ScheduleBy GroupDaily ScheduleBy TopicsLecturerClass RoomBy StudentNo Lecturer

Lecturer Schedule

    Lecturer Plan Lecturer Detail Plan



From ~ ToGroupLocationCourse CodeCourseTopic
Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah
Mon 29-May
08:30 ~ 09:30Group 2Classroom 2000F01OPV 1800: Performance1 ~ Introduction OPV 1800.
08:30 ~ 09:30Group 1Classroom 4000F01OPV 1800: Performance1 ~ Introduction OPV 1800.
08:30 ~ 09:30Group 2Classroom 2000A00Non Training Items1 ~ Training Launch Introduction
09:30 ~ 10:30Group 1Classroom 4000F01OPV 1800: Performance2 ~ Ship's Operational Capabilities.
09:30 ~ 10:30Group 2Classroom 2000F01OPV 1800: Performance2 ~ Ship's Operational Capabilities.
11:00 ~ 13:00Group 2Classroom 4000F02OPV 1800: Major System & Equipment2 ~ The Ship's Major System and Equipments.
11:00 ~ 13:00Group 1Classroom 4000F01OPV 1800: Performance3 ~ Vessel Layout.
11:00 ~ 13:00Group 2Classroom 2000F01OPV 1800: Performance3 ~ Vessel Layout.
11:00 ~ 13:00Group 1Classroom 4000F02OPV 1800: Major System & Equipment2 ~ The Ship's Major System and Equipments.
14:00 ~ 15:00Group 1Classroom 4000F01OPV 1800: Performance6 ~ SOLAS Equipment and Fire Fighting Onboard.
14:00 ~ 15:00Group 2Classroom 4000F01OPV 1800: Performance5 ~ Emergency Station.
14:00 ~ 15:00Group 2Classroom 4000F01OPV 1800: Performance6 ~ SOLAS Equipment and Fire Fighting Onboard.
14:00 ~ 15:00Group 1Classroom 4000F01OPV 1800: Performance5 ~ Emergency Station.
16:00 ~ 17:00Group 1Classroom 4000F02OPV 1800: Major System & Equipment1 ~ Safety Systems and Lifesaving Equipment.
16:00 ~ 17:00Group 2Classroom 4000F02OPV 1800: Major System & Equipment1 ~ Safety Systems and Lifesaving Equipment.
Tue 30-May
11:00 ~ 12:00Group 2Classroom 4000F02OPV 1800: Major System & Equipment3 ~ The Ship's Auxiliary System.
11:00 ~ 12:00Group 1Classroom 4000F02OPV 1800: Major System & Equipment3 ~ The Ship's Auxiliary System.
14:00 ~ 15:00Group 2Classroom 4000F02OPV 1800: Major System & Equipment4 ~ Deck Machineries.
14:00 ~ 15:00Group 1Classroom 4000F02OPV 1800: Major System & Equipment4 ~ Deck Machineries.
14:00 ~ 15:00Group 1Classroom 4000F01OPV 1800: Performance4 ~ Deck Arrangements.
14:00 ~ 15:00Group 2Classroom 2000F01OPV 1800: Performance4 ~ Deck Arrangements.
15:00 ~ 15:30Group 1Classroom 4110F01Sub-system of Hull Structure - 164 ICAF3 ~ ICAF - Check the condition and functionality of Control Panel Unit and display.
15:00 ~ 15:15Group 2Classroom 4110F01Sub-system of Hull Structure - 164 ICAF1 ~ ICAF - Perform maintenance tasks which are specified under “Daily”.
15:00 ~ 15:30Group 2Classroom 4110F01Sub-system of Hull Structure - 164 ICAF3 ~ ICAF - Check the condition and functionality of Control Panel Unit and display.
15:00 ~ 15:15Group 1Classroom 4110F01Sub-system of Hull Structure - 164 ICAF1 ~ ICAF - Perform maintenance tasks which are specified under “Daily”.
15:15 ~ 15:30Group 2Classroom 4110F01Sub-system of Hull Structure - 164 ICAF2 ~ Clean and upkeep the Control Panel and cabinet.
15:15 ~ 15:30Group 1Classroom 4110F01Sub-system of Hull Structure - 164 ICAF2 ~ Clean and upkeep the Control Panel and cabinet.
16:00 ~ 16:30Group 1Classroom 4110F01Sub-system of Hull Structure - 164 ICAF4 ~ Check cables connection on terminals for tightness and damage.
16:00 ~ 17:00Group 2Classroom 4000F02OPV 1800: Major System & Equipment5 ~ Other Electronics Equipments and systems Onboard.
16:00 ~ 16:20Group 1Classroom 4110F01Sub-system of Hull Structure - 164 ICAF5 ~ Electrical Checks on Protective devices and safety circuit.
16:00 ~ 16:20Group 2Classroom 4110F01Sub-system of Hull Structure - 164 ICAF5 ~ Electrical Checks on Protective devices and safety circuit.
16:00 ~ 16:30Group 2Classroom 4110F01Sub-system of Hull Structure - 164 ICAF4 ~ Check cables connection on terminals for tightness and damage.
16:00 ~ 17:00Group 1Classroom 4000F02OPV 1800: Major System & Equipment5 ~ Other Electronics Equipments and systems Onboard.
Fri 09-Jun
08:30 ~ 09:30Group 4Classroom 4000F01OPV 1800: Performance5 ~ Emergency Station.
11:00 ~ 12:00Group 4Classroom 4000F01OPV 1800: Performance6 ~ SOLAS Equipment and Fire Fighting Onboard.
Tue 11-Jul
13:45 ~ 17:45Group 4Classroom 4000F11OPV 1800: Performance - Practical On Board1 ~ Familiarization Onboard.
Wed 12-Jul
09:15 ~ 10:15Group 4Classroom 4000F02OPV 1800: Major System & Equipment1 ~ Safety Systems and Lifesaving Equipment.
10:30 ~ 12:30Group 4Classroom 4000F02OPV 1800: Major System & Equipment2 ~ The Ship's Major System and Equipments.
12:30 ~ 13:30Group 4Classroom 4000F02OPV 1800: Major System & Equipment3 ~ The Ship's Auxiliary System.
14:30 ~ 15:30Group 4Classroom 4000F02OPV 1800: Major System & Equipment4 ~ Deck Machineries.
Thu 13-Jul
09:15 ~ 10:15Group 4Classroom 2000F02OPV 1800: Major System & Equipment5 ~ Other Electronics Equipments and systems Onboard.
10:30 ~ 11:30Group 4Classroom 4000F02OPV 1800: Major System & Equipment6 ~ Bilges, Ballast and Internal Fi-Fi System.
13:30 ~ 17:30Group 4On Board000F12OPV 1800: Major System & Equipment - Practical On Board1 ~ Familiarization Onboard.
Fri 14-Jul
09:15 ~ 09:30Group 4Classroom 4110F01Sub-system of Hull Structure - 164 ICAF1 ~ ICAF - Perform maintenance tasks which are specified under “Daily”.
09:30 ~ 09:45Group 4Classroom 4110F01Sub-system of Hull Structure - 164 ICAF2 ~ Clean and upkeep the Control Panel and cabinet.
09:45 ~ 10:15Group 4Classroom 4110F01Sub-system of Hull Structure - 164 ICAF3 ~ ICAF - Check the condition and functionality of Control Panel Unit and display.
10:15 ~ 10:45Group 4Classroom 4110F01Sub-system of Hull Structure - 164 ICAF4 ~ Check cables connection on terminals for tightness and damage.
11:00 ~ 11:20Group 4Classroom 4110F01Sub-system of Hull Structure - 164 ICAF5 ~ Electrical Checks on Protective devices and safety circuit.
11:20 ~ 12:20Group 4On Board110F11Sub-system of Hull Structure - 164 ICAF - Practical On Board1 ~ Perform Site Survey and familiarization with the ICAF system layout and operation
14:20 ~ 14:50Group 4On Board110F11Sub-system of Hull Structure - 164 ICAF - Practical On Board2 ~ Visually check cables inside power controller unit for damage and tightness.
14:50 ~ 15:50Group 4On Board110F11Sub-system of Hull Structure - 164 ICAF - Practical On Board3 ~ Perform checks and inspections and identify fault conditions.
Thu 03-Aug
11:35 ~ 12:35Group 1110F11Sub-system of Hull Structure - 164 ICAF - Practical On Board1 ~ Perform Site Survey and familiarization with the ICAF system layout and operation
12:35 ~ 13:05Group 1110F11Sub-system of Hull Structure - 164 ICAF - Practical On Board2 ~ Visually check cables inside power controller unit for damage and tightness.
14:05 ~ 15:05Group 1110F11Sub-system of Hull Structure - 164 ICAF - Practical On Board3 ~ Perform checks and inspections and identify fault conditions.
Sun 06-Aug
11:45 ~ 15:45Group 2On Board000F12OPV 1800: Major System & Equipment - Practical On Board1 ~ Familiarization Onboard.
Mon 07-Aug
09:45 ~ 10:45Group 3Classroom 3000F01OPV 1800: Performance5 ~ Emergency Station.
11:00 ~ 12:00Group 3Classroom 3000F01OPV 1800: Performance6 ~ SOLAS Equipment and Fire Fighting Onboard.
Tue 22-Aug
11:35 ~ 12:35Group 2On Board110F11Sub-system of Hull Structure - 164 ICAF - Practical On Board1 ~ Perform Site Survey and familiarization with the ICAF system layout and operation
14:35 ~ 15:05Group 2On Board110F11Sub-system of Hull Structure - 164 ICAF - Practical On Board2 ~ Visually check cables inside power controller unit for damage and tightness.
15:05 ~ 16:05Group 2On Board110F11Sub-system of Hull Structure - 164 ICAF - Practical On Board3 ~ Perform checks and inspections and identify fault conditions.
Fri 25-Aug
09:30 ~ 10:30Group 3Classroom 3000A00Non Training Items1 ~ Training Launch Introduction
10:45 ~ 11:45Group 3Classroom 3000F01OPV 1800: Performance1 ~ Introduction OPV 1800.
11:45 ~ 12:45Group 3Classroom 3000F01OPV 1800: Performance2 ~ Ship's Operational Capabilities.
13:45 ~ 15:45Group 3Classroom 3000F01OPV 1800: Performance3 ~ Vessel Layout.
16:00 ~ 17:00Group 3Classroom 3000F01OPV 1800: Performance4 ~ Deck Arrangements.
Sat 30-Sep
09:30 ~ 09:45Group 3Classroom 3110F01Sub-system of Hull Structure - 164 ICAF1 ~ ICAF - Perform maintenance tasks which are specified under “Daily”.
09:45 ~ 10:00Group 3Classroom 3110F01Sub-system of Hull Structure - 164 ICAF2 ~ Clean and upkeep the Control Panel and cabinet.
10:00 ~ 10:30Group 3Classroom 3110F01Sub-system of Hull Structure - 164 ICAF3 ~ ICAF - Check the condition and functionality of Control Panel Unit and display.
10:45 ~ 11:15Group 3Classroom 3110F01Sub-system of Hull Structure - 164 ICAF4 ~ Check cables connection on terminals for tightness and damage.
11:15 ~ 11:35Group 3Classroom 3110F01Sub-system of Hull Structure - 164 ICAF5 ~ Electrical Checks on Protective devices and safety circuit.
Khairul Azuadi Bin Ariffin
Tue 30-May
08:30 ~ 09:00Group 1Classroom 1310S01Fire Main, Flushing, Draining and Ballasting1 ~ Fire Main and the ships FF system-Establish system arrangements.
09:00 ~ 09:40Group 1Classroom 1310S01Fire Main, Flushing, Draining and Ballasting2 ~ Connectivity of the fire Main to the Sprinkler & the Foam system- General characteristics, functions, operations and the utilisation.
09:40 ~ 10:40Group 1Classroom 1310S01Fire Main, Flushing, Draining and Ballasting3 ~ CO2 and the Watermist system- General characteristics, functions, operations, and utilisation.
09:40 ~ 10:00Group 1On Board310S11Fire Main, Flushing, Draining and Ballasting - Practical On Board1 ~ The FF arrangements – Utilise for Deck Wash, Spray, Flushing and Draining.
Wed 31-May
08:30 ~ 09:10Group 1Classroom 1360S01Lubricating System1 ~ The LO Bunker Station and LO Supply System – Establish the system arrangements for the Transfer and Supply of LO to consumers.
09:10 ~ 09:30Group 1Classroom 1360S01Lubricating System2 ~ Process of filling/transfer of LO tanks - Tanks capacities, Flow rate and time period of filling or transfer.
09:30 ~ 09:45Group 1Classroom 1360S01Lubricating System3 ~ Establish the Overflow line and tanks.
09:45 ~ 10:00Group 1Classroom 1360S01Lubricating System4 ~ The High Level Alarm – Activation and height levels.
11:00 ~ 11:30Group 1Classroom 1360S01Lubricating System5 ~ The DO and Sludge System – Establish the system arrangements, functions and operations.
11:30 ~ 12:00Group 1Classroom 1360S01Lubricating System6 ~ Suction, Collecting, of DO and Sludge – Transfer into the Sludge Tank or Shore facilities.
12:00 ~ 13:00Group 1Classroom 1360S11Lubricating System - Practical On Board1 ~ On Board Familiarisation
12:00 ~ 12:15Group 1Classroom 1360S01Lubricating System7 ~ Health Safety & Environment Protection
12:15 ~ 12:35Group 1Classroom 1360S01Lubricating System8 ~ Administer Oil Sampling
14:00 ~ 14:40Group 1Classroom 1320S01Fuel System2 ~ Process of filling/transfer of FO tanks - Tanks capacities, Flow rate and time period of filling or transfer.
14:00 ~ 14:40Group 1Classroom 1320S01Fuel System1 ~ The Fuel Transfer and Supply System – Establish the system arrangements for the Transfer and Supply of fuel.
14:40 ~ 14:55Group 1Classroom 1320S01Fuel System3 ~ Establish the overflow line and tanks.
14:55 ~ 15:15Group 1Classroom 1320S01Fuel System4 ~ Utilising the Day Tanks – Rate of consumption.
16:00 ~ 16:20Group 1Classroom 1320S01Fuel System5 ~ Cargo Handling System for FO – Establish the system arrangements and operations, for the FO Transfer onboard and discharge ashore.
Thu 01-Jun
14:00 ~ 14:20Group 1Classroom 1320S01Fuel System6 ~ Administer oil sampling.
14:20 ~ 14:35Group 1Classroom 1320S11Fuel System - Practical On Board1 ~ The Low and High Level Alarm – Activation and height levels.
14:30 ~ 15:30Group 1Classroom 1320S11Fuel System - Practical On Board2 ~ On Board Familiarisation.
16:00 ~ 17:00Group 1Classroom 4000F02OPV 1800: Major System & Equipment6 ~ Bilges, Ballast and Internal Fi-Fi System.
16:00 ~ 16:30Group 1Classroom 1310S01Fire Main, Flushing, Draining and Ballasting5 ~ Operation of the Ballast system- System arrangements.
16:00 ~ 17:00Group 1Classroom 1310S01Fire Main, Flushing, Draining and Ballasting6 ~ Performance of the Ballast pumps- Rate of filling the tanks and tank capacities, the resulting trim.
16:00 ~ 16:30Group 1Classroom 1310S01Fire Main, Flushing, Draining and Ballasting4 ~ Operation of the Bilge System- System arrangements of the bilges.
16:00 ~ 17:00Group 2Classroom 4000F02OPV 1800: Major System & Equipment6 ~ Bilges, Ballast and Internal Fi-Fi System.
Fri 02-Jun
08:30 ~ 09:30Group 1Classroom 1620S01Compressed Air System1 ~ Working and Control Air System – Establish the Compressors and the system arrangements, for Working and Control Air.
11:00 ~ 11:40Group 1Classroom 1620S01Compressed Air System2 ~ System Operations – The Air Bottles and Driers and Distribution of the Working and the Control Air.
11:40 ~ 11:55Group 1Classroom 1620S01Compressed Air System3 ~ Connectivity - Working Air System and Control Air System.
11:55 ~ 12:10Group 1Classroom 1620S01Compressed Air System4 ~ System performance – Charging the bottles, the Air pressures.
14:00 ~ 14:15Group 1Classroom 1620S01Compressed Air System5 ~ Controlling the Air Pressures.
14:15 ~ 14:30Group 1Classroom 1620S01Compressed Air System6 ~ Alarm activation – Low pressure.
16:00 ~ 17:00Group 1Classroom 1620S11Compressed Air System - Practical On Board1 ~ On Board Familiarisation
Fri 09-Jun
16:35 ~ 17:35Group 1310S11Fire Main, Flushing, Draining and Ballasting - Practical On Board2 ~ On Board Familiarisation.
Mon 07-Aug
10:05 ~ 11:05Group 2310S11Fire Main, Flushing, Draining and Ballasting - Practical On Board2 ~ On Board Familiarisation.
Tue 22-Aug
16:20 ~ 16:50Group 2Classroom 2310S01Fire Main, Flushing, Draining and Ballasting1 ~ Fire Main and the ships FF system-Establish system arrangements.
16:50 ~ 17:30Group 2Classroom 2310S01Fire Main, Flushing, Draining and Ballasting2 ~ Connectivity of the fire Main to the Sprinkler & the Foam system- General characteristics, functions, operations and the utilisation.
17:30 ~ 18:30Group 2Classroom 2310S01Fire Main, Flushing, Draining and Ballasting3 ~ CO2 and the Watermist system- General characteristics, functions, operations, and utilisation.
Fri 25-Aug
09:15 ~ 09:45Group 2Classroom 2310S01Fire Main, Flushing, Draining and Ballasting4 ~ Operation of the Bilge System- System arrangements of the bilges.
09:45 ~ 10:15Group 2Classroom 2310S01Fire Main, Flushing, Draining and Ballasting5 ~ Operation of the Ballast system- System arrangements.
10:30 ~ 11:30Group 2310S01Fire Main, Flushing, Draining and Ballasting6 ~ Performance of the Ballast pumps- Rate of filling the tanks and tank capacities, the resulting trim.
11:30 ~ 11:50Group 2On Board310S11Fire Main, Flushing, Draining and Ballasting - Practical On Board1 ~ The FF arrangements – Utilise for Deck Wash, Spray, Flushing and Draining.
Akmal Hidayat
Wed 31-May
14:00 ~ 15:30Group 1On Board400S11Electrical Plant - Practical On Board2 ~ Perform Practical Site Survey and inspection on the system and components onboard.
15:15 ~ 15:35Group 1On Board400S11Electrical Plant - Practical On Board1 ~ Fuel System Primary Filter - Drain and check conditions
Tue 06-Jun
08:30 ~ 08:45Group 1Classroom 1400S01Electrical Plant1 ~ Introduction to Diesel Generation System
10:15 ~ 10:30Group 1Classroom 1400S01Electrical Plant8 ~ Shore connection - Shore Supply (SS)cables and stowage reels.
11:00 ~ 11:15Group 1Classroom 1400S01Electrical Plant2 ~ Emergency Generators: Daily Checklist
11:15 ~ 11:30Group 1Classroom 1400S01Electrical Plant3 ~ Emergency Generators: Instrument Panel Overview.
11:30 ~ 11:45Group 1Classroom 1400S01Electrical Plant4 ~ Emergency Generators: Oil Sampling
11:45 ~ 12:00Group 1Classroom 1400S01Electrical Plant5 ~ Emergency Generators: Visual Inspection & Troubleshooting
12:00 ~ 12:15Group 1Classroom 1400S01Electrical Plant6 ~ Emergency Generators: Check the function of Protection Panel and check protection device.
12:15 ~ 12:30Group 1Classroom 1400S01Electrical Plant7 ~ Emergency Generators - Inspect Electrical Diesel Engine Instrument Panel.
12:30 ~ 12:45Group 1Classroom 1400S01Electrical Plant9 ~ Shore Connection: SS Panels & Connection Box
12:45 ~ 13:00Group 1Classroom 1400S01Electrical Plant10 ~ Shore Connection:SOP SS connections ( Before/ After)
14:00 ~ 14:30Group 1Classroom 1430S01LP Switchboards and Distributions14 ~ Ships Batteries and UPS - Check battery capacity and charging current rating
14:00 ~ 14:15Group 1Classroom 1400S01Electrical Plant11 ~ Battery Sets: Visual Inspection & Troubleshooting
14:10 ~ 14:40Group 1Classroom 1430S01LP Switchboards and Distributions17 ~ Batteries and UPS - Check Ventilations layout and arrangement.
14:15 ~ 14:30Group 1Classroom 1400S01Electrical Plant12 ~ Battery Sets - Functional check of charging units and check cable any sign of damage.
14:30 ~ 14:45Group 1Classroom 1400S01Electrical Plant13 ~ UPS: Visual Check on ventilation system
14:30 ~ 14:50Group 1Classroom 1430S01LP Switchboards and Distributions15 ~ Ships Batteries and UPS - Visual Inspection and Identifying components and common faults
14:45 ~ 15:00Group 1Classroom 1400S01Electrical Plant14 ~ UPS: Run Self Check (BITE)
14:50 ~ 15:10Group 1Classroom 1430S01LP Switchboards and Distributions16 ~ Ships Batteries and UPS - Check and clean Earth bonding straps tightness and free from dirt and corrosion.
15:00 ~ 15:15Group 1Classroom 1400S01Electrical Plant15 ~ UPS: Clean and Inspect
15:15 ~ 15:30Group 1Classroom 1400S01Electrical Plant16 ~ UPS:Check Insulation and earthing.
16:00 ~ 16:15Group 1Classroom 1400S01Electrical Plant17 ~ Emergency switchboard: Visual check and clean
Wed 07-Jun
08:30 ~ 08:50Group 1Classroom 1430S01LP Switchboards and Distributions1 ~ 230V 50Hz Panels : Visual inspection on connections
08:50 ~ 09:10Group 1Classroom 1430S01LP Switchboards and Distributions2 ~ 230V 50Hz Panels : Visual inspection on Bus/Bus Layout
09:10 ~ 09:30Group 1Classroom 1430S01LP Switchboards and Distributions3 ~ 230 V 50Hz Panels : Front panels of dead front switchboards: Visual inspection & clean.
09:30 ~ 10:30Group 1On Board430S11LP Switchboards and Distributions - Practical On Board1 ~ Maintain - Propose” Perform Site survey, identify system layout and operating instructions.
09:45 ~ 10:05Group 1Classroom 1430S01LP Switchboards and Distributions4 ~ 230 V 50Hz Panels : Check Front panels of dead front switchboards: gauges and display Instruments for correct function and calibrated.
10:05 ~ 10:25Group 1Classroom 1430S01LP Switchboards and Distributions5 ~ 230 V 50Hz Panels - Run self check on BITE facilities.
10:45 ~ 12:45Group 1On Board430S11LP Switchboards and Distributions - Practical On Board2 ~ Perform Practical Site Survey and inspection on the system and components onboard.
11:00 ~ 11:20Group 1Classroom 1430S01LP Switchboards and Distributions6 ~ 230V 50Hz Panels protective circuits : Visual inspection on all protective devices and relays.
11:20 ~ 11:40Group 1Classroom 1430S01LP Switchboards and Distributions7 ~ 230 V 50Hz Panels : Check earth bonding connection and conditions
11:40 ~ 12:00Group 1Classroom 1430S01LP Switchboards and Distributions8 ~ 230 V 50Hz Panels - Visual and functional check the protective devices on Distribution Boxes
13:15 ~ 13:30Group 1Classroom 1450S01Power Distribution and Lighting Systems3 ~ Transitional Lighting - Visual inspection, check sign of corrosion and moisture.
14:00 ~ 14:15Group 1On Board450S11Power Distribution and Lighting Systems - Practical On Board3 ~ Emergency lighting - Functional check and inspection.
14:00 ~ 14:15Group 1Classroom 1450S01Power Distribution and Lighting Systems5 ~ Emergency Lighting - Check Emergency Lighting Layout and fittings.
14:15 ~ 14:30Group 1Classroom 1450S01Power Distribution and Lighting Systems6 ~ Emergency lighting - Functional check the lighting by compartments and system for normal and alternative supplies.
15:15 ~ 15:30Group 1Classroom 1450S01Power Distribution and Lighting Systems7 ~ External Lighting - Visual check on fittings and general layout.
15:45 ~ 16:00Group 1Classroom 1450S01Power Distribution and Lighting Systems8 ~ External lighting - Check watertight integrity at cable entry and cable gland.
16:00 ~ 17:00Group 1Classroom 1450S01Power Distribution and Lighting Systems9 ~ Portable Lighting - Functional check on lighting system and General Layout.
16:00 ~ 16:15Group 1Classroom 1450S01Power Distribution and Lighting Systems11 ~ Portable lighting - Earth Fault Insulation and Continuity Check.
16:00 ~ 16:15Group 1Classroom 1450S01Power Distribution and Lighting Systems10 ~ Portable Lighting - Visual check on fittings
16:00 ~ 16:15Group 1Classroom 1450S01Power Distribution and Lighting Systems12 ~ Portable lighting - Check for watertight integrity at flab entry and switches.
Thu 08-Jun
08:30 ~ 08:45Group 1Classroom 1450S01Power Distribution and Lighting Systems1 ~ General Lighting - Lighting general layout and functional checks..
08:45 ~ 09:00Group 1Classroom 1450S01Power Distribution and Lighting Systems2 ~ General Lighting - Check earth fault and continuity.
09:00 ~ 09:15Group 1On Board450S11Power Distribution and Lighting Systems - Practical On Board1 ~ General Lighting Visual inspection and general Layout: and arrangement
10:45 ~ 11:00Group 1On Board450S11Power Distribution and Lighting Systems - Practical On Board2 ~ Transitional lighting - Functional check and inspection.
11:15 ~ 11:30Group 1On Board450S11Power Distribution and Lighting Systems - Practical On Board4 ~ External lighting - Functional check and inspection.
11:30 ~ 12:30Group 1On Board450S11Power Distribution and Lighting Systems - Practical On Board5 ~ Perform Practical Site Survey and inspection on the system and components onboard of Power Distribution and Lighting Systems.
14:00 ~ 14:15Group 1Classroom 1400S01Electrical Plant18 ~ Transformers:: Visual check and clean
14:15 ~ 14:30Group 1Classroom 1400S01Electrical Plant19 ~ Transformers: Visual and functional check.
14:15 ~ 14:45Group 1Classroom 1430S01LP Switchboards and Distributions11 ~ Transformers - Check and clean Earth bonding straps tightness and free from dirt and corrosion.
14:30 ~ 15:00Group 1Classroom 1430S01LP Switchboards and Distributions9 ~ Transformers -, Visual Inspection and check for corrosion and cleanliness.
16:00 ~ 16:20Group 1Classroom 1430S01LP Switchboards and Distributions10 ~ Transformers - Electrical checks and troubleshooting
16:00 ~ 16:30Group 1Classroom 1430S01LP Switchboards and Distributions12 ~ Transformers - Check and examine the electrical properties continuity, insulation are within the acceptable limits.
16:00 ~ 16:30Group 1Classroom 1430S01LP Switchboards and Distributions13 ~ Transformers - Keep all electrical connections and mechanical fastenings tight according to right torque and the fastenings are dry, clean and rust free.
Thu 22-Jun
14:30 ~ 14:45Group 1Classroom 1450S01Power Distribution and Lighting Systems4 ~ Transitional Lighting - Functional check the lighting by compartments and system.
UMW 1
Thu 01-Jun
08:30 ~ 09:10Group 4Classroom 1640P01Oil Spill Response1 ~ Dispersant Pumps & Boom - Clean & Inspect: Pumps, control panel, motor, valves, spray booms, hoses, loose fittings.
09:10 ~ 09:40Group 4Classroom 2640P01Oil Spill Response2 ~ Dispersant Pumps & Boom: Functional checks – Setting up the system, pre starting checks and safety procedures, performance.
09:40 ~ 09:50Group 4Classroom 1640P01Oil Spill Response3 ~ Dispersant Pumps & Boom - Clean, Inspect, Check Insulation – Motors, control panel, cables and termination, Insulation Tester.
09:50 ~ 09:55Group 4Classroom 1640P01Oil Spill Response4 ~ Dispersant Pumps & Boom:Earthing straps, fastenings, Continuity tester.
11:00 ~ 13:00Group 4On Board640P01Oil Spill Response5 ~ Skimmer System - Operational Test – Setting up, pre starting checks, safety procedures, performance.
11:00 ~ 13:00Group 4On Board640P01Oil Spill Response6 ~ On Board Familiarisation
Fri 18-Aug
10:25 ~ 10:40Group 4Classroom 1000000Break Times1 ~ Morning Tea Break
Damen 1
Mon 05-Jun
09:30 ~ 09:50Group 4Classroom 1370P01Air Conditioning Equipment1 ~ Visual Check and inspect for leaks in HVAC system
09:30 ~ 10:30Group 3On Board411M02Ships Batteries and UPS1 ~ Ships Batteries and UPS: Perform Site Survey and to familirise with the overall system layout examine general conditions including to be acquinted system operating instruction prior to perform the task.
09:50 ~ 10:10Group 4On Board370P01Air Conditioning Equipment2 ~ Air conditioning system: Check pressure regulator for correct operations
10:10 ~ 10:25Group 4On Board370P01Air Conditioning Equipment3 ~ Air conditioning : Clean grease separator in hoods galley and pantry
10:25 ~ 10:40Group 4On Board370P01Air Conditioning Equipment4 ~ Air conditioning: Check pneumatic relays
10:45 ~ 11:15Group 3Classroom 3411M02Ships Batteries and UPS2 ~ Battery Sets: Check Charging cable insulation and physical properties.
10:55 ~ 11:10Group 4On Board370P01Air Conditioning Equipment5 ~ Air conditioning: Check fire protection flap with electro magnet device.
11:10 ~ 11:25Group 4On Board370P01Air Conditioning Equipment6 ~ Air Conditioning: Check, clean dust filter Air handling units,- Bridge, small arms store
11:15 ~ 11:35Group 3On Board411M02Ships Batteries and UPS3 ~ Ships Batteries and UPS - Measure and record electrolyte SG reading.
11:25 ~ 11:40Group 4On Board370P01Air Conditioning Equipment7 ~ Air Conditioning Equipment: Check, clean dust filter Air handling units, - Ammunition, MCSR and small arms store
11:35 ~ 11:55Group 3On Board411M02Ships Batteries and UPS4 ~ Ships Batteries and UPS -Check battery voltage and charging current.
11:40 ~ 11:55Group 4On Board370P01Air Conditioning Equipment8 ~ Air Conditioning Equipment: Check electric motor and centrifugal fan - Various location
11:55 ~ 12:15Group 3On Board411M02Ships Batteries and UPS5 ~ Ships Batteries and UPS: Visual inspection and keep electrical connections and mechanical fastenings tight.
11:55 ~ 12:10Group 4On Board370P01Air Conditioning Equipment9 ~ Air Conditioning Equipment: Check sensors and controllers.
12:10 ~ 12:30Group 4On Board370P01Air Conditioning Equipment10 ~ Air Conditioning Equipment: Check, clean ventilation flap with pneumatic actuators.
13:30 ~ 13:45Group 4On Board370P01Air Conditioning Equipment11 ~ Air Conditioning Equipment: Check, clean non-return flap type- mechanically operated.
13:45 ~ 14:00Group 4On Board370P01Air Conditioning Equipment12 ~ Chilled water system: "Walk-Around visual Inspection ( Perform Daily Check & VI)"
14:00 ~ 14:15Group 4On Board370P01Air Conditioning Equipment13 ~ Chilled Unit: Check electrical motor and radial fan for regular operation.
14:15 ~ 14:35Group 4On Board370P01Air Conditioning Equipment14 ~ Chilled water system: Check air intakes and outlets for dirt deposits, clean if necessary.
14:30 ~ 15:00Group 3Classroom 3411M02Ships Batteries and UPS6 ~ Batteries and UPS: Check Earth bonding straps tightness and free from dirt and corrosion.
14:35 ~ 14:50Group 4On Board370P01Air Conditioning Equipment15 ~ Emergency air-conditioning: Check for refrigerant leaks.
14:50 ~ 15:05Group 4On Board370P01Air Conditioning Equipment16 ~ Chilled water system: Check dust filter, replace if necessary.
15:00 ~ 15:30Group 3Classroom 3411M02Ships Batteries and UPS7 ~ Ships Batteries and UPS: Keep electrical connections and mechanical fastenings tight.
15:45 ~ 16:15Group 3Classroom 3411M02Ships Batteries and UPS8 ~ Batteries and UPS: Check the ventilation and air flow in working order in both Battery spaces and UPS Cabinet-rack.
16:15 ~ 16:45Group 3Classroom 3411M02Ships Batteries and UPS9 ~ Batteries and UPS: Observe safety precautions, practices and handling of hazadous material in performing the work.
16:45 ~ 17:15Group 3Classroom 3411M02Ships Batteries and UPS10 ~ Batteries and UPS: Check and eximine the power supplies input both AC and DC are available and operational.
Mon 12-Jun
08:30 ~ 09:10Group 2Classroom 1320M01Fuel System1 ~ Fuel Oil Transfer System: Clean and inspect – Pumps, valves, motors, control panel.
09:10 ~ 10:10Group 2Classroom 1320M01Fuel System2 ~ Fuel Oil Transfer System: Start/stop Local, auto & emergency – Transfer operations, performance of pumps.
10:10 ~ 10:20Group 2Classroom 1320M01Fuel System3 ~ Fuel Oil Transfer System: Clean, inspect and check insulation – Electrical equipment, Insulation tester.
11:00 ~ 11:40Group 4Classroom 1110P01Anchors1 ~ Establish the arrangements - Anchor Chain and the Windlass.
11:40 ~ 12:00Group 4Classroom 1110P01Anchors3 ~ The Control Panel and Controlling the speed.
12:00 ~ 12:15Group 4Classroom 1110P01Anchors4 ~ Inspect - The Braking Mechanism and Brake Pad.
12:15 ~ 12:30Group 4Classroom 1110P01Anchors5 ~ Operate - Let Go, Heaving Anchor & Chain Stopper.
12:30 ~ 12:45Group 4Classroom 1110P01Anchors6 ~ Washing Anchor and Chain – The process.
12:45 ~ 12:55Group 4Classroom 1110P01Anchors7 ~ Oiling and Greasing the Windlass – The Procedure.
16:00 ~ 16:10Group 4On Board110P01Anchors8 ~ Adherence to Safety Precautions.
16:10 ~ 16:25Group 4On Board110P01Anchors2 ~ The Windlass - Functions and Operations.
16:45 ~ 18:45Group 4On Board110P01Anchors9 ~ On Board Familiarisation
Tue 13-Jun
08:30 ~ 08:50Group 3Classroom 3330M01Circulating & Sea Water Cooling1 ~ Clean and Inspect – Motors, air vents, cable & guards, mountings and fastenings.
08:50 ~ 09:10Group 3Classroom 3330M01Circulating & Sea Water Cooling2 ~ Clean and Inspect – Starters, switches, alarms and indications, mountings and cables.
09:10 ~ 09:40Group 3Classroom 3330M01Circulating & Sea Water Cooling3 ~ Clean and Inspect – Aux SW Pumps, valves and couplings, mountings and fastenings, indicators and alarm.
09:40 ~ 10:10Group 3Classroom 3330M01Circulating & Sea Water Cooling4 ~ Functional Checks – Motors and Starters, switches, Pre starting checks and safety procedures, performance checks.
10:10 ~ 10:30Group 3Classroom 3330M01Circulating & Sea Water Cooling5 ~ Run Pumps (SW) if not in regular use – Pre starting checks and safety procedures; performance; check operating pressures, leaks and abnormalities.
11:00 ~ 11:20Group 3Classroom 3330M01Circulating & Sea Water Cooling6 ~ Clean and Inspect Heat exchangers – Thermostic control valves, temperature gauges.
11:20 ~ 11:25Group 3Classroom 3330M01Circulating & Sea Water Cooling7 ~ Clean and Inspect – Pump couplings, pipes and joints.
11:25 ~ 11:40Group 3Classroom 3330M01Circulating & Sea Water Cooling8 ~ Inspect, Clean and Check Insulation - electrical equipment cables and terminations, use of Insulation Tester.
11:40 ~ 11:50Group 3Classroom 3330M01Circulating & Sea Water Cooling9 ~ Inspect Earth Bonding – Motors and Starters, earthing straps and fastenings, use of Continuity tester.
11:50 ~ 12:30Group 3Classroom 3330M01Circulating & Sea Water Cooling10 ~ Functional Checks – SW Cooling System, system operation and performance, check temperatures and pressures, check for abnormalities.
14:00 ~ 16:00Group 3On Board330M01Circulating & Sea Water Cooling11 ~ On Board Familiarisation.
Wed 14-Jun
08:30 ~ 09:00Group 2Classroom 1320M01Fuel System4 ~ Fuel Oil Purifier: Clean and inspect – Control panel, pump, motor, valve.
09:00 ~ 09:05Group 2Classroom 1320M01Fuel System7 ~ Fuel Oil Purifier: Inspect earth bonding – Earthing strap, Continuity tester.
09:05 ~ 09:35Group 2Classroom 1320M01Fuel System8 ~ Fuel Oil Supply System: Day tanks, purified FO to consumers, water and sludge line, valves, overflow line.
09:30 ~ 09:50Group 3Classroom 3371M01Air Conditioning and Ventilation20 ~ Emergency air-conditioning: Check condenser water drain valve.
09:35 ~ 10:05Group 2Classroom 1320M01Fuel System9 ~ Cargo Handling Fuel Oil System: Clean and Inspect – Bunkering points, Control panel.
09:50 ~ 10:10Group 3Classroom 3371M01Air Conditioning and Ventilation21 ~ Emergency air-conditioning: Check wetness indicator of sight glass.
10:05 ~ 10:20Group 2Classroom 1320M01Fuel System10 ~ Cargo Handling Fuel Oil System: Inspect after use – Safety procedures, and procedure after after use.
10:10 ~ 10:30Group 3Classroom 3371M01Air Conditioning and Ventilation22 ~ Check cooling seawater regulating valve.
10:20 ~ 10:35Group 2Classroom 1320M01Fuel System11 ~ Check and inspect: Day tank and water trap – sight glass, alarms an activation.
10:30 ~ 10:45Group 3000000Break Times1 ~ Morning Tea Break
10:45 ~ 11:05Group 3Classroom 3371M01Air Conditioning and Ventilation24 ~ Emergency air-conditioning: Check dust filter, replace if necessary.
11:00 ~ 11:15Group 2Classroom 1341M01Fresh Water System1 ~ Fresh Water Supply System: Clean & Inspect - Motors, starters, cables and terminations, mountings and fastenings.
11:00 ~ 11:30Group 1On Board340S01Fresh Water Supply System1 ~ The FW Supply & FW Supply System Accommodation – Establish the system arrangements.
11:05 ~ 11:25Group 3Classroom 3371M01Air Conditioning and Ventilation25 ~ Emergency air-conditioning: Check centrifugal fan motor and all electrical connections.
11:15 ~ 11:55Group 2Classroom 1341M01Fresh Water System2 ~ Fresh Water Supply System: Functional Checks Motors & Starters - Pre starting checks, performance and abnormalities.
11:25 ~ 11:45Group 3Classroom 3371M01Air Conditioning and Ventilation26 ~ Safety and Handling - Observe safety precaution and practices, handling of hazadous materials when performing the work.
11:30 ~ 12:00Group 1On Board340S01Fresh Water Supply System2 ~ Process of filling/Supply to FW tanks – The FW Cargo Handling system, the Reverse Osmosis Systems and the Hydrophore, their functions and operations.
11:55 ~ 12:35Group 2Classroom 1341M01Fresh Water System3 ~ Fresh Water Supply System: Clean & Inspect - Pumps & Outfits; couplings, valves, filters, gauges, pipes and fastenings.
12:00 ~ 12:30Group 1On Board340S01Fresh Water Supply System3 ~ RO systems – Production rate, managing the Chemicals and the Backwash.
12:30 ~ 12:40Group 1On Board340S01Fresh Water Supply System4 ~ Administer water sampling.
12:35 ~ 12:45Group 2Classroom 1341M01Fresh Water System4 ~ Fresh Water Supply System: Clean, Inspect and Check Insulation – cables & terminations
12:40 ~ 13:00Group 1On Board340S01Fresh Water Supply System5 ~ FW Supply System Accommodation – FW circulation and pumps, Distribution to consumers and Equipment on board
12:45 ~ 12:50Group 2Classroom 1341M01Fresh Water System5 ~ Fresh Water Supply System: Inspect - Earth Bonding.
12:50 ~ 13:10Group 2Classroom 1341M01Fresh Water System7 ~ Fresh Water Supply System: Run Pump if not in regular use – Pre starting checks, check performance, leaks, abnormalities.
13:00 ~ 13:20Group 3On Board371M01Air Conditioning and Ventilation23 ~ Emergency air-conditioning: Check all shut-off valves.
13:20 ~ 15:20Group 3On Board371M01Air Conditioning and Ventilation27 ~ Air Conditioning and Ventilation: Practical Site Survey and Inspection on the System and Components onboard.
14:00 ~ 14:15Group 2On Board320M01Fuel System5 ~ Fuel Oil Purifier: Functional checks – Health checks using the Control panel.
14:15 ~ 14:25Group 2On Board320M01Fuel System6 ~ Fuel Oil Purifier: Clean, inspect and check insulation – Electrical equipment, cables and termination, Insulation tester.
14:25 ~ 18:25Group 2On Board320M01Fuel System12 ~ On Board Familiarisation.
16:00 ~ 16:15Group 2On Board341M01Fresh Water System6 ~ Fresh Water Supply System: Clean & Inspect - Pressure Control Switch.
16:00 ~ 16:20Group 1On Board340S01Fresh Water Supply System6 ~ Establish Tanks capacities, Flow rate and time period of filling or transfer.
16:20 ~ 16:50Group 1On Board340S01Fresh Water Supply System7 ~ The Hot Water System – Production, circulation, temperature control and distribution to consumers.
16:50 ~ 17:50Group 1On Board340S01Fresh Water Supply System8 ~ On Board Familiarisation.
Thu 15-Jun
15:05 ~ 15:20Group 4000000Break Times3 ~ Tea Break
Tue 20-Jun
08:30 ~ 08:40Group 3Classroom 3360M01Lubrication System1 ~ Lubrication System: Clean and Inspect – Motor & Starters, control panel, level switches
08:40 ~ 09:10Group 3Classroom 3360M01Lubrication System2 ~ Lubrication System: Clean and Inspect – Pumps and outfits, valves, filters, pipes, gauges.
09:10 ~ 09:30Group 3On Board360M01Lubrication System3 ~ Lubrication System: Functional Checks – Motors and Starters, Pre starting checks and safety procedures, Control Panel and Alarm settings.
09:30 ~ 10:10Group 3Classroom 3360M01Lubrication System4 ~ Lubrication System: Functional Checks – Pumps and outfits, Pre starting checks and safety procedures, Filling point, Supply to consumers, check functionalities at control positions
10:10 ~ 10:20Group 3Classroom 3360M01Lubrication System5 ~ Lubrication System: LO Filter and Drainage – Clean, inspect for good operations.
10:20 ~ 10:25Group 3Classroom 3360M01Lubrication System6 ~ Lubrication System: Clean, inspect and check insulation - Motor Starters Control Panel , cables and terminations.
10:25 ~ 10:30Group 3Classroom 3360M01Lubrication System7 ~ Lubrication System: Inspect earth bonding - Motor and starters, Earthing straps and fastening.
11:00 ~ 11:20Group 3Classroom 3360M01Lubrication System9 ~ Dirty - Oil System: DO Pump – Run pump if not in regular use: Pre starting checks and safety procedures, Inspect various operations, Check performance, abnormalities.
11:20 ~ 11:40Group 3Classroom 3360M01Lubrication System10 ~ Dirty-Oil System: Functional Checks - DO Pump motor: Pre starting checks, and safety procedures, Check FW valves, inspect for various operations.
11:40 ~ 11:50Group 3Classroom 3360M01Lubrication System11 ~ Dirty-Oil System: Clean, Inspect and insulation - DO Pump (Motor and starters), Control Panel, cables and termination, Insulation Tester.
11:45 ~ 12:05Group 3Classroom 3360M01Lubrication System8 ~ Dirty-Oil System: Clean and Inspect - Pump, Motor and starter, Safety valves, Filters, Drain plug, Level switches.
11:50 ~ 11:55Group 3Classroom 3360M01Lubrication System12 ~ Dirty-Oil System: Inspect Earth Bonding- DO Pump (Motor and starters), Earthing straps and fastening, Continuity Tester.
11:55 ~ 13:55Group 3On Board360M01Lubrication System13 ~ On Board Familiarisation
Wed 21-Jun
08:30 ~ 09:00Group 3Classroom 3310M01Fire main, Bilge & Ballast8 ~ Stripping (oily-bilge) system (S oily-bilge S): Functional checks – Control Panel, Pre starting checks, Suction and discharge valves.
08:30 ~ 08:50Group 3Classroom 3310M01Fire main, Bilge & Ballast1 ~ Bilge System: Clean and Inspect ( Motors & Starter) – Motors and starters, cables and termination, mounting and fastenings.
08:30 ~ 08:40Group 3Classroom 3310M01Fire main, Bilge & Ballast7 ~ Clean and Inspect (Air line) – Control air, valves, air line, and gauges.
08:30 ~ 08:40Group 3Classroom 3310M01Fire main, Bilge & Ballast10 ~ Bilge water separator: Clean Y filters – Remove and re-reinstall.
08:30 ~ 08:40Group 3On Board310M01Fire main, Bilge & Ballast9 ~ Functional checks – Control Panel, Pre starting checks, Suction and discharge valves.
08:30 ~ 08:35Group 3Classroom 3310M01Fire main, Bilge & Ballast11 ~ Drip Trays: Clean & Inspect – Hose and tray
08:50 ~ 09:30Group 3Classroom 3310M01Fire main, Bilge & Ballast2 ~ Bilge System: Functional Checks: Pumps, motors, pneumatic valve, ejectors; Prestarting checks, Control panel performance and abnormalities
09:30 ~ 09:50Group 3Classroom 3310M01Fire main, Bilge & Ballast3 ~ Bilge System (pumps): Clean and Inspect – Pumps, strainer and filters, valves.
09:50 ~ 10:00Group 3Classroom 3310M01Fire main, Bilge & Ballast4 ~ Clean, inspect and check Insulation (Motors & Starters): Control panel, cables and termination, Insulation tester.
10:00 ~ 10:05Group 3Classroom 3310M01Fire main, Bilge & Ballast5 ~ Inspect Earth Bonding (Motors & Starters): Control Panel, Continuity Tester.
10:05 ~ 10:25Group 3Classroom 3310M01Fire main, Bilge & Ballast6 ~ Stripping (oily-bilge) system (S oily-bilge S): Clean &Inspect (Stripping oily-bilge pump) – Pumps, strainers, hoses.
11:00 ~ 11:10Group 3On Board310M01Fire main, Bilge & Ballast18 ~ Emergency FF pumps: Functional Checks with GS Pumps – Pre starting checks and safety procedures, performance of GS pumps with Emergency FF pumps.
14:00 ~ 14:10Group 3On Board310M01Fire main, Bilge & Ballast12 ~ BWS Pumps and outfit: Clean and Inspect – Pumps, motors, Control Panel, valves.
14:10 ~ 14:40Group 3Classroom 3310M01Fire main, Bilge & Ballast13 ~ BWS Functional Checks – Pre starting checks and safety procedures, managing ballast water.
14:15 ~ 14:20Group 3On Board310M01Fire main, Bilge & Ballast21 ~ GS Pumps (Motors & Starters): Inspect earth bonding – Earthing straps and fastenings.
14:40 ~ 14:50Group 3Classroom 3310M01Fire main, Bilge & Ballast14 ~ BWS – Clean, inspect and check insulation – Control panel,motors, cables and terminations, Insulation tester.
14:50 ~ 14:55Group 3Classroom 3310M01Fire main, Bilge & Ballast15 ~ BWS – Inspect earth bonding : Earthing straps, fastenings, continuity tester.
14:55 ~ 15:55Group 3Classroom 3310M01Fire main, Bilge & Ballast16 ~ GS Pumps & Outfit: Clean and inspect – Pumps, motors, Control Panel, valves, associated fittings.
15:50 ~ 16:20Group 3Classroom 3310M01Fire main, Bilge & Ballast17 ~ GS Pumps and Outfit: Functional checks – Pre starting checks and safety procedures, performance, bilge and ballast functions.
16:00 ~ 20:00Group 3On Board310M01Fire main, Bilge & Ballast22 ~ On Board Familiarisation.
16:20 ~ 16:30Group 3Classroom 1310M01Fire main, Bilge & Ballast19 ~ GS Pumps and outfit: Clean, insect and check insulation – Electrical Equipment, Cables and terminations, Insulation Tester.
16:30 ~ 17:00Group 3Classroom 3310M01Fire main, Bilge & Ballast20 ~ Fire hydrant and spray: Clean and inspect – Hydrant, spray, nozzles, hoses, loose fittings.
Thu 22-Jun
14:30 ~ 15:10Group 3On Board650M01External Fire-Fighting System1 ~ Flight Deck FF System (Foam System) - Clean and Inspect Externally: Hydrants, monitors, foam tank and applicator, fire man suits, Hoses, and loose fittings.
15:10 ~ 15:25Group 3On Board650M01External Fire-Fighting System2 ~ Flight Deck FF System (Foam System) - Functional checks: Pre-starting checks and safety procedures.
15:25 ~ 15:55Group 3On Board650M01External Fire-Fighting System3 ~ Flight Deck FF System (Foam System) - Operational Checks: Pre starting checks, safety and operational procedures, performance
16:10 ~ 16:50Group 3On Board650M01External Fire-Fighting System4 ~ Clean And Inspect: Engine driven pump,monitors, valves, hoses, nozzles, control panel
16:50 ~ 17:05Group 3On Board650M01External Fire-Fighting System5 ~ Operational Check: Pre starting checks and safety procedures, Running with s’tbd ME
17:05 ~ 17:25Group 3On Board650M01External Fire-Fighting System6 ~ Fire Hoses-Clean, Inspect and Pressure Testing: Setting up pressure test, procedure after use.
Tue 27-Jun
13:15 ~ 13:45Group 1On Board870S01Wind & Metererological System1 ~ Barometer/hermometer/hygrometer - Examine the general conditions and system functional prior to performing the task.
13:45 ~ 14:15Group 1On Board870S01Wind & Metererological System2 ~ Barometer/hermometer/hygrometer - Visual inspection of the unit and clean as necessary.
14:15 ~ 14:45Group 1On Board870S01Wind & Metererological System3 ~ Barometer/hermometer/hygrometer - Check and clean the exposed part and sight glass as necessary.
14:45 ~ 15:15Group 1On Board870S01Wind & Metererological System4 ~ Barometer/hermometer/hygrometer - Check and clean the station annually.
15:15 ~ 15:45Group 1On Board870S01Wind & Metererological System5 ~ Barometer/hermometer/hygrometer - Visual inspection of the unit and clean as necessary.
16:00 ~ 16:30Group 1On Board870S01Wind & Metererological System6 ~ Anemometer - Check cabling and cable support for any sign of damage and corrosion.
16:30 ~ 17:00Group 1On Board870S01Wind & Metererological System7 ~ Anemometer - Check mounting conditions and earthing strap connection, re tighten if necessary.
17:00 ~ 17:30Group 1On Board870S01Wind & Metererological System9 ~ Anemometer - Check mounting for sign of corrosion and re tighten fasteners if necessary.
17:30 ~ 18:00Group 1On Board870S01Wind & Metererological System8 ~ Anemometer - Run self test or BITE for normal operation.
Wed 28-Jun
09:30 ~ 10:00Group 1On Board870S01Wind & Metererological System10 ~ Weather fax - Functional check power supply connection in good working order.
10:00 ~ 10:30Group 1On Board870S01Wind & Metererological System11 ~ Weather fax - Check above deck unit -pre- amp is clean and free form dirt and salt deposit.
10:45 ~ 11:15Group 1On Board870S01Wind & Metererological System12 ~ Weather fax - Run system check using BITE facility or self test.
11:15 ~ 11:45Group 1On Board870S01Wind & Metererological System13 ~ Weather fax - Ensure the cable interconnection between receiver unit, pre-amp and connection hub are correctly terminated.
11:45 ~ 13:45Group 1On Board870S01Wind & Metererological System14 ~ Wind & Meteorological System - Practical Site Survey and inspection on the system and components onboard.
14:45 ~ 15:25Group 1On Board333S01Cooling Water System1 ~ SW Cooling System – Establish system arrangements, the suction and overboard discharge.
15:25 ~ 15:40Group 1On Board333S01Cooling Water System2 ~ Operation of the SW Cooling and the Heat Exchangers, the Low Temp and High Temp Coolers.
15:55 ~ 16:05Group 1On Board333S01Cooling Water System3 ~ System Performance – Temperature and Pressures.
16:05 ~ 16:35Group 1On Board333S01Cooling Water System4 ~ Fresh Cooling Water System – Establish system arrangements, the FW circulation and Heat Exchangers.
16:35 ~ 16:50Group 1On Board333S01Cooling Water System5 ~ System Operation - The Circulation Pumps and the system operation.
16:50 ~ 17:00Group 1On Board333S01Cooling Water System6 ~ Circulating Pumps – Controlling the pumps.
17:00 ~ 17:10Group 1On Board333S01Cooling Water System7 ~ System performance – Temperature and pressures.
Wed 05-Jul
08:30 ~ 08:50Group 3Classroom 3371M01Air Conditioning and Ventilation1 ~ Air Conditioning and Ventilation: Examine the general conditions and system operation prior to perform the task.
08:50 ~ 09:05Group 3Classroom 3371M01Air Conditioning and Ventilation2 ~ Ventilation system: Check Motor Temperature, revolution and noise and vibration.
09:05 ~ 09:20Group 3Classroom 3371M01Air Conditioning and Ventilation3 ~ Ventilation system: Earthing Arrangement - Inspect Earth Bonding.
09:20 ~ 09:35Group 3Classroom 3371M01Air Conditioning and Ventilation5 ~ Ventilation system: Motors Controllers functional check of various protective and overload devices and type of controllers employed.
09:35 ~ 09:55Group 3Classroom 3371M01Air Conditioning and Ventilation6 ~ Air Conditioning and Ventilation: Visual Check and inspect for leaks in HVAC system.
09:55 ~ 10:10Group 3Classroom 3371M01Air Conditioning and Ventilation7 ~ Ventilation system: Vent. Flaps, covers and trunking-inspect & Clean.
10:10 ~ 10:30Group 3Classroom 3371M01Air Conditioning and Ventilation8 ~ Air Conditioning and Ventilation: Pre checks and safety instruction before, during and after performing the task.
11:00 ~ 11:15Group 3Classroom 3371M01Air Conditioning and Ventilation9 ~ Ventilation system: Functional check of various protective and overload devices and type of controllers employed.
11:15 ~ 11:35Group 3Classroom 3371M01Air Conditioning and Ventilation10 ~ Air conditioning system: Check SW side of heat exchanger flow and pressure.
11:35 ~ 11:55Group 3Classroom 3371M01Air Conditioning and Ventilation11 ~ Air conditioning system: Check control valve and actuator heat exchanger.
11:55 ~ 12:25Group 3Classroom 3371M01Air Conditioning and Ventilation12 ~ Air Conditioning and Ventilation: Equipment and Test Procedures for Electrical Circuit Components.
12:25 ~ 12:55Group 3Classroom 3371M01Air Conditioning and Ventilation13 ~ Air conditioning system: Check, clean dust filter Air handling units, - Ammunition, MCSR and small arms store.
12:35 ~ 13:05Group 3Classroom 3371M01Air Conditioning and Ventilation14 ~ Air conditioning system: Check heat exchanger air conditioning unit at various locations and station in working order.
13:05 ~ 13:35Group 3Classroom 3371M01Air Conditioning and Ventilation15 ~ Air conditioning system: Check the chilled water control valves for leaks, stiffness and corrosion.
14:00 ~ 14:30Group 3Classroom 3371M01Air Conditioning and Ventilation16 ~ Ventilation system: Check electric motor and centrifugal fan - Various locations.
14:30 ~ 14:50Group 3Classroom 3371M01Air Conditioning and Ventilation17 ~ Ventilation system: Check electric motor and Ventilation fan- (Accommodation) spaces and Switchboard room.
14:50 ~ 15:10Group 3Classroom 3371M01Air Conditioning and Ventilation18 ~ Ventilation system: Check fire protection flap with electro magnet device.
15:10 ~ 15:30Group 3Classroom 3371M01Air Conditioning and Ventilation19 ~ Ventilation system: Clean and disinfect air duct of the Sick Bay and treatment room.
16:00 ~ 16:15Group 3On Board371M01Air Conditioning and Ventilation4 ~ Ventilation system: Filters - Clean the Dust Filter Mat.
Tue 11-Jul
14:20 ~ 14:40Group 1On Board340S02Sewage System1 ~ The Sanitary Discharge Grey Water System - System arrangements, functions and operations.
14:40 ~ 14:55Group 1On Board340S02Sewage System2 ~ Sewage collecting Tank 16, Sewage tank 17 - Arrangement, Functions.
14:55 ~ 15:25Group 1On Board340S02Sewage System3 ~ STP: Clean and Inspect- External Feed Pump, vacuum pumps, valves, Local operator panel, ventilation lines – functions, operations.
15:40 ~ 16:00Group 1On Board340S02Sewage System4 ~ STP: Functional Checks- The LOP- Health checks, auto start/stop. Alarms, pre starting checks, safety procedures, operation and Performance.
16:00 ~ 16:15Group 1On Board340S02Sewage System5 ~ STP: Replenish disinfectant- Procedures when handling disinfectant, Safety precautions.
16:15 ~ 16:25Group 1On Board340S02Sewage System6 ~ Discharge of Sanitary Grey and Black Water.
16:25 ~ 17:25Group 1On Board340S02Sewage System7 ~ On Board Familiarisation.
Wed 12-Jul
13:30 ~ 15:40Group 1On Board333S01Cooling Water System8 ~ On Board Familiarisation
Tue 25-Jul
09:30 ~ 10:10Group 2Classroom 1341M01Fresh Water System8 ~ Fresh Water Makers: Daily Checks Reverse Osmosis – Control panel, Filters, differential pressures, Oil level.
10:10 ~ 10:25Group 2Classroom 1341M01Fresh Water System9 ~ Fresh Water Makers: Check Filling heights – Deacidification Filter heights
10:40 ~ 10:50Group 2Classroom 1341M01Fresh Water System10 ~ Fresh Water Makers: Stop Rinse – Module Membrane.
10:50 ~ 11:00Group 2Classroom 1341M01Fresh Water System11 ~ Fresh Water Makers: Clean – Module Membrane.
11:00 ~ 11:10Group 2Classroom 1341M01Fresh Water System12 ~ Fresh Water Makers: Check Torque – Module Membrane.
11:10 ~ 11:25Group 2Classroom 1341M01Fresh Water System13 ~ Fresh Water Makers: RO unit - Change Lub Oil
11:25 ~ 11:55Group 2Classroom 1341M01Fresh Water System14 ~ Hot Water Circuit: Run Pump if not in regular use – Pre starting checks, Control panel, check performance, leaks, and abnormalities.
11:55 ~ 12:15Group 2Classroom 1341M01Fresh Water System15 ~ Hot Water Circuit: Clean & Inspect – Control Panel, HW Circulating Pump and motors, Valves, cables and terminations
12:15 ~ 12:25Group 2Classroom 1341M01Fresh Water System16 ~ Hot Water Circuit: Functional Checks- Control panel
12:25 ~ 12:35Group 2Classroom 1341M01Fresh Water System17 ~ Hot Water Circuit: Clean, Inspect and Check Insulation – Motors & Control Panel.
12:35 ~ 12:40Group 2Classroom 1341M01Fresh Water System18 ~ Hot Water Circuit: Inspect Earth Bonding – Motors, control Panel.
12:50 ~ 13:00Group 2Classroom 1341M01Fresh Water System19 ~ Hot Water Circuit: Clean and Inspect – Pressure Control Switch.
14:00 ~ 16:00Group 2On Board341M01Fresh Water System20 ~ On Board Familiarisation
Thu 27-Jul
09:30 ~ 10:00Group 2Classroom 1670M01Fixed Internal Fire fighting System1 ~ Sprinkler System - Clean and inspect: Compressed air pipe coupling, test valves, sprinklers head.
10:00 ~ 10:20Group 2Classroom 1670M01Fixed Internal Fire fighting System2 ~ Sprinkler System - Check Audibles & Visual Alarm & Water Pressure: Check audibles & visual alarm and water pressure.
10:20 ~ 11:00Group 2Classroom 1670M01Fixed Internal Fire fighting System3 ~ Water Mist System (Control Panel) - Inspect externally: Control panel, water pump, valve, nozzles.
11:15 ~ 11:35Group 2Classroom 1670M01Fixed Internal Fire fighting System4 ~ Water Mist System - Clean and inspect water pump and outfit: Clean and inspect water pump and outfit, manual and auto operation.
11:35 ~ 11:50Group 2Classroom 1670M01Fixed Internal Fire fighting System5 ~ Water Mist System (Control Panel): Clean and inspect internally.
11:50 ~ 12:05Group 2Classroom 1670M01Fixed Internal Fire fighting System6 ~ Water Mist System - Alarm Checks: Control panel self tests and Alarm activation.
12:05 ~ 12:45Group 2Classroom 1670M01Fixed Internal Fire fighting System7 ~ Foam System - Clean externally: Foam and fire pumps, valves, monitors, hoses, nozzles.
12:45 ~ 13:00Group 2Classroom 1670M01Fixed Internal Fire fighting System8 ~ Foam System - Functional Checks: Pre starting checks, procedure when running the fire pump.
13:00 ~ 13:15Group 2Classroom 1670M01Fixed Internal Fire fighting System9 ~ Foam System - Operational Check: Pre starting check, Operational procedures, performance.
13:15 ~ 13:55Group 2Classroom 1670M01Fixed Internal Fire fighting System10 ~ CO2 System - Clean & Check Pipes, Nozzles & associated Components, Clean and check pipes, Nozzles and associated components.
14:55 ~ 15:10Group 2Classroom 1670M01Fixed Internal Fire fighting System11 ~ CO2 System - Weight the cylinder: Weight the cylinder.
15:10 ~ 18:10Group 2On Board670M01Fixed Internal Fire fighting System12 ~ On Board Familiarisation
Fri 28-Jul
09:30 ~ 10:10Group 2Classroom 1650P01Damage Control and Fire Fighting1 ~ The ship’s Fire Fighting System arrangements – Fire Main line.
10:10 ~ 10:25Group 2Classroom 1650P01Damage Control and Fire Fighting2 ~ Fire Hydrants and the Locations.
10:40 ~ 11:40Group 2Classroom 1650P01Damage Control and Fire Fighting3 ~ Operating the system using the Hoses, Nozzles and sprays.
11:40 ~ 12:40Group 2Classroom 1650P01Damage Control and Fire Fighting4 ~ The Sprinkler, CO2, Foam and the Water Mist system-General arrangements, general characteristics and operations.
14:40 ~ 15:10Group 2Classroom 1650P01Damage Control and Fire Fighting5 ~ The External FF system - The general arrangements, general characteristics and operations.
15:10 ~ 15:50Group 2Classroom 1333P01Fresh Water Cooling System1 ~ Establish the Fresh Water Cooling System.
15:50 ~ 16:10Group 2Classroom 1333P01Fresh Water Cooling System2 ~ The Circulating Pumps and the Circulating FW.
16:10 ~ 16:20Group 2Classroom 1333P01Fresh Water Cooling System3 ~ The Heat Exchangers - Cooling process.
16:35 ~ 16:55Group 2Classroom 1333P01Fresh Water Cooling System4 ~ Equipments and systems cooled.
16:55 ~ 17:05Group 2Classroom 1333P01Fresh Water Cooling System5 ~ Pre-Starting Checks and Safety Procedures.
17:05 ~ 17:20Group 2Classroom 1333P01Fresh Water Cooling System6 ~ Running the System - verify System Pressures and Temperatures and state of Alarm.
17:20 ~ 18:20Group 2On Board333P01Fresh Water Cooling System7 ~ On Board Familiarisation.
Mon 31-Jul
09:30 ~ 10:30Group 2On Board411P01Shore Supply1 ~ Shore Supply: Perform Site Survey and to familirise with the overall system layout examine general conditions including to be acquinted system operating instruction prior to perform the task.
10:45 ~ 11:00Group 2On Board411P01Shore Supply3 ~ Shore Supply - Check periodically the Phase Sequence Meter.
11:00 ~ 11:30Group 2On Board411P01Shore Supply4 ~ Shore Supply - Functional Check of the Control Panel, meters, gauges, phase sequence meter prior ship shore connections prior to connection and termination.
11:30 ~ 12:00Group 2On Board411P01Shore Supply6 ~ Shore Supply Safety Handling: Observe safety precaution and practices, handling of hazardous substance in performing the work.
12:00 ~ 12:30Group 2Classroom 1411P01Shore Supply2 ~ Shore Supply -Check and clean Earth bonding straps tightness and free from dirt and corrosion.
12:00 ~ 12:15Group 2Classroom 1411P01Shore Supply5 ~ Visual inspection of Shore supply connection panel and box.
12:30 ~ 13:30Group 2Classroom 1411P01Shore Supply7 ~ Shore Supply: Practical Survey and Inspection on the Shore Supply System and Components onboard.
14:30 ~ 14:45Group 2Classroom 1411P01Shore Supply8 ~ Shore Supply - Visual Inspection the Shore Supply cables and stowage reels.
14:45 ~ 15:05Group 2Classroom 1411P01Shore Supply9 ~ Keep all electrical connections and mechanical fastenings tight according to right torque and the fastenings are dry, clean and rust free.
15:20 ~ 17:20Group 2On Board411P01Shore Supply10 ~ Perform Practical Site Survey and inspection of the system and components onboard.
Tue 01-Aug
09:30 ~ 09:50Group 2Classroom 1400M02Power Conversion Systems1 ~ Transformers: Examine the general conditions of the transformer Units and functional status prior to perform any task.
09:50 ~ 10:10Group 2Classroom 1400M02Power Conversion Systems2 ~ Transformer: Examine for signs of abnormalities, dirt, dust and corrosion. Clean as necessary.
10:10 ~ 10:30Group 2Classroom 1400M02Power Conversion Systems3 ~ Transfomers: Examine and check the input voltage from 415VAC Panels and Output voltage 230VAC at DB panels.
10:45 ~ 11:05Group 2Classroom 1400M02Power Conversion Systems4 ~ Transformers: Clean, inspect and check insulation and earthing straps connections for tightness and corrosion.
11:05 ~ 11:25Group 2Classroom 1400M02Power Conversion Systems5 ~ Transformer: Check the ambient temperature and air flow cooling requirements, sign of noise and vibration.
11:25 ~ 11:45Group 2Classroom 1400M02Power Conversion Systems6 ~ Safety and Handling - Observe safety precaution and practices, handling of hazadous materials when performing the work.
11:45 ~ 12:00Group 2Classroom 1400M02Power Conversion Systems8 ~ Battery and Charging Units: :Examine the general conditions of the Units and functional status prior to perform any task.
12:00 ~ 12:15Group 2Classroom 1400M02Power Conversion Systems9 ~ Battery and Charging Units: Check the physical conditions for any sign of defect and damage and check insulation cables and units.
12:15 ~ 12:30Group 2Classroom 1400M02Power Conversion Systems10 ~ Battery and Charging Unit: Measure and record electrolyte SG reading in Battery Log Book.
12:30 ~ 12:50Group 2Classroom 1400M02Power Conversion Systems11 ~ Battery sets and Charging Units : Check and record the overall float voltage at the battery terminals.
12:50 ~ 13:05Group 2Classroom 1400M02Power Conversion Systems12 ~ Battery sets and Charging Units: Check ventilation cooling fan in battery spaces for correct operation.
13:05 ~ 13:20Group 2Classroom 1400M02Power Conversion Systems14 ~ UPS: Visual check the cells cleanliness, cracks, electrolyte leakage and signs of damage.
14:20 ~ 14:35Group 2Classroom 1400M02Power Conversion Systems16 ~ UPS: Check and record the overall float voltage at the battery terminals.
14:35 ~ 14:50Group 2Classroom 1400M02Power Conversion Systems19 ~ UPS Safety and Handling: Observe safety precaution and practices, handling of hazadous materials when performing the work.
14:50 ~ 16:20Group 2On Board400M02Power Conversion Systems7 ~ Transformers: Practical Site Survey and Inspection on the System and Components onboard.
16:35 ~ 16:50Group 2On Board400M02Power Conversion Systems13 ~ Uninterrupted Power Supply (UPS) for the 230 V systems: Examine the general conditions of the UPS Units and functional status prior to perform task.
16:50 ~ 17:05Group 2On Board400M02Power Conversion Systems15 ~ UPS: Check the ventilation system in the UPS spaces in good operating conditions.
17:05 ~ 17:20Group 2On Board400M02Power Conversion Systems17 ~ UPS: Check grounding and earthing straps for tightness and sign of corrosion.
17:20 ~ 17:35Group 2On Board400M02Power Conversion Systems18 ~ UPS: Run self Check or BITE and record results.
Wed 02-Aug
09:15 ~ 10:15Group 2On Board400M02Power Conversion Systems20 ~ UPS: Practical Site Survey and Inspection on the System and Components onboard.
10:30 ~ 11:30Group 2On Board430M01Electrical Plants - Switchboard and switch gears1 ~ Perform Site Survey and to familirise with the overall system layout examine general conditions including to be acquainted system operating instruction prior to perform the task.
11:30 ~ 12:00Group 2Classroom 1430M01Electrical Plants - Switchboard and switch gears2 ~ Switchboard (415V 50Hz) Panels 230 V 50Hz Switchboard Panels - Perform Inspection on loose electrical connections or mechanical fastenings and tighten them as necessary iaw required torque.
12:00 ~ 12:10Group 2Classroom 1430M01Electrical Plants - Switchboard and switch gears3 ~ Switchboard (415V 50Hz) Panels 230 V 50Hz Switchboard Panels - Check and visual inspection and all bus/ bus are clean and dry. To perform cleaning ensure the Switchboard /panel are de-energised.
12:10 ~ 12:40Group 2Classroom 1430M01Electrical Plants - Switchboard and switch gears4 ~ Switchboard (415V 50Hz) Panels 230 V 50Hz Panel - The front panels of dead front switchboards: Visual inspection of the front panels of dead front switchboards frre from dirt and moiture and corrosion, Clean as necessary without de-energizing (Switch Off).
12:40 ~ 12:55Group 2Classroom 1430M01Electrical Plants - Switchboard and switch gears5 ~ Switchboard (415V 50Hz) Panels 230 V 50Hz Switchboard Panels - Check and examine he front panels of dead front switchboards Instruments and metering display analog pointers and digital are zero(when Static) and calibrated.
12:55 ~ 13:25Group 2On Board430M01Electrical Plants - Switchboard and switch gears6 ~ Run self check on the instrument and display with BITE facilities.
14:25 ~ 14:55Group 2On Board430M01Electrical Plants - Switchboard and switch gears7 ~ Switchboard (415V 50Hz), 230 V 50Hz Panels Protective circuits - Visually check and, over current or reverse current circuits, overload relays, and protective circuit performs its desired functions for fuses.
14:55 ~ 15:25Group 2Classroom 1430M01Electrical Plants - Switchboard and switch gears8 ~ Switchboard (415V 50Hz) Panels Bus Transfer Equipment - (Interconnecting Breakers, Supply Breakers,Shore Supply Breakers): Visually check are for operation at desired functions (When testing bus transfer equipment, should follow the safety precautions given for testing circuit breakers).
15:25 ~ 15:40Group 2Classroom 1430M01Electrical Plants - Switchboard and switch gears9 ~ Switchboard (415V 50Hz), 230 V 50Hz Panels Fuses - Check and examine the right size and that they make firm contact with fuse clips. Ensure that lock-in devices (if provided) are properly fitted and that all fuse wiring connections are tight.
15:40 ~ 16:10Group 2Classroom 1430M01Electrical Plants - Switchboard and switch gears10 ~ Switchboard (415V 50Hz), 230 V 50Hz Panels Distribution Boxes - Check the function of wiring distribution boxes (fused), with and without switches, feed circuits fuse clip barrel nuts and terminal connections tightness.
16:25 ~ 16:55Group 2Classroom 1430M01Electrical Plants - Switchboard and switch gears11 ~ Emergency Switchboard Panel - Check and examine he front panels of dead front switchboards Instruments and metering display analog pointers and digital are zero (when Static) and calibrated.
16:50 ~ 17:20Group 2Classroom 1430M01Electrical Plants - Switchboard and switch gears12 ~ Emergency Switchboard Panel - Run self check on the instrument and display with BITE facilities and log the result in switchboard log book or computer system.
Thu 03-Aug
09:15 ~ 09:45Group 2Classroom 1430M01Electrical Plants - Switchboard and switch gears13 ~ Switchboard (415V 50Hz), 230 V 50Hz Panels Protective circuits - Visually check and, over current or reverse current circuits, overload relays, and protective circuit performs its desired functions for fuses.
09:45 ~ 10:15Group 2Classroom 1430M01Electrical Plants - Switchboard and switch gears14 ~ Transformers - Visual inspection of the external parts are free from dirt and moisture and corrosion, clean as necessary without de-energizing (Switch Off).
10:15 ~ 10:45Group 2Classroom 1430M01Electrical Plants - Switchboard and switch gears15 ~ Transformers check and clean earth bonding straps tightness and free from dirt and corrosion.
11:00 ~ 11:30Group 2430M01Electrical Plants - Switchboard and switch gears16 ~ Transformers - Check and examine the electrical properties continuity, insulation are within the acceptable limits.
11:30 ~ 12:00Group 2430M01Electrical Plants - Switchboard and switch gears17 ~ Observe safety precautions, practices and handling of hazardous material in performing the work.
13:30 ~ 15:30Group 2On Board430M01Electrical Plants - Switchboard and switch gears18 ~ Perform Practical Site Survey and inspection on the system and components onboard.
Mon 07-Aug
09:15 ~ 09:35Group 2On Board810M01Navigation Light1 ~ Navigation Light - Daily User functional check.
09:35 ~ 10:05Group 2On Board810M01Navigation Light2 ~ Navigation Light - Check and test BITE functionalities.
10:05 ~ 10:25Group 2On Board810M01Navigation Light3 ~ Navigation Light - Visual inspection of the control panel free from dust and dirt.
10:40 ~ 11:00Group 2On Board810M01Navigation Light4 ~ Navigation Light - Clean and inspect the navigation light fitting.
11:00 ~ 11:20Group 2On Board810M01Navigation Light5 ~ Navigation Light - Control Panel, Navigation and Signal Light System Check.
11:20 ~ 11:40Group 2On Board810M01Navigation Light6 ~ Navigation Light - Clean, inspect and check insulation Control Panel.
11:40 ~ 12:00Group 2On Board810M01Navigation Light7 ~ Searchlight system - Visual and functional check.
12:00 ~ 12:20Group 2On Board810M01Navigation Light8 ~ Searchlight system - Check the cable connection fittings and continuity and insulation.
12:20 ~ 12:40Group 2On Board810M01Navigation Light9 ~ Acoustical signalling equipment - Visual and functional check.
12:40 ~ 13:00Group 2On Board810M01Navigation Light10 ~ Acoustical signalling equipment - Clean and inspect the devices for its correct operation.
15:45 ~ 15:50Group 3Classroom 3310M01Fire main, Bilge & Ballast15 ~ BWS – Inspect earth bonding : Earthing straps, fastenings, continuity tester.
16:05 ~ 17:05Group 3Classroom 3310M01Fire main, Bilge & Ballast16 ~ GS Pumps & Outfit: Clean and inspect – Pumps, motors, Control Panel, valves, associated fittings.
17:05 ~ 17:35Group 3Classroom 3310M01Fire main, Bilge & Ballast17 ~ GS Pumps and Outfit: Functional checks – Pre starting checks and safety procedures, performance, bilge and ballast functions.
17:35 ~ 17:45Group 3Classroom 3310M01Fire main, Bilge & Ballast19 ~ GS Pumps and outfit: Clean, insect and check insulation – Electrical Equipment, Cables and terminations, Insulation Tester.
17:45 ~ 18:15Group 3Classroom 3310M01Fire main, Bilge & Ballast20 ~ Fire hydrant and spray: Clean and inspect – Hydrant, spray, nozzles, hoses, loose fittings.
18:15 ~ 18:25Group 3On Board310M01Fire main, Bilge & Ballast12 ~ BWS Pumps and outfit: Clean and Inspect – Pumps, motors, Control Panel, valves.
18:25 ~ 18:35Group 3On Board310M01Fire main, Bilge & Ballast18 ~ Emergency FF pumps: Functional Checks with GS Pumps – Pre starting checks and safety procedures, performance of GS pumps with Emergency FF pumps.
Caterpillar System
Tue 13-Jun
10:30 ~ 10:45Group 1000000Break Times1 ~ Morning Tea Break
12:45 ~ 13:45Group 1000000Break Times2 ~ Lunch Break
Thu 13-Jul
08:30 ~ 08:45Group 1210S01Propulsion Systems1 ~ Propulsion engine - Perform Daily Checks.
08:45 ~ 09:00Group 1210S01Propulsion Systems2 ~ Propulsion Diesel Engines (PDE) - Inspect PDE Instrument Panel.
09:00 ~ 09:15Group 1210S01Propulsion Systems3 ~ PDE - Inspect for leaks and loose connection.
09:15 ~ 09:45Group 1210S01Propulsion Systems4 ~ PDE- Engine Oil Filter - Change.
09:45 ~ 10:15Group 1210S01Propulsion Systems5 ~ Reduction gear system-Perform an oil change and replace oil filter.
10:15 ~ 10:30Group 1210S01Propulsion Systems6 ~ Reduction gear system - Clean heat exchanger.
11:00 ~ 11:15Group 1210S01Propulsion Systems7 ~ Clean heat exchanger.
11:15 ~ 11:30Group 1210S01Propulsion Systems8 ~ Flexible couplings - Visual inspection for sign of damage and vulcanised.
11:30 ~ 11:45Group 1210S01Propulsion Systems9 ~ Propeller Shaft - Check lubrication system and temperature.
11:45 ~ 12:00Group 1210S01Propulsion Systems10 ~ Propeller shaft sealing - Visual check for leaking.
12:00 ~ 12:15Group 1210S01Propulsion Systems11 ~ Propeller shaft Bearing - Check propeller shaft lubrication operation and bearing temperature (when shaft is turning).
12:15 ~ 12:30Group 1210S01Propulsion Systems12 ~ Control system propulsion - Check cooling fan operation.
12:30 ~ 13:00Group 1210S01Propulsion Systems13 ~ Propulsion Control - Check condition of Electronic devices and LRUs.
14:00 ~ 14:15Group 1210S01Propulsion Systems14 ~ Propulsion Control - Check cooling fan operation.
14:15 ~ 14:30Group 1210S01Propulsion Systems15 ~ Propulsion Control - Visually inspect the Circuit Board (Line Replaceable Unit - LRU.
14:30 ~ 14:45Group 1210S01Propulsion Systems16 ~ Propulsion Control - Check condition and functionality of Display Panel and Indicating Lights including LED.
14:45 ~ 15:00Group 1210S01Propulsion Systems17 ~ Propulsion control- Inspect terminal blocks. Inspect circuit breakers.
15:00 ~ 15:15Group 1210S01Propulsion Systems18 ~ Propulsion Control - Check fan operation.
Fri 14-Jul
08:30 ~ 08:50Group 1Classroom 1410S01HP & LP Power Generation2 ~ HP & LP Power Generation -
08:50 ~ 09:10Group 1Classroom 1410S01HP & LP Power Generation3 ~ Diesel Generators and Emergency Generators - Perform Daily Checks.
09:10 ~ 09:30Group 1Classroom 1410S01HP & LP Power Generation4 ~ Diesel Generators and Emergency Generators - Inspect DE Instrument Panel.
09:30 ~ 09:50Group 1Classroom 1410S01HP & LP Power Generation5 ~ Diesel Generators and Emergency Generators - Inspect for leaks and loose connection.
09:50 ~ 10:10Group 1Classroom 1410S01HP & LP Power Generation6 ~ Emergency Generators - Inspect Electrical component Diesel Engine Instrument Panel.
10:10 ~ 10:30Group 1Classroom 1410S01HP & LP Power Generation7 ~ Diesel Generators and Emergency Generators - Protection devices - Check.
11:00 ~ 11:20Group 1Classroom 1410S01HP & LP Power Generation8 ~ Main Switchboard (MSB) and Emergency switchboard (ESB) 415V Panels - Clean, inspect and check insulation and continuity.
11:20 ~ 11:40Group 1Classroom 1410S01HP & LP Power Generation9 ~ Main Switchboard (MSB) and Emergency switchboard (ESB) 415V Panels Inspect earth bonding.
11:40 ~ 12:10Group 1Classroom 1410S01HP & LP Power Generation10 ~ Main Switchboard (MSB) and Emergency switchboard (ESB) 415V Panels - Clean And Inspect Front end panel free from dirt, moisture and corrosion free.
12:10 ~ 12:30Group 1Classroom 1410S01HP & LP Power Generation11 ~ Shore connection - Visual inspection of Shore supply connection panel and box.
12:30 ~ 12:50Group 1Classroom 1410S01HP & LP Power Generation12 ~ Shore connection - Visual Inspection the Shore Supply cables and stowage reels.
12:50 ~ 13:10Group 1Classroom 1410S01HP & LP Power Generation13 ~ Shore connection : Functional Check of the Control Panel, meters, gauges, phase sequence meter prior ship shore connections prior to connection and termination.
14:00 ~ 14:30Group 1Classroom 1410S01HP & LP Power Generation14 ~ Battery sets - Visual inspection and check the terminals tightness.
14:30 ~ 14:50Group 1Classroom 1410S01HP & LP Power Generation15 ~ Battery Sets - Functional check of charging units and check cable any sign of damage.
14:50 ~ 15:10Group 1Classroom 1410S01HP & LP Power Generation16 ~ ransformers - Clean, inspect and check insulation and continuity
15:10 ~ 15:30Group 1Classroom 1410S01HP & LP Power Generation17 ~ Transformers - Clean And Inspect for temperature, noise and vibration.
16:00 ~ 16:20Group 1Classroom 1410S01HP & LP Power Generation18 ~ UPS) for the 230 V systems - Check the ventilation system in the UPS spaces in good operating conditions.
16:00 ~ 17:00Group 1On Board410S01HP & LP Power Generation1 ~ Perform Site Survey and to familirise with the overall system layout examine general conditions including to be acquinted system operating instruction prior to perform the task.
Mon 17-Jul
08:30 ~ 09:00Group 1Classroom 1745S01Machinery Control and Propulsion Control Systems1 ~ Machinery Control (MC) and Propulsion Control Systems (PCS): MC & PCS - Examine the general conditions, and system functional prior to performing any task.
09:00 ~ 09:30Group 1Classroom 1745S01Machinery Control and Propulsion Control Systems2 ~ Machinery Control and Propulsion Control Systems (MC & PCS) - Check condition and functionality of Display Panel and Indicating Lights including LED.
09:30 ~ 10:00Group 1Classroom 1745S01Machinery Control and Propulsion Control Systems3 ~ AMS workstations - Check fan and ventilation cooling operation.
10:00 ~ 10:30Group 1Classroom 1745S01Machinery Control and Propulsion Control Systems4 ~ AMS workstations configuration - Visually inspect the consoles.
11:00 ~ 11:30Group 1Classroom 1745S01Machinery Control and Propulsion Control Systems5 ~ AMS workstations: Check Earth Grounding strap to the Hull structures
11:30 ~ 12:00Group 1Classroom 1745S01Machinery Control and Propulsion Control Systems6 ~ AMS workstations - Run AMS system self checks or BITE.
12:00 ~ 12:30Group 1Classroom 1745S01Machinery Control and Propulsion Control Systems7 ~ AMS Local operation panel (LOP): Check Power Supply AC & DC to the AMS
12:30 ~ 13:00Group 1Classroom 1745S01Machinery Control and Propulsion Control Systems8 ~ AMS workstations - Inspect terminal blocks and Inspect circuit breakers MCB & MCCP or sign of corrosion and cleanliness and dust free.
14:00 ~ 14:30Group 1Classroom 1745S01Machinery Control and Propulsion Control Systems9 ~ AMS Local operation panel (LOP) - Check fan / cooling operation and air flow.
14:30 ~ 15:00Group 1Classroom 1745S01Machinery Control and Propulsion Control Systems10 ~ MC-PCS Safety and Handling - Observe Pre checks, safety procedures and practices, handling of hazardous materials when performing the work before, during and after performing the task.
Sat 12-Aug
09:30 ~ 10:30Group 4Classroom 4000A00Non Training Items1 ~ Training Launch Introduction
10:30 ~ 10:45Group 4000000Break Times1 ~ Morning Tea Break
10:45 ~ 11:45Group 4Classroom 4000F01OPV 1800: Performance1 ~ Introduction OPV 1800.
11:45 ~ 12:45Group 4Classroom 4000F01OPV 1800: Performance2 ~ Ship's Operational Capabilities.
13:30 ~ 14:30Group 4000000Break Times2 ~ Lunch Break
14:30 ~ 15:30Group 4Classroom 4000F01OPV 1800: Performance4 ~ Deck Arrangements.
Enigma 1
Thu 15-Jun
08:30 ~ 09:50Group 1Classroom 1734S01Computer Support System1 ~ Daily users check: ILS modules and configurations, Password and Data entry.
09:50 ~ 10:10Group 1Classroom 1734S01Computer Support System2 ~ Data Cleansing.
10:10 ~ 10:25Group 1Classroom 1734S01Computer Support System3 ~ Clean and Inspect: Monitor, keyboard, server, UPS, power plugs.
11:00 ~ 11:40Group 1Classroom 1734S01Computer Support System4 ~ Types of templates, Data Generation, Data Analysis.
11:40 ~ 11:50Group 1Classroom 1734S01Computer Support System5 ~ Clean, inspect and check insulation: Insulation properties, Set up Insulation testing, Insulation tester.
14:00 ~ 15:00Group 1On Board734S01Computer Support System6 ~ On Board Familiarisation
Caterpillar 1
Fri 16-Jun
09:30 ~ 10:00Group 2Classroom 1400M01Electrical Plant1 ~ Initial Step- Examine the general conditions and operational status prior to perform the tasks.
10:00 ~ 10:20Group 2Classroom 1400M01Electrical Plant2 ~ Diesel Generator - Visual inspection for leaks and signs of loose connections.
10:20 ~ 10:50Group 2Classroom 1400M01Electrical Plant3 ~ Diesel generators - Perform Daily Checks and Inspection iaw PMS and service routine.
11:05 ~ 11:25Group 2Classroom 1400M01Electrical Plant4 ~ Diesel generators: Check Fuel System Primary Filter and drain as necessary.
11:25 ~ 11:45Group 2Classroom 1400M01Electrical Plant6 ~ Diesel generators: Check the Governor Actuator Linkage
11:45 ~ 12:05Group 2Classroom 1400M01Electrical Plant7 ~ Diesel generators: Check the condition of Governor Actuator Linkage.
12:05 ~ 12:35Group 2Classroom 1400M01Electrical Plant8 ~ Diesel generators: Test the Cooling Syst. Supplemental Cool. Additive (SCA)
14:35 ~ 15:05Group 2Classroom 1400M01Electrical Plant10 ~ Diesel generators: Check and examine DG Protection devices.
15:05 ~ 15:25Group 2Classroom 1400M01Electrical Plant11 ~ Diesel generators: Examine and clean the Oil Mist Detector free from dirt and corrosion
15:25 ~ 15:45Group 2Classroom 1400M01Electrical Plant12 ~ Diesel generators : Clean and Inspect. the Magnetic Pick Ups
16:00 ~ 16:30Group 2Classroom 1400M01Electrical Plant13 ~ Diesel generators: Examine and replacement of DG Oil Filters
16:30 ~ 16:50Group 2On Board400M01Electrical Plant5 ~ Diesel generators: Inspect the condition of Zinc Rod
16:50 ~ 17:10Group 2On Board400M01Electrical Plant9 ~ Diesel generators: Check starting Motor conditions and clean as necessary.
17:10 ~ 17:40Group 2On Board400M01Electrical Plant14 ~ Diesel generators: Inspect the DG mountings for signs of damage and vulcanised
Mon 19-Jun
09:30 ~ 09:50Group 2Classroom 1400M01Electrical Plant15 ~ Diesel Generators: Examine and clean the Fuel System Primary Filter.
09:50 ~ 10:10Group 2Classroom 1400M01Electrical Plant16 ~ DG - Check and lubricate Barring device
10:10 ~ 10:30Group 2Classroom 1400M01Electrical Plant17 ~ DG: Examine and lubricate Prelube Pump
10:45 ~ 11:15Group 2Classroom 1400M01Electrical Plant18 ~ DG: Examine Fuel System Secondary Filter - Change Element.
11:15 ~ 11:45Group 2Classroom 1400M01Electrical Plant20 ~ Emergency Diesel Generator ( EDG): Inspect Electrical EDG Instrument Panel.
11:45 ~ 12:15Group 2Classroom 1400M01Electrical Plant21 ~ EDG: Perform daily checks i.a.w PMS and Checklist
12:15 ~ 12:35Group 2Classroom 1400M01Electrical Plant23 ~ EDG: Fuel System Primary Filter - Drain.
12:35 ~ 12:55Group 2Classroom 1400M01Electrical Plant24 ~ EDG: Check the EDG Lube Oil Level within the tolerence.
13:55 ~ 14:15Group 2Classroom 1400M01Electrical Plant25 ~ EDG: Fuel System Primary Filter/Water Separator Drain
14:15 ~ 14:35Group 2Classroom 1400M01Electrical Plant26 ~ EDG: Engine - Inspect for leaks and loose connection.
14:35 ~ 14:55Group 2Classroom 1400M01Electrical Plant27 ~ EDG: Inspect Hoses and Clamps for leaks and tightness
14:55 ~ 15:15Group 2Classroom 1400M01Electrical Plant28 ~ EDG: Fuel Tank Water and Sediment - Drain
15:15 ~ 15:35Group 2Classroom 1400M01Electrical Plant30 ~ EDG: Governor Actuator Linkage - Check the conditions..
15:35 ~ 15:50Group 2Classroom 1400M01Electrical Plant31 ~ EDG - Check electrolyte level within acceptable limit.
16:05 ~ 16:25Group 2On Board400M01Electrical Plant19 ~ DG: Inspect the Exhaust Piping and system.
16:25 ~ 16:55Group 2On Board400M01Electrical Plant22 ~ EDG: Walk-around and visual inspection
16:55 ~ 17:15Group 2On Board400M01Electrical Plant29 ~ EDG: Check Fan clearence and no obstructions
Tue 20-Jun
09:30 ~ 09:45Group 2Classroom 1400M01Electrical Plant32 ~ EDG: Obtain or collect coolant sample (level1)
09:45 ~ 10:00Group 2Classroom 1400M01Electrical Plant34 ~ EDG: Test Cooling Syst. Supplemental Cool. Additive (SCA)
10:00 ~ 10:15Group 2Classroom 1400M01Electrical Plant36 ~ EDG: Check EDG moutings for crack, vulcanised and sign of damage
10:30 ~ 10:45Group 2On Board400M01Electrical Plant33 ~ EDG: Check EDG Protection devices.
10:45 ~ 11:15Group 2On Board400M01Electrical Plant35 ~ EDG H500: Check, or replace Filters and Elements: Engine Oil - Fuel Filter,Fuel System primary and Secondary and Engine Air Cleaner Element (Single Element)
11:15 ~ 13:15Group 2On Board400M01Electrical Plant37 ~ DG & EDG: Practical Site Survey and Inspection on the System and Components onboard.
14:15 ~ 14:35Group 2Classroom 1411M01Electrical Plant - Generators1 ~ Diesel Generators (DG) and Emergency (EDG): Examine the general conditions and system operation before start to perform the task.
14:35 ~ 14:55Group 2Classroom 1411M01Electrical Plant - Generators2 ~ DG and EDG: Check Fuel System Primary Filter and Drain.
14:55 ~ 15:15Group 2Classroom 1411M01Electrical Plant - Generators3 ~ DG and EDG: Perform Daily Checks as stipulated in PMS and service instruction.
15:15 ~ 15:35Group 2Classroom 1411M01Electrical Plant - Generators4 ~ DG and EDG: Check Oil Mist Detector for operation and cleanliness.
15:50 ~ 16:05Group 2Classroom 1411M01Electrical Plant - Generators5 ~ DG and EDG: Inspect DE Instrument Panel for cleanliness, functionalities and any signs of abnormilities.
16:05 ~ 16:25Group 2Classroom 1411M01Electrical Plant - Generators6 ~ DG and EDG: Examine and Inspect for leaks and loose connection.
16:25 ~ 16:45Group 2Classroom 1411M01Electrical Plant - Generators7 ~ DG and EDG: Cooling Syst. Supplemental Cool. Additive (SCA) - Test.
16:45 ~ 17:05Group 2Classroom 1411M01Electrical Plant - Generators8 ~ DG and EDG: Check and examine Governor Actuator Linkage for looseness, misalignment and stiffness.
17:05 ~ 17:20Group 2Classroom 1411M01Electrical Plant - Generators9 ~ DG and EDG: : Inspect crankshaft vibration damper.
Wed 21-Jun
09:30 ~ 10:00Group 2Classroom 1411M01Electrical Plant - Generators10 ~ DG and EDG: Engine Oil Filter - Change.
10:00 ~ 10:30Group 2Classroom 1411M01Electrical Plant - Generators11 ~ DG and EDG: Inspect DG Instrument Panel.
10:45 ~ 11:15Group 2Classroom 1411M01Electrical Plant - Generators12 ~ DG and EDG: Cooling Syst. Supplemental Cool. Additive (SCA) - Test.
11:15 ~ 11:30Group 2Classroom 1411M01Electrical Plant - Generators13 ~ DG and EDG: Engine Protection devices - Check.
11:30 ~ 11:45Group 2Classroom 1411M01Electrical Plant - Generators14 ~ DG and EDG: Obtain Diesel Generators Oil Sample.
11:45 ~ 12:00Group 2Classroom 1411M01Electrical Plant - Generators15 ~ DG and EDG: Check Starting Motor connections tightness and signs of abnormilities.
12:00 ~ 12:15Group 2Classroom 1411M01Electrical Plant - Generators16 ~ DG and EDG: Check Battery and charging unit charging current and float voltage in good working condition. Battery are fully charged.
12:15 ~ 12:35Group 2Classroom 1411M01Electrical Plant - Generators17 ~ DG and EDG: Examine and check Engine Mounts for signs of abnormilities damage and vulcanised.
13:35 ~ 15:35Group 2On Board411M01Electrical Plant - Generators18 ~ Electrical Plant - Generators: Practical Site Survey and inspection on the system and components onboard.
15:50 ~ 16:20Group 2Classroom 1745M01Machinery Control and Propulsion Control Systems1 ~ MC & PCS - Examine the general conditions, and system functional prior to performing any task.
16:20 ~ 16:50Group 2Classroom 1745M01Machinery Control and Propulsion Control Systems2 ~ Machinery Control and Propulsion Control Systems (MC & PCS): Check condition and functionality of Display Panel and Indicating Lights including LED.
16:50 ~ 17:20Group 2Classroom 1745M01Machinery Control and Propulsion Control Systems3 ~ MC & PCS - Check condition of Electronic devices and LRUs.
Thu 22-Jun
09:30 ~ 10:00Group 2Classroom 1745M01Machinery Control and Propulsion Control Systems4 ~ MC & PCS - Check cooling or ventilation fan operation and no obstruction of air flow.
10:00 ~ 10:30Group 2Classroom 1745M01Machinery Control and Propulsion Control Systems5 ~ MC & PCS - Check sensing, audible and visual devices fitted and installed in the alarm, safety, and warning systems.
10:45 ~ 11:15Group 2Classroom 1745M01Machinery Control and Propulsion Control Systems6 ~ MC & PCS - Clean external and Internal surfaces of console free from dirt, moisture and sign of corrosion for the console cabinet.
11:15 ~ 11:45Group 2Classroom 1745M01Machinery Control and Propulsion Control Systems7 ~ MC & PCS - Check input main and back-up power supply. Inspect terminal blocks,circuit breakers and protective devices.
11:45 ~ 12:15Group 2Classroom 1745M01Machinery Control and Propulsion Control Systems8 ~ MC & PCS - Clean panel free from dust, dirt and corrosion. Perform cleanliness and preservation as necessary.
12:15 ~ 12:45Group 2Classroom 1745M01Machinery Control and Propulsion Control Systems10 ~ MC & PCS - Check earth grounding straps for continuity and tightness.
13:45 ~ 14:15Group 2Classroom 1745M01Machinery Control and Propulsion Control Systems9 ~ MC & PCS - Inspect cable installation for loose connections and clean cable bundles free from dirt, duct and moisture.
14:15 ~ 14:45Group 2Classroom 1745M01Machinery Control and Propulsion Control Systems11 ~ PC-PCS Safety and Handling - Observe Pre checks, safety procedures and practices, handling of hazardous materials when performing the work before, during and after performing the task.
15:00 ~ 17:00Group 2On Board745M01Machinery Control and Propulsion Control Systems12 ~ MC-PCS - Practical Site Survey and inspection on the system and components onboard.
Fri 23-Jun
09:30 ~ 10:30Group 3On Board210M01CPP1 ~ CPP - Examine the general layout conditions and system operation prior to perform the task.
10:45 ~ 11:05Group 3Classroom 3210M01CPP2 ~ Perform Daily Checks: Walk around and survey visually to examine the general conditions and system operation.
11:05 ~ 11:25Group 3On Board210M01CPP3 ~ Check operation from Remote and Local and Emergency Positions.
11:25 ~ 11:45Group 3On Board210M01CPP4 ~ Check and maintain the oil level in the hydraulic tank of the system.
11:45 ~ 12:05Group 3On Board210M01CPP5 ~ CPP - Observe safety precaution,practices and clealiness in performing the work at all time.
12:05 ~ 12:25Group 3Classroom 3210M01CPP6 ~ Keep all electrical connections and mechanical fastenings tight according to right torque. and the fastenings are dry, clean and rust free.
14:30 ~ 14:50Group 3Classroom 3210M01CPP7 ~ Power Supply and Services: Check power services are available before start the operation.
14:50 ~ 15:10Group 3Classroom 3210M01CPP8 ~ Inspect and test the equipment at sufficient intervals to make sure that the equipment is in operating condition.
15:25 ~ 17:25Group 3On Board210M01CPP9 ~ Perform Practical Site Survey and inspection of the system and components onboard.
Mon 26-Jun
09:30 ~ 10:00Group 3On Board211M01Main Engines1 ~ Engine - Inspect for leaks and loose connection.
10:00 ~ 10:15Group 3Classroom 3211M01Main Engines2 ~ Inspect PDE Instrument Panel.
10:15 ~ 10:30Group 3On Board211M01Main Engines3 ~ Fuel System Primary Filter - Drain.
10:30 ~ 10:45Group 3On Board211M01Main Engines4 ~ Zinc Rod - Inspect.
11:00 ~ 11:15Group 3On Board211M01Main Engines5 ~ Engine Mounts - Inspect.
11:15 ~ 11:45Group 3On Board211M01Main Engines6 ~ Cooling Syst. Supplemental Cool. Additive (SCA) - Test.
11:45 ~ 12:00Group 3On Board211M01Main Engines7 ~ Obtain PDE Engine Oil Sample.
12:00 ~ 12:30Group 3On Board211M01Main Engines8 ~ Engine Protection devices - Check.
12:30 ~ 12:45Group 3On Board211M01Main Engines9 ~ Perform Daily Checks.
13:45 ~ 14:00Group 3On Board211M01Main Engines10 ~ Magnetic Pick Ups - Clean and Inspect.
14:00 ~ 14:15Group 3On Board211M01Main Engines11 ~ Prelube Pump - Lubricate.
14:15 ~ 14:45Group 3On Board211M01Main Engines12 ~ Governor Actuator Linkage - Check.
14:45 ~ 15:05Group 3On Board211M01Main Engines13 ~ Inspect Exhaust Piping
15:05 ~ 15:25Group 3On Board211M01Main Engines14 ~ Fuel System Primary Filter - Clean.
15:25 ~ 15:40Group 3On Board211M01Main Engines15 ~ Fuel System Secondary Filter - Change Element.
Tue 27-Jun
13:05 ~ 13:25Group 3Classroom 3212M02Reduction Gears1 ~ Reduction Gears: Examine the general conditions and system operation of Reduction Gears prior to perform the task.
13:25 ~ 13:40Group 3On Board212M02Reduction Gears2 ~ Reduction gear system - Clean heat exchanger.
13:40 ~ 13:55Group 3On Board212M02Reduction Gears3 ~ Reduction gear system- Check threaded connections.
13:55 ~ 14:10Group 3On Board212M02Reduction Gears4 ~ Reduction gear system - Perform an oil change and replace oil filter.
14:10 ~ 14:30Group 3Classroom 3212M02Reduction Gears5 ~ Reduction Gears: Visual Check for pipes and hoses connections for leaks.
14:30 ~ 14:50Group 3Classroom 3212M02Reduction Gears6 ~ Examine the conditions of the external parts are free from dirt, oil leaks and any sign of corrosion.
14:50 ~ 15:10Group 3Classroom 3212M02Reduction Gears7 ~ Reduction Gears - Pre checks and Safety Procedures before, during and after performing the task.
15:25 ~ 15:45Group 3Classroom 3212M02Reduction Gears8 ~ Reduction Gears: Safety and Handling - Observe safety precaution and practices, handling of hazardous materials when performing the work.
15:45 ~ 17:15Group 3On Board212M02Reduction Gears9 ~ Reduction Gears: Practical Site Survey and Inspection on the Reduction Gears System and Components onboard.
Wed 28-Jun
09:30 ~ 10:30Group 3On Board212M03Clutches and Couplings1 ~ Perform Site Survey and to familiarise with the overall system and examine general conditions including to be acquainted system operation prior to perform the task.
10:45 ~ 11:15Group 3Classroom 3212M03Clutches and Couplings2 ~ Flexible Coupling - Inspect on the fasteners and coupling Elements for signs of cracks or stiffness.
11:15 ~ 11:35Group 3Classroom 3212M03Clutches and Couplings3 ~ Flexible Coupling - Perform visual check and inspection prior to sailing and after sailing for signs of leaks or abnormalities.
11:35 ~ 11:50Group 3Classroom 3212M03Clutches and Couplings4 ~ Visual inspection for sign of damage and vulcanised
11:50 ~ 12:10Group 3Classroom 3212M03Clutches and Couplings5 ~ Coupling - Examine general layout and system installation and operation.
12:10 ~ 12:40Group 3Classroom 3212M03Clutches and Couplings6 ~ Keep all electrical connections and mechanical fastenings tight according to right torque. and the fastenings are dry, clean and rust free.
13:40 ~ 14:00Group 3Classroom 3212M03Clutches and Couplings7 ~ Inspect and test the equipment at sufficient intervals to make sure that the equipment is in operating condition.
14:00 ~ 16:00Group 3On Board212M03Clutches and Couplings8 ~ Practical Survey and Inspection on the UAV System and Components onboard.
Thu 29-Jun
09:30 ~ 10:30Group 3On Board213M01Propulsion Plant - Shaft, shaft bearing and seals1 ~ Perform Site Survey to familiarise with the overall system layout and examine general conditions, initiation of the standard operating instruction prior to perform the task.
10:45 ~ 11:05Group 3Classroom 1213M01Propulsion Plant - Shaft, shaft bearing and seals2 ~ Check oil level in the thrust bearing header tank.
11:05 ~ 11:25Group 3Classroom 1213M01Propulsion Plant - Shaft, shaft bearing and seals3 ~ Check and clean Earth bonding straps tightness and free from dirt and corrosion.
11:25 ~ 11:45Group 3Classroom 1213M01Propulsion Plant - Shaft, shaft bearing and seals4 ~ Check water level in the tank.
11:45 ~ 12:05Group 3Classroom 1213M01Propulsion Plant - Shaft, shaft bearing and seals5 ~ Shaft Bonding Device: Keep equipment clean and dry free from dirt, salt deposit, and corrosion.
12:05 ~ 12:25Group 3Classroom 1213M01Propulsion Plant - Shaft, shaft bearing and seals6 ~ Keep all electrical connections and mechanical fastenings tight according to right torque. and the fastenings are dry, clean and rust free.
12:25 ~ 12:45Group 3Classroom 1213M01Propulsion Plant - Shaft, shaft bearing and seals7 ~ Inspect and test the equipment at sufficient intervals to make sure that the equipment is in operating condition.
13:45 ~ 14:05Group 3Classroom 1213M01Propulsion Plant - Shaft, shaft bearing and seals8 ~ Observe safety precautions, practices and handling of hazardous material in performing the work , particularly in shaft confined space and oily.
14:05 ~ 16:05Group 3On Board213M01Propulsion Plant - Shaft, shaft bearing and seals9 ~ Perform Practical Site Survey and inspection of the system and components onboard.
Tue 18-Jul
08:30 ~ 08:50Group 3Classroom 3212M01Transmission Systems4 ~ Check and clean Earth bonding straps tightness and free from dirt and corrosion.
08:50 ~ 09:10Group 3Classroom 3212M01Transmission Systems5 ~ Keep all electrical connections and mechanical fastenings tight according to right torque and the fastenings are dry, clean and rust free.
09:10 ~ 09:30Group 3Classroom 3212M01Transmission Systems6 ~ Inspect and test the equipment at sufficient intervals to make sure that the equipment is in operating condition.
09:30 ~ 09:50Group 3Classroom 3212M01Transmission Systems7 ~ Observe safety precautions, practices and handling of hazardous material in performing the work.
11:00 ~ 11:15Group 3On Board212M01Transmission Systems1 ~ Transmission Systems - Clean heat exchanger.
11:15 ~ 11:30Group 3On Board212M01Transmission Systems2 ~ Transmission Systems - Check threaded connections.
11:30 ~ 11:45Group 3On Board212M01Transmission Systems3 ~ Transmission System - Perform an oil change and replace oil filter.
11:45 ~ 13:45Group 3On Board212M01Transmission Systems8 ~ Perform Practical Site Survey and inspection of the system and components onboard.
Mon 24-Jul
15:50 ~ 15:50Group 3Classroom 3212M01Transmission Systems99 ~ 1. Topic Code 212M01 is also 212M02 ~ c) Reduction Gears: Notation: The Transmission and Reduction Gear is same System but by different terminology.
Kongsberg 1
Mon 19-Jun
08:30 ~ 09:00Group 1Classroom 1691S01Fin Stabilizer1 ~ Fin Stabilizer - Examine the general conditions, and system functional prior to performing the task.
09:00 ~ 09:30Group 1Classroom 1691S01Fin Stabilizer2 ~ Fin Stabilizer - Check Fluid Levels are in acceptable limits and utilise correct grade of fluids.
09:30 ~ 10:00Group 1Classroom 1691S01Fin Stabilizer3 ~ Fin Stabilizer - Perform Lubricating Oil Test using test kit and hydraulic fluids crackle and cleanliness test.
10:00 ~ 10:30Group 1Classroom 1691S01Fin Stabilizer4 ~ Fin Stabilizer - Inspect Fins Stabiliser System operation and functions.
11:00 ~ 12:00Group 1Classroom 1691S01Fin Stabilizer6 ~ Fin Stabilizer - Visual check and Inspections of the electrical components of Steering Gear HPU motor and controller.
12:00 ~ 12:30Group 1Classroom 1691S01Fin Stabilizer7 ~ Fin Stabilizer - Visual inspection on Control valves and instruments for sign of defects and abnormalities.
12:30 ~ 13:00Group 1Classroom 1691S01Fin Stabilizer8 ~ Fin Stabilizer - Obtain Lubricating Oil Sample for analysis and diagnostic - for CBM.
14:00 ~ 14:30Group 1On Board691S01Fin Stabilizer5 ~ Fin Stabilizer - Perform Functional test and operation using of manual hand pump for maintenance and emergency.
14:30 ~ 15:00Group 1On Board691S01Fin Stabilizer9 ~ Fin Stabilizer - Safety and Handling - Observe safety precaution and practices, handling of hazardous materials when performing the work.
16:00 ~ 17:30Group 1On Board691S01Fin Stabilizer10 ~ Fin Stabilizer - Practical Site Survey and Inspection on the System and Components onboard.
Sinor Marine Technologies 1
Mon 19-Jun
15:15 ~ 15:35Group 4Classroom 4822M01Navigation Radar96 ~ 18 .Antenna Radiator - Check for dirt and cracks on the radiator surface clean and repair as necessary.
Tue 20-Jun
09:30 ~ 10:30Group 4On Board824M01DGPS1 ~ Examine the general physical conditions of the system/Equipment and Principle of operation prior to perform any task.
10:45 ~ 11:15Group 4Classroom 4824M01DGPS2 ~ Perform daily checks including Start up, running and shutdown procedures.
11:15 ~ 11:45Group 4Classroom 4824M01DGPS4 ~ Clean and inspect panel from dirt and dust.
11:45 ~ 12:15Group 4Classroom 4824M01DGPS5 ~ Battery System Inspect and replace backup battery should the battery capacity falls below limits.
12:15 ~ 12:30Group 4Classroom 4824M01DGPS6 ~ Above Deck Equipment Antennas - Visual inspection for any signs of salt deposit, dirt and water. clean and preserve.
13:35 ~ 13:55Group 4Classroom 4824M01DGPS7 ~ Check operation from Remote (ICS and INS Network) and Local Positions.
13:55 ~ 14:10Group 4Classroom 4824M01DGPS8 ~ Connectors - Check that connectors on the rear panel are firmly tightened and free of rust.
14:10 ~ 14:40Group 4Classroom 4824M01DGPS10 ~ Check that battery voltage is sufficient and fully charged and terminal are clean and free from rust.
14:40 ~ 14:55Group 4Classroom 4824M01DGPS11 ~ Antenna Unit - Keep all electrical connections and mechanical fastenings tight according to right torque, and the fastenings are dry, clean and rust free.
14:55 ~ 15:10Group 4Classroom 4824M01DGPS13 ~ LCD ambient temperature and humidity - Maintain cooling and ventilation for ambient temperature and humidity.
15:10 ~ 15:25Group 4Classroom 4824M01DGPS14 ~ LCD Display - Clean and wipe the LCD display with soft cloth to remove dirt salt deposit.
15:25 ~ 15:40Group 4Classroom 4824M01DGPS15 ~ Protective Device - Fuse is to protect over voltage and short circuit current and may be replaced with specified rating and size.
15:55 ~ 16:15Group 4On Board824M01DGPS3 ~ Antennas - Check, Inspection and clean and preserve.
16:15 ~ 16:30Group 4On Board824M01DGPS9 ~ Earth bonding Straps - Check that the ground system is free of rust and the ground wire is tightly fastened.
16:30 ~ 16:50Group 4On Board824M01DGPS12 ~ Antenna Unit - Perform cleaning and remove dust, dirt and rust with detergent, do not use chemical cleaner or solvent.
16:50 ~ 17:05Group 4On Board824M01DGPS16 ~ Self check and BITE - Check the ROM, RAM, input /output data, GPS Core, Beacon, Keyboard and LCD performance.
17:05 ~ 17:20Group 4On Board824M01DGPS17 ~ Inspect and test the equipment at sufficient intervals to make sure that the equipment is in operating condition.
17:20 ~ 18:20Group 4On Board824M01DGPS18 ~ Perform Practical Site Survey and inspection of the system and components onboard.
Wed 21-Jun
09:30 ~ 10:00Group 4Classroom 4825M01Gyros1 ~ Examine the general layout conditions of Gyro Units and operation prior to perform the task.
10:00 ~ 10:20Group 4Classroom 4825M01Gyros2 ~ Operator unit - functional checks free from dirt, dust and sign of corrosion including the pelorous position.
10:20 ~ 10:40Group 4Classroom 4825M01Gyros3 ~ Operator unit - functional checks including starting up- running and shut-down.
10:55 ~ 11:25Group 4Classroom 4825M01Gyros4 ~ Perform visual check on the Master Unit for sign of noise, vibration and failure. Clean the external unit free from dust and moisture.
11:25 ~ 11:55Group 4Classroom 4825M01Gyros5 ~ Run self check and BITE at control panel and check Gyro Failure alarm.
11:55 ~ 12:10Group 4Classroom 4825M01Gyros6 ~ Check the the main power supply and back up input to the Gyro Units are in good order.
12:10 ~ 12:30Group 4Classroom 4825M01Gyros7 ~ Functional checks the electrical part of the Gyro repeater units and check sign of corrosion and watertight integrity.
13:30 ~ 13:50Group 4Classroom 4825M01Gyros8 ~ Visual check ventilation and cooling facility maintaining ambient temperature in Gyro room in good order.
13:50 ~ 14:10Group 4Classroom 4825M01Gyros9 ~ Observe safety precautions and practices cleanliness, corrosion control and preservation at all time when performing the task.
14:10 ~ 15:40Group 4On Board825M01Gyros10 ~ Practical Site Survey and inspection on the system and components onboard.
15:55 ~ 16:10Group 4Classroom 4829M01Speed Log1 ~ Control and Display Unit- Clean and inspect externally
16:10 ~ 16:30Group 4Classroom 4829M01Speed Log2 ~ Speed Log - Self test the system with BITE.
16:30 ~ 16:50Group 4Classroom 4829M01Speed Log3 ~ Speed Log - Clean and inspect EM Log Sensor free from corrosion and dirt.
Thu 22-Jun
09:30 ~ 10:00Group 4On Board828M01Echo Sounder1 ~ Examine the general layout conditions and system operation prior to perform the task.
10:00 ~ 10:30Group 4On Board828M01Echo Sounder2 ~ Visual Check of Echo sounder cable connections between Display unit, Transmitter/Receiver (TX/RX) are intact and are not kink.
10:45 ~ 11:05Group 4Classroom 4828M01Echo Sounder3 ~ Display Unit - Clean and remove dust, dirt, moisture on the Display Unit.
11:05 ~ 11:35Group 4Classroom 4828M01Echo Sounder5 ~ Power Supply - Check the condition of power supplies input AC and DC supplies are available and connected to the system.
11:35 ~ 12:05Group 4Classroom 4828M01Echo Sounder6 ~ Battery - Check function of the LP of AC and DC supplies are good working order free from defect.
12:05 ~ 12:35Group 4Classroom 4828M01Echo Sounder8 ~ Replacing the Fuse. The fuse in the power cable protects the system from reverse polarity of the power supply and equipment fault.
13:35 ~ 14:05Group 4On Board828M01Echo Sounder4 ~ Run Self Test or BITE to monitor starting , running and shutting down.
14:05 ~ 14:35Group 4On Board828M01Echo Sounder7 ~ Observe cleanliness, corrosion control and preservation at all time when performing the task.
14:35 ~ 16:05Group 4On Board828M01Echo Sounder9 ~ Practical Site Survey and inspection on the system and components onboard.
Mon 10-Jul
08:30 ~ 08:50Group 1Classroom 1821S01Navigation System.6 ~ Keep equipment and console panels are clean and dry free from dirt, salt deposit, and corrosion.
08:50 ~ 09:10Group 1Classroom 1821S01Navigation System.7 ~ Power Supply - Check the condition of power supplies input AC and DC supplies quality are available and connected to the IBS system.
09:10 ~ 09:40Group 1Classroom 1821S01Navigation System.8 ~ IBS - Inspect and test the system and equipment at sufficient intervals to make sure that the equipment is in operating conditions.
09:40 ~ 10:10Group 1Classroom 1821S01Navigation System.9 ~ Keep earthing straps connections and mechanical fastenings tight according to right torque. Measure the insulation and continuity.
10:10 ~ 10:40Group 1Classroom 1821S01Navigation System.10 ~ IBS - Check and examine the IBS components and peripherals connectivity/ interface between IBS to other sub- system are functioning seamlessly.
11:00 ~ 11:30Group 1Classroom 1821S01Navigation System.11 ~ IBS - Check and examine the Power Back supply AC and DC thourg back-up battery bank and UPS are in good working order.
14:00 ~ 15:30Group 1On Board821S01Navigation System.1 ~ Perform Site Survey and to familiarise with the overall system layout examine general conditions including to be acquinted system operating instruction prior to perform the task.
14:00 ~ 16:00Group 1On Board821S01Navigation System.12 ~ IBS - Practical Site Survey and Inspection on the System and Components onboard.
16:00 ~ 16:20Group 1On Board821S01Navigation System.2 ~ Integrated navigation system - Visual Check on loose connection on workstations and interfacing units.
16:20 ~ 16:40Group 1On Board821S01Navigation System.3 ~ Integrated navigation system - Visual check on control panel - terminal block.
16:40 ~ 17:00Group 1On Board821S01Navigation System.4 ~ Integrated navigation system - All electrical connections and mechanical fastenings tight according to right torque and the fastenings are dry, clean and rust free.
17:00 ~ 17:30Group 1On Board821S01Navigation System.5 ~ Integrated navigation system - IBS System check at User Level with BITE facilities.
Tue 11-Jul
08:30 ~ 09:00Group 4Classroom 4822M01Navigation Radar2 ~ Navigation Radar - Functional checks and run Self Test or BITE to monitor starting , running and shutting down.
09:00 ~ 09:15Group 4Classroom 4822M01Navigation Radar4 ~ Visual check for any sign of dirt and corrosion.
09:15 ~ 09:35Group 4Classroom 4822M01Navigation Radar7 ~ Navigation Radar - Check and clean Earth bonding straps tightness and free from dirt and corrosion and measure Earth Bonding Continuity within tolerance.
09:35 ~ 09:55Group 4Classroom 4822M01Navigation Radar8 ~ Ground Terminal on Display unit - Check for tight connections.
09:55 ~ 10:15Group 4Classroom 4822M01Navigation Radar9 ~ LCD - Remove dust, dirt and salt deposit from LCD display.
10:15 ~ 10:35Group 4Classroom 4822M01Navigation Radar10 ~ Keep all electrical connections and mechanical fastenings tight according to right torque. and the fastenings are dry, clean and rust free.
11:00 ~ 11:20Group 4Classroom 4822M01Navigation Radar11 ~ Radar power switching On/Off from control unit or remote through BS station.
11:20 ~ 11:35Group 4Classroom 4822M01Navigation Radar12 ~ Power Supply and Services - Check power services are available before start the operation.
11:35 ~ 11:50Group 4Classroom 4822M01Navigation Radar13 ~ Processor Unit - Inspect and clean the external unit free from dirt, dust and rust.
11:50 ~ 12:05Group 4Classroom 4822M01Navigation Radar15 ~ Antenna Unit - Check the exposed nuts and bolts corroded and loose connection. Tighten and preserved accordingly.
12:05 ~ 12:20Group 4Classroom 4822M01Navigation Radar17 ~ Antenna Unit - Keep all electrical connections and mechanical fastenings tight according to right torque, and the fastenings are dry, clean and rust free.
14:00 ~ 15:00Group 4On Board822M01Navigation Radar1 ~ Perform Site Survey to familirise with the overall system layout and examine general conditions, initiation of the standard operating instruction prior to perform the task.
15:00 ~ 15:15Group 4On Board822M01Navigation Radar3 ~ Navigation Radar - Antenna Gearbox-Inspect V-Belt.
15:15 ~ 15:30Group 4On Board822M01Navigation Radar5 ~ Navigation Radar - Visual check Antenna Gearbox or drive unit for sign of corrosion and dirt. Clean if necessary.
16:00 ~ 16:15Group 4On Board822M01Navigation Radar6 ~ Clean and inspect consoles from dirt and dust.
16:15 ~ 16:30Group 4On Board822M01Navigation Radar14 ~ Processor Unit - Check and examine Terminal Strips, sockets, earth terminals on processor unit for loose connection and proper seating of the plug.
16:30 ~ 16:50Group 4On Board822M01Navigation Radar16 ~ Antenna Radiator - Check for dirt and cracks on the radiator surface clean and repair as necessary.
16:50 ~ 17:50Group 4Classroom 4822M01Navigation Radar18 ~ Perform Practical Site Survey and inspection of the system and components onboard.
Wed 12-Jul
08:30 ~ 08:50Group 2Classroom 2710M01SOLAS Equipment in DGPS2 ~ SOLAS Equipment in DGPS - Perform Daily Checks including Start up, running and shutdown procedures.
08:50 ~ 09:10Group 2Classroom 2710M01SOLAS Equipment in DGPS3 ~ Above Deck Equipment Antennas: - Visual inspection for any signs of salt deposit, dirt and water. Clean and preserve.
09:10 ~ 09:30Group 2Classroom 2710M01SOLAS Equipment in DGPS4 ~ Check operation from Remote (ICS and INS Network) and Local Positions.
09:30 ~ 09:50Group 2Classroom 2710M01SOLAS Equipment in DGPS5 ~ Connectors: Check that connectors on the rear panel are firmly tightened and free of rust.
09:50 ~ 10:20Group 2Classroom 2710M01SOLAS Equipment in DGPS6 ~ Earth bonding Straps - Check that the ground system is free of rust and the ground wire is tightly fastened.
10:20 ~ 10:40Group 2Classroom 2710M01SOLAS Equipment in DGPS7 ~ Check that battery voltage is sufficient and fully charged and terminal are clean and free from rust.
11:00 ~ 11:30Group 2Classroom 2710M01SOLAS Equipment in DGPS8 ~ Antenna Unit - Keep all electrical connections and mechanical fastenings tight according to right torque, and the fastenings are dry, clean and rust free.
11:30 ~ 11:50Group 2Classroom 2710M01SOLAS Equipment in DGPS9 ~ Antenna Unit - Perform cleaning and remove dust, dirt and rust with detergent, do not use chemical cleaner or solvent.
11:50 ~ 12:10Group 2Classroom 2710M01SOLAS Equipment in DGPS10 ~ LCD Display - Clean and wipe the LCD display with soft cloth to remove dirt salt deposit.
12:10 ~ 12:30Group 2Classroom 2710M01SOLAS Equipment in DGPS13 ~ Self check and BITE - Check the ROM, RAM, input /output data, GPS Core, Beacon, Keyboard and LCD performance.
12:10 ~ 12:30Group 2Classroom 2710M01SOLAS Equipment in DGPS11 ~ LCD ambient temperature and humidity - Maintain cooling and ventilation for ambient temperature and humidity.
12:30 ~ 12:50Group 2Classroom 2710M01SOLAS Equipment in DGPS12 ~ Protective Device - Fuse is to protect over voltage and short circuit current and may be replaced with specified rating and size.
14:00 ~ 14:20Group 2Classroom 2710M01SOLAS Equipment in DGPS14 ~ Inspect and test the equipment at sufficient intervals to make sure that the equipment is in operating condition.
14:20 ~ 15:20Group 2On Board710M01SOLAS Equipment in DGPS1 ~ Examine the general physical conditions of the system/Equipment and Principle of operation prior to perform any task.
16:00 ~ 17:00Group 2On Board710M01SOLAS Equipment in DGPS15 ~ Perform Practical Site Survey and inspection of the system and components onboard.
Van Der Velden
Fri 23-Jun
08:30 ~ 09:00Group 3Classroom 3222M01Steering Gear1 ~ Steering Gear: Examine the general conditions of steering gear and system functional prior to perform the task.
09:00 ~ 09:30Group 3Classroom 3222M01Steering Gear2 ~ Steering Gear: Inspect Steering Gear System for leaks, loose connection and any sign of corrosions or damage.
09:30 ~ 10:00Group 3Classroom 3222M01Steering Gear3 ~ Steering Gear System: Perform Functional test and operation using emergency hand pump.
10:00 ~ 10:30Group 3Classroom 3222M01Steering Gear4 ~ Steering Gear System: Obtain Hydraulic Oil Sample for analysis and screening.
14:00 ~ 14:15Group 3On Board222M01Steering Gear5 ~ Measure the wear of journal bearing.
14:15 ~ 14:30Group 3On Board222M01Steering Gear6 ~ Inspect Electrical Components.
14:30 ~ 15:00Group 3Classroom 3222M01Steering Gear7 ~ Steering Gear System: Check fluid levels is sufficient and acceptable limit refill or replace if necessary iaw OEM manual.
15:00 ~ 15:30Group 3Classroom 3222M01Steering Gear8 ~ Steering Gear: Inspect Steering Gear System for any signs of abnormalities and undue noise and vibration.
16:00 ~ 16:30Group 3Classroom 3222M01Steering Gear9 ~ Steering Gear: Examine Pre starting and shut down checks and Safety Procedures before, during and after performing the task.
16:30 ~ 18:30Group 3On Board222M01Steering Gear10 ~ Steering Gear: Practical Site survey and Inspection on the System and Components onboard.
Morten Jepsen
Tue 27-Jun
08:30 ~ 09:00Group 1Classroom 1800S01Communication System1 ~ Examine the general conditions and of SAAB Integrated Communication System (ICS) - TactiCall system networks functional status prior to perform the tasks ( Physical and dynamic).
09:00 ~ 09:30Group 1Classroom 1800S01Communication System2 ~ Functional check of the overall External Communication system networks and sub-system.
09:30 ~ 10:00Group 1Classroom 1800S01Communication System3 ~ HF Radio System - Functional check of the from Local (Communication Room) and various remote positions.
10:00 ~ 10:30Group 1Classroom 1800S01Communication System4 ~ Fleet Broadband FFB - Functional check both Local (Communication Room) and various remote positions.
11:00 ~ 11:30Group 1Classroom 1800S01Communication System5 ~ V/UHF Radio System - Functional check of the from Local (Communication Room) and various remote positions.
11:30 ~ 12:00Group 1Classroom 1800S01Communication System6 ~ V/HF Radio System - Perform Routine test with BITE (Built In Test Equipment) without radiating signals in Transmitter TX, Receiver, Power and Antennas modules accordance with relevant IMO circulars.
12:00 ~ 12:30Group 1On Board800S01Communication System7 ~ HF Transceiver System - Perform Weekly routine check on The Antenna Tuning Unit.
12:30 ~ 13:00Group 1Classroom 1800S01Communication System8 ~ MF/HF radio’s display - GPS is connected, check the position and time in the MF/HF radio’s display.
14:00 ~ 14:30Group 1Classroom 1800S01Communication System9 ~ MF/HF DSC Live test call with a Maritime Communications Station Send a DSC call to the appropriate coast station. The acknowledgement from the coast station is received by the 2187.5 kHz watch receiver if the call was sent on that frequency. If the call is sent on HF only the audio signal output from the 2187.5 kHz watch receiver should be checked.
14:30 ~ 15:00Group 1Classroom 1800S01Communication System10 ~ DSC routine testing - Check the DSC function regularly. Verify the complete DSC installation, with antennas, by transmitting a Safety Test call to another station (coast or ship). The test call is generated using the DSC call flow via menu.
15:00 ~ 15:30Group 1Classroom 1800S01Communication System11 ~ Internal Communication - Intercom: Visual Check the terminal and display. Free from dirt and dust.
16:00 ~ 16:30Group 1Classroom 1800S01Communication System12 ~ Internal Communication Intercom - User level system Check for functionality.
16:30 ~ 17:00Group 1Classroom 1800S01Communication System13 ~ Internal Communication - Public Address system: Visual Check and Cleaning of Units.
Wed 28-Jun
08:30 ~ 09:00Group 1On Board800S01Communication System14 ~ Internal Communication - Public Address system (PAGA - Visual Check, Inspect earth bonding Units and clean as necessary.
09:00 ~ 09:30Group 1Classroom 1800S01Communication System15 ~ Internal Communication - Public Address system:- Inspect earth bondingand straps, fasterners tightness and corrosion free.
09:30 ~ 10:00Group 1Classroom 1800S01Communication System16 ~ Internal Communication - Wireless VHF Communication: Check the system visually and check correct function of charger unit.
10:00 ~ 10:30Group 1Classroom 1800S01Communication System17 ~ Internal Communication - Wireless VHF Communication: Visual Check RBS Panel and clean as necessary.
11:00 ~ 11:30Group 1Classroom 1800S01Communication System18 ~ Internal Communication - Wireless VHF Communication: Check Earth bonding at RBS.
11:30 ~ 12:00Group 1Classroom 1800S01Communication System19 ~ Internal Communication - Internal telephone system: Visually Check control panel / Front panel free from dirt and moisture and corrosion.
12:00 ~ 12:30Group 1Classroom 1800S01Communication System20 ~ Internal Communication - Internal telephone system - Visual Check for loose connection and free from dirt.
12:30 ~ 13:00Group 1Classroom 1800S01Communication System21 ~ Internal Communication - CCTV system: Visual Check and free from dust and ingress of water.
14:00 ~ 14:30Group 1Classroom 1800S01Communication System22 ~ Internal Communication - CCTV system: Check earth bonding and cable gland.
14:30 ~ 15:00Group 1Classroom 1800S01Communication System23 ~ Internal Communication - Sound Powered Telephone: Check the installation completeness and functional check.
15:00 ~ 15:30Group 1Classroom 1800S01Communication System24 ~ Internal Communication - Sound Powered Telephone: Check earth bonding and cable gland watertightness integrity.
16:30 ~ 17:00Group 1Classroom 1800S01Communication System25 ~ Internal Communication - Homing Beacon: Visual inspection and clean and inspect externally.
Tue 25-Jul
09:15 ~ 09:45Group 1Classroom 1800S01Communication System26 ~ Internal Communication - Flight Deck Communication Station: Visual inspect and clean wireless station. From ingress of dust and moisture.
09:45 ~ 10:15Group 1Classroom 1800S01Communication System27 ~ Internal Communication - Flight Deck Communication Station - Carry out self check of BITE on station control panel and portable sets.
10:30 ~ 11:00Group 1Classroom 1800S01Communication System28 ~ External and Internal Communication system networks: Visual check the exposed surface hardware and panel for signs of damage,loose connections and free from dust and moisture.
11:00 ~ 11:30Group 1Classroom 1800S01Communication System29 ~ System BITE Failures and corrective actions: Using Self check and BITE (Built In Test Equipment) the transmitter or the receiver units able to detects a failure, the Alarm and Alert LED on the front panel.
11:30 ~ 12:00Group 1Classroom 1800S01Communication System30 ~ System Power Supply - Check and examine power supply input and connections for the network are in good order including Power Back-Up system.
12:00 ~ 12:30Group 1Classroom 1800S01Communication System31 ~ Communication System which is an Integrated Communication System (ICS) consists of External Communication system and Internal Communication System Networks.
12:30 ~ 13:00Group 1Classroom 1800S01Communication System32 ~ Power supplies: Check Circuit breakers and fuses of in DB panel for correct operation.
13:00 ~ 13:30Group 1Classroom 1800S01Communication System33 ~ Power supplies - Check Circuit breakers and fuses of in DB panel for correct operation and fault free.
14:30 ~ 15:00Group 1On Board800S01Communication System34 ~ External and Internal Communication System Components - Check Earth bonding straps and connections to ship structure are intact and free from dust and corrosion.
15:00 ~ 15:30Group 1Classroom 1800S01Communication System35 ~ Antennas and coupling unit - Visual check Antenna Units free from obstruction and moisture and salt deposit and corrosion.
15:30 ~ 18:30Group 1On Board800S01Communication System36 ~ Practical Site survey and inspection on the ICS ( External & Internal Comm. Networks System and components onboard.
Atlas Copco 1
Fri 30-Jun
09:30 ~ 10:00Group 3Classroom 3620M01Compressed Air System1 ~ Compressors Check Oil Level (Working and Control Air ) – Types and characteristics, Oil flow, the type of LO, sight glass.
10:00 ~ 10:20Group 3Classroom 3620M01Compressed Air System2 ~ Clean and Inspect ( Electrical sub-systems) – Motors and starters types, cables and terminations, mountings and fastenings.
10:35 ~ 11:15Group 3Classroom 3620M01Compressed Air System3 ~ Functional Checks (Motors and Compressors) – Pre starting checks, performance and meter readings (Working and Control Air), abnormalities.
11:15 ~ 11:30Group 3Classroom 3620M01Compressed Air System4 ~ Pressure Sensors - Clean and Inspect: Cables and terminations, alarm and settings.
11:30 ~ 11:45Group 3Classroom 3620M01Compressed Air System5 ~ Change Lubrication Oil – Safety procedures, procedure for oil change.
11:45 ~ 12:00Group 3Classroom 3620M01Compressed Air System6 ~ Test Safety Valve - Pre starting checks, Procedure of test.
12:00 ~ 12:10Group 3Classroom 3620M01Compressed Air System7 ~ Grease Bearing (Compressor Motors) – Grease and types, procedure of greasing, using the grease gun.
12:10 ~ 12:40Group 3Classroom 3620M01Compressed Air System8 ~ Clean and Inspect Compressors - Types and characteristics; safety procedures, cleaning procedures.
12:40 ~ 14:40Group 3000000Break Times5 ~ Friday Lunch
14:40 ~ 14:50Group 3Classroom 3620M01Compressed Air System9 ~ Clean Air Filter – Types and functions, Safety procedures when cleaning.
14:50 ~ 15:00Group 3Classroom 3620M01Compressed Air System10 ~ Check Drainage – Formation and draining the Condensate, safety precautions.
15:00 ~ 15:10Group 3Classroom 3620M01Compressed Air System11 ~ Clean, Inspect and Check Insulation – Motors and control panels, cables and terminations, insulating properties, Insulation Tester.
15:10 ~ 15:15Group 3Classroom 3620M01Compressed Air System12 ~ Check Earth Bonding – Motors and control panels, Continuity Tester.
15:30 ~ 17:30Group 3On Board620M01Compressed Air System13 ~ On Board Familiarisation
Ahmad Bin Abdul Rahim
Mon 07-Aug
11:20 ~ 11:50Group 2370S01Heating & Ventilation1 ~ Functional check of various protective and overload devices and type of controllers employed.
11:50 ~ 12:20Group 2370S01Heating & Ventilation2 ~ Ventilation Fan Motor: Check Motor conditions such as Air Flow,Temperature, RPM, noise and vibration.
12:20 ~ 12:40Group 2370S01Heating & Ventilation3 ~ Vent. Flaps, covers and trunking-inspect - Clean as necessary.
12:40 ~ 13:10Group 2370S01Heating & Ventilation4 ~ Measure Earth Bonding strap and fastenings Continuity and keep the fastenings are tight, clean, dry and free from rust.
Sat 26-Aug
12:55 ~ 13:15Group 2370S01Heating & Ventilation5 ~ Vent.flaps & covers-inspect perfom chalk test.
Staco 1
Tue 15-Aug
09:15 ~ 09:45Group 4Classroom 1371P01Galley1 ~ Administer the Range of Galley Equipment.
09:45 ~ 09:50Group 4Classroom 1371P01Galley2 ~ Establish the Fuse Boxes, Control panel.
09:50 ~ 10:30Group 4Classroom 1371P01Galley3 ~ Switching On Procedures and operating the Range of equipment.
10:45 ~ 11:15Group 4Classroom 1371P01Galley4 ~ Establish the ventilation and exhaust system and Switching on procedures.
11:15 ~ 11:35Group 4Classroom 1371P01Galley5 ~ Safety Procedures - operating the Foam and CO2 system before, during and after use.
11:35 ~ 11:55Group 4Classroom 1371P01Galley6 ~ Daily maintenance of equipment after use.
11:55 ~ 12:55Group 4On Board371P01Galley7 ~ On Board Familiarisation
Mon 21-Aug
09:15 ~ 09:30Group 4On Board680M01680 Cold Store/ Freezing Room System1 ~ Check Oil Level – PCU Compressor.
09:30 ~ 09:50Group 4Classroom 1680M01680 Cold Store/ Freezing Room System2 ~ PCU SW Pump - Run pump if not in regular use: Pre starting checks, check performance, leaks and abnormalities.
09:50 ~ 10:20Group 4Classroom 1680M01680 Cold Store/ Freezing Room System3 ~ Clean & Inspect – PCU SW Pump, pipes ,couplings, valves mountings, fastenings.
10:35 ~ 10:55Group 4Classroom 1680M01680 Cold Store/ Freezing Room System4 ~ PCU - Check Refrigerant, Procedure of checks.
10:55 ~ 11:10Group 4Classroom 1680M01680 Cold Store/ Freezing Room System5 ~ PCU - Checks for Leaks, Procedure of checks.
11:10 ~ 11:40Group 4Classroom 1680M01680 Cold Store/ Freezing Room System6 ~ PCU Compressor Motor - Functional checks: Pre starting checks, check performance and abnormalities.
11:40 ~ 12:10Group 4Classroom 1680M01680 Cold Store/ Freezing Room System7 ~ PCU SW Pump Motor - Functional checks: Pre starting checks, performance and abnormalities.
12:10 ~ 12:40Group 4Classroom 1680M01680 Cold Store/ Freezing Room System8 ~ PCU Control Panel - Functional checks: Check system operation, performance and abnormalities.
12:40 ~ 13:00Group 4Classroom 1680M01680 Cold Store/ Freezing Room System9 ~ Clean & Inspect – PCU Control Panel, switches and indicators, cables and terminations.
13:00 ~ 13:10Group 4Classroom 1680M01680 Cold Store/ Freezing Room System10 ~ PCU Compressor Motor - Clean Inspect & Check Insulation Pre starting checks, Cables and terminations, Insulation tester.
13:10 ~ 13:20Group 4Classroom 1680M01680 Cold Store/ Freezing Room System11 ~ PCU SW Pump Motor - Clean Inspect & Check Insulation – Pre starting checks, cables and terminations, Insulation tester.
13:20 ~ 13:25Group 4Classroom 1680M01680 Cold Store/ Freezing Room System12 ~ Clean Inspect & Check Insulation – Pre starting checks, cables and terminations, Insulation Tester.
13:25 ~ 13:40Group 4Classroom 1680M01680 Cold Store/ Freezing Room System13 ~ Check Combined High-Low Pressure Switch – Procedure of setting the Pressure switches.
14:40 ~ 14:55Group 4Classroom 1680M01680 Cold Store/ Freezing Room System14 ~ PCU Compressor - Change LO– Pre starting checks, clean strainers.
14:55 ~ 15:05Group 4On Board680M01680 Cold Store/ Freezing Room System15 ~ PCU Compressor Motor - Inspect earth bonding: Earthing straps, fastenings, Continuity Tester.
15:05 ~ 15:10Group 4Classroom 2680M01680 Cold Store/ Freezing Room System16 ~ PCU SW Pump Motor - Inspect earth bonding: Earthing straps, fastenings, Continuity tester.
15:10 ~ 15:15Group 4Classroom 1680M01680 Cold Store/ Freezing Room System17 ~ PCU Control Panel - Inspect earth bonding: Earthing straps, fastenings, Continuity Tester.
15:30 ~ 17:30Group 4On Board680M01680 Cold Store/ Freezing Room System18 ~ On Board Familiarisation
Vestdavit 1
Wed 16-Aug
09:15 ~ 10:15Group 4On Board570P01Davits Rescue Boat1 ~ Perform Site Survey to familirise with the overall system layout and examine general conditions, initiation of the standard operating instruction prior to perform the task.
10:15 ~ 10:35Group 4Classroom 1570P01Davits Rescue Boat2 ~ Davits - Check hydraulic system for damage and leaks.
10:50 ~ 11:10Group 4Classroom 1570P01Davits Rescue Boat3 ~ Davits - Check the davit for visible damages free from dirt, rust and damage.
11:10 ~ 11:25Group 4On Board570P01Davits Rescue Boat4 ~ Davit - Functional check that the davit can move freely in its operation area. Switch “ON” MCCB on starter panel.
11:25 ~ 11:40Group 4Classroom 1570P01Davits Rescue Boat5 ~ Davits - Apply grease to necessary points as specified in Operation Manual or PMS.
11:40 ~ 12:00Group 4Classroom 1570P01Davits Rescue Boat6 ~ Check hydraulic system clean and dry free from dirt, salt deposit, and corrosion free.
12:00 ~ 12:20Group 4Classroom 1570P01Davits Rescue Boat7 ~ Keep all electrical connections and mechanical fastenings tight according to right torque. and the fastenings are dry, clean and rust free.
12:20 ~ 12:40Group 4Classroom 1570P01Davits Rescue Boat8 ~ Check and clean Earth bonding straps tightness and free from dirt and corrosion.
12:40 ~ 13:00Group 4Classroom 1570P01Davits Rescue Boat9 ~ Inspect and test the equipment at sufficient intervals to make sure that the equipment is in operating condition.
13:00 ~ 13:20Group 4Classroom 1570P01Davits Rescue Boat10 ~ Observe cleanliness, corrosion control and preservation at all time when performing the task.
14:20 ~ 14:40Group 4Classroom 1570P01Davits Rescue Boat11 ~ Power Supply Services - Check power ON and Off of the system prior to start operation.
14:40 ~ 15:00Group 4Classroom 1570P01Davits Rescue Boat12 ~ Inspect and test the equipment at sufficient intervals to make sure that the equipment is in operating condition.
15:15 ~ 17:15Group 4On Board570P01Davits Rescue Boat13 ~ Perform Practical Site Survey and inspection of the system and components onboard.
Thu 17-Aug
09:15 ~ 09:30Group 4On Board570P02Emergency Equipment1 ~ Rescue Boat - Check and verify the inventory list as fitted.
09:30 ~ 09:45Group 4On Board570P02Emergency Equipment2 ~ Rescue Boat - Check propulsion or outboard engine start and stop function and bilge pump.
09:45 ~ 10:00Group 4On Board570P02Emergency Equipment3 ~ Rescue Boat - Visual condition of stowage and releasing and recovery mechanism.
10:00 ~ 10:15Group 4On Board570P02Emergency Equipment4 ~ Rescue Boat - Condition of hull inside & outside any sign of damage or corrosion.
10:30 ~ 10:45Group 4On Board570P02Emergency Equipment5 ~ Rescue Boat - Check the Bilge keel and hull appendages on both sides in good order.
10:45 ~ 11:00Group 4On Board570P02Emergency Equipment6 ~ Davit - Check the davit for visible damages free from dirt, rust and damage.
11:00 ~ 11:15Group 4On Board570P02Emergency Equipment7 ~ Davit - Apply grease to necessary points as specfied in Operation Manual or PMS.
11:15 ~ 11:30Group 4On Board570P02Emergency Equipment8 ~ Davit - Functional check that the davit can move freely in its operation area. Switch “ON” MCCB on starter panel.
11:30 ~ 11:45Group 4On Board570P02Emergency Equipment9 ~ Davit -Check wire rope of the hoist is in perfect condition and good order.
11:45 ~ 12:00Group 4On Board570P02Emergency Equipment10 ~ Life Rafts - Self-protection of with cover from direct heat.
12:00 ~ 12:15Group 4On Board570P02Emergency Equipment11 ~ Life Raft - Keep clean the life raft from salt deposit and moisture.
12:15 ~ 12:30Group 4On Board570P02Emergency Equipment12 ~ Life Raft - Check Condition of stowage and releasing mechanism.
12:30 ~ 12:45Group 4On Board570P02Emergency Equipment13 ~ Life Raft - Visual Inspection the external condition for any sign of damage.
12:45 ~ 13:00Group 4On Board570P02Emergency Equipment14 ~ Life Raft - Check and record the Service interval date and next periodic service.
TP TBD
Sat 26-Aug
13:15 ~ 13:45Group 1Classroom 1370S01Heating & Ventilation1 ~ Functional check of various protective and overload devices and type of controllers employed.
13:15 ~ 13:45Group 2370S01Heating & Ventilation6 ~ Functional check the functionalities of various protective and overload devices on mlotor and starters-controllers
13:30 ~ 17:30Group 3On Board000F11OPV 1800: Performance - Practical On Board1 ~ Familiarization Onboard.
13:45 ~ 14:15Group 1Classroom 1370S01Heating & Ventilation2 ~ Ventilation Fan Motor: Check Motor conditions such as Air Flow,Temperature, RPM, noise and vibration.
14:15 ~ 14:35Group 1Classroom 1370S01Heating & Ventilation3 ~ Vent. Flaps, covers and trunking-inspect - Clean as necessary.
14:35 ~ 15:05Group 1Classroom 1370S01Heating & Ventilation4 ~ Measure Earth Bonding strap and fastenings Continuity and keep the fastenings are tight, clean, dry and free from rust.
14:45 ~ 15:05Group 2370S01Heating & Ventilation7 ~ Inspect the earth bonding straps and mechnical fastening are tight free fom dirt, moisture and rust
15:05 ~ 15:25Group 2370S01Heating & Ventilation8 ~ Inspect and test the equipment at sufficient intervals to make sure that the equipment is in operating condition.
15:05 ~ 15:25Group 1Classroom 1370S01Heating & Ventilation5 ~ Vent.flaps & covers-inspect perfom chalk test.
15:25 ~ 15:45Group 2370S01Heating & Ventilation9 ~ Observe cleanliness, corrosion control and preservation at all time when performing the task
15:40 ~ 16:10Group 1Classroom 1370S01Heating & Ventilation6 ~ Functional check the functionalities of various protective and overload devices on mlotor and starters-controllers
15:45 ~ 16:05Group 2370S01Heating & Ventilation10 ~ Observe safety precautions, practices and handling of hazadous material in performing the work.
16:10 ~ 16:30Group 1Classroom 1370S01Heating & Ventilation7 ~ Inspect the earth bonding straps and mechnical fastening are tight free fom dirt, moisture and rust
16:30 ~ 16:50Group 1Classroom 1370S01Heating & Ventilation8 ~ Inspect and test the equipment at sufficient intervals to make sure that the equipment is in operating condition.
16:50 ~ 17:10Group 1Classroom 1370S01Heating & Ventilation9 ~ Observe cleanliness, corrosion control and preservation at all time when performing the task
Sun 27-Aug
09:15 ~ 09:35Group 1Classroom 1370S01Heating & Ventilation10 ~ Observe safety precautions, practices and handling of hazadous material in performing the work.
09:30 ~ 10:30Group 2370S11Heating & Ventilation - Practical On Board1 ~ Initial Walk around: Examine the general conditions and system operationn prior to perform the task.
09:30 ~ 10:30Group 3Classroom 3000F02OPV 1800: Major System & Equipment1 ~ Safety Systems and Lifesaving Equipment.
09:35 ~ 10:35Group 1On Board370S11Heating & Ventilation - Practical On Board1 ~ Initial Walk around: Examine the general conditions and system operationn prior to perform the task.
10:45 ~ 11:45Group 2370S11Heating & Ventilation - Practical On Board2 ~ Ensure the filter mat are clean and dry.
10:45 ~ 12:45Group 3Classroom 3000F02OPV 1800: Major System & Equipment2 ~ The Ship's Major System and Equipments.
10:50 ~ 11:50Group 1On Board370S11Heating & Ventilation - Practical On Board2 ~ Ensure the filter mat are clean and dry.
11:50 ~ 13:50Group 1On Board370S11Heating & Ventilation - Practical On Board3 ~ Practical Site Survey and inspection on the system and components onboard.
12:45 ~ 13:45Group 3Classroom 3000F02OPV 1800: Major System & Equipment3 ~ The Ship's Auxiliary System.
14:45 ~ 15:45Group 3Classroom 3000F02OPV 1800: Major System & Equipment4 ~ Deck Machineries.
14:45 ~ 16:45Group 2370S11Heating & Ventilation - Practical On Board3 ~ Practical Site Survey and inspection on the system and components onboard.
Mon 28-Aug
09:30 ~ 10:30Group 3Classroom 3000F02OPV 1800: Major System & Equipment5 ~ Other Electronics Equipments and systems Onboard.
10:45 ~ 11:45Group 3Classroom 3000F02OPV 1800: Major System & Equipment6 ~ Bilges, Ballast and Internal Fi-Fi System.
13:45 ~ 17:45Group 3On Board000F12OPV 1800: Major System & Equipment - Practical On Board1 ~ Familiarization Onboard.
Mon 04-Sep
13:00 ~ 17:00Group 2On Board000F11OPV 1800: Performance - Practical On Board1 ~ Familiarization Onboard.
Thu 07-Sep
11:45 ~ 15:45Group 1On Board000F11OPV 1800: Performance - Practical On Board1 ~ Familiarization Onboard.
13:30 ~ 17:30Group 1On Board000F12OPV 1800: Major System & Equipment - Practical On Board1 ~ Familiarization Onboard.
Sat 30-Sep
11:35 ~ 12:35Group 3On Board110F11Sub-system of Hull Structure - 164 ICAF - Practical On Board1 ~ Perform Site Survey and familiarization with the ICAF system layout and operation
14:35 ~ 15:05Group 3On Board110F11Sub-system of Hull Structure - 164 ICAF - Practical On Board2 ~ Visually check cables inside power controller unit for damage and tightness.
15:05 ~ 16:05Group 3On Board110F11Sub-system of Hull Structure - 164 ICAF - Practical On Board3 ~ Perform checks and inspections and identify fault conditions.