 ~ MF/HF radio’s display - GPS is connected, check the position and time in the MF/HF radio’s display. |
14:00 ~ 14:30 | Group 1 | Classroom 1 | 800S01 | Communication System | 9 ~ MF/HF DSC Live test call with a Maritime Communications Station Send a DSC call to the appropriate coast station. The acknowledgement from the coast station is received by the 2187.5 kHz watch receiver if the call was sent on that frequency. If the call is sent on HF only the audio signal output from the 2187.5 kHz watch receiver should be checked. |
14:30 ~ 15:00 | Group 1 | Classroom 1 | 800S01 | Communication System | 10 ~ DSC routine testing - Check the DSC function regularly. Verify the complete DSC installation, with antennas, by transmitting a Safety Test call to another station (coast or ship). The test call is generated using the DSC call flow via menu. |
15:00 ~ 15:30 | Group 1 | Classroom 1 | 800S01 | Communication System | 11 ~ Internal Communication - Intercom: Visual Check the terminal and display. Free from dirt and dust. |
16:00 ~ 16:30 | Group 1 | Classroom 1 | 800S01 | Communication System | 12 ~ Internal Communication Intercom - User level system Check for functionality. |
16:30 ~ 17:00 | Group 1 | Classroom 1 | 800S01 | Communication System | 13 ~ Internal Communication - Public Address system: Visual Check and Cleaning of Units. |
Wed 28-Jun |
08:30 ~ 09:00 | Group 1 | On Board | 800S01 | Communication System | 14 ~ Internal Communication - Public Address system (PAGA - Visual Check, Inspect earth bonding Units and clean as necessary. |
09:00 ~ 09:30 | Group 1 | Classroom 1 | 800S01 | Communication System | 15 ~ Internal Communication - Public Address system:- Inspect earth bondingand straps, fasterners tightness and corrosion free. |
09:30 ~ 10:00 | Group 1 | Classroom 1 | 800S01 | Communication System | 16 ~ Internal Communication - Wireless VHF Communication: Check the system visually and check correct function of charger unit. |
10:00 ~ 10:30 | Group 1 | Classroom 1 | 800S01 | Communication System | 17 ~ Internal Communication - Wireless VHF Communication: Visual Check RBS Panel and clean as necessary. |
11:00 ~ 11:30 | Group 1 | Classroom 1 | 800S01 | Communication System | 18 ~ Internal Communication - Wireless VHF Communication: Check Earth bonding at RBS. |
11:30 ~ 12:00 | Group 1 | Classroom 1 | 800S01 | Communication System | 19 ~ Internal Communication - Internal telephone system: Visually Check control panel / Front panel free from dirt and moisture and corrosion. |
12:00 ~ 12:30 | Group 1 | Classroom 1 | 800S01 | Communication System | 20 ~ Internal Communication - Internal telephone system - Visual Check for loose connection and free from dirt. |
12:30 ~ 13:00 | Group 1 | Classroom 1 | 800S01 | Communication System | 21 ~ Internal Communication - CCTV system: Visual Check and free from dust and ingress of water. |
14:00 ~ 14:30 | Group 1 | Classroom 1 | 800S01 | Communication System | 22 ~ Internal Communication - CCTV system: Check earth bonding and cable gland. |
14:30 ~ 15:00 | Group 1 | Classroom 1 | 800S01 | Communication System | 23 ~ Internal Communication - Sound Powered Telephone: Check the installation completeness and functional check. |
15:00 ~ 15:30 | Group 1 | Classroom 1 | 800S01 | Communication System | 24 ~ Internal Communication - Sound Powered Telephone: Check earth bonding and cable gland watertightness integrity. |
16:30 ~ 17:00 | Group 1 | Classroom 1 | 800S01 | Communication System | 25 ~ Internal Communication - Homing Beacon: Visual inspection and clean and inspect externally. |
Tue 25-Jul |
09:15 ~ 09:45 | Group 1 | Classroom 1 | 800S01 | Communication System | 26 ~ Internal Communication - Flight Deck Communication Station: Visual inspect and clean wireless station. From ingress of dust and moisture. |
09:45 ~ 10:15 | Group 1 | Classroom 1 | 800S01 | Communication System | 27 ~ Internal Communication - Flight Deck Communication Station - Carry out self check of BITE on station control panel and portable sets. |
10:30 ~ 11:00 | Group 1 | Classroom 1 | 800S01 | Communication System | 28 ~ External and Internal Communication system networks: Visual check the exposed surface hardware and panel for signs of damage,loose connections and free from dust and moisture. |
11:00 ~ 11:30 | Group 1 | Classroom 1 | 800S01 | Communication System | 29 ~ System BITE Failures and corrective actions: Using Self check and BITE (Built In Test Equipment) the transmitter or the receiver units able to detects a failure, the Alarm and Alert LED on the front panel. |
11:30 ~ 12:00 | Group 1 | Classroom 1 | 800S01 | Communication System | 30 ~ System Power Supply - Check and examine power supply input and connections for the network are in good order including Power Back-Up system. |
12:00 ~ 12:30 | Group 1 | Classroom 1 | 800S01 | Communication System | 31 ~ Communication System which is an Integrated Communication System (ICS) consists of External Communication system and Internal Communication System Networks. |
12:30 ~ 13:00 | Group 1 | Classroom 1 | 800S01 | Communication System | 32 ~ Power supplies: Check Circuit breakers and fuses of in DB panel for correct operation. |
13:00 ~ 13:30 | Group 1 | Classroom 1 | 800S01 | Communication System | 33 ~ Power supplies - Check Circuit breakers and fuses of in DB panel for correct operation and fault free. |
14:30 ~ 15:00 | Group 1 | On Board | 800S01 | Communication System | 34 ~ External and Internal Communication System Components - Check Earth bonding straps and connections to ship structure are intact and free from dust and corrosion. |
15:00 ~ 15:30 | Group 1 | Classroom 1 | 800S01 | Communication System | 35 ~ Antennas and coupling unit - Visual check Antenna Units free from obstruction and moisture and salt deposit and corrosion. |
15:30 ~ 18:30 | Group 1 | On Board | 800S01 | Communication System | 36 ~ Practical Site survey and inspection on the ICS ( External & Internal Comm. Networks System and components onboard. |
Atlas Copco 1 |
Fri 30-Jun |
09:30 ~ 10:00 | Group 3 | Classroom 3 | 620M01 | Compressed Air System | 1 ~ Compressors Check Oil Level (Working and Control Air ) – Types and characteristics, Oil flow, the type of LO, sight glass. |
10:00 ~ 10:20 | Group 3 | Classroom 3 | 620M01 | Compressed Air System | 2 ~ Clean and Inspect ( Electrical sub-systems) – Motors and starters types, cables and terminations, mountings and fastenings. |
10:35 ~ 11:15 | Group 3 | Classroom 3 | 620M01 | Compressed Air System | 3 ~ Functional Checks (Motors and Compressors) – Pre starting checks, performance and meter readings (Working and Control Air), abnormalities. |
11:15 ~ 11:30 | Group 3 | Classroom 3 | 620M01 | Compressed Air System | 4 ~ Pressure Sensors - Clean and Inspect: Cables and terminations, alarm and settings. |
11:30 ~ 11:45 | Group 3 | Classroom 3 | 620M01 | Compressed Air System | 5 ~ Change Lubrication Oil – Safety procedures, procedure for oil change. |
11:45 ~ 12:00 | Group 3 | Classroom 3 | 620M01 | Compressed Air System | 6 ~ Test Safety Valve - Pre starting checks, Procedure of test. |
12:00 ~ 12:10 | Group 3 | Classroom 3 | 620M01 | Compressed Air System | 7 ~ Grease Bearing (Compressor Motors) – Grease and types, procedure of greasing, using the grease gun. |
12:10 ~ 12:40 | Group 3 | Classroom 3 | 620M01 | Compressed Air System | 8 ~ Clean and Inspect Compressors - Types and characteristics; safety procedures, cleaning procedures. |
12:40 ~ 14:40 | Group 3 | | 000000 | Break Times | 5 ~ Friday Lunch |
14:40 ~ 14:50 | Group 3 | Classroom 3 | 620M01 | Compressed Air System | 9 ~ Clean Air Filter – Types and functions, Safety procedures when cleaning. |
14:50 ~ 15:00 | Group 3 | Classroom 3 | 620M01 | Compressed Air System | 10 ~ Check Drainage – Formation and draining the Condensate, safety precautions. |
15:00 ~ 15:10 | Group 3 | Classroom 3 | 620M01 | Compressed Air System | 11 ~ Clean, Inspect and Check Insulation – Motors and control panels, cables and terminations, insulating properties, Insulation Tester. |
15:10 ~ 15:15 | Group 3 | Classroom 3 | 620M01 | Compressed Air System | 12 ~ Check Earth Bonding – Motors and control panels, Continuity Tester. |
15:30 ~ 17:30 | Group 3 | On Board | 620M01 | Compressed Air System | 13 ~ On Board Familiarisation |
Ahmad Bin Abdul Rahim |
Mon 07-Aug |
11:20 ~ 11:50 | Group 2 | | 370S01 | Heating & Ventilation | 1 ~ Functional check of various protective and overload devices and type of controllers employed. |
11:50 ~ 12:20 | Group 2 | | 370S01 | Heating & Ventilation | 2 ~ Ventilation Fan Motor: Check Motor conditions such as Air Flow,Temperature, RPM, noise and vibration. |
12:20 ~ 12:40 | Group 2 | | 370S01 | Heating & Ventilation | 3 ~ Vent. Flaps, covers and trunking-inspect - Clean as necessary. |
12:40 ~ 13:10 | Group 2 | | 370S01 | Heating & Ventilation | 4 ~ Measure Earth Bonding strap and fastenings Continuity and keep the fastenings are tight, clean, dry and free from rust. |
Sat 26-Aug |
12:55 ~ 13:15 | Group 2 | | 370S01 | Heating & Ventilation | 5 ~ Vent.flaps & covers-inspect perfom chalk test. |
Staco 1 |
Tue 15-Aug |
09:15 ~ 09:45 | Group 4 | Classroom 1 | 371P01 | Galley | 1 ~ Administer the Range of Galley Equipment. |
09:45 ~ 09:50 | Group 4 | Classroom 1 | 371P01 | Galley | 2 ~ Establish the Fuse Boxes, Control panel. |
09:50 ~ 10:30 | Group 4 | Classroom 1 | 371P01 | Galley | 3 ~ Switching On Procedures and operating the Range of equipment. |
10:45 ~ 11:15 | Group 4 | Classroom 1 | 371P01 | Galley | 4 ~ Establish the ventilation and exhaust system and Switching on procedures. |
11:15 ~ 11:35 | Group 4 | Classroom 1 | 371P01 | Galley | 5 ~ Safety Procedures - operating the Foam and CO2 system before, during and after use. |
11:35 ~ 11:55 | Group 4 | Classroom 1 | 371P01 | Galley | 6 ~ Daily maintenance of equipment after use. |
11:55 ~ 12:55 | Group 4 | On Board | 371P01 | Galley | 7 ~ On Board Familiarisation |
Mon 21-Aug |
09:15 ~ 09:30 | Group 4 | On Board | 680M01 | 680 Cold Store/ Freezing Room System | 1 ~ Check Oil Level – PCU Compressor. |
09:30 ~ 09:50 | Group 4 | Classroom 1 | 680M01 | 680 Cold Store/ Freezing Room System | 2 ~ PCU SW Pump - Run pump if not in regular use: Pre starting checks, check performance, leaks and abnormalities. |
09:50 ~ 10:20 | Group 4 | Classroom 1 | 680M01 | 680 Cold Store/ Freezing Room System | 3 ~ Clean & Inspect – PCU SW Pump, pipes ,couplings, valves mountings, fastenings. |
10:35 ~ 10:55 | Group 4 | Classroom 1 | 680M01 | 680 Cold Store/ Freezing Room System | 4 ~ PCU - Check Refrigerant, Procedure of checks. |
10:55 ~ 11:10 | Group 4 | Classroom 1 | 680M01 | 680 Cold Store/ Freezing Room System | 5 ~ PCU - Checks for Leaks, Procedure of checks. |
11:10 ~ 11:40 | Group 4 | Classroom 1 | 680M01 | 680 Cold Store/ Freezing Room System | 6 ~ PCU Compressor Motor - Functional checks: Pre starting checks, check performance and abnormalities. |
11:40 ~ 12:10 | Group 4 | Classroom 1 | 680M01 | 680 Cold Store/ Freezing Room System | 7 ~ PCU SW Pump Motor - Functional checks: Pre starting checks, performance and abnormalities. |
12:10 ~ 12:40 | Group 4 | Classroom 1 | 680M01 | 680 Cold Store/ Freezing Room System | 8 ~ PCU Control Panel - Functional checks: Check system operation, performance and abnormalities. |
12:40 ~ 13:00 | Group 4 | Classroom 1 | 680M01 | 680 Cold Store/ Freezing Room System | 9 ~ Clean & Inspect – PCU Control Panel, switches and indicators, cables and terminations. |
13:00 ~ 13:10 | Group 4 | Classroom 1 | 680M01 | 680 Cold Store/ Freezing Room System | 10 ~ PCU Compressor Motor - Clean Inspect & Check Insulation Pre starting checks, Cables and terminations, Insulation tester. |
13:10 ~ 13:20 | Group 4 | Classroom 1 | 680M01 | 680 Cold Store/ Freezing Room System | 11 ~ PCU SW Pump Motor - Clean Inspect & Check Insulation – Pre starting checks, cables and terminations, Insulation tester. |
13:20 ~ 13:25 | Group 4 | Classroom 1 | 680M01 | 680 Cold Store/ Freezing Room System | 12 ~ Clean Inspect & Check Insulation – Pre starting checks, cables and terminations, Insulation Tester. |
13:25 ~ 13:40 | Group 4 | Classroom 1 | 680M01 | 680 Cold Store/ Freezing Room System | 13 ~ Check Combined High-Low Pressure Switch – Procedure of setting the Pressure switches. |
14:40 ~ 14:55 | Group 4 | Classroom 1 | 680M01 | 680 Cold Store/ Freezing Room System | 14 ~ PCU Compressor - Change LO– Pre starting checks, clean strainers. |
14:55 ~ 15:05 | Group 4 | On Board | 680M01 | 680 Cold Store/ Freezing Room System | 15 ~ PCU Compressor Motor - Inspect earth bonding: Earthing straps, fastenings, Continuity Tester. |
15:05 ~ 15:10 | Group 4 | Classroom 2 | 680M01 | 680 Cold Store/ Freezing Room System | 16 ~ PCU SW Pump Motor - Inspect earth bonding: Earthing straps, fastenings, Continuity tester. |
15:10 ~ 15:15 | Group 4 | Classroom 1 | 680M01 | 680 Cold Store/ Freezing Room System | 17 ~ PCU Control Panel - Inspect earth bonding: Earthing straps, fastenings, Continuity Tester. |
15:30 ~ 17:30 | Group 4 | On Board | 680M01 | 680 Cold Store/ Freezing Room System | 18 ~ On Board Familiarisation |
Vestdavit 1 |
Wed 16-Aug |
09:15 ~ 10:15 | Group 4 | On Board | 570P01 | Davits Rescue Boat | 1 ~ Perform Site Survey to familirise with the overall system layout and examine general conditions, initiation of the standard operating instruction prior to perform the task. |
10:15 ~ 10:35 | Group 4 | Classroom 1 | 570P01 | Davits Rescue Boat | 2 ~ Davits - Check hydraulic system for damage and leaks. |
10:50 ~ 11:10 | Group 4 | Classroom 1 | 570P01 | Davits Rescue Boat | 3 ~ Davits - Check the davit for visible damages free from dirt, rust and damage. |
11:10 ~ 11:25 | Group 4 | On Board | 570P01 | Davits Rescue Boat | 4 ~ Davit - Functional check that the davit can move freely in its operation area. Switch “ON” MCCB on starter panel. |
11:25 ~ 11:40 | Group 4 | Classroom 1 | 570P01 | Davits Rescue Boat | 5 ~ Davits - Apply grease to necessary points as specified in Operation Manual or PMS. |
11:40 ~ 12:00 | Group 4 | Classroom 1 | 570P01 | Davits Rescue Boat | 6 ~ Check hydraulic system clean and dry free from dirt, salt deposit, and corrosion free. |
12:00 ~ 12:20 | Group 4 | Classroom 1 | 570P01 | Davits Rescue Boat | 7 ~ Keep all electrical connections and mechanical fastenings tight according to right torque. and the fastenings are dry, clean and rust free. |
12:20 ~ 12:40 | Group 4 | Classroom 1 | 570P01 | Davits Rescue Boat | 8 ~ Check and clean Earth bonding straps tightness and free from dirt and corrosion. |
12:40 ~ 13:00 | Group 4 | Classroom 1 | 570P01 | Davits Rescue Boat | 9 ~ Inspect and test the equipment at sufficient intervals to make sure that the equipment is in operating condition. |
13:00 ~ 13:20 | Group 4 | Classroom 1 | 570P01 | Davits Rescue Boat | 10 ~ Observe cleanliness, corrosion control and preservation at all time when performing the task. |
14:20 ~ 14:40 | Group 4 | Classroom 1 | 570P01 | Davits Rescue Boat | 11 ~ Power Supply Services - Check power ON and Off of the system prior to start operation. |
14:40 ~ 15:00 | Group 4 | Classroom 1 | 570P01 | Davits Rescue Boat | 12 ~ Inspect and test the equipment at sufficient intervals to make sure that the equipment is in operating condition. |
15:15 ~ 17:15 | Group 4 | On Board | 570P01 | Davits Rescue Boat | 13 ~ Perform Practical Site Survey and inspection of the system and components onboard. |
Thu 17-Aug |
09:15 ~ 09:30 | Group 4 | On Board | 570P02 | Emergency Equipment | 1 ~ Rescue Boat - Check and verify the inventory list as fitted. |
09:30 ~ 09:45 | Group 4 | On Board | 570P02 | Emergency Equipment | 2 ~ Rescue Boat - Check propulsion or outboard engine start and stop function and bilge pump. |
09:45 ~ 10:00 | Group 4 | On Board | 570P02 | Emergency Equipment | 3 ~ Rescue Boat - Visual condition of stowage and releasing and recovery mechanism. |
10:00 ~ 10:15 | Group 4 | On Board | 570P02 | Emergency Equipment | 4 ~ Rescue Boat - Condition of hull inside & outside any sign of damage or corrosion. |
10:30 ~ 10:45 | Group 4 | On Board | 570P02 | Emergency Equipment | 5 ~ Rescue Boat - Check the Bilge keel and hull appendages on both sides in good order. |
10:45 ~ 11:00 | Group 4 | On Board | 570P02 | Emergency Equipment | 6 ~ Davit - Check the davit for visible damages free from dirt, rust and damage. |
11:00 ~ 11:15 | Group 4 | On Board | 570P02 | Emergency Equipment | 7 ~ Davit - Apply grease to necessary points as specfied in Operation Manual or PMS. |
11:15 ~ 11:30 | Group 4 | On Board | 570P02 | Emergency Equipment | 8 ~ Davit - Functional check that the davit can move freely in its operation area. Switch “ON” MCCB on starter panel. |
11:30 ~ 11:45 | Group 4 | On Board | 570P02 | Emergency Equipment | 9 ~ Davit -Check wire rope of the hoist is in perfect condition and good order. |
11:45 ~ 12:00 | Group 4 | On Board | 570P02 | Emergency Equipment | 10 ~ Life Rafts - Self-protection of with cover from direct heat. |
12:00 ~ 12:15 | Group 4 | On Board | 570P02 | Emergency Equipment | 11 ~ Life Raft - Keep clean the life raft from salt deposit and moisture. |
12:15 ~ 12:30 | Group 4 | On Board | 570P02 | Emergency Equipment | 12 ~ Life Raft - Check Condition of stowage and releasing mechanism. |
12:30 ~ 12:45 | Group 4 | On Board | 570P02 | Emergency Equipment | 13 ~ Life Raft - Visual Inspection the external condition for any sign of damage. |
12:45 ~ 13:00 | Group 4 | On Board | 570P02 | Emergency Equipment | 14 ~ Life Raft - Check and record the Service interval date and next periodic service. |
TP TBD |
Sat 26-Aug |
13:15 ~ 13:45 | Group 1 | Classroom 1 | 370S01 | Heating & Ventilation | 1 ~ Functional check of various protective and overload devices and type of controllers employed. |
13:15 ~ 13:45 | Group 2 | | 370S01 | Heating & Ventilation | 6 ~ Functional check the functionalities of various protective and overload devices on mlotor and starters-controllers |
13:30 ~ 17:30 | Group 3 | On Board | 000F11 | OPV 1800: Performance - Practical On Board | 1 ~ Familiarization Onboard. |
13:45 ~ 14:15 | Group 1 | Classroom 1 | 370S01 | Heating & Ventilation | 2 ~ Ventilation Fan Motor: Check Motor conditions such as Air Flow,Temperature, RPM, noise and vibration. |
14:15 ~ 14:35 | Group 1 | Classroom 1 | 370S01 | Heating & Ventilation | 3 ~ Vent. Flaps, covers and trunking-inspect - Clean as necessary. |
14:35 ~ 15:05 | Group 1 | Classroom 1 | 370S01 | Heating & Ventilation | 4 ~ Measure Earth Bonding strap and fastenings Continuity and keep the fastenings are tight, clean, dry and free from rust. |
14:45 ~ 15:05 | Group 2 | | 370S01 | Heating & Ventilation | 7 ~ Inspect the earth bonding straps and mechnical fastening are tight free fom dirt, moisture and rust |
15:05 ~ 15:25 | Group 2 | | 370S01 | Heating & Ventilation | 8 ~ Inspect and test the equipment at sufficient intervals to make sure that the equipment is in operating condition. |
15:05 ~ 15:25 | Group 1 | Classroom 1 | 370S01 | Heating & Ventilation | 5 ~ Vent.flaps & covers-inspect perfom chalk test. |
15:25 ~ 15:45 | Group 2 | | 370S01 | Heating & Ventilation | 9 ~ Observe cleanliness, corrosion control and preservation at all time when performing the task |
15:40 ~ 16:10 | Group 1 | Classroom 1 | 370S01 | Heating & Ventilation | 6 ~ Functional check the functionalities of various protective and overload devices on mlotor and starters-controllers |
15:45 ~ 16:05 | Group 2 | | 370S01 | Heating & Ventilation | 10 ~ Observe safety precautions, practices and handling of hazadous material in performing the work. |
16:10 ~ 16:30 | Group 1 | Classroom 1 | 370S01 | Heating & Ventilation | 7 ~ Inspect the earth bonding straps and mechnical fastening are tight free fom dirt, moisture and rust |
16:30 ~ 16:50 | Group 1 | Classroom 1 | 370S01 | Heating & Ventilation | 8 ~ Inspect and test the equipment at sufficient intervals to make sure that the equipment is in operating condition. |
16:50 ~ 17:10 | Group 1 | Classroom 1 | 370S01 | Heating & Ventilation | 9 ~ Observe cleanliness, corrosion control and preservation at all time when performing the task |
Sun 27-Aug |
09:15 ~ 09:35 | Group 1 | Classroom 1 | 370S01 | Heating & Ventilation | 10 ~ Observe safety precautions, practices and handling of hazadous material in performing the work. |
09:30 ~ 10:30 | Group 2 | | 370S11 | Heating & Ventilation - Practical On Board | 1 ~ Initial Walk around: Examine the general conditions and system operationn prior to perform the task. |
09:30 ~ 10:30 | Group 3 | Classroom 3 | 000F02 | OPV 1800: Major System & Equipment | 1 ~ Safety Systems and Lifesaving Equipment. |
09:35 ~ 10:35 | Group 1 | On Board | 370S11 | Heating & Ventilation - Practical On Board | 1 ~ Initial Walk around: Examine the general conditions and system operationn prior to perform the task. |
10:45 ~ 11:45 | Group 2 | | 370S11 | Heating & Ventilation - Practical On Board | 2 ~ Ensure the filter mat are clean and dry. |
10:45 ~ 12:45 | Group 3 | Classroom 3 | 000F02 | OPV 1800: Major System & Equipment | 2 ~ The Ship's Major System and Equipments. |
10:50 ~ 11:50 | Group 1 | On Board | 370S11 | Heating & Ventilation - Practical On Board | 2 ~ Ensure the filter mat are clean and dry. |
11:50 ~ 13:50 | Group 1 | On Board | 370S11 | Heating & Ventilation - Practical On Board | 3 ~ Practical Site Survey and inspection on the system and components onboard. |
12:45 ~ 13:45 | Group 3 | Classroom 3 | 000F02 | OPV 1800: Major System & Equipment | 3 ~ The Ship's Auxiliary System. |
14:45 ~ 15:45 | Group 3 | Classroom 3 | 000F02 | OPV 1800: Major System & Equipment | 4 ~ Deck Machineries. |
14:45 ~ 16:45 | Group 2 | | 370S11 | Heating & Ventilation - Practical On Board | 3 ~ Practical Site Survey and inspection on the system and components onboard. |
Mon 28-Aug |
09:30 ~ 10:30 | Group 3 | Classroom 3 | 000F02 | OPV 1800: Major System & Equipment | 5 ~ Other Electronics Equipments and systems Onboard. |
10:45 ~ 11:45 | Group 3 | Classroom 3 | 000F02 | OPV 1800: Major System & Equipment | 6 ~ Bilges, Ballast and Internal Fi-Fi System. |
13:45 ~ 17:45 | Group 3 | On Board | 000F12 | OPV 1800: Major System & Equipment - Practical On Board | 1 ~ Familiarization Onboard. |
Mon 04-Sep |
13:00 ~ 17:00 | Group 2 | On Board | 000F11 | OPV 1800: Performance - Practical On Board | 1 ~ Familiarization Onboard. |
Thu 07-Sep |
11:45 ~ 15:45 | Group 1 | On Board | 000F11 | OPV 1800: Performance - Practical On Board | 1 ~ Familiarization Onboard. |
13:30 ~ 17:30 | Group 1 | On Board | 000F12 | OPV 1800: Major System & Equipment - Practical On Board | 1 ~ Familiarization Onboard. |
Sat 30-Sep |
11:35 ~ 12:35 | Group 3 | On Board | 110F11 | Sub-system of Hull Structure - 164 ICAF - Practical On Board | 1 ~ Perform Site Survey and familiarization with the ICAF system layout and operation |
14:35 ~ 15:05 | Group 3 | On Board | 110F11 | Sub-system of Hull Structure - 164 ICAF - Practical On Board | 2 ~ Visually check cables inside power controller unit for damage and tightness. |
15:05 ~ 16:05 | Group 3 | On Board | 110F11 | Sub-system of Hull Structure - 164 ICAF - Practical On Board | 3 ~ Perform checks and inspections and identify fault conditions. |