Mon 29-May |
Group 1 |
08:30 ~ 09:30 | 000F01 | 1 ~ Introduction OPV 1800. | C | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | Classroom 4 | ShowEditDestroy |
08:30 ~ 09:30 | 000A00 | 1 ~ Training Launch Introduction | C | | Classroom 4 | ShowEditDestroy |
09:30 ~ 10:30 | 000F01 | 2 ~ Ship's Operational Capabilities. | C | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | Classroom 4 | ShowEditDestroy |
10:30 ~ 10:45 | 000000 | Morning Tea Break | | | Classroom 4 | ShowEditDestroy |
11:00 ~ 13:00 | 000F01 | 3 ~ Vessel Layout. | C | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | Classroom 4 | ShowEditDestroy |
11:00 ~ 13:00 | 000F02 | 2 ~ The Ship's Major System and Equipments. | C | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | Classroom 4 | ShowEditDestroy |
13:00 ~ 14:00 | 000000 | Lunch Break | C | | Classroom 4 | ShowEditDestroy |
14:00 ~ 15:00 | 000F01 | 5 ~ Emergency Station. | C | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | Classroom 4 | ShowEditDestroy |
14:00 ~ 15:00 | 000F01 | 6 ~ SOLAS Equipment and Fire Fighting Onboard. | C | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | Classroom 4 | ShowEditDestroy |
15:30 ~ 15:45 | 000000 | Tea Break | | | Classroom 4 | ShowEditDestroy |
16:00 ~ 17:00 | 000F02 | 1 ~ Safety Systems and Lifesaving Equipment. | C | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | Classroom 4 | ShowEditDestroy |
Group 2 |
08:30 ~ 09:30 | 000A00 | 1 ~ Training Launch Introduction | C | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | Classroom 2 | ShowEditDestroy |
08:30 ~ 09:30 | 000F01 | 1 ~ Introduction OPV 1800. | C | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | Classroom 2 | ShowEditDestroy |
09:30 ~ 10:30 | 000F01 | 2 ~ Ship's Operational Capabilities. | C | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | Classroom 2 | ShowEditDestroy |
10:30 ~ 10:45 | 000000 | Morning Tea Break | | | | ShowEditDestroy |
11:00 ~ 13:00 | 000F02 | 2 ~ The Ship's Major System and Equipments. | C | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | Classroom 4 | ShowEditDestroy |
11:00 ~ 13:00 | 000F01 | 3 ~ Vessel Layout. | C | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | Classroom 2 | ShowEditDestroy |
13:00 ~ 14:00 | 000000 | Lunch Break | C | | | ShowEditDestroy |
14:00 ~ 15:00 | 000F01 | 6 ~ SOLAS Equipment and Fire Fighting Onboard. | C | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | Classroom 4 | ShowEditDestroy |
14:00 ~ 15:00 | 000F01 | 5 ~ Emergency Station. | C | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | Classroom 4 | ShowEditDestroy |
15:30 ~ 15:45 | 000000 | Tea Break | | | | ShowEditDestroy |
16:00 ~ 17:00 | 000F02 | 1 ~ Safety Systems and Lifesaving Equipment. | C | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | Classroom 4 | ShowEditDestroy |
Tue 30-May |
Group 1 |
08:30 ~ 09:00 | 310S01 | 1 ~ Fire Main and the ships FF system-Establish system arrangements. | C | Khairul Azuadi Bin Ariffin | Classroom 1 | ShowEditDestroy |
09:00 ~ 09:40 | 310S01 | 2 ~ Connectivity of the fire Main to the Sprinkler & the Foam system- General characteristics, functions, operations and the utilisation. | C | Khairul Azuadi Bin Ariffin | Classroom 1 | ShowEditDestroy |
09:40 ~ 10:00 | 310S11 | 1 ~ The FF arrangements – Utilise for Deck Wash, Spray, Flushing and Draining. | O | Khairul Azuadi Bin Ariffin | On Board | ShowEditDestroy |
09:40 ~ 10:40 | 310S01 | 3 ~ CO2 and the Watermist system- General characteristics, functions, operations, and utilisation. | C | Khairul Azuadi Bin Ariffin | Classroom 1 | ShowEditDestroy |
10:30 ~ 10:45 | 000000 | Morning Tea Break | | | Classroom 4 | ShowEditDestroy |
11:00 ~ 12:00 | 000F02 | 3 ~ The Ship's Auxiliary System. | C | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | Classroom 4 | ShowEditDestroy |
12:00 ~ 13:00 | 000000 | Lunch Break | C | | Classroom 4 | ShowEditDestroy |
14:00 ~ 15:00 | 000F02 | 4 ~ Deck Machineries. | C | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | Classroom 4 | ShowEditDestroy |
14:00 ~ 15:00 | 000F01 | 4 ~ Deck Arrangements. | C | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | Classroom 4 | ShowEditDestroy |
15:00 ~ 15:30 | 110F01 | 3 ~ ICAF - Check the condition and functionality of Control Panel Unit and display. | C | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | Classroom 4 | ShowEditDestroy |
15:00 ~ 15:15 | 110F01 | 1 ~ ICAF - Perform maintenance tasks which are specified under “Daily”. | C | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | Classroom 4 | ShowEditDestroy |
15:15 ~ 15:30 | 110F01 | 2 ~ Clean and upkeep the Control Panel and cabinet. | C | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | Classroom 4 | ShowEditDestroy |
15:30 ~ 15:45 | 000000 | Tea Break | | | Classroom 4 | ShowEditDestroy |
16:00 ~ 16:30 | 110F01 | 4 ~ Check cables connection on terminals for tightness and damage. | C | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | Classroom 4 | ShowEditDestroy |
16:00 ~ 16:20 | 110F01 | 5 ~ Electrical Checks on Protective devices and safety circuit. | C | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | Classroom 4 | ShowEditDestroy |
16:00 ~ 17:00 | 000F02 | 5 ~ Other Electronics Equipments and systems Onboard. | C | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | Classroom 4 | ShowEditDestroy |
Group 2 |
10:30 ~ 10:45 | 000000 | Morning Tea Break | | | Classroom 4 | ShowEditDestroy |
11:00 ~ 12:00 | 000F02 | 3 ~ The Ship's Auxiliary System. | C | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | Classroom 4 | ShowEditDestroy |
12:00 ~ 13:00 | 000000 | Lunch Break | C | | Classroom 4 | ShowEditDestroy |
14:00 ~ 15:00 | 000F02 | 4 ~ Deck Machineries. | C | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | Classroom 4 | ShowEditDestroy |
14:00 ~ 15:00 | 000F01 | 4 ~ Deck Arrangements. | C | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | Classroom 2 | ShowEditDestroy |
15:00 ~ 15:15 | 110F01 | 1 ~ ICAF - Perform maintenance tasks which are specified under “Daily”. | C | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | Classroom 4 | ShowEditDestroy |
15:00 ~ 15:30 | 110F01 | 3 ~ ICAF - Check the condition and functionality of Control Panel Unit and display. | C | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | Classroom 4 | ShowEditDestroy |
15:15 ~ 15:30 | 110F01 | 2 ~ Clean and upkeep the Control Panel and cabinet. | C | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | Classroom 4 | ShowEditDestroy |
15:30 ~ 15:45 | 000000 | Tea Break | | | | ShowEditDestroy |
16:00 ~ 17:00 | 000F02 | 5 ~ Other Electronics Equipments and systems Onboard. | C | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | Classroom 4 | ShowEditDestroy |
16:00 ~ 16:30 | 110F01 | 4 ~ Check cables connection on terminals for tightness and damage. | C | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | Classroom 4 | ShowEditDestroy |
16:00 ~ 16:20 | 110F01 | 5 ~ Electrical Checks on Protective devices and safety circuit. | C | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | Classroom 4 | ShowEditDestroy |
Wed 31-May |
Group 1 |
08:30 ~ 09:10 | 360S01 | 1 ~ The LO Bunker Station and LO Supply System – Establish the system arrangements for the Transfer and Supply of LO to consumers. | C | Khairul Azuadi Bin Ariffin | Classroom 1 | ShowEditDestroy |
09:10 ~ 09:30 | 360S01 | 2 ~ Process of filling/transfer of LO tanks - Tanks capacities, Flow rate and time period of filling or transfer. | C | Khairul Azuadi Bin Ariffin | Classroom 1 | ShowEditDestroy |
09:30 ~ 09:45 | 360S01 | 3 ~ Establish the Overflow line and tanks. | C | Khairul Azuadi Bin Ariffin | Classroom 1 | ShowEditDestroy |
09:45 ~ 10:00 | 360S01 | 4 ~ The High Level Alarm – Activation and height levels. | C | Khairul Azuadi Bin Ariffin | Classroom 1 | ShowEditDestroy |
10:30 ~ 10:45 | 000000 | Morning Tea Break | | | Classroom 4 | ShowEditDestroy |
11:00 ~ 11:30 | 360S01 | 5 ~ The DO and Sludge System – Establish the system arrangements, functions and operations. | C | Khairul Azuadi Bin Ariffin | Classroom 1 | ShowEditDestroy |
11:30 ~ 12:00 | 360S01 | 6 ~ Suction, Collecting, of DO and Sludge – Transfer into the Sludge Tank or Shore facilities. | C | Khairul Azuadi Bin Ariffin | Classroom 1 | ShowEditDestroy |
12:00 ~ 12:15 | 360S01 | 7 ~ Health Safety & Environment Protection | C | Khairul Azuadi Bin Ariffin | Classroom 1 | ShowEditDestroy |
12:00 ~ 13:00 | 360S11 | 1 ~ On Board Familiarisation | O | Khairul Azuadi Bin Ariffin | Classroom 1 | ShowEditDestroy |
12:15 ~ 12:35 | 360S01 | 8 ~ Administer Oil Sampling | C | Khairul Azuadi Bin Ariffin | Classroom 1 | ShowEditDestroy |
13:00 ~ 14:00 | 000000 | Lunch Break | C | | Classroom 4 | ShowEditDestroy |
14:00 ~ 14:40 | 320S01 | 1 ~ The Fuel Transfer and Supply System – Establish the system arrangements for the Transfer and Supply of fuel. | C | Khairul Azuadi Bin Ariffin | Classroom 1 | ShowEditDestroy |
14:00 ~ 14:40 | 320S01 | 2 ~ Process of filling/transfer of FO tanks - Tanks capacities, Flow rate and time period of filling or transfer. | C | Khairul Azuadi Bin Ariffin | Classroom 1 | ShowEditDestroy |
14:00 ~ 15:30 | 400S11 | 2 ~ Perform Practical Site Survey and inspection on the system and components onboard. | O | Akmal Hidayat | On Board | ShowEditDestroy |
14:40 ~ 14:55 | 320S01 | 3 ~ Establish the overflow line and tanks. | C | Khairul Azuadi Bin Ariffin | Classroom 1 | ShowEditDestroy |
14:55 ~ 15:15 | 320S01 | 4 ~ Utilising the Day Tanks – Rate of consumption. | C | Khairul Azuadi Bin Ariffin | Classroom 1 | ShowEditDestroy |
15:15 ~ 15:35 | 400S11 | 1 ~ Fuel System Primary Filter - Drain and check conditions | O | Akmal Hidayat | On Board | ShowEditDestroy |
15:30 ~ 15:45 | 000000 | Tea Break | | | Classroom 4 | ShowEditDestroy |
16:00 ~ 16:20 | 320S01 | 5 ~ Cargo Handling System for FO – Establish the system arrangements and operations, for the FO Transfer onboard and discharge ashore. | C | Khairul Azuadi Bin Ariffin | Classroom 1 | ShowEditDestroy |
Group 2 |
10:30 ~ 10:45 | 000000 | Morning Tea Break | | | Classroom 4 | ShowEditDestroy |
13:00 ~ 14:00 | 000000 | Lunch Break | C | | Classroom 4 | ShowEditDestroy |
15:30 ~ 15:45 | 000000 | Tea Break | | | Classroom 4 | ShowEditDestroy |
Thu 01-Jun |
Group 4 |
08:30 ~ 09:10 | 640P01 | 1 ~ Dispersant Pumps & Boom - Clean & Inspect: Pumps, control panel, motor, valves, spray booms, hoses, loose fittings. | C | UMW 1 | Classroom 1 | ShowEditDestroy |
09:10 ~ 09:40 | 640P01 | 2 ~ Dispersant Pumps & Boom: Functional checks – Setting up the system, pre starting checks and safety procedures, performance. | C | UMW 1 | Classroom 2 | ShowEditDestroy |
09:40 ~ 09:50 | 640P01 | 3 ~ Dispersant Pumps & Boom - Clean, Inspect, Check Insulation – Motors, control panel, cables and termination, Insulation Tester. | C | UMW 1 | Classroom 1 | ShowEditDestroy |
09:50 ~ 09:55 | 640P01 | 4 ~ Dispersant Pumps & Boom:Earthing straps, fastenings, Continuity tester. | C | UMW 1 | Classroom 1 | ShowEditDestroy |
11:00 ~ 13:00 | 640P01 | 5 ~ Skimmer System - Operational Test – Setting up, pre starting checks, safety procedures, performance. | O | UMW 1 | On Board | ShowEditDestroy |
11:00 ~ 13:00 | 640P01 | 6 ~ On Board Familiarisation | O | UMW 1 | On Board | ShowEditDestroy |
Group 1 |
10:45 ~ 11:00 | 000000 | Morning Tea Break | | | | ShowEditDestroy |
13:00 ~ 14:00 | 000000 | Lunch Break | C | | | ShowEditDestroy |
14:00 ~ 14:20 | 320S01 | 6 ~ Administer oil sampling. | C | Khairul Azuadi Bin Ariffin | Classroom 1 | ShowEditDestroy |
14:20 ~ 14:35 | 320S11 | 1 ~ The Low and High Level Alarm – Activation and height levels. | O | Khairul Azuadi Bin Ariffin | Classroom 1 | ShowEditDestroy |
14:30 ~ 15:30 | 320S11 | 2 ~ On Board Familiarisation. | O | Khairul Azuadi Bin Ariffin | Classroom 1 | ShowEditDestroy |
15:15 ~ 15:30 | 000000 | Tea Break | | | | ShowEditDestroy |
16:00 ~ 17:00 | 000F02 | 6 ~ Bilges, Ballast and Internal Fi-Fi System. | C | Khairul Azuadi Bin Ariffin | Classroom 4 | ShowEditDestroy |
16:00 ~ 16:30 | 310S01 | 4 ~ Operation of the Bilge System- System arrangements of the bilges. | C | Khairul Azuadi Bin Ariffin | Classroom 1 | ShowEditDestroy |
16:00 ~ 16:30 | 310S01 | 5 ~ Operation of the Ballast system- System arrangements. | C | Khairul Azuadi Bin Ariffin | Classroom 1 | ShowEditDestroy |
16:00 ~ 17:00 | 310S01 | 6 ~ Performance of the Ballast pumps- Rate of filling the tanks and tank capacities, the resulting trim. | C | Khairul Azuadi Bin Ariffin | Classroom 1 | ShowEditDestroy |
Group 2 |
16:00 ~ 17:00 | 000F02 | 6 ~ Bilges, Ballast and Internal Fi-Fi System. | C | Khairul Azuadi Bin Ariffin | Classroom 4 | ShowEditDestroy |
Fri 02-Jun |
Group 1 |
08:30 ~ 09:30 | 620S01 | 1 ~ Working and Control Air System – Establish the Compressors and the system arrangements, for Working and Control Air. | C | Khairul Azuadi Bin Ariffin | Classroom 1 | ShowEditDestroy |
10:05 ~ 10:20 | 000000 | Morning Tea Break | | | Classroom 1 | ShowEditDestroy |
11:00 ~ 11:40 | 620S01 | 2 ~ System Operations – The Air Bottles and Driers and Distribution of the Working and the Control Air. | C | Khairul Azuadi Bin Ariffin | Classroom 1 | ShowEditDestroy |
11:40 ~ 11:55 | 620S01 | 3 ~ Connectivity - Working Air System and Control Air System. | C | Khairul Azuadi Bin Ariffin | Classroom 1 | ShowEditDestroy |
11:55 ~ 12:10 | 620S01 | 4 ~ System performance – Charging the bottles, the Air pressures. | C | Khairul Azuadi Bin Ariffin | Classroom 1 | ShowEditDestroy |
12:00 ~ 14:00 | 000000 | Friday Lunch | | | Classroom 1 | ShowEditDestroy |
14:00 ~ 14:15 | 620S01 | 5 ~ Controlling the Air Pressures. | C | Khairul Azuadi Bin Ariffin | Classroom 1 | ShowEditDestroy |
14:15 ~ 14:30 | 620S01 | 6 ~ Alarm activation – Low pressure. | C | Khairul Azuadi Bin Ariffin | Classroom 1 | ShowEditDestroy |
15:30 ~ 15:45 | 000000 | Tea Break | | | Classroom 1 | ShowEditDestroy |
16:00 ~ 17:00 | 620S11 | 1 ~ On Board Familiarisation | O | Khairul Azuadi Bin Ariffin | Classroom 1 | ShowEditDestroy |
Mon 05-Jun |
Group 3 |
09:30 ~ 10:30 | 411M02 | 1 ~ Ships Batteries and UPS: Perform Site Survey and to familirise with the overall system layout examine general conditions including to be acquinted system operating instruction prior to perform the task. | O | Damen 1 | On Board | ShowEditDestroy |
10:45 ~ 11:15 | 411M02 | 2 ~ Battery Sets: Check Charging cable insulation and physical properties. | C | Damen 1 | Classroom 3 | ShowEditDestroy |
11:15 ~ 11:35 | 411M02 | 3 ~ Ships Batteries and UPS - Measure and record electrolyte SG reading. | O | Damen 1 | On Board | ShowEditDestroy |
11:35 ~ 11:55 | 411M02 | 4 ~ Ships Batteries and UPS -Check battery voltage and charging current. | O | Damen 1 | On Board | ShowEditDestroy |
11:55 ~ 12:15 | 411M02 | 5 ~ Ships Batteries and UPS: Visual inspection and keep electrical connections and mechanical fastenings tight. | O | Damen 1 | On Board | ShowEditDestroy |
13:00 ~ 14:00 | 000000 | Lunch Break | C | | | ShowEditDestroy |
14:30 ~ 15:00 | 411M02 | 6 ~ Batteries and UPS: Check Earth bonding straps tightness and free from dirt and corrosion. | C | Damen 1 | Classroom 3 | ShowEditDestroy |
15:00 ~ 15:30 | 411M02 | 7 ~ Ships Batteries and UPS: Keep electrical connections and mechanical fastenings tight. | C | Damen 1 | Classroom 3 | ShowEditDestroy |
15:45 ~ 16:15 | 411M02 | 8 ~ Batteries and UPS: Check the ventilation and air flow in working order in both Battery spaces and UPS Cabinet-rack. | C | Damen 1 | Classroom 3 | ShowEditDestroy |
16:00 ~ 16:15 | 000000 | Tea Break | | | | ShowEditDestroy |
16:15 ~ 16:45 | 411M02 | 9 ~ Batteries and UPS: Observe safety precautions, practices and handling of hazadous material in performing the work. | C | Damen 1 | Classroom 3 | ShowEditDestroy |
16:45 ~ 17:15 | 411M02 | 10 ~ Batteries and UPS: Check and eximine the power supplies input both AC and DC are available and operational. | C | Damen 1 | Classroom 3 | ShowEditDestroy |
Group 4 |
09:30 ~ 09:50 | 370P01 | 1 ~ Visual Check and inspect for leaks in HVAC system | C | Damen 1 | Classroom 1 | ShowEditDestroy |
09:50 ~ 10:10 | 370P01 | 2 ~ Air conditioning system: Check pressure regulator for correct operations | O | Damen 1 | On Board | ShowEditDestroy |
10:10 ~ 10:25 | 370P01 | 3 ~ Air conditioning : Clean grease separator in hoods galley and pantry | O | Damen 1 | On Board | ShowEditDestroy |
10:25 ~ 10:40 | 370P01 | 4 ~ Air conditioning: Check pneumatic relays | O | Damen 1 | On Board | ShowEditDestroy |
10:55 ~ 11:10 | 370P01 | 5 ~ Air conditioning: Check fire protection flap with electro magnet device. | O | Damen 1 | On Board | ShowEditDestroy |
11:10 ~ 11:25 | 370P01 | 6 ~ Air Conditioning: Check, clean dust filter Air handling units,- Bridge, small arms store | O | Damen 1 | On Board | ShowEditDestroy |
11:25 ~ 11:40 | 370P01 | 7 ~ Air Conditioning Equipment: Check, clean dust filter Air handling units, - Ammunition, MCSR and small arms store | O | Damen 1 | On Board | ShowEditDestroy |
11:40 ~ 11:55 | 370P01 | 8 ~ Air Conditioning Equipment: Check electric motor and centrifugal fan - Various location | O | Damen 1 | On Board | ShowEditDestroy |
11:55 ~ 12:10 | 370P01 | 9 ~ Air Conditioning Equipment: Check sensors and controllers. | O | Damen 1 | On Board | ShowEditDestroy |
12:10 ~ 12:30 | 370P01 | 10 ~ Air Conditioning Equipment: Check, clean ventilation flap with pneumatic actuators. | O | Damen 1 | On Board | ShowEditDestroy |
13:30 ~ 13:45 | 370P01 | 11 ~ Air Conditioning Equipment: Check, clean non-return flap type- mechanically operated. | O | Damen 1 | On Board | ShowEditDestroy |
13:45 ~ 14:00 | 370P01 | 12 ~ Chilled water system: "Walk-Around visual Inspection ( Perform Daily Check & VI)" | O | Damen 1 | On Board | ShowEditDestroy |
14:00 ~ 14:15 | 370P01 | 13 ~ Chilled Unit: Check electrical motor and radial fan for regular operation. | O | Damen 1 | On Board | ShowEditDestroy |
14:15 ~ 14:35 | 370P01 | 14 ~ Chilled water system: Check air intakes and outlets for dirt deposits, clean if necessary. | O | Damen 1 | On Board | ShowEditDestroy |
14:35 ~ 14:50 | 370P01 | 15 ~ Emergency air-conditioning: Check for refrigerant leaks. | O | Damen 1 | On Board | ShowEditDestroy |
14:50 ~ 15:05 | 370P01 | 16 ~ Chilled water system: Check dust filter, replace if necessary. | O | Damen 1 | On Board | ShowEditDestroy |
Tue 06-Jun |
Group 1 |
08:30 ~ 08:45 | 400S01 | 1 ~ Introduction to Diesel Generation System | C | Akmal Hidayat | Classroom 1 | ShowEditDestroy |
10:15 ~ 10:30 | 400S01 | 8 ~ Shore connection - Shore Supply (SS)cables and stowage reels. | C | Akmal Hidayat | Classroom 1 | ShowEditDestroy |
10:30 ~ 10:45 | 000000 | Morning Tea Break | | | | ShowEditDestroy |
10:30 ~ 10:45 | 000000 | Morning Tea Break | | | | ShowEditDestroy |
11:00 ~ 11:15 | 400S01 | 2 ~ Emergency Generators: Daily Checklist | C | Akmal Hidayat | Classroom 1 | ShowEditDestroy |
11:15 ~ 11:30 | 400S01 | 3 ~ Emergency Generators: Instrument Panel Overview. | C | Akmal Hidayat | Classroom 1 | ShowEditDestroy |
11:30 ~ 11:45 | 400S01 | 4 ~ Emergency Generators: Oil Sampling | C | Akmal Hidayat | Classroom 1 | ShowEditDestroy |
11:45 ~ 12:00 | 400S01 | 5 ~ Emergency Generators: Visual Inspection & Troubleshooting | C | Akmal Hidayat | Classroom 1 | ShowEditDestroy |
12:00 ~ 12:15 | 400S01 | 6 ~ Emergency Generators: Check the function of Protection Panel and check protection device. | C | Akmal Hidayat | Classroom 1 | ShowEditDestroy |
12:15 ~ 12:30 | 400S01 | 7 ~ Emergency Generators - Inspect Electrical Diesel Engine Instrument Panel. | C | Akmal Hidayat | Classroom 1 | ShowEditDestroy |
12:30 ~ 12:45 | 400S01 | 9 ~ Shore Connection: SS Panels & Connection Box | C | Akmal Hidayat | Classroom 1 | ShowEditDestroy |
12:45 ~ 13:00 | 400S01 | 10 ~ Shore Connection:SOP SS connections ( Before/ After) | C | Akmal Hidayat | Classroom 1 | ShowEditDestroy |
13:00 ~ 14:00 | 000000 | Lunch Break | C | | | ShowEditDestroy |
14:00 ~ 14:30 | 430S01 | 14 ~ Ships Batteries and UPS - Check battery capacity and charging current rating | C | Akmal Hidayat | Classroom 1 | ShowEditDestroy |
14:00 ~ 14:15 | 400S01 | 11 ~ Battery Sets: Visual Inspection & Troubleshooting | C | Akmal Hidayat | Classroom 1 | ShowEditDestroy |
14:10 ~ 14:40 | 430S01 | 17 ~ Batteries and UPS - Check Ventilations layout and arrangement. | C | Akmal Hidayat | Classroom 1 | ShowEditDestroy |
14:15 ~ 14:30 | 400S01 | 12 ~ Battery Sets - Functional check of charging units and check cable any sign of damage. | C | Akmal Hidayat | Classroom 1 | ShowEditDestroy |
14:30 ~ 14:45 | 400S01 | 13 ~ UPS: Visual Check on ventilation system | C | Akmal Hidayat | Classroom 1 | ShowEditDestroy |
14:30 ~ 14:50 | 430S01 | 15 ~ Ships Batteries and UPS - Visual Inspection and Identifying components and common faults | C | Akmal Hidayat | Classroom 1 | ShowEditDestroy |
14:45 ~ 15:00 | 400S01 | 14 ~ UPS: Run Self Check (BITE) | C | Akmal Hidayat | Classroom 1 | ShowEditDestroy |
14:50 ~ 15:10 | 430S01 | 16 ~ Ships Batteries and UPS - Check and clean Earth bonding straps tightness and free from dirt and corrosion. | C | Akmal Hidayat | Classroom 1 | ShowEditDestroy |
15:00 ~ 15:15 | 400S01 | 15 ~ UPS: Clean and Inspect | C | Akmal Hidayat | Classroom 1 | ShowEditDestroy |
15:15 ~ 15:30 | 400S01 | 16 ~ UPS:Check Insulation and earthing. | C | Akmal Hidayat | Classroom 1 | ShowEditDestroy |
15:45 ~ 16:00 | 000000 | Tea Break | | | | ShowEditDestroy |
16:00 ~ 16:15 | 400S01 | 17 ~ Emergency switchboard: Visual check and clean | C | Akmal Hidayat | Classroom 1 | ShowEditDestroy |
Group 3 |
10:30 ~ 10:45 | 000000 | Morning Tea Break | | | | ShowEditDestroy |
13:00 ~ 14:00 | 000000 | Lunch Break | C | | | ShowEditDestroy |
15:35 ~ 15:50 | 000000 | Tea Break | | | | ShowEditDestroy |
Wed 07-Jun |
Group 1 |
08:30 ~ 08:50 | 430S01 | 1 ~ 230V 50Hz Panels : Visual inspection on connections | C | Akmal Hidayat | Classroom 1 | ShowEditDestroy |
08:50 ~ 09:10 | 430S01 | 2 ~ 230V 50Hz Panels : Visual inspection on Bus/Bus Layout | C | Akmal Hidayat | Classroom 1 | ShowEditDestroy |
09:10 ~ 09:30 | 430S01 | 3 ~ 230 V 50Hz Panels : Front panels of dead front switchboards: Visual inspection & clean. | C | Akmal Hidayat | Classroom 1 | ShowEditDestroy |
09:30 ~ 10:30 | 430S11 | 1 ~ Maintain - Propose” Perform Site survey, identify system layout and operating instructions. | O | Akmal Hidayat | On Board | ShowEditDestroy |
09:45 ~ 10:05 | 430S01 | 4 ~ 230 V 50Hz Panels : Check Front panels of dead front switchboards: gauges and display Instruments for correct function and calibrated. | C | Akmal Hidayat | Classroom 1 | ShowEditDestroy |
10:05 ~ 10:25 | 430S01 | 5 ~ 230 V 50Hz Panels - Run self check on BITE facilities. | C | Akmal Hidayat | Classroom 1 | ShowEditDestroy |
10:30 ~ 10:45 | 000000 | Morning Tea Break | | | | ShowEditDestroy |
10:45 ~ 12:45 | 430S11 | 2 ~ Perform Practical Site Survey and inspection on the system and components onboard. | O | Akmal Hidayat | On Board | ShowEditDestroy |
11:00 ~ 11:20 | 430S01 | 6 ~ 230V 50Hz Panels protective circuits : Visual inspection on all protective devices and relays. | C | Akmal Hidayat | Classroom 1 | ShowEditDestroy |
11:20 ~ 11:40 | 430S01 | 7 ~ 230 V 50Hz Panels : Check earth bonding connection and conditions | C | Akmal Hidayat | Classroom 1 | ShowEditDestroy |
11:30 ~ 11:45 | 000000 | Morning Tea Break | | | | ShowEditDestroy |
11:40 ~ 12:00 | 430S01 | 8 ~ 230 V 50Hz Panels - Visual and functional check the protective devices on Distribution Boxes | C | Akmal Hidayat | Classroom 1 | ShowEditDestroy |
13:15 ~ 13:30 | 450S01 | 3 ~ Transitional Lighting - Visual inspection, check sign of corrosion and moisture. | C | Akmal Hidayat | Classroom 1 | ShowEditDestroy |
13:30 ~ 14:30 | 000000 | Lunch Break | C | | | ShowEditDestroy |
14:00 ~ 14:15 | 450S01 | 5 ~ Emergency Lighting - Check Emergency Lighting Layout and fittings. | C | Akmal Hidayat | Classroom 1 | ShowEditDestroy |
14:00 ~ 14:15 | 450S11 | 3 ~ Emergency lighting - Functional check and inspection. | O | Akmal Hidayat | On Board | ShowEditDestroy |
14:15 ~ 14:30 | 450S01 | 6 ~ Emergency lighting - Functional check the lighting by compartments and system for normal and alternative supplies. | C | Akmal Hidayat | Classroom 1 | ShowEditDestroy |
15:15 ~ 15:30 | 450S01 | 7 ~ External Lighting - Visual check on fittings and general layout. | C | Akmal Hidayat | Classroom 1 | ShowEditDestroy |
15:30 ~ 15:45 | 000000 | Tea Break | | | | ShowEditDestroy |
15:45 ~ 16:00 | 450S01 | 8 ~ External lighting - Check watertight integrity at cable entry and cable gland. | C | Akmal Hidayat | Classroom 1 | ShowEditDestroy |
16:00 ~ 16:15 | 450S01 | 11 ~ Portable lighting - Earth Fault Insulation and Continuity Check. | C | Akmal Hidayat | Classroom 1 | ShowEditDestroy |
16:00 ~ 17:00 | 450S01 | 9 ~ Portable Lighting - Functional check on lighting system and General Layout. | C | Akmal Hidayat | Classroom 1 | ShowEditDestroy |
16:00 ~ 16:15 | 450S01 | 12 ~ Portable lighting - Check for watertight integrity at flab entry and switches. | C | Akmal Hidayat | Classroom 1 | ShowEditDestroy |
16:00 ~ 16:15 | 450S01 | 10 ~ Portable Lighting - Visual check on fittings | C | Akmal Hidayat | Classroom 1 | ShowEditDestroy |
Group 3 |
13:30 ~ 14:30 | 000000 | Lunch Break | C | | | ShowEditDestroy |
15:55 ~ 16:10 | 000000 | Tea Break | | | | ShowEditDestroy |
Thu 08-Jun |
Group 1 |
08:30 ~ 08:45 | 450S01 | 1 ~ General Lighting - Lighting general layout and functional checks.. | C | Akmal Hidayat | Classroom 1 | ShowEditDestroy |
08:45 ~ 09:00 | 450S01 | 2 ~ General Lighting - Check earth fault and continuity. | C | Akmal Hidayat | Classroom 1 | ShowEditDestroy |
09:00 ~ 09:15 | 450S11 | 1 ~ General Lighting Visual inspection and general Layout: and arrangement | O | Akmal Hidayat | On Board | ShowEditDestroy |
10:15 ~ 10:30 | 000000 | Morning Tea Break | | | | ShowEditDestroy |
10:45 ~ 11:00 | 450S11 | 2 ~ Transitional lighting - Functional check and inspection. | O | Akmal Hidayat | On Board | ShowEditDestroy |
11:15 ~ 11:30 | 450S11 | 4 ~ External lighting - Functional check and inspection. | O | Akmal Hidayat | On Board | ShowEditDestroy |
11:30 ~ 12:30 | 450S11 | 5 ~ Perform Practical Site Survey and inspection on the system and components onboard of Power Distribution and Lighting Systems. | O | Akmal Hidayat | On Board | ShowEditDestroy |
12:30 ~ 13:30 | 000000 | Lunch Break | C | | | ShowEditDestroy |
14:00 ~ 14:15 | 400S01 | 18 ~ Transformers:: Visual check and clean | C | Akmal Hidayat | Classroom 1 | ShowEditDestroy |
14:15 ~ 14:30 | 400S01 | 19 ~ Transformers: Visual and functional check. | C | Akmal Hidayat | Classroom 1 | ShowEditDestroy |
14:15 ~ 14:45 | 430S01 | 11 ~ Transformers - Check and clean Earth bonding straps tightness and free from dirt and corrosion. | C | Akmal Hidayat | Classroom 1 | ShowEditDestroy |
14:30 ~ 15:00 | 430S01 | 9 ~ Transformers -, Visual Inspection and check for corrosion and cleanliness. | C | Akmal Hidayat | Classroom 1 | ShowEditDestroy |
16:00 ~ 16:30 | 430S01 | 13 ~ Transformers - Keep all electrical connections and mechanical fastenings tight according to right torque and the fastenings are dry, clean and rust free. | C | Akmal Hidayat | Classroom 1 | ShowEditDestroy |
16:00 ~ 16:30 | 430S01 | 12 ~ Transformers - Check and examine the electrical properties continuity, insulation are within the acceptable limits. | C | Akmal Hidayat | Classroom 1 | ShowEditDestroy |
16:00 ~ 16:20 | 430S01 | 10 ~ Transformers - Electrical checks and troubleshooting | C | Akmal Hidayat | Classroom 1 | ShowEditDestroy |
Group 3 |
10:25 ~ 10:40 | 000000 | Morning Tea Break | | | | ShowEditDestroy |
12:20 ~ 13:20 | 000000 | Lunch Break | C | | | ShowEditDestroy |
15:30 ~ 15:45 | 000000 | Tea Break | | | | ShowEditDestroy |
Fri 09-Jun |
Group 4 |
08:30 ~ 09:30 | 000F01 | 5 ~ Emergency Station. | C | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | Classroom 4 | ShowEditDestroy |
11:00 ~ 12:00 | 000F01 | 6 ~ SOLAS Equipment and Fire Fighting Onboard. | C | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | Classroom 4 | ShowEditDestroy |
Group 3 |
10:30 ~ 10:45 | 000000 | Morning Tea Break | | | | ShowEditDestroy |
12:30 ~ 14:30 | 000000 | Friday Lunch | | | | ShowEditDestroy |
15:30 ~ 15:45 | 000000 | Tea Break | | | | ShowEditDestroy |
Group 1 |
10:40 ~ 10:55 | 000000 | Morning Tea Break | | | | ShowEditDestroy |
12:30 ~ 14:30 | 000000 | Friday Lunch | | | | ShowEditDestroy |
16:00 ~ 16:15 | 000000 | Tea Break | | | | ShowEditDestroy |
16:35 ~ 17:35 | 310S11 | 2 ~ On Board Familiarisation. | O | Khairul Azuadi Bin Ariffin | | ShowEditDestroy |
Mon 12-Jun |
Group 2 |
08:30 ~ 09:10 | 320M01 | 1 ~ Fuel Oil Transfer System: Clean and inspect – Pumps, valves, motors, control panel. | C | Damen 1 | Classroom 1 | ShowEditDestroy |
09:10 ~ 10:10 | 320M01 | 2 ~ Fuel Oil Transfer System: Start/stop Local, auto & emergency – Transfer operations, performance of pumps. | C | Damen 1 | Classroom 1 | ShowEditDestroy |
10:10 ~ 10:20 | 320M01 | 3 ~ Fuel Oil Transfer System: Clean, inspect and check insulation – Electrical equipment, Insulation tester. | C | Damen 1 | Classroom 1 | ShowEditDestroy |
Group 3 |
10:30 ~ 10:45 | 000000 | Morning Tea Break | | | | ShowEditDestroy |
Group 4 |
11:00 ~ 11:40 | 110P01 | 1 ~ Establish the arrangements - Anchor Chain and the Windlass. | C | Damen 1 | Classroom 1 | ShowEditDestroy |
11:40 ~ 12:00 | 110P01 | 3 ~ The Control Panel and Controlling the speed. | C | Damen 1 | Classroom 1 | ShowEditDestroy |
12:00 ~ 12:15 | 110P01 | 4 ~ Inspect - The Braking Mechanism and Brake Pad. | C | Damen 1 | Classroom 1 | ShowEditDestroy |
12:15 ~ 12:30 | 110P01 | 5 ~ Operate - Let Go, Heaving Anchor & Chain Stopper. | C | Damen 1 | Classroom 1 | ShowEditDestroy |
12:30 ~ 12:45 | 110P01 | 6 ~ Washing Anchor and Chain – The process. | C | Damen 1 | Classroom 1 | ShowEditDestroy |
12:45 ~ 12:55 | 110P01 | 7 ~ Oiling and Greasing the Windlass – The Procedure. | C | Damen 1 | Classroom 1 | ShowEditDestroy |
16:00 ~ 16:10 | 110P01 | 8 ~ Adherence to Safety Precautions. | O | Damen 1 | On Board | ShowEditDestroy |
16:10 ~ 16:25 | 110P01 | 2 ~ The Windlass - Functions and Operations. | O | Damen 1 | On Board | ShowEditDestroy |
16:45 ~ 18:45 | 110P01 | 9 ~ On Board Familiarisation | O | Damen 1 | On Board | ShowEditDestroy |
Group 1 |
13:00 ~ 14:00 | 000000 | Lunch Break | C | | | ShowEditDestroy |
15:30 ~ 15:45 | 000000 | Tea Break | | | | ShowEditDestroy |
Tue 13-Jun |
Group 3 |
08:30 ~ 08:50 | 330M01 | 1 ~ Clean and Inspect – Motors, air vents, cable & guards, mountings and fastenings. | C | Damen 1 | Classroom 3 | ShowEditDestroy |
08:50 ~ 09:10 | 330M01 | 2 ~ Clean and Inspect – Starters, switches, alarms and indications, mountings and cables. | C | Damen 1 | Classroom 3 | ShowEditDestroy |
09:10 ~ 09:40 | 330M01 | 3 ~ Clean and Inspect – Aux SW Pumps, valves and couplings, mountings and fastenings, indicators and alarm. | C | Damen 1 | Classroom 3 | ShowEditDestroy |
09:40 ~ 10:10 | 330M01 | 4 ~ Functional Checks – Motors and Starters, switches, Pre starting checks and safety procedures, performance checks. | C | Damen 1 | Classroom 3 | ShowEditDestroy |
10:10 ~ 10:30 | 330M01 | 5 ~ Run Pumps (SW) if not in regular use – Pre starting checks and safety procedures; performance; check operating pressures, leaks and abnormalities. | C | Damen 1 | Classroom 3 | ShowEditDestroy |
10:35 ~ 10:50 | 000000 | Morning Tea Break | | | | ShowEditDestroy |
11:00 ~ 11:20 | 330M01 | 6 ~ Clean and Inspect Heat exchangers – Thermostic control valves, temperature gauges. | C | Damen 1 | Classroom 3 | ShowEditDestroy |
11:20 ~ 11:25 | 330M01 | 7 ~ Clean and Inspect – Pump couplings, pipes and joints. | C | Damen 1 | Classroom 3 | ShowEditDestroy |
11:25 ~ 11:40 | 330M01 | 8 ~ Inspect, Clean and Check Insulation - electrical equipment cables and terminations, use of Insulation Tester. | C | Damen 1 | Classroom 3 | ShowEditDestroy |
11:40 ~ 11:50 | 330M01 | 9 ~ Inspect Earth Bonding – Motors and Starters, earthing straps and fastenings, use of Continuity tester. | C | Damen 1 | Classroom 3 | ShowEditDestroy |
11:50 ~ 12:30 | 330M01 | 10 ~ Functional Checks – SW Cooling System, system operation and performance, check temperatures and pressures, check for abnormalities. | C | Damen 1 | Classroom 3 | ShowEditDestroy |
12:50 ~ 13:50 | 000000 | Lunch Break | C | | | ShowEditDestroy |
14:00 ~ 16:00 | 330M01 | 11 ~ On Board Familiarisation. | O | Damen 1 | On Board | ShowEditDestroy |
15:25 ~ 15:40 | 000000 | Tea Break | | | | ShowEditDestroy |
Group 1 |
10:30 ~ 10:45 | 000000 | Morning Tea Break | | Caterpillar System | | ShowEditDestroy |
12:45 ~ 13:45 | 000000 | Lunch Break | C | Caterpillar System | | ShowEditDestroy |
Wed 14-Jun |
Group 2 |
08:30 ~ 09:00 | 320M01 | 4 ~ Fuel Oil Purifier: Clean and inspect – Control panel, pump, motor, valve. | C | Damen 1 | Classroom 1 | ShowEditDestroy |
09:00 ~ 09:05 | 320M01 | 7 ~ Fuel Oil Purifier: Inspect earth bonding – Earthing strap, Continuity tester. | C | Damen 1 | Classroom 1 | ShowEditDestroy |
09:05 ~ 09:35 | 320M01 | 8 ~ Fuel Oil Supply System: Day tanks, purified FO to consumers, water and sludge line, valves, overflow line. | C | Damen 1 | Classroom 1 | ShowEditDestroy |
09:35 ~ 10:05 | 320M01 | 9 ~ Cargo Handling Fuel Oil System: Clean and Inspect – Bunkering points, Control panel. | C | Damen 1 | Classroom 1 | ShowEditDestroy |
10:05 ~ 10:20 | 320M01 | 10 ~ Cargo Handling Fuel Oil System: Inspect after use – Safety procedures, and procedure after after use. | C | Damen 1 | Classroom 1 | ShowEditDestroy |
10:20 ~ 10:35 | 320M01 | 11 ~ Check and inspect: Day tank and water trap – sight glass, alarms an activation. | C | Damen 1 | Classroom 1 | ShowEditDestroy |
11:00 ~ 11:15 | 341M01 | 1 ~ Fresh Water Supply System: Clean & Inspect - Motors, starters, cables and terminations, mountings and fastenings. | C | Damen 1 | Classroom 1 | ShowEditDestroy |
11:15 ~ 11:55 | 341M01 | 2 ~ Fresh Water Supply System: Functional Checks Motors & Starters - Pre starting checks, performance and abnormalities. | C | Damen 1 | Classroom 1 | ShowEditDestroy |
11:55 ~ 12:35 | 341M01 | 3 ~ Fresh Water Supply System: Clean & Inspect - Pumps & Outfits; couplings, valves, filters, gauges, pipes and fastenings. | C | Damen 1 | Classroom 1 | ShowEditDestroy |
12:35 ~ 12:45 | 341M01 | 4 ~ Fresh Water Supply System: Clean, Inspect and Check Insulation – cables & terminations | C | Damen 1 | Classroom 1 | ShowEditDestroy |
12:45 ~ 12:50 | 341M01 | 5 ~ Fresh Water Supply System: Inspect - Earth Bonding. | C | Damen 1 | Classroom 1 | ShowEditDestroy |
12:50 ~ 13:10 | 341M01 | 7 ~ Fresh Water Supply System: Run Pump if not in regular use – Pre starting checks, check performance, leaks, abnormalities. | C | Damen 1 | Classroom 1 | ShowEditDestroy |
14:00 ~ 14:15 | 320M01 | 5 ~ Fuel Oil Purifier: Functional checks – Health checks using the Control panel. | O | Damen 1 | On Board | ShowEditDestroy |
14:15 ~ 14:25 | 320M01 | 6 ~ Fuel Oil Purifier: Clean, inspect and check insulation – Electrical equipment, cables and termination, Insulation tester. | O | Damen 1 | On Board | ShowEditDestroy |
14:25 ~ 18:25 | 320M01 | 12 ~ On Board Familiarisation. | O | Damen 1 | On Board | ShowEditDestroy |
16:00 ~ 16:15 | 341M01 | 6 ~ Fresh Water Supply System: Clean & Inspect - Pressure Control Switch. | O | Damen 1 | On Board | ShowEditDestroy |
Group 3 |
09:30 ~ 09:50 | 371M01 | 20 ~ Emergency air-conditioning: Check condenser water drain valve. | C | Damen 1 | Classroom 3 | ShowEditDestroy |
09:50 ~ 10:10 | 371M01 | 21 ~ Emergency air-conditioning: Check wetness indicator of sight glass. | C | Damen 1 | Classroom 3 | ShowEditDestroy |
10:10 ~ 10:30 | 371M01 | 22 ~ Check cooling seawater regulating valve. | C | Damen 1 | Classroom 3 | ShowEditDestroy |
10:30 ~ 10:45 | 000000 | Morning Tea Break | | Damen 1 | | ShowEditDestroy |
10:45 ~ 11:05 | 371M01 | 24 ~ Emergency air-conditioning: Check dust filter, replace if necessary. | C | Damen 1 | Classroom 3 | ShowEditDestroy |
11:05 ~ 11:25 | 371M01 | 25 ~ Emergency air-conditioning: Check centrifugal fan motor and all electrical connections. | C | Damen 1 | Classroom 3 | ShowEditDestroy |
11:25 ~ 11:45 | 371M01 | 26 ~ Safety and Handling - Observe safety precaution and practices, handling of hazadous materials when performing the work. | C | Damen 1 | Classroom 3 | ShowEditDestroy |
12:00 ~ 13:00 | 000000 | Lunch Break | C | | | ShowEditDestroy |
13:00 ~ 13:20 | 371M01 | 23 ~ Emergency air-conditioning: Check all shut-off valves. | O | Damen 1 | On Board | ShowEditDestroy |
13:20 ~ 15:20 | 371M01 | 27 ~ Air Conditioning and Ventilation: Practical Site Survey and Inspection on the System and Components onboard. | O | Damen 1 | On Board | ShowEditDestroy |
15:20 ~ 15:35 | 000000 | Tea Break | | | | ShowEditDestroy |
Group 1 |
10:40 ~ 10:55 | 000000 | Morning Tea Break | | | | ShowEditDestroy |
11:00 ~ 11:30 | 340S01 | 1 ~ The FW Supply & FW Supply System Accommodation – Establish the system arrangements. | C | Damen 1 | On Board | ShowEditDestroy |
11:30 ~ 12:00 | 340S01 | 2 ~ Process of filling/Supply to FW tanks – The FW Cargo Handling system, the Reverse Osmosis Systems and the Hydrophore, their functions and operations. | C | Damen 1 | On Board | ShowEditDestroy |
12:00 ~ 12:30 | 340S01 | 3 ~ RO systems – Production rate, managing the Chemicals and the Backwash. | C | Damen 1 | On Board | ShowEditDestroy |
12:30 ~ 12:40 | 340S01 | 4 ~ Administer water sampling. | C | Damen 1 | On Board | ShowEditDestroy |
12:40 ~ 13:00 | 340S01 | 5 ~ FW Supply System Accommodation – FW circulation and pumps, Distribution to consumers and Equipment on board | C | Damen 1 | On Board | ShowEditDestroy |
13:25 ~ 14:25 | 000000 | Lunch Break | C | | | ShowEditDestroy |
16:00 ~ 16:20 | 340S01 | 6 ~ Establish Tanks capacities, Flow rate and time period of filling or transfer. | O | Damen 1 | On Board | ShowEditDestroy |
16:15 ~ 16:30 | 000000 | Tea Break | | | | ShowEditDestroy |
16:20 ~ 16:50 | 340S01 | 7 ~ The Hot Water System – Production, circulation, temperature control and distribution to consumers. | C | Damen 1 | On Board | ShowEditDestroy |
16:50 ~ 17:50 | 340S01 | 8 ~ On Board Familiarisation. | O | Damen 1 | On Board | ShowEditDestroy |
Thu 15-Jun |
Group 1 |
08:30 ~ 09:50 | 734S01 | 1 ~ Daily users check: ILS modules and configurations, Password and Data entry. | C | Enigma 1 | Classroom 1 | ShowEditDestroy |
09:50 ~ 10:10 | 734S01 | 2 ~ Data Cleansing. | C | Enigma 1 | Classroom 1 | ShowEditDestroy |
10:10 ~ 10:25 | 734S01 | 3 ~ Clean and Inspect: Monitor, keyboard, server, UPS, power plugs. | C | Enigma 1 | Classroom 1 | ShowEditDestroy |
10:45 ~ 11:00 | 000000 | Morning Tea Break | | | | ShowEditDestroy |
11:00 ~ 11:40 | 734S01 | 4 ~ Types of templates, Data Generation, Data Analysis. | C | Enigma 1 | Classroom 1 | ShowEditDestroy |
11:40 ~ 11:50 | 734S01 | 5 ~ Clean, inspect and check insulation: Insulation properties, Set up Insulation testing, Insulation tester. | C | Enigma 1 | Classroom 1 | ShowEditDestroy |
12:30 ~ 14:30 | 000000 | Friday Lunch | | | | ShowEditDestroy |
14:00 ~ 15:00 | 734S01 | 6 ~ On Board Familiarisation | O | Enigma 1 | On Board | ShowEditDestroy |
16:30 ~ 16:45 | 000000 | Tea Break | | | | ShowEditDestroy |
Group 4 |
10:40 ~ 10:55 | 000000 | Morning Tea Break | | | | ShowEditDestroy |
12:30 ~ 13:30 | 000000 | Lunch Break | C | | | ShowEditDestroy |
15:05 ~ 15:20 | 000000 | Tea Break | | Damen 1 | | ShowEditDestroy |
Fri 16-Jun |
Group 2 |
09:30 ~ 10:00 | 400M01 | 1 ~ Initial Step- Examine the general conditions and operational status prior to perform the tasks. | C | Caterpillar 1 | Classroom 1 | ShowEditDestroy |
10:00 ~ 10:20 | 400M01 | 2 ~ Diesel Generator - Visual inspection for leaks and signs of loose connections. | C | Caterpillar 1 | Classroom 1 | ShowEditDestroy |
10:20 ~ 10:50 | 400M01 | 3 ~ Diesel generators - Perform Daily Checks and Inspection iaw PMS and service routine. | C | Caterpillar 1 | Classroom 1 | ShowEditDestroy |
10:50 ~ 11:05 | 000000 | Tea Break | | | Classroom 1 | ShowEditDestroy |
11:05 ~ 11:25 | 400M01 | 4 ~ Diesel generators: Check Fuel System Primary Filter and drain as necessary. | C | Caterpillar 1 | Classroom 1 | ShowEditDestroy |
11:25 ~ 11:45 | 400M01 | 6 ~ Diesel generators: Check the Governor Actuator Linkage | C | Caterpillar 1 | Classroom 1 | ShowEditDestroy |
11:45 ~ 12:05 | 400M01 | 7 ~ Diesel generators: Check the condition of Governor Actuator Linkage. | C | Caterpillar 1 | Classroom 1 | ShowEditDestroy |
12:05 ~ 12:35 | 400M01 | 8 ~ Diesel generators: Test the Cooling Syst. Supplemental Cool. Additive (SCA) | C | Caterpillar 1 | Classroom 1 | ShowEditDestroy |
12:35 ~ 14:35 | 000000 | Friday Lunch | | | | ShowEditDestroy |
14:35 ~ 15:05 | 400M01 | 10 ~ Diesel generators: Check and examine DG Protection devices. | C | Caterpillar 1 | Classroom 1 | ShowEditDestroy |
15:05 ~ 15:25 | 400M01 | 11 ~ Diesel generators: Examine and clean the Oil Mist Detector free from dirt and corrosion | C | Caterpillar 1 | Classroom 1 | ShowEditDestroy |
15:25 ~ 15:45 | 400M01 | 12 ~ Diesel generators : Clean and Inspect. the Magnetic Pick Ups | C | Caterpillar 1 | Classroom 1 | ShowEditDestroy |
15:45 ~ 16:00 | 000000 | Tea Break | | | | ShowEditDestroy |
16:00 ~ 16:30 | 400M01 | 13 ~ Diesel generators: Examine and replacement of DG Oil Filters | C | Caterpillar 1 | Classroom 1 | ShowEditDestroy |
16:30 ~ 16:50 | 400M01 | 5 ~ Diesel generators: Inspect the condition of Zinc Rod | O | Caterpillar 1 | On Board | ShowEditDestroy |
16:50 ~ 17:10 | 400M01 | 9 ~ Diesel generators: Check starting Motor conditions and clean as necessary. | O | Caterpillar 1 | On Board | ShowEditDestroy |
17:10 ~ 17:40 | 400M01 | 14 ~ Diesel generators: Inspect the DG mountings for signs of damage and vulcanised | O | Caterpillar 1 | On Board | ShowEditDestroy |
Group 4 |
10:30 ~ 10:45 | 000000 | Tea Break | | | | ShowEditDestroy |
12:30 ~ 14:30 | 000000 | Friday Lunch | | | | ShowEditDestroy |
Mon 19-Jun |
Group 1 |
08:30 ~ 09:00 | 691S01 | 1 ~ Fin Stabilizer - Examine the general conditions, and system functional prior to performing the task. | C | Kongsberg 1 | Classroom 1 | ShowEditDestroy |
09:00 ~ 09:30 | 691S01 | 2 ~ Fin Stabilizer - Check Fluid Levels are in acceptable limits and utilise correct grade of fluids. | C | Kongsberg 1 | Classroom 1 | ShowEditDestroy |
09:30 ~ 10:00 | 691S01 | 3 ~ Fin Stabilizer - Perform Lubricating Oil Test using test kit and hydraulic fluids crackle and cleanliness test. | C | Kongsberg 1 | Classroom 1 | ShowEditDestroy |
10:00 ~ 10:30 | 691S01 | 4 ~ Fin Stabilizer - Inspect Fins Stabiliser System operation and functions. | C | Kongsberg 1 | Classroom 1 | ShowEditDestroy |
11:00 ~ 12:00 | 691S01 | 6 ~ Fin Stabilizer - Visual check and Inspections of the electrical components of Steering Gear HPU motor and controller. | C | Kongsberg 1 | Classroom 1 | ShowEditDestroy |
12:00 ~ 12:30 | 691S01 | 7 ~ Fin Stabilizer - Visual inspection on Control valves and instruments for sign of defects and abnormalities. | C | Kongsberg 1 | Classroom 1 | ShowEditDestroy |
12:30 ~ 13:00 | 691S01 | 8 ~ Fin Stabilizer - Obtain Lubricating Oil Sample for analysis and diagnostic - for CBM. | C | Kongsberg 1 | Classroom 1 | ShowEditDestroy |
14:00 ~ 14:30 | 691S01 | 5 ~ Fin Stabilizer - Perform Functional test and operation using of manual hand pump for maintenance and emergency. | O | Kongsberg 1 | On Board | ShowEditDestroy |
14:30 ~ 15:00 | 691S01 | 9 ~ Fin Stabilizer - Safety and Handling - Observe safety precaution and practices, handling of hazardous materials when performing the work. | O | Kongsberg 1 | On Board | ShowEditDestroy |
16:00 ~ 17:30 | 691S01 | 10 ~ Fin Stabilizer - Practical Site Survey and Inspection on the System and Components onboard. | O | Kongsberg 1 | On Board | ShowEditDestroy |
Group 2 |
09:30 ~ 09:50 | 400M01 | 15 ~ Diesel Generators: Examine and clean the Fuel System Primary Filter. | C | Caterpillar 1 | Classroom 1 | ShowEditDestroy |
09:50 ~ 10:10 | 400M01 | 16 ~ DG - Check and lubricate Barring device | C | Caterpillar 1 | Classroom 1 | ShowEditDestroy |
10:10 ~ 10:30 | 400M01 | 17 ~ DG: Examine and lubricate Prelube Pump | C | Caterpillar 1 | Classroom 1 | ShowEditDestroy |
10:30 ~ 10:45 | 000000 | Morning Tea Break | | | | ShowEditDestroy |
10:45 ~ 11:15 | 400M01 | 18 ~ DG: Examine Fuel System Secondary Filter - Change Element. | C | Caterpillar 1 | Classroom 1 | ShowEditDestroy |
11:15 ~ 11:45 | 400M01 | 20 ~ Emergency Diesel Generator ( EDG): Inspect Electrical EDG Instrument Panel. | C | Caterpillar 1 | Classroom 1 | ShowEditDestroy |
11:45 ~ 12:15 | 400M01 | 21 ~ EDG: Perform daily checks i.a.w PMS and Checklist | C | Caterpillar 1 | Classroom 1 | ShowEditDestroy |
12:15 ~ 12:35 | 400M01 | 23 ~ EDG: Fuel System Primary Filter - Drain. | C | Caterpillar 1 | Classroom 1 | ShowEditDestroy |
12:35 ~ 12:55 | 400M01 | 24 ~ EDG: Check the EDG Lube Oil Level within the tolerence. | C | Caterpillar 1 | Classroom 1 | ShowEditDestroy |
12:55 ~ 13:55 | 000000 | Lunch Break | C | | | ShowEditDestroy |
13:55 ~ 14:15 | 400M01 | 25 ~ EDG: Fuel System Primary Filter/Water Separator Drain | C | Caterpillar 1 | Classroom 1 | ShowEditDestroy |
14:15 ~ 14:35 | 400M01 | 26 ~ EDG: Engine - Inspect for leaks and loose connection. | C | Caterpillar 1 | Classroom 1 | ShowEditDestroy |
14:35 ~ 14:55 | 400M01 | 27 ~ EDG: Inspect Hoses and Clamps for leaks and tightness | C | Caterpillar 1 | Classroom 1 | ShowEditDestroy |
14:55 ~ 15:15 | 400M01 | 28 ~ EDG: Fuel Tank Water and Sediment - Drain | C | Caterpillar 1 | Classroom 1 | ShowEditDestroy |
15:15 ~ 15:35 | 400M01 | 30 ~ EDG: Governor Actuator Linkage - Check the conditions.. | C | Caterpillar 1 | Classroom 1 | ShowEditDestroy |
15:35 ~ 15:50 | 400M01 | 31 ~ EDG - Check electrolyte level within acceptable limit. | C | Caterpillar 1 | Classroom 1 | ShowEditDestroy |
15:50 ~ 16:05 | 000000 | Tea Break | | | | ShowEditDestroy |
16:05 ~ 16:25 | 400M01 | 19 ~ DG: Inspect the Exhaust Piping and system. | O | Caterpillar 1 | On Board | ShowEditDestroy |
16:25 ~ 16:55 | 400M01 | 22 ~ EDG: Walk-around and visual inspection | O | Caterpillar 1 | On Board | ShowEditDestroy |
16:55 ~ 17:15 | 400M01 | 29 ~ EDG: Check Fan clearence and no obstructions | O | Caterpillar 1 | On Board | ShowEditDestroy |
Group 4 |
10:30 ~ 10:45 | 000000 | Morning Tea Break | | | | ShowEditDestroy |
12:35 ~ 13:35 | 000000 | Lunch Break | C | | | ShowEditDestroy |
15:15 ~ 15:35 | 822M01 | 96 ~ 18 .Antenna Radiator - Check for dirt and cracks on the radiator surface clean and repair as necessary. | C | Sinor Marine Technologies 1 | Classroom 4 | ShowEditDestroy |
15:35 ~ 15:50 | 000000 | Tea Break | | | | ShowEditDestroy |
Tue 20-Jun |
Group 3 |
08:30 ~ 08:40 | 360M01 | 1 ~ Lubrication System: Clean and Inspect – Motor & Starters, control panel, level switches | C | Damen 1 | Classroom 3 | ShowEditDestroy |
08:40 ~ 09:10 | 360M01 | 2 ~ Lubrication System: Clean and Inspect – Pumps and outfits, valves, filters, pipes, gauges. | C | Damen 1 | Classroom 3 | ShowEditDestroy |
09:10 ~ 09:30 | 360M01 | 3 ~ Lubrication System: Functional Checks – Motors and Starters, Pre starting checks and safety procedures, Control Panel and Alarm settings. | O | Damen 1 | On Board | ShowEditDestroy |
09:30 ~ 10:10 | 360M01 | 4 ~ Lubrication System: Functional Checks – Pumps and outfits, Pre starting checks and safety procedures, Filling point, Supply to consumers, check functionalities at control positions | C | Damen 1 | Classroom 3 | ShowEditDestroy |
10:10 ~ 10:20 | 360M01 | 5 ~ Lubrication System: LO Filter and Drainage – Clean, inspect for good operations. | C | Damen 1 | Classroom 3 | ShowEditDestroy |
10:20 ~ 10:25 | 360M01 | 6 ~ Lubrication System: Clean, inspect and check insulation - Motor Starters Control Panel , cables and terminations. | C | Damen 1 | Classroom 3 | ShowEditDestroy |
10:25 ~ 10:30 | 360M01 | 7 ~ Lubrication System: Inspect earth bonding - Motor and starters, Earthing straps and fastening. | C | Damen 1 | Classroom 3 | ShowEditDestroy |
11:00 ~ 11:20 | 360M01 | 9 ~ Dirty - Oil System: DO Pump – Run pump if not in regular use: Pre starting checks and safety procedures, Inspect various operations, Check performance, abnormalities. | C | Damen 1 | Classroom 3 | ShowEditDestroy |
11:20 ~ 11:40 | 360M01 | 10 ~ Dirty-Oil System: Functional Checks - DO Pump motor: Pre starting checks, and safety procedures, Check FW valves, inspect for various operations. | C | Damen 1 | Classroom 3 | ShowEditDestroy |
11:40 ~ 11:50 | 360M01 | 11 ~ Dirty-Oil System: Clean, Inspect and insulation - DO Pump (Motor and starters), Control Panel, cables and termination, Insulation Tester. | C | Damen 1 | Classroom 3 | ShowEditDestroy |
11:45 ~ 12:05 | 360M01 | 8 ~ Dirty-Oil System: Clean and Inspect - Pump, Motor and starter, Safety valves, Filters, Drain plug, Level switches. | C | Damen 1 | Classroom 3 | ShowEditDestroy |
11:50 ~ 11:55 | 360M01 | 12 ~ Dirty-Oil System: Inspect Earth Bonding- DO Pump (Motor and starters), Earthing straps and fastening, Continuity Tester. | O | Damen 1 | Classroom 3 | ShowEditDestroy |
11:55 ~ 13:55 | 360M01 | 13 ~ On Board Familiarisation | O | Damen 1 | On Board | ShowEditDestroy |
Group 2 |
09:30 ~ 09:45 | 400M01 | 32 ~ EDG: Obtain or collect coolant sample (level1) | C | Caterpillar 1 | Classroom 1 | ShowEditDestroy |
09:45 ~ 10:00 | 400M01 | 34 ~ EDG: Test Cooling Syst. Supplemental Cool. Additive (SCA) | C | Caterpillar 1 | Classroom 1 | ShowEditDestroy |
10:00 ~ 10:15 | 400M01 | 36 ~ EDG: Check EDG moutings for crack, vulcanised and sign of damage | C | Caterpillar 1 | Classroom 1 | ShowEditDestroy |
10:15 ~ 10:30 | 000000 | Morning Tea Break | | | | ShowEditDestroy |
10:30 ~ 10:45 | 400M01 | 33 ~ EDG: Check EDG Protection devices. | O | Caterpillar 1 | On Board | ShowEditDestroy |
10:45 ~ 11:15 | 400M01 | 35 ~ EDG H500: Check, or replace Filters and Elements: Engine Oil - Fuel Filter,Fuel System primary and Secondary and Engine Air Cleaner Element (Single Element) | O | Caterpillar 1 | On Board | ShowEditDestroy |
11:15 ~ 13:15 | 400M01 | 37 ~ DG & EDG: Practical Site Survey and Inspection on the System and Components onboard. | O | Caterpillar 1 | On Board | ShowEditDestroy |
13:15 ~ 14:15 | 000000 | Lunch Break | C | | | ShowEditDestroy |
14:15 ~ 14:35 | 411M01 | 1 ~ Diesel Generators (DG) and Emergency (EDG): Examine the general conditions and system operation before start to perform the task. | C | Caterpillar 1 | Classroom 1 | ShowEditDestroy |
14:35 ~ 14:55 | 411M01 | 2 ~ DG and EDG: Check Fuel System Primary Filter and Drain. | C | Caterpillar 1 | Classroom 1 | ShowEditDestroy |
14:55 ~ 15:15 | 411M01 | 3 ~ DG and EDG: Perform Daily Checks as stipulated in PMS and service instruction. | C | Caterpillar 1 | Classroom 1 | ShowEditDestroy |
15:15 ~ 15:35 | 411M01 | 4 ~ DG and EDG: Check Oil Mist Detector for operation and cleanliness. | C | Caterpillar 1 | Classroom 1 | ShowEditDestroy |
15:35 ~ 15:50 | 000000 | Tea Break | | | | ShowEditDestroy |
15:50 ~ 16:05 | 411M01 | 5 ~ DG and EDG: Inspect DE Instrument Panel for cleanliness, functionalities and any signs of abnormilities. | C | Caterpillar 1 | Classroom 1 | ShowEditDestroy |
16:05 ~ 16:25 | 411M01 | 6 ~ DG and EDG: Examine and Inspect for leaks and loose connection. | C | Caterpillar 1 | Classroom 1 | ShowEditDestroy |
16:25 ~ 16:45 | 411M01 | 7 ~ DG and EDG: Cooling Syst. Supplemental Cool. Additive (SCA) - Test. | C | Caterpillar 1 | Classroom 1 | ShowEditDestroy |
16:45 ~ 17:05 | 411M01 | 8 ~ DG and EDG: Check and examine Governor Actuator Linkage for looseness, misalignment and stiffness. | C | Caterpillar 1 | Classroom 1 | ShowEditDestroy |
17:05 ~ 17:20 | 411M01 | 9 ~ DG and EDG: : Inspect crankshaft vibration damper. | C | Caterpillar 1 | Classroom 1 | ShowEditDestroy |
Group 4 |
09:30 ~ 10:30 | 824M01 | 1 ~ Examine the general physical conditions of the system/Equipment and Principle of operation prior to perform any task. | O | Sinor Marine Technologies 1 | On Board | ShowEditDestroy |
10:30 ~ 10:45 | 000000 | Morning Tea Break | | | | ShowEditDestroy |
10:45 ~ 11:15 | 824M01 | 2 ~ Perform daily checks including Start up, running and shutdown procedures. | C | Sinor Marine Technologies 1 | Classroom 4 | ShowEditDestroy |
11:15 ~ 11:45 | 824M01 | 4 ~ Clean and inspect panel from dirt and dust. | C | Sinor Marine Technologies 1 | Classroom 4 | ShowEditDestroy |
11:45 ~ 12:15 | 824M01 | 5 ~ Battery System Inspect and replace backup battery should the battery capacity falls below limits. | C | Sinor Marine Technologies 1 | Classroom 4 | ShowEditDestroy |
12:15 ~ 12:30 | 824M01 | 6 ~ Above Deck Equipment Antennas - Visual inspection for any signs of salt deposit, dirt and water. clean and preserve. | C | Sinor Marine Technologies 1 | Classroom 4 | ShowEditDestroy |
12:35 ~ 13:35 | 000000 | Lunch Break | C | | | ShowEditDestroy |
13:35 ~ 13:55 | 824M01 | 7 ~ Check operation from Remote (ICS and INS Network) and Local Positions. | C | Sinor Marine Technologies 1 | Classroom 4 | ShowEditDestroy |
13:55 ~ 14:10 | 824M01 | 8 ~ Connectors - Check that connectors on the rear panel are firmly tightened and free of rust. | C | Sinor Marine Technologies 1 | Classroom 4 | ShowEditDestroy |
14:10 ~ 14:40 | 824M01 | 10 ~ Check that battery voltage is sufficient and fully charged and terminal are clean and free from rust. | C | Sinor Marine Technologies 1 | Classroom 4 | ShowEditDestroy |
14:40 ~ 14:55 | 824M01 | 11 ~ Antenna Unit - Keep all electrical connections and mechanical fastenings tight according to right torque, and the fastenings are dry, clean and rust free. | C | Sinor Marine Technologies 1 | Classroom 4 | ShowEditDestroy |
14:55 ~ 15:10 | 824M01 | 13 ~ LCD ambient temperature and humidity - Maintain cooling and ventilation for ambient temperature and humidity. | C | Sinor Marine Technologies 1 | Classroom 4 | ShowEditDestroy |
15:10 ~ 15:25 | 824M01 | 14 ~ LCD Display - Clean and wipe the LCD display with soft cloth to remove dirt salt deposit. | C | Sinor Marine Technologies 1 | Classroom 4 | ShowEditDestroy |
15:25 ~ 15:40 | 824M01 | 15 ~ Protective Device - Fuse is to protect over voltage and short circuit current and may be replaced with specified rating and size. | C | Sinor Marine Technologies 1 | Classroom 4 | ShowEditDestroy |
15:40 ~ 15:55 | 000000 | Tea Break | | | | ShowEditDestroy |
15:55 ~ 16:15 | 824M01 | 3 ~ Antennas - Check, Inspection and clean and preserve. | O | Sinor Marine Technologies 1 | On Board | ShowEditDestroy |
16:15 ~ 16:30 | 824M01 | 9 ~ Earth bonding Straps - Check that the ground system is free of rust and the ground wire is tightly fastened. | O | Sinor Marine Technologies 1 | On Board | ShowEditDestroy |
16:30 ~ 16:50 | 824M01 | 12 ~ Antenna Unit - Perform cleaning and remove dust, dirt and rust with detergent, do not use chemical cleaner or solvent. | O | Sinor Marine Technologies 1 | On Board | ShowEditDestroy |
16:50 ~ 17:05 | 824M01 | 16 ~ Self check and BITE - Check the ROM, RAM, input /output data, GPS Core, Beacon, Keyboard and LCD performance. | C | Sinor Marine Technologies 1 | On Board | ShowEditDestroy |
17:05 ~ 17:20 | 824M01 | 17 ~ Inspect and test the equipment at sufficient intervals to make sure that the equipment is in operating condition. | C | Sinor Marine Technologies 1 | On Board | ShowEditDestroy |
17:20 ~ 18:20 | 824M01 | 18 ~ Perform Practical Site Survey and inspection of the system and components onboard. | O | Sinor Marine Technologies 1 | On Board | ShowEditDestroy |
Wed 21-Jun |
Group 3 |
08:30 ~ 09:00 | 310M01 | 8 ~ Stripping (oily-bilge) system (S oily-bilge S): Functional checks – Control Panel, Pre starting checks, Suction and discharge valves. | C | Damen 1 | Classroom 3 | ShowEditDestroy |
08:30 ~ 08:35 | 310M01 | 11 ~ Drip Trays: Clean & Inspect – Hose and tray | C | Damen 1 | Classroom 3 | ShowEditDestroy |
08:30 ~ 08:40 | 310M01 | 9 ~ Functional checks – Control Panel, Pre starting checks, Suction and discharge valves. | O | Damen 1 | On Board | ShowEditDestroy |
08:30 ~ 08:40 | 310M01 | 10 ~ Bilge water separator: Clean Y filters – Remove and re-reinstall. | C | Damen 1 | Classroom 3 | ShowEditDestroy |
08:30 ~ 08:50 | 310M01 | 1 ~ Bilge System: Clean and Inspect ( Motors & Starter) – Motors and starters, cables and termination, mounting and fastenings. | C | Damen 1 | Classroom 3 | ShowEditDestroy |
08:30 ~ 08:40 | 310M01 | 7 ~ Clean and Inspect (Air line) – Control air, valves, air line, and gauges. | C | Damen 1 | Classroom 3 | ShowEditDestroy |
08:50 ~ 09:30 | 310M01 | 2 ~ Bilge System: Functional Checks: Pumps, motors, pneumatic valve, ejectors; Prestarting checks, Control panel performance and abnormalities | C | Damen 1 | Classroom 3 | ShowEditDestroy |
09:30 ~ 09:50 | 310M01 | 3 ~ Bilge System (pumps): Clean and Inspect – Pumps, strainer and filters, valves. | C | Damen 1 | Classroom 3 | ShowEditDestroy |
09:50 ~ 10:00 | 310M01 | 4 ~ Clean, inspect and check Insulation (Motors & Starters): Control panel, cables and termination, Insulation tester. | C | Damen 1 | Classroom 3 | ShowEditDestroy |
10:00 ~ 10:05 | 310M01 | 5 ~ Inspect Earth Bonding (Motors & Starters): Control Panel, Continuity Tester. | C | Damen 1 | Classroom 3 | ShowEditDestroy |
10:05 ~ 10:25 | 310M01 | 6 ~ Stripping (oily-bilge) system (S oily-bilge S): Clean &Inspect (Stripping oily-bilge pump) – Pumps, strainers, hoses. | C | Damen 1 | Classroom 3 | ShowEditDestroy |
11:00 ~ 11:10 | 310M01 | 18 ~ Emergency FF pumps: Functional Checks with GS Pumps – Pre starting checks and safety procedures, performance of GS pumps with Emergency FF pumps. | O | Damen 1 | On Board | ShowEditDestroy |
14:00 ~ 14:10 | 310M01 | 12 ~ BWS Pumps and outfit: Clean and Inspect – Pumps, motors, Control Panel, valves. | O | Damen 1 | On Board | ShowEditDestroy |
14:10 ~ 14:40 | 310M01 | 13 ~ BWS Functional Checks – Pre starting checks and safety procedures, managing ballast water. | C | Damen 1 | Classroom 3 | ShowEditDestroy |
14:15 ~ 14:20 | 310M01 | 21 ~ GS Pumps (Motors & Starters): Inspect earth bonding – Earthing straps and fastenings. | O | Damen 1 | On Board | ShowEditDestroy |
14:40 ~ 14:50 | 310M01 | 14 ~ BWS – Clean, inspect and check insulation – Control panel,motors, cables and terminations, Insulation tester. | C | Damen 1 | Classroom 3 | ShowEditDestroy |
14:50 ~ 14:55 | 310M01 | 15 ~ BWS – Inspect earth bonding : Earthing straps, fastenings, continuity tester. | C | Damen 1 | Classroom 3 | ShowEditDestroy |
14:55 ~ 15:55 | 310M01 | 16 ~ GS Pumps & Outfit: Clean and inspect – Pumps, motors, Control Panel, valves, associated fittings. | C | Damen 1 | Classroom 3 | ShowEditDestroy |
15:50 ~ 16:20 | 310M01 | 17 ~ GS Pumps and Outfit: Functional checks – Pre starting checks and safety procedures, performance, bilge and ballast functions. | C | Damen 1 | Classroom 3 | ShowEditDestroy |
16:00 ~ 20:00 | 310M01 | 22 ~ On Board Familiarisation. | O | Damen 1 | On Board | ShowEditDestroy |
16:20 ~ 16:30 | 310M01 | 19 ~ GS Pumps and outfit: Clean, insect and check insulation – Electrical Equipment, Cables and terminations, Insulation Tester. | C | Damen 1 | Classroom 1 | ShowEditDestroy |
16:30 ~ 17:00 | 310M01 | 20 ~ Fire hydrant and spray: Clean and inspect – Hydrant, spray, nozzles, hoses, loose fittings. | C | Damen 1 | Classroom 3 | ShowEditDestroy |
Group 2 |
09:30 ~ 10:00 | 411M01 | 10 ~ DG and EDG: Engine Oil Filter - Change. | C | Caterpillar 1 | Classroom 1 | ShowEditDestroy |
10:00 ~ 10:30 | 411M01 | 11 ~ DG and EDG: Inspect DG Instrument Panel. | C | Caterpillar 1 | Classroom 1 | ShowEditDestroy |
10:30 ~ 10:45 | 000000 | Morning Tea Break | | | | ShowEditDestroy |
10:45 ~ 11:15 | 411M01 | 12 ~ DG and EDG: Cooling Syst. Supplemental Cool. Additive (SCA) - Test. | C | Caterpillar 1 | Classroom 1 | ShowEditDestroy |
11:15 ~ 11:30 | 411M01 | 13 ~ DG and EDG: Engine Protection devices - Check. | C | Caterpillar 1 | Classroom 1 | ShowEditDestroy |
11:30 ~ 11:45 | 411M01 | 14 ~ DG and EDG: Obtain Diesel Generators Oil Sample. | C | Caterpillar 1 | Classroom 1 | ShowEditDestroy |
11:45 ~ 12:00 | 411M01 | 15 ~ DG and EDG: Check Starting Motor connections tightness and signs of abnormilities. | C | Caterpillar 1 | Classroom 1 | ShowEditDestroy |
12:00 ~ 12:15 | 411M01 | 16 ~ DG and EDG: Check Battery and charging unit charging current and float voltage in good working condition. Battery are fully charged. | C | Caterpillar 1 | Classroom 1 | ShowEditDestroy |
12:15 ~ 12:35 | 411M01 | 17 ~ DG and EDG: Examine and check Engine Mounts for signs of abnormilities damage and vulcanised. | C | Caterpillar 1 | Classroom 1 | ShowEditDestroy |
12:35 ~ 13:35 | 000000 | Lunch Break | C | | | ShowEditDestroy |
13:35 ~ 15:35 | 411M01 | 18 ~ Electrical Plant - Generators: Practical Site Survey and inspection on the system and components onboard. | O | Caterpillar 1 | On Board | ShowEditDestroy |
15:35 ~ 15:50 | 000000 | Tea Break | | | | ShowEditDestroy |
15:50 ~ 16:20 | 745M01 | 1 ~ MC & PCS - Examine the general conditions, and system functional prior to performing any task. | C | Caterpillar 1 | Classroom 1 | ShowEditDestroy |
16:20 ~ 16:50 | 745M01 | 2 ~ Machinery Control and Propulsion Control Systems (MC & PCS): Check condition and functionality of Display Panel and Indicating Lights including LED. | C | Caterpillar 1 | Classroom 1 | ShowEditDestroy |
16:50 ~ 17:20 | 745M01 | 3 ~ MC & PCS - Check condition of Electronic devices and LRUs. | C | Caterpillar 1 | Classroom 1 | ShowEditDestroy |
Group 4 |
09:30 ~ 10:00 | 825M01 | 1 ~ Examine the general layout conditions of Gyro Units and operation prior to perform the task. | C | Sinor Marine Technologies 1 | Classroom 4 | ShowEditDestroy |
10:00 ~ 10:20 | 825M01 | 2 ~ Operator unit - functional checks free from dirt, dust and sign of corrosion including the pelorous position. | C | Sinor Marine Technologies 1 | Classroom 4 | ShowEditDestroy |
10:20 ~ 10:40 | 825M01 | 3 ~ Operator unit - functional checks including starting up- running and shut-down. | C | Sinor Marine Technologies 1 | Classroom 4 | ShowEditDestroy |
10:40 ~ 10:55 | 000000 | Morning Tea Break | | | | ShowEditDestroy |
10:55 ~ 11:25 | 825M01 | 4 ~ Perform visual check on the Master Unit for sign of noise, vibration and failure. Clean the external unit free from dust and moisture. | C | Sinor Marine Technologies 1 | Classroom 4 | ShowEditDestroy |
11:25 ~ 11:55 | 825M01 | 5 ~ Run self check and BITE at control panel and check Gyro Failure alarm. | C | Sinor Marine Technologies 1 | Classroom 4 | ShowEditDestroy |
11:55 ~ 12:10 | 825M01 | 6 ~ Check the the main power supply and back up input to the Gyro Units are in good order. | C | Sinor Marine Technologies 1 | Classroom 4 | ShowEditDestroy |
12:10 ~ 12:30 | 825M01 | 7 ~ Functional checks the electrical part of the Gyro repeater units and check sign of corrosion and watertight integrity. | C | Sinor Marine Technologies 1 | Classroom 4 | ShowEditDestroy |
12:30 ~ 13:30 | 000000 | Lunch Break | C | | | ShowEditDestroy |
13:30 ~ 13:50 | 825M01 | 8 ~ Visual check ventilation and cooling facility maintaining ambient temperature in Gyro room in good order. | C | Sinor Marine Technologies 1 | Classroom 4 | ShowEditDestroy |
13:50 ~ 14:10 | 825M01 | 9 ~ Observe safety precautions and practices cleanliness, corrosion control and preservation at all time when performing the task. | C | Sinor Marine Technologies 1 | Classroom 4 | ShowEditDestroy |
14:10 ~ 15:40 | 825M01 | 10 ~ Practical Site Survey and inspection on the system and components onboard. | O | Sinor Marine Technologies 1 | On Board | ShowEditDestroy |
15:40 ~ 15:55 | 000000 | Tea Break | | | | ShowEditDestroy |
15:55 ~ 16:10 | 829M01 | 1 ~ Control and Display Unit- Clean and inspect externally | O | Sinor Marine Technologies 1 | Classroom 4 | ShowEditDestroy |
16:10 ~ 16:30 | 829M01 | 2 ~ Speed Log - Self test the system with BITE. | O | Sinor Marine Technologies 1 | Classroom 4 | ShowEditDestroy |
16:30 ~ 16:50 | 829M01 | 3 ~ Speed Log - Clean and inspect EM Log Sensor free from corrosion and dirt. | O | Sinor Marine Technologies 1 | Classroom 4 | ShowEditDestroy |
Thu 22-Jun |
Group 2 |
09:30 ~ 10:00 | 745M01 | 4 ~ MC & PCS - Check cooling or ventilation fan operation and no obstruction of air flow. | C | Caterpillar 1 | Classroom 1 | ShowEditDestroy |
10:00 ~ 10:30 | 745M01 | 5 ~ MC & PCS - Check sensing, audible and visual devices fitted and installed in the alarm, safety, and warning systems. | C | Caterpillar 1 | Classroom 1 | ShowEditDestroy |
10:30 ~ 10:45 | 000000 | Morning Tea Break | | | | ShowEditDestroy |
10:45 ~ 11:15 | 745M01 | 6 ~ MC & PCS - Clean external and Internal surfaces of console free from dirt, moisture and sign of corrosion for the console cabinet. | C | Caterpillar 1 | Classroom 1 | ShowEditDestroy |
11:15 ~ 11:45 | 745M01 | 7 ~ MC & PCS - Check input main and back-up power supply. Inspect terminal blocks,circuit breakers and protective devices. | C | Caterpillar 1 | Classroom 1 | ShowEditDestroy |
11:45 ~ 12:15 | 745M01 | 8 ~ MC & PCS - Clean panel free from dust, dirt and corrosion. Perform cleanliness and preservation as necessary. | C | Caterpillar 1 | Classroom 1 | ShowEditDestroy |
12:15 ~ 12:45 | 745M01 | 10 ~ MC & PCS - Check earth grounding straps for continuity and tightness. | C | Caterpillar 1 | Classroom 1 | ShowEditDestroy |
12:45 ~ 13:45 | 000000 | Lunch Break | C | | Classroom 1 | ShowEditDestroy |
13:45 ~ 14:15 | 745M01 | 9 ~ MC & PCS - Inspect cable installation for loose connections and clean cable bundles free from dirt, duct and moisture. | C | Caterpillar 1 | Classroom 1 | ShowEditDestroy |
14:15 ~ 14:45 | 745M01 | 11 ~ PC-PCS Safety and Handling - Observe Pre checks, safety procedures and practices, handling of hazardous materials when performing the work before, during and after performing the task. | C | Caterpillar 1 | Classroom 1 | ShowEditDestroy |
14:45 ~ 15:00 | 000000 | Tea Break | | | Classroom 1 | ShowEditDestroy |
15:00 ~ 17:00 | 745M01 | 12 ~ MC-PCS - Practical Site Survey and inspection on the system and components onboard. | O | Caterpillar 1 | On Board | ShowEditDestroy |
Group 4 |
09:30 ~ 10:00 | 828M01 | 1 ~ Examine the general layout conditions and system operation prior to perform the task. | O | Sinor Marine Technologies 1 | On Board | ShowEditDestroy |
10:00 ~ 10:30 | 828M01 | 2 ~ Visual Check of Echo sounder cable connections between Display unit, Transmitter/Receiver (TX/RX) are intact and are not kink. | O | Sinor Marine Technologies 1 | On Board | ShowEditDestroy |
10:30 ~ 10:45 | 000000 | Morning Tea Break | | | | ShowEditDestroy |
10:45 ~ 11:05 | 828M01 | 3 ~ Display Unit - Clean and remove dust, dirt, moisture on the Display Unit. | C | Sinor Marine Technologies 1 | Classroom 4 | ShowEditDestroy |
11:05 ~ 11:35 | 828M01 | 5 ~ Power Supply - Check the condition of power supplies input AC and DC supplies are available and connected to the system. | C | Sinor Marine Technologies 1 | Classroom 4 | ShowEditDestroy |
11:35 ~ 12:05 | 828M01 | 6 ~ Battery - Check function of the LP of AC and DC supplies are good working order free from defect. | C | Sinor Marine Technologies 1 | Classroom 4 | ShowEditDestroy |
12:05 ~ 12:35 | 828M01 | 8 ~ Replacing the Fuse. The fuse in the power cable protects the system from reverse polarity of the power supply and equipment fault. | C | Sinor Marine Technologies 1 | Classroom 4 | ShowEditDestroy |
12:35 ~ 13:35 | 000000 | Lunch Break | C | | | ShowEditDestroy |
13:35 ~ 14:05 | 828M01 | 4 ~ Run Self Test or BITE to monitor starting , running and shutting down. | O | Sinor Marine Technologies 1 | On Board | ShowEditDestroy |
14:05 ~ 14:35 | 828M01 | 7 ~ Observe cleanliness, corrosion control and preservation at all time when performing the task. | O | Sinor Marine Technologies 1 | On Board | ShowEditDestroy |
14:35 ~ 16:05 | 828M01 | 9 ~ Practical Site Survey and inspection on the system and components onboard. | O | Sinor Marine Technologies 1 | On Board | ShowEditDestroy |
16:05 ~ 16:20 | 000000 | Tea Break | | | | ShowEditDestroy |
Group 1 |
14:30 ~ 14:45 | 450S01 | 4 ~ Transitional Lighting - Functional check the lighting by compartments and system. | C | Akmal Hidayat | Classroom 1 | ShowEditDestroy |
Group 3 |
14:30 ~ 15:10 | 650M01 | 1 ~ Flight Deck FF System (Foam System) - Clean and Inspect Externally: Hydrants, monitors, foam tank and applicator, fire man suits, Hoses, and loose fittings. | C | Damen 1 | On Board | ShowEditDestroy |
15:10 ~ 15:25 | 650M01 | 2 ~ Flight Deck FF System (Foam System) - Functional checks: Pre-starting checks and safety procedures. | C | Damen 1 | On Board | ShowEditDestroy |
15:25 ~ 15:55 | 650M01 | 3 ~ Flight Deck FF System (Foam System) - Operational Checks: Pre starting checks, safety and operational procedures, performance | C | Damen 1 | On Board | ShowEditDestroy |
16:10 ~ 16:50 | 650M01 | 4 ~ Clean And Inspect: Engine driven pump,monitors, valves, hoses, nozzles, control panel | C | Damen 1 | On Board | ShowEditDestroy |
16:50 ~ 17:05 | 650M01 | 5 ~ Operational Check: Pre starting checks and safety procedures, Running with s’tbd ME | C | Damen 1 | On Board | ShowEditDestroy |
17:05 ~ 17:25 | 650M01 | 6 ~ Fire Hoses-Clean, Inspect and Pressure Testing: Setting up pressure test, procedure after use. | C | Damen 1 | On Board | ShowEditDestroy |
Fri 23-Jun |
Group 3 |
08:30 ~ 09:00 | 222M01 | 1 ~ Steering Gear: Examine the general conditions of steering gear and system functional prior to perform the task. | C | Van Der Velden | Classroom 3 | ShowEditDestroy |
09:00 ~ 09:30 | 222M01 | 2 ~ Steering Gear: Inspect Steering Gear System for leaks, loose connection and any sign of corrosions or damage. | C | Van Der Velden | Classroom 3 | ShowEditDestroy |
09:30 ~ 10:30 | 210M01 | 1 ~ CPP - Examine the general layout conditions and system operation prior to perform the task. | O | Caterpillar 1 | On Board | ShowEditDestroy |
09:30 ~ 10:00 | 222M01 | 3 ~ Steering Gear System: Perform Functional test and operation using emergency hand pump. | C | Van Der Velden | Classroom 3 | ShowEditDestroy |
10:00 ~ 10:30 | 222M01 | 4 ~ Steering Gear System: Obtain Hydraulic Oil Sample for analysis and screening. | C | Van Der Velden | Classroom 3 | ShowEditDestroy |
10:30 ~ 10:45 | 000000 | Morning Tea Break | | | | ShowEditDestroy |
10:45 ~ 11:05 | 210M01 | 2 ~ Perform Daily Checks: Walk around and survey visually to examine the general conditions and system operation. | C | Caterpillar 1 | Classroom 3 | ShowEditDestroy |
11:05 ~ 11:25 | 210M01 | 3 ~ Check operation from Remote and Local and Emergency Positions. | O | Caterpillar 1 | On Board | ShowEditDestroy |
11:25 ~ 11:45 | 210M01 | 4 ~ Check and maintain the oil level in the hydraulic tank of the system. | O | Caterpillar 1 | On Board | ShowEditDestroy |
11:45 ~ 12:05 | 210M01 | 5 ~ CPP - Observe safety precaution,practices and clealiness in performing the work at all time. | O | Caterpillar 1 | On Board | ShowEditDestroy |
12:05 ~ 12:25 | 210M01 | 6 ~ Keep all electrical connections and mechanical fastenings tight according to right torque. and the fastenings are dry, clean and rust free. | C | Caterpillar 1 | Classroom 3 | ShowEditDestroy |
12:30 ~ 14:30 | 000000 | Friday Lunch | | | | ShowEditDestroy |
14:00 ~ 14:15 | 222M01 | 5 ~ Measure the wear of journal bearing. | O | Van Der Velden | On Board | ShowEditDestroy |
14:15 ~ 14:30 | 222M01 | 6 ~ Inspect Electrical Components. | O | Van Der Velden | On Board | ShowEditDestroy |
14:30 ~ 15:00 | 222M01 | 7 ~ Steering Gear System: Check fluid levels is sufficient and acceptable limit refill or replace if necessary iaw OEM manual. | C | Van Der Velden | Classroom 3 | ShowEditDestroy |
14:30 ~ 14:50 | 210M01 | 7 ~ Power Supply and Services: Check power services are available before start the operation. | C | Caterpillar 1 | Classroom 3 | ShowEditDestroy |
14:50 ~ 15:10 | 210M01 | 8 ~ Inspect and test the equipment at sufficient intervals to make sure that the equipment is in operating condition. | C | Caterpillar 1 | Classroom 3 | ShowEditDestroy |
15:00 ~ 15:30 | 222M01 | 8 ~ Steering Gear: Inspect Steering Gear System for any signs of abnormalities and undue noise and vibration. | C | Van Der Velden | Classroom 3 | ShowEditDestroy |
15:10 ~ 15:25 | 000000 | Tea Break | | | | ShowEditDestroy |
15:25 ~ 17:25 | 210M01 | 9 ~ Perform Practical Site Survey and inspection of the system and components onboard. | O | Caterpillar 1 | On Board | ShowEditDestroy |
16:00 ~ 16:30 | 222M01 | 9 ~ Steering Gear: Examine Pre starting and shut down checks and Safety Procedures before, during and after performing the task. | C | Van Der Velden | Classroom 3 | ShowEditDestroy |
16:30 ~ 18:30 | 222M01 | 10 ~ Steering Gear: Practical Site survey and Inspection on the System and Components onboard. | O | Van Der Velden | On Board | ShowEditDestroy |
Group 2 |
10:30 ~ 10:45 | 000000 | Morning Tea Break | | | | ShowEditDestroy |
12:35 ~ 14:35 | 000000 | Friday Lunch | | | | ShowEditDestroy |
15:45 ~ 16:00 | 000000 | Tea Break | | | | ShowEditDestroy |
16:25 ~ 16:40 | 000000 | Tea Break | | | | ShowEditDestroy |
Mon 26-Jun |
Group 3 |
09:30 ~ 10:00 | 211M01 | 1 ~ Engine - Inspect for leaks and loose connection. | O | Caterpillar 1 | On Board | ShowEditDestroy |
10:00 ~ 10:15 | 211M01 | 2 ~ Inspect PDE Instrument Panel. | C | Caterpillar 1 | Classroom 3 | ShowEditDestroy |
10:15 ~ 10:30 | 211M01 | 3 ~ Fuel System Primary Filter - Drain. | O | Caterpillar 1 | On Board | ShowEditDestroy |
10:30 ~ 10:45 | 211M01 | 4 ~ Zinc Rod - Inspect. | O | Caterpillar 1 | On Board | ShowEditDestroy |
10:45 ~ 11:00 | 000000 | Morning Tea Break | | | | ShowEditDestroy |
11:00 ~ 11:15 | 211M01 | 5 ~ Engine Mounts - Inspect. | O | Caterpillar 1 | On Board | ShowEditDestroy |
11:15 ~ 11:45 | 211M01 | 6 ~ Cooling Syst. Supplemental Cool. Additive (SCA) - Test. | O | Caterpillar 1 | On Board | ShowEditDestroy |
11:45 ~ 12:00 | 211M01 | 7 ~ Obtain PDE Engine Oil Sample. | O | Caterpillar 1 | On Board | ShowEditDestroy |
12:00 ~ 12:30 | 211M01 | 8 ~ Engine Protection devices - Check. | O | Caterpillar 1 | On Board | ShowEditDestroy |
12:30 ~ 12:45 | 211M01 | 9 ~ Perform Daily Checks. | O | Caterpillar 1 | On Board | ShowEditDestroy |
12:45 ~ 13:45 | 000000 | Lunch Break | C | | | ShowEditDestroy |
13:45 ~ 14:00 | 211M01 | 10 ~ Magnetic Pick Ups - Clean and Inspect. | O | Caterpillar 1 | On Board | ShowEditDestroy |
14:00 ~ 14:15 | 211M01 | 11 ~ Prelube Pump - Lubricate. | O | Caterpillar 1 | On Board | ShowEditDestroy |
14:15 ~ 14:45 | 211M01 | 12 ~ Governor Actuator Linkage - Check. | O | Caterpillar 1 | On Board | ShowEditDestroy |
14:45 ~ 15:05 | 211M01 | 13 ~ Inspect Exhaust Piping | O | Caterpillar 1 | On Board | ShowEditDestroy |
15:05 ~ 15:25 | 211M01 | 14 ~ Fuel System Primary Filter - Clean. | O | Caterpillar 1 | On Board | ShowEditDestroy |
15:25 ~ 15:40 | 211M01 | 15 ~ Fuel System Secondary Filter - Change Element. | O | Caterpillar 1 | On Board | ShowEditDestroy |
15:40 ~ 15:55 | 000000 | Tea Break | | | | ShowEditDestroy |
Group 1 |
10:30 ~ 10:45 | 000000 | Morning Tea Break | | | | ShowEditDestroy |
12:35 ~ 13:35 | 000000 | Lunch Break | C | | | ShowEditDestroy |
15:30 ~ 15:45 | 000000 | Tea Break | | | | ShowEditDestroy |
Group 2 |
10:30 ~ 10:45 | 000000 | Morning Tea Break | | | | ShowEditDestroy |
Tue 27-Jun |
Group 1 |
08:30 ~ 09:00 | 800S01 | 1 ~ Examine the general conditions and of SAAB Integrated Communication System (ICS) - TactiCall system networks functional status prior to perform the tasks ( Physical and dynamic). | C | Morten Jepsen | Classroom 1 | ShowEditDestroy |
09:00 ~ 09:30 | 800S01 | 2 ~ Functional check of the overall External Communication system networks and sub-system. | C | Morten Jepsen | Classroom 1 | ShowEditDestroy |
09:30 ~ 10:00 | 800S01 | 3 ~ HF Radio System - Functional check of the from Local (Communication Room) and various remote positions. | C | Morten Jepsen | Classroom 1 | ShowEditDestroy |
10:00 ~ 10:15 | 000000 | Morning Tea Break | | | Classroom 1 | ShowEditDestroy |
10:00 ~ 10:30 | 800S01 | 4 ~ Fleet Broadband FFB - Functional check both Local (Communication Room) and various remote positions. | C | Morten Jepsen | Classroom 1 | ShowEditDestroy |
10:30 ~ 10:45 | 000000 | Morning Tea Break | | | | ShowEditDestroy |
11:00 ~ 11:30 | 800S01 | 5 ~ V/UHF Radio System - Functional check of the from Local (Communication Room) and various remote positions. | C | Morten Jepsen | Classroom 1 | ShowEditDestroy |
11:30 ~ 12:00 | 800S01 | 6 ~ V/HF Radio System - Perform Routine test with BITE (Built In Test Equipment) without radiating signals in Transmitter TX, Receiver, Power and Antennas modules accordance with relevant IMO circulars. | C | Morten Jepsen | Classroom 1 | ShowEditDestroy |
12:00 ~ 12:30 | 800S01 | 7 ~ HF Transceiver System - Perform Weekly routine check on The Antenna Tuning Unit. | O | Morten Jepsen | On Board | ShowEditDestroy |
12:15 ~ 13:15 | 000000 | Lunch Break | C | | | ShowEditDestroy |
12:30 ~ 13:00 | 800S01 | 8 ~ MF/HF radio’s display - GPS is connected, check the position and time in the MF/HF radio’s display. | C | Morten Jepsen | Classroom 1 | ShowEditDestroy |
13:15 ~ 13:45 | 870S01 | 1 ~ Barometer/hermometer/hygrometer - Examine the general conditions and system functional prior to performing the task. | C | Damen 1 | On Board | ShowEditDestroy |
13:45 ~ 14:15 | 870S01 | 2 ~ Barometer/hermometer/hygrometer - Visual inspection of the unit and clean as necessary. | C | Damen 1 | On Board | ShowEditDestroy |
14:00 ~ 14:30 | 800S01 | 9 ~ MF/HF DSC Live test call with a Maritime Communications Station Send a DSC call to the appropriate coast station. The acknowledgement from the coast station is received by the 2187.5 kHz watch receiver if the call was sent on that frequency. If the call is sent on HF only the audio signal output from the 2187.5 kHz watch receiver should be checked. | C | Morten Jepsen | Classroom 1 | ShowEditDestroy |
14:15 ~ 14:45 | 870S01 | 3 ~ Barometer/hermometer/hygrometer - Check and clean the exposed part and sight glass as necessary. | O | Damen 1 | On Board | ShowEditDestroy |
14:30 ~ 15:00 | 800S01 | 10 ~ DSC routine testing - Check the DSC function regularly. Verify the complete DSC installation, with antennas, by transmitting a Safety Test call to another station (coast or ship). The test call is generated using the DSC call flow via menu. | C | Morten Jepsen | Classroom 1 | ShowEditDestroy |
14:45 ~ 15:15 | 870S01 | 4 ~ Barometer/hermometer/hygrometer - Check and clean the station annually. | O | Damen 1 | On Board | ShowEditDestroy |
15:00 ~ 15:30 | 800S01 | 11 ~ Internal Communication - Intercom: Visual Check the terminal and display. Free from dirt and dust. | C | Morten Jepsen | Classroom 1 | ShowEditDestroy |
15:15 ~ 15:45 | 870S01 | 5 ~ Barometer/hermometer/hygrometer - Visual inspection of the unit and clean as necessary. | O | Damen 1 | On Board | ShowEditDestroy |
15:30 ~ 15:45 | 000000 | Tea Break | | | | ShowEditDestroy |
15:45 ~ 16:00 | 000000 | Tea Break | | | | ShowEditDestroy |
16:00 ~ 16:30 | 800S01 | 12 ~ Internal Communication Intercom - User level system Check for functionality. | C | Morten Jepsen | Classroom 1 | ShowEditDestroy |
16:00 ~ 16:30 | 870S01 | 6 ~ Anemometer - Check cabling and cable support for any sign of damage and corrosion. | O | Damen 1 | On Board | ShowEditDestroy |
16:30 ~ 17:00 | 800S01 | 13 ~ Internal Communication - Public Address system: Visual Check and Cleaning of Units. | C | Morten Jepsen | Classroom 1 | ShowEditDestroy |
16:30 ~ 17:00 | 870S01 | 7 ~ Anemometer - Check mounting conditions and earthing strap connection, re tighten if necessary. | C | Damen 1 | On Board | ShowEditDestroy |
17:00 ~ 17:30 | 870S01 | 9 ~ Anemometer - Check mounting for sign of corrosion and re tighten fasteners if necessary. | C | Damen 1 | On Board | ShowEditDestroy |
17:30 ~ 18:00 | 870S01 | 8 ~ Anemometer - Run self test or BITE for normal operation. | C | Damen 1 | On Board | ShowEditDestroy |
Group 3 |
11:50 ~ 12:05 | 000000 | Morning Tea Break | | | | ShowEditDestroy |
12:05 ~ 13:05 | 000000 | Lunch Break | C | | | ShowEditDestroy |
13:05 ~ 13:25 | 212M02 | 1 ~ Reduction Gears: Examine the general conditions and system operation of Reduction Gears prior to perform the task. | C | Caterpillar 1 | Classroom 3 | ShowEditDestroy |
13:25 ~ 13:40 | 212M02 | 2 ~ Reduction gear system - Clean heat exchanger. | O | Caterpillar 1 | On Board | ShowEditDestroy |
13:40 ~ 13:55 | 212M02 | 3 ~ Reduction gear system- Check threaded connections. | O | Caterpillar 1 | On Board | ShowEditDestroy |
13:55 ~ 14:10 | 212M02 | 4 ~ Reduction gear system - Perform an oil change and replace oil filter. | O | Caterpillar 1 | On Board | ShowEditDestroy |
14:10 ~ 14:30 | 212M02 | 5 ~ Reduction Gears: Visual Check for pipes and hoses connections for leaks. | C | Caterpillar 1 | Classroom 3 | ShowEditDestroy |
14:30 ~ 14:50 | 212M02 | 6 ~ Examine the conditions of the external parts are free from dirt, oil leaks and any sign of corrosion. | C | Caterpillar 1 | Classroom 3 | ShowEditDestroy |
14:50 ~ 15:10 | 212M02 | 7 ~ Reduction Gears - Pre checks and Safety Procedures before, during and after performing the task. | C | Caterpillar 1 | Classroom 3 | ShowEditDestroy |
15:10 ~ 15:25 | 000000 | Tea Break | | | | ShowEditDestroy |
15:25 ~ 15:45 | 212M02 | 8 ~ Reduction Gears: Safety and Handling - Observe safety precaution and practices, handling of hazardous materials when performing the work. | C | Caterpillar 1 | Classroom 3 | ShowEditDestroy |
15:45 ~ 17:15 | 212M02 | 9 ~ Reduction Gears: Practical Site Survey and Inspection on the Reduction Gears System and Components onboard. | O | Caterpillar 1 | On Board | ShowEditDestroy |
Group 2 |
13:00 ~ 14:00 | 000000 | Lunch Break | C | | | ShowEditDestroy |
Wed 28-Jun |
Group 1 |
08:30 ~ 09:00 | 800S01 | 14 ~ Internal Communication - Public Address system (PAGA - Visual Check, Inspect earth bonding Units and clean as necessary. | O | Morten Jepsen | On Board | ShowEditDestroy |
09:00 ~ 09:30 | 800S01 | 15 ~ Internal Communication - Public Address system:- Inspect earth bondingand straps, fasterners tightness and corrosion free. | C | Morten Jepsen | Classroom 1 | ShowEditDestroy |
09:30 ~ 10:00 | 870S01 | 10 ~ Weather fax - Functional check power supply connection in good working order. | O | Damen 1 | On Board | ShowEditDestroy |
09:30 ~ 10:00 | 800S01 | 16 ~ Internal Communication - Wireless VHF Communication: Check the system visually and check correct function of charger unit. | C | Morten Jepsen | Classroom 1 | ShowEditDestroy |
10:00 ~ 10:30 | 800S01 | 17 ~ Internal Communication - Wireless VHF Communication: Visual Check RBS Panel and clean as necessary. | C | Morten Jepsen | Classroom 1 | ShowEditDestroy |
10:00 ~ 10:30 | 870S01 | 11 ~ Weather fax - Check above deck unit -pre- amp is clean and free form dirt and salt deposit. | C | Damen 1 | On Board | ShowEditDestroy |
10:30 ~ 10:45 | 000000 | Morning Tea Break | | | | ShowEditDestroy |
10:45 ~ 11:15 | 870S01 | 12 ~ Weather fax - Run system check using BITE facility or self test. | O | Damen 1 | On Board | ShowEditDestroy |
11:00 ~ 11:30 | 800S01 | 18 ~ Internal Communication - Wireless VHF Communication: Check Earth bonding at RBS. | C | Morten Jepsen | Classroom 1 | ShowEditDestroy |
11:15 ~ 11:45 | 870S01 | 13 ~ Weather fax - Ensure the cable interconnection between receiver unit, pre-amp and connection hub are correctly terminated. | O | Damen 1 | On Board | ShowEditDestroy |
11:30 ~ 12:00 | 800S01 | 19 ~ Internal Communication - Internal telephone system: Visually Check control panel / Front panel free from dirt and moisture and corrosion. | C | Morten Jepsen | Classroom 1 | ShowEditDestroy |
11:45 ~ 13:45 | 870S01 | 14 ~ Wind & Meteorological System - Practical Site Survey and inspection on the system and components onboard. | O | Damen 1 | On Board | ShowEditDestroy |
12:00 ~ 12:30 | 800S01 | 20 ~ Internal Communication - Internal telephone system - Visual Check for loose connection and free from dirt. | C | Morten Jepsen | Classroom 1 | ShowEditDestroy |
12:30 ~ 13:00 | 800S01 | 21 ~ Internal Communication - CCTV system: Visual Check and free from dust and ingress of water. | C | Morten Jepsen | Classroom 1 | ShowEditDestroy |
13:45 ~ 14:45 | 000000 | Lunch Break | C | | | ShowEditDestroy |
14:00 ~ 14:30 | 800S01 | 22 ~ Internal Communication - CCTV system: Check earth bonding and cable gland. | C | Morten Jepsen | Classroom 1 | ShowEditDestroy |
14:30 ~ 15:00 | 800S01 | 23 ~ Internal Communication - Sound Powered Telephone: Check the installation completeness and functional check. | C | Morten Jepsen | Classroom 1 | ShowEditDestroy |
14:45 ~ 15:25 | 333S01 | 1 ~ SW Cooling System – Establish system arrangements, the suction and overboard discharge. | C | Damen 1 | On Board | ShowEditDestroy |
15:00 ~ 15:30 | 800S01 | 24 ~ Internal Communication - Sound Powered Telephone: Check earth bonding and cable gland watertightness integrity. | C | Morten Jepsen | Classroom 1 | ShowEditDestroy |
15:25 ~ 15:40 | 333S01 | 2 ~ Operation of the SW Cooling and the Heat Exchangers, the Low Temp and High Temp Coolers. | C | Damen 1 | On Board | ShowEditDestroy |
15:40 ~ 15:55 | 000000 | Morning Tea Break | | | | ShowEditDestroy |
15:55 ~ 16:05 | 333S01 | 3 ~ System Performance – Temperature and Pressures. | C | Damen 1 | On Board | ShowEditDestroy |
16:05 ~ 16:35 | 333S01 | 4 ~ Fresh Cooling Water System – Establish system arrangements, the FW circulation and Heat Exchangers. | C | Damen 1 | On Board | ShowEditDestroy |
16:30 ~ 17:00 | 800S01 | 25 ~ Internal Communication - Homing Beacon: Visual inspection and clean and inspect externally. | C | Morten Jepsen | Classroom 1 | ShowEditDestroy |
16:35 ~ 16:50 | 333S01 | 5 ~ System Operation - The Circulation Pumps and the system operation. | C | Damen 1 | On Board | ShowEditDestroy |
16:50 ~ 17:00 | 333S01 | 6 ~ Circulating Pumps – Controlling the pumps. | C | Damen 1 | On Board | ShowEditDestroy |
17:00 ~ 17:10 | 333S01 | 7 ~ System performance – Temperature and pressures. | C | Damen 1 | On Board | ShowEditDestroy |
Group 3 |
09:30 ~ 10:30 | 212M03 | 1 ~ Perform Site Survey and to familiarise with the overall system and examine general conditions including to be acquainted system operation prior to perform the task. | O | Caterpillar 1 | On Board | ShowEditDestroy |
10:30 ~ 10:45 | 000000 | Morning Tea Break | | | | ShowEditDestroy |
10:45 ~ 11:15 | 212M03 | 2 ~ Flexible Coupling - Inspect on the fasteners and coupling Elements for signs of cracks or stiffness. | C | Caterpillar 1 | Classroom 3 | ShowEditDestroy |
11:15 ~ 11:35 | 212M03 | 3 ~ Flexible Coupling - Perform visual check and inspection prior to sailing and after sailing for signs of leaks or abnormalities. | C | Caterpillar 1 | Classroom 3 | ShowEditDestroy |
11:35 ~ 11:50 | 212M03 | 4 ~ Visual inspection for sign of damage and vulcanised | O | Caterpillar 1 | Classroom 3 | ShowEditDestroy |
11:50 ~ 12:10 | 212M03 | 5 ~ Coupling - Examine general layout and system installation and operation. | C | Caterpillar 1 | Classroom 3 | ShowEditDestroy |
12:10 ~ 12:40 | 212M03 | 6 ~ Keep all electrical connections and mechanical fastenings tight according to right torque. and the fastenings are dry, clean and rust free. | C | Caterpillar 1 | Classroom 3 | ShowEditDestroy |
12:40 ~ 13:40 | 000000 | Lunch Break | C | | | ShowEditDestroy |
13:40 ~ 14:00 | 212M03 | 7 ~ Inspect and test the equipment at sufficient intervals to make sure that the equipment is in operating condition. | O | Caterpillar 1 | Classroom 3 | ShowEditDestroy |
14:00 ~ 16:00 | 212M03 | 8 ~ Practical Survey and Inspection on the UAV System and Components onboard. | O | Caterpillar 1 | On Board | ShowEditDestroy |
Thu 29-Jun |
Group 3 |
09:30 ~ 10:30 | 213M01 | 1 ~ Perform Site Survey to familiarise with the overall system layout and examine general conditions, initiation of the standard operating instruction prior to perform the task. | O | Caterpillar 1 | On Board | ShowEditDestroy |
10:30 ~ 10:45 | 000000 | Morning Tea Break | | | | ShowEditDestroy |
10:45 ~ 11:05 | 213M01 | 2 ~ Check oil level in the thrust bearing header tank. | C | Caterpillar 1 | Classroom 1 | ShowEditDestroy |
11:05 ~ 11:25 | 213M01 | 3 ~ Check and clean Earth bonding straps tightness and free from dirt and corrosion. | C | Caterpillar 1 | Classroom 1 | ShowEditDestroy |
11:25 ~ 11:45 | 213M01 | 4 ~ Check water level in the tank. | C | Caterpillar 1 | Classroom 1 | ShowEditDestroy |
11:45 ~ 12:05 | 213M01 | 5 ~ Shaft Bonding Device: Keep equipment clean and dry free from dirt, salt deposit, and corrosion. | C | Caterpillar 1 | Classroom 1 | ShowEditDestroy |
12:05 ~ 12:25 | 213M01 | 6 ~ Keep all electrical connections and mechanical fastenings tight according to right torque. and the fastenings are dry, clean and rust free. | C | Caterpillar 1 | Classroom 1 | ShowEditDestroy |
12:25 ~ 12:45 | 213M01 | 7 ~ Inspect and test the equipment at sufficient intervals to make sure that the equipment is in operating condition. | C | Caterpillar 1 | Classroom 1 | ShowEditDestroy |
12:45 ~ 13:45 | 000000 | Lunch Break | C | | | ShowEditDestroy |
13:45 ~ 14:05 | 213M01 | 8 ~ Observe safety precautions, practices and handling of hazardous material in performing the work , particularly in shaft confined space and oily. | C | Caterpillar 1 | Classroom 1 | ShowEditDestroy |
14:05 ~ 16:05 | 213M01 | 9 ~ Perform Practical Site Survey and inspection of the system and components onboard. | O | Caterpillar 1 | On Board | ShowEditDestroy |
Fri 30-Jun |
Group 3 |
09:30 ~ 10:00 | 620M01 | 1 ~ Compressors Check Oil Level (Working and Control Air ) – Types and characteristics, Oil flow, the type of LO, sight glass. | S | Atlas Copco 1 | Classroom 3 | ShowEditDestroy |
10:00 ~ 10:20 | 620M01 | 2 ~ Clean and Inspect ( Electrical sub-systems) – Motors and starters types, cables and terminations, mountings and fastenings. | S | Atlas Copco 1 | Classroom 3 | ShowEditDestroy |
10:20 ~ 10:35 | 000000 | Morning Tea Break | | | | ShowEditDestroy |
10:35 ~ 11:15 | 620M01 | 3 ~ Functional Checks (Motors and Compressors) – Pre starting checks, performance and meter readings (Working and Control Air), abnormalities. | S | Atlas Copco 1 | Classroom 3 | ShowEditDestroy |
11:15 ~ 11:30 | 620M01 | 4 ~ Pressure Sensors - Clean and Inspect: Cables and terminations, alarm and settings. | S | Atlas Copco 1 | Classroom 3 | ShowEditDestroy |
11:30 ~ 11:45 | 620M01 | 5 ~ Change Lubrication Oil – Safety procedures, procedure for oil change. | S | Atlas Copco 1 | Classroom 3 | ShowEditDestroy |
11:45 ~ 12:00 | 620M01 | 6 ~ Test Safety Valve - Pre starting checks, Procedure of test. | S | Atlas Copco 1 | Classroom 3 | ShowEditDestroy |
12:00 ~ 12:10 | 620M01 | 7 ~ Grease Bearing (Compressor Motors) – Grease and types, procedure of greasing, using the grease gun. | S | Atlas Copco 1 | Classroom 3 | ShowEditDestroy |
12:10 ~ 12:40 | 620M01 | 8 ~ Clean and Inspect Compressors - Types and characteristics; safety procedures, cleaning procedures. | S | Atlas Copco 1 | Classroom 3 | ShowEditDestroy |
12:40 ~ 14:40 | 000000 | Friday Lunch | | Atlas Copco 1 | | ShowEditDestroy |
14:40 ~ 14:50 | 620M01 | 9 ~ Clean Air Filter – Types and functions, Safety procedures when cleaning. | S | Atlas Copco 1 | Classroom 3 | ShowEditDestroy |
14:50 ~ 15:00 | 620M01 | 10 ~ Check Drainage – Formation and draining the Condensate, safety precautions. | S | Atlas Copco 1 | Classroom 3 | ShowEditDestroy |
15:00 ~ 15:10 | 620M01 | 11 ~ Clean, Inspect and Check Insulation – Motors and control panels, cables and terminations, insulating properties, Insulation Tester. | S | Atlas Copco 1 | Classroom 3 | ShowEditDestroy |
15:10 ~ 15:15 | 620M01 | 12 ~ Check Earth Bonding – Motors and control panels, Continuity Tester. | S | Atlas Copco 1 | Classroom 3 | ShowEditDestroy |
15:15 ~ 15:30 | 000000 | Tea Break | | | | ShowEditDestroy |
15:30 ~ 17:30 | 620M01 | 13 ~ On Board Familiarisation | S | Atlas Copco 1 | On Board | ShowEditDestroy |
Mon 03-Jul |
Group 3 |
10:30 ~ 10:45 | 000000 | Morning Tea Break | | | | ShowEditDestroy |
12:45 ~ 13:45 | 000000 | Lunch Break | C | | | ShowEditDestroy |
16:45 ~ 17:00 | 000000 | Tea Break | | | | ShowEditDestroy |
Wed 05-Jul |
Group 3 |
08:30 ~ 08:50 | 371M01 | 1 ~ Air Conditioning and Ventilation: Examine the general conditions and system operation prior to perform the task. | C | Damen 1 | Classroom 3 | ShowEditDestroy |
08:50 ~ 09:05 | 371M01 | 2 ~ Ventilation system: Check Motor Temperature, revolution and noise and vibration. | C | Damen 1 | Classroom 3 | ShowEditDestroy |
09:05 ~ 09:20 | 371M01 | 3 ~ Ventilation system: Earthing Arrangement - Inspect Earth Bonding. | C | Damen 1 | Classroom 3 | ShowEditDestroy |
09:20 ~ 09:35 | 371M01 | 5 ~ Ventilation system: Motors Controllers functional check of various protective and overload devices and type of controllers employed. | C | Damen 1 | Classroom 3 | ShowEditDestroy |
09:35 ~ 09:55 | 371M01 | 6 ~ Air Conditioning and Ventilation: Visual Check and inspect for leaks in HVAC system. | O | Damen 1 | Classroom 3 | ShowEditDestroy |
09:55 ~ 10:10 | 371M01 | 7 ~ Ventilation system: Vent. Flaps, covers and trunking-inspect & Clean. | C | Damen 1 | Classroom 3 | ShowEditDestroy |
10:10 ~ 10:30 | 371M01 | 8 ~ Air Conditioning and Ventilation: Pre checks and safety instruction before, during and after performing the task. | C | Damen 1 | Classroom 3 | ShowEditDestroy |
11:00 ~ 11:15 | 371M01 | 9 ~ Ventilation system: Functional check of various protective and overload devices and type of controllers employed. | C | Damen 1 | Classroom 3 | ShowEditDestroy |
11:15 ~ 11:35 | 371M01 | 10 ~ Air conditioning system: Check SW side of heat exchanger flow and pressure. | C | Damen 1 | Classroom 3 | ShowEditDestroy |
11:35 ~ 11:55 | 371M01 | 11 ~ Air conditioning system: Check control valve and actuator heat exchanger. | C | Damen 1 | Classroom 3 | ShowEditDestroy |
11:55 ~ 12:25 | 371M01 | 12 ~ Air Conditioning and Ventilation: Equipment and Test Procedures for Electrical Circuit Components. | C | Damen 1 | Classroom 3 | ShowEditDestroy |
12:25 ~ 12:55 | 371M01 | 13 ~ Air conditioning system: Check, clean dust filter Air handling units, - Ammunition, MCSR and small arms store. | O | Damen 1 | Classroom 3 | ShowEditDestroy |
12:35 ~ 13:05 | 371M01 | 14 ~ Air conditioning system: Check heat exchanger air conditioning unit at various locations and station in working order. | C | Damen 1 | Classroom 3 | ShowEditDestroy |
13:05 ~ 13:35 | 371M01 | 15 ~ Air conditioning system: Check the chilled water control valves for leaks, stiffness and corrosion. | C | Damen 1 | Classroom 3 | ShowEditDestroy |
14:00 ~ 14:30 | 371M01 | 16 ~ Ventilation system: Check electric motor and centrifugal fan - Various locations. | C | Damen 1 | Classroom 3 | ShowEditDestroy |
14:30 ~ 14:50 | 371M01 | 17 ~ Ventilation system: Check electric motor and Ventilation fan- (Accommodation) spaces and Switchboard room. | C | Damen 1 | Classroom 3 | ShowEditDestroy |
14:50 ~ 15:10 | 371M01 | 18 ~ Ventilation system: Check fire protection flap with electro magnet device. | C | Damen 1 | Classroom 3 | ShowEditDestroy |
15:10 ~ 15:30 | 371M01 | 19 ~ Ventilation system: Clean and disinfect air duct of the Sick Bay and treatment room. | C | Damen 1 | Classroom 3 | ShowEditDestroy |
16:00 ~ 16:15 | 371M01 | 4 ~ Ventilation system: Filters - Clean the Dust Filter Mat. | O | Damen 1 | On Board | ShowEditDestroy |
Mon 10-Jul |
Group 1 |
08:30 ~ 08:50 | 821S01 | 6 ~ Keep equipment and console panels are clean and dry free from dirt, salt deposit, and corrosion. | C | Sinor Marine Technologies 1 | Classroom 1 | ShowEditDestroy |
08:50 ~ 09:10 | 821S01 | 7 ~ Power Supply - Check the condition of power supplies input AC and DC supplies quality are available and connected to the IBS system. | C | Sinor Marine Technologies 1 | Classroom 1 | ShowEditDestroy |
09:10 ~ 09:40 | 821S01 | 8 ~ IBS - Inspect and test the system and equipment at sufficient intervals to make sure that the equipment is in operating conditions. | C | Sinor Marine Technologies 1 | Classroom 1 | ShowEditDestroy |
09:40 ~ 10:10 | 821S01 | 9 ~ Keep earthing straps connections and mechanical fastenings tight according to right torque. Measure the insulation and continuity. | C | Sinor Marine Technologies 1 | Classroom 1 | ShowEditDestroy |
10:10 ~ 10:40 | 821S01 | 10 ~ IBS - Check and examine the IBS components and peripherals connectivity/ interface between IBS to other sub- system are functioning seamlessly. | C | Sinor Marine Technologies 1 | Classroom 1 | ShowEditDestroy |
11:00 ~ 11:30 | 821S01 | 11 ~ IBS - Check and examine the Power Back supply AC and DC thourg back-up battery bank and UPS are in good working order. | C | Sinor Marine Technologies 1 | Classroom 1 | ShowEditDestroy |
14:00 ~ 16:00 | 821S01 | 12 ~ IBS - Practical Site Survey and Inspection on the System and Components onboard. | O | Sinor Marine Technologies 1 | On Board | ShowEditDestroy |
14:00 ~ 15:30 | 821S01 | 1 ~ Perform Site Survey and to familiarise with the overall system layout examine general conditions including to be acquinted system operating instruction prior to perform the task. | O | Sinor Marine Technologies 1 | On Board | ShowEditDestroy |
16:00 ~ 16:20 | 821S01 | 2 ~ Integrated navigation system - Visual Check on loose connection on workstations and interfacing units. | O | Sinor Marine Technologies 1 | On Board | ShowEditDestroy |
16:20 ~ 16:40 | 821S01 | 3 ~ Integrated navigation system - Visual check on control panel - terminal block. | O | Sinor Marine Technologies 1 | On Board | ShowEditDestroy |
16:40 ~ 17:00 | 821S01 | 4 ~ Integrated navigation system - All electrical connections and mechanical fastenings tight according to right torque and the fastenings are dry, clean and rust free. | O | Sinor Marine Technologies 1 | On Board | ShowEditDestroy |
17:00 ~ 17:30 | 821S01 | 5 ~ Integrated navigation system - IBS System check at User Level with BITE facilities. | O | Sinor Marine Technologies 1 | On Board | ShowEditDestroy |
Tue 11-Jul |
Group 4 |
08:30 ~ 09:00 | 822M01 | 2 ~ Navigation Radar - Functional checks and run Self Test or BITE to monitor starting , running and shutting down. | C | Sinor Marine Technologies 1 | Classroom 4 | ShowEditDestroy |
09:00 ~ 09:15 | 822M01 | 4 ~ Visual check for any sign of dirt and corrosion. | C | Sinor Marine Technologies 1 | Classroom 4 | ShowEditDestroy |
09:15 ~ 09:35 | 822M01 | 7 ~ Navigation Radar - Check and clean Earth bonding straps tightness and free from dirt and corrosion and measure Earth Bonding Continuity within tolerance. | C | Sinor Marine Technologies 1 | Classroom 4 | ShowEditDestroy |
09:35 ~ 09:55 | 822M01 | 8 ~ Ground Terminal on Display unit - Check for tight connections. | C | Sinor Marine Technologies 1 | Classroom 4 | ShowEditDestroy |
09:55 ~ 10:15 | 822M01 | 9 ~ LCD - Remove dust, dirt and salt deposit from LCD display. | C | Sinor Marine Technologies 1 | Classroom 4 | ShowEditDestroy |
10:15 ~ 10:35 | 822M01 | 10 ~ Keep all electrical connections and mechanical fastenings tight according to right torque. and the fastenings are dry, clean and rust free. | C | Sinor Marine Technologies 1 | Classroom 4 | ShowEditDestroy |
10:15 ~ 10:30 | 000000 | Morning Tea Break | | | | ShowEditDestroy |
11:00 ~ 11:20 | 822M01 | 11 ~ Radar power switching On/Off from control unit or remote through BS station. | C | Sinor Marine Technologies 1 | Classroom 4 | ShowEditDestroy |
11:20 ~ 11:35 | 822M01 | 12 ~ Power Supply and Services - Check power services are available before start the operation. | C | Sinor Marine Technologies 1 | Classroom 4 | ShowEditDestroy |
11:35 ~ 11:50 | 822M01 | 13 ~ Processor Unit - Inspect and clean the external unit free from dirt, dust and rust. | C | Sinor Marine Technologies 1 | Classroom 4 | ShowEditDestroy |
11:50 ~ 12:05 | 822M01 | 15 ~ Antenna Unit - Check the exposed nuts and bolts corroded and loose connection. Tighten and preserved accordingly. | C | Sinor Marine Technologies 1 | Classroom 4 | ShowEditDestroy |
12:05 ~ 12:20 | 822M01 | 17 ~ Antenna Unit - Keep all electrical connections and mechanical fastenings tight according to right torque, and the fastenings are dry, clean and rust free. | C | Sinor Marine Technologies 1 | Classroom 4 | ShowEditDestroy |
12:45 ~ 13:45 | 000000 | Lunch Break | C | | | ShowEditDestroy |
13:45 ~ 17:45 | 000F11 | 1 ~ Familiarization Onboard. | O | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | Classroom 4 | ShowEditDestroy |
14:00 ~ 15:00 | 822M01 | 1 ~ Perform Site Survey to familirise with the overall system layout and examine general conditions, initiation of the standard operating instruction prior to perform the task. | O | Sinor Marine Technologies 1 | On Board | ShowEditDestroy |
15:00 ~ 15:15 | 822M01 | 3 ~ Navigation Radar - Antenna Gearbox-Inspect V-Belt. | O | Sinor Marine Technologies 1 | On Board | ShowEditDestroy |
15:15 ~ 15:30 | 822M01 | 5 ~ Navigation Radar - Visual check Antenna Gearbox or drive unit for sign of corrosion and dirt. Clean if necessary. | O | Sinor Marine Technologies 1 | On Board | ShowEditDestroy |
16:00 ~ 16:15 | 822M01 | 6 ~ Clean and inspect consoles from dirt and dust. | O | Sinor Marine Technologies 1 | On Board | ShowEditDestroy |
16:15 ~ 16:30 | 822M01 | 14 ~ Processor Unit - Check and examine Terminal Strips, sockets, earth terminals on processor unit for loose connection and proper seating of the plug. | O | Sinor Marine Technologies 1 | On Board | ShowEditDestroy |
16:30 ~ 16:50 | 822M01 | 16 ~ Antenna Radiator - Check for dirt and cracks on the radiator surface clean and repair as necessary. | O | Sinor Marine Technologies 1 | On Board | ShowEditDestroy |
16:50 ~ 17:50 | 822M01 | 18 ~ Perform Practical Site Survey and inspection of the system and components onboard. | O | Sinor Marine Technologies 1 | Classroom 4 | ShowEditDestroy |
Group 1 |
10:45 ~ 11:00 | 000000 | Morning Tea Break | | | | ShowEditDestroy |
13:20 ~ 14:20 | 000000 | Lunch Break | C | | | ShowEditDestroy |
14:20 ~ 14:40 | 340S02 | 1 ~ The Sanitary Discharge Grey Water System - System arrangements, functions and operations. | C | Damen 1 | On Board | ShowEditDestroy |
14:40 ~ 14:55 | 340S02 | 2 ~ Sewage collecting Tank 16, Sewage tank 17 - Arrangement, Functions. | C | Damen 1 | On Board | ShowEditDestroy |
14:55 ~ 15:25 | 340S02 | 3 ~ STP: Clean and Inspect- External Feed Pump, vacuum pumps, valves, Local operator panel, ventilation lines – functions, operations. | C | Damen 1 | On Board | ShowEditDestroy |
15:25 ~ 15:40 | 000000 | Morning Tea Break | | | | ShowEditDestroy |
15:40 ~ 16:00 | 340S02 | 4 ~ STP: Functional Checks- The LOP- Health checks, auto start/stop. Alarms, pre starting checks, safety procedures, operation and Performance. | C | Damen 1 | On Board | ShowEditDestroy |
16:00 ~ 16:15 | 340S02 | 5 ~ STP: Replenish disinfectant- Procedures when handling disinfectant, Safety precautions. | O | Damen 1 | On Board | ShowEditDestroy |
16:15 ~ 16:25 | 340S02 | 6 ~ Discharge of Sanitary Grey and Black Water. | C | Damen 1 | On Board | ShowEditDestroy |
16:25 ~ 17:25 | 340S02 | 7 ~ On Board Familiarisation. | O | Damen 1 | On Board | ShowEditDestroy |
Wed 12-Jul |
Group 2 |
08:30 ~ 08:50 | 710M01 | 2 ~ SOLAS Equipment in DGPS - Perform Daily Checks including Start up, running and shutdown procedures. | C | Sinor Marine Technologies 1 | Classroom 2 | ShowEditDestroy |
08:50 ~ 09:10 | 710M01 | 3 ~ Above Deck Equipment Antennas: - Visual inspection for any signs of salt deposit, dirt and water. Clean and preserve. | C | Sinor Marine Technologies 1 | Classroom 2 | ShowEditDestroy |
09:10 ~ 09:30 | 710M01 | 4 ~ Check operation from Remote (ICS and INS Network) and Local Positions. | C | Sinor Marine Technologies 1 | Classroom 2 | ShowEditDestroy |
09:30 ~ 09:50 | 710M01 | 5 ~ Connectors: Check that connectors on the rear panel are firmly tightened and free of rust. | C | Sinor Marine Technologies 1 | Classroom 2 | ShowEditDestroy |
09:50 ~ 10:20 | 710M01 | 6 ~ Earth bonding Straps - Check that the ground system is free of rust and the ground wire is tightly fastened. | C | Sinor Marine Technologies 1 | Classroom 2 | ShowEditDestroy |
10:20 ~ 10:40 | 710M01 | 7 ~ Check that battery voltage is sufficient and fully charged and terminal are clean and free from rust. | C | Sinor Marine Technologies 1 | Classroom 2 | ShowEditDestroy |
11:00 ~ 11:30 | 710M01 | 8 ~ Antenna Unit - Keep all electrical connections and mechanical fastenings tight according to right torque, and the fastenings are dry, clean and rust free. | C | Sinor Marine Technologies 1 | Classroom 2 | ShowEditDestroy |
11:30 ~ 11:50 | 710M01 | 9 ~ Antenna Unit - Perform cleaning and remove dust, dirt and rust with detergent, do not use chemical cleaner or solvent. | C | Sinor Marine Technologies 1 | Classroom 2 | ShowEditDestroy |
11:50 ~ 12:10 | 710M01 | 10 ~ LCD Display - Clean and wipe the LCD display with soft cloth to remove dirt salt deposit. | C | Sinor Marine Technologies 1 | Classroom 2 | ShowEditDestroy |
12:10 ~ 12:30 | 710M01 | 13 ~ Self check and BITE - Check the ROM, RAM, input /output data, GPS Core, Beacon, Keyboard and LCD performance. | C | Sinor Marine Technologies 1 | Classroom 2 | ShowEditDestroy |
12:10 ~ 12:30 | 710M01 | 11 ~ LCD ambient temperature and humidity - Maintain cooling and ventilation for ambient temperature and humidity. | C | Sinor Marine Technologies 1 | Classroom 2 | ShowEditDestroy |
12:30 ~ 12:50 | 710M01 | 12 ~ Protective Device - Fuse is to protect over voltage and short circuit current and may be replaced with specified rating and size. | C | Sinor Marine Technologies 1 | Classroom 2 | ShowEditDestroy |
14:00 ~ 14:20 | 710M01 | 14 ~ Inspect and test the equipment at sufficient intervals to make sure that the equipment is in operating condition. | C | Sinor Marine Technologies 1 | Classroom 2 | ShowEditDestroy |
14:20 ~ 15:20 | 710M01 | 1 ~ Examine the general physical conditions of the system/Equipment and Principle of operation prior to perform any task. | O | Sinor Marine Technologies 1 | On Board | ShowEditDestroy |
16:00 ~ 17:00 | 710M01 | 15 ~ Perform Practical Site Survey and inspection of the system and components onboard. | O | Sinor Marine Technologies 1 | On Board | ShowEditDestroy |
Group 4 |
09:15 ~ 10:15 | 000F02 | 1 ~ Safety Systems and Lifesaving Equipment. | C | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | Classroom 4 | ShowEditDestroy |
10:15 ~ 10:30 | 000000 | Morning Tea Break | | | | ShowEditDestroy |
10:30 ~ 12:30 | 000F02 | 2 ~ The Ship's Major System and Equipments. | C | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | Classroom 4 | ShowEditDestroy |
12:30 ~ 13:30 | 000F02 | 3 ~ The Ship's Auxiliary System. | C | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | Classroom 4 | ShowEditDestroy |
13:30 ~ 14:30 | 000000 | Lunch Break | C | | | ShowEditDestroy |
14:30 ~ 15:30 | 000F02 | 4 ~ Deck Machineries. | C | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | Classroom 4 | ShowEditDestroy |
15:30 ~ 15:45 | 000000 | Tea Break | | | | ShowEditDestroy |
Group 1 |
12:30 ~ 13:30 | 000000 | Lunch Break | C | | | ShowEditDestroy |
13:30 ~ 15:40 | 333S01 | 8 ~ On Board Familiarisation | O | Damen 1 | On Board | ShowEditDestroy |
Thu 13-Jul |
Group 1 |
08:30 ~ 08:45 | 210S01 | 1 ~ Propulsion engine - Perform Daily Checks. | O | Caterpillar System | | ShowEditDestroy |
08:45 ~ 09:00 | 210S01 | 2 ~ Propulsion Diesel Engines (PDE) - Inspect PDE Instrument Panel. | O | Caterpillar System | | ShowEditDestroy |
09:00 ~ 09:15 | 210S01 | 3 ~ PDE - Inspect for leaks and loose connection. | O | Caterpillar System | | ShowEditDestroy |
09:15 ~ 09:45 | 210S01 | 4 ~ PDE- Engine Oil Filter - Change. | O | Caterpillar System | | ShowEditDestroy |
09:45 ~ 10:15 | 210S01 | 5 ~ Reduction gear system-Perform an oil change and replace oil filter. | O | Caterpillar System | | ShowEditDestroy |
10:15 ~ 10:30 | 210S01 | 6 ~ Reduction gear system - Clean heat exchanger. | O | Caterpillar System | | ShowEditDestroy |
11:00 ~ 11:15 | 210S01 | 7 ~ Clean heat exchanger. | O | Caterpillar System | | ShowEditDestroy |
11:15 ~ 11:30 | 210S01 | 8 ~ Flexible couplings - Visual inspection for sign of damage and vulcanised. | O | Caterpillar System | | ShowEditDestroy |
11:30 ~ 11:45 | 210S01 | 9 ~ Propeller Shaft - Check lubrication system and temperature. | O | Caterpillar System | | ShowEditDestroy |
11:45 ~ 12:00 | 210S01 | 10 ~ Propeller shaft sealing - Visual check for leaking. | O | Caterpillar System | | ShowEditDestroy |
12:00 ~ 12:15 | 210S01 | 11 ~ Propeller shaft Bearing - Check propeller shaft lubrication operation and bearing temperature (when shaft is turning). | O | Caterpillar System | | ShowEditDestroy |
12:15 ~ 12:30 | 210S01 | 12 ~ Control system propulsion - Check cooling fan operation. | O | Caterpillar System | | ShowEditDestroy |
12:30 ~ 13:00 | 210S01 | 13 ~ Propulsion Control - Check condition of Electronic devices and LRUs. | O | Caterpillar System | | ShowEditDestroy |
14:00 ~ 14:15 | 210S01 | 14 ~ Propulsion Control - Check cooling fan operation. | O | Caterpillar System | | ShowEditDestroy |
14:15 ~ 14:30 | 210S01 | 15 ~ Propulsion Control - Visually inspect the Circuit Board (Line Replaceable Unit - LRU. | O | Caterpillar System | | ShowEditDestroy |
14:30 ~ 14:45 | 210S01 | 16 ~ Propulsion Control - Check condition and functionality of Display Panel and Indicating Lights including LED. | O | Caterpillar System | | ShowEditDestroy |
14:45 ~ 15:00 | 210S01 | 17 ~ Propulsion control- Inspect terminal blocks. Inspect circuit breakers. | O | Caterpillar System | | ShowEditDestroy |
15:00 ~ 15:15 | 210S01 | 18 ~ Propulsion Control - Check fan operation. | O | Caterpillar System | | ShowEditDestroy |
Group 4 |
09:15 ~ 10:15 | 000F02 | 5 ~ Other Electronics Equipments and systems Onboard. | C | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | Classroom 2 | ShowEditDestroy |
10:15 ~ 10:30 | 000000 | Morning Tea Break | | | | ShowEditDestroy |
10:30 ~ 11:30 | 000F02 | 6 ~ Bilges, Ballast and Internal Fi-Fi System. | C | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | Classroom 4 | ShowEditDestroy |
12:30 ~ 13:30 | 000000 | Lunch Break | C | | | ShowEditDestroy |
13:30 ~ 17:30 | 000F12 | 1 ~ Familiarization Onboard. | O | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | On Board | ShowEditDestroy |
Fri 14-Jul |
Group 1 |
08:30 ~ 08:50 | 410S01 | 2 ~ HP & LP Power Generation - | C | Caterpillar System | Classroom 1 | ShowEditDestroy |
08:50 ~ 09:10 | 410S01 | 3 ~ Diesel Generators and Emergency Generators - Perform Daily Checks. | C | Caterpillar System | Classroom 1 | ShowEditDestroy |
09:10 ~ 09:30 | 410S01 | 4 ~ Diesel Generators and Emergency Generators - Inspect DE Instrument Panel. | C | Caterpillar System | Classroom 1 | ShowEditDestroy |
09:30 ~ 09:50 | 410S01 | 5 ~ Diesel Generators and Emergency Generators - Inspect for leaks and loose connection. | C | Caterpillar System | Classroom 1 | ShowEditDestroy |
09:50 ~ 10:10 | 410S01 | 6 ~ Emergency Generators - Inspect Electrical component Diesel Engine Instrument Panel. | C | Caterpillar System | Classroom 1 | ShowEditDestroy |
10:10 ~ 10:30 | 410S01 | 7 ~ Diesel Generators and Emergency Generators - Protection devices - Check. | C | Caterpillar System | Classroom 1 | ShowEditDestroy |
10:45 ~ 11:00 | 000000 | Morning Tea Break | | | Classroom 1 | ShowEditDestroy |
11:00 ~ 11:20 | 410S01 | 8 ~ Main Switchboard (MSB) and Emergency switchboard (ESB) 415V Panels - Clean, inspect and check insulation and continuity. | C | Caterpillar System | Classroom 1 | ShowEditDestroy |
11:20 ~ 11:40 | 410S01 | 9 ~ Main Switchboard (MSB) and Emergency switchboard (ESB) 415V Panels Inspect earth bonding. | C | Caterpillar System | Classroom 1 | ShowEditDestroy |
11:40 ~ 12:10 | 410S01 | 10 ~ Main Switchboard (MSB) and Emergency switchboard (ESB) 415V Panels - Clean And Inspect Front end panel free from dirt, moisture and corrosion free. | C | Caterpillar System | Classroom 1 | ShowEditDestroy |
12:10 ~ 12:30 | 410S01 | 11 ~ Shore connection - Visual inspection of Shore supply connection panel and box. | C | Caterpillar System | Classroom 1 | ShowEditDestroy |
12:30 ~ 12:50 | 410S01 | 12 ~ Shore connection - Visual Inspection the Shore Supply cables and stowage reels. | C | Caterpillar System | Classroom 1 | ShowEditDestroy |
12:30 ~ 14:30 | 000000 | Friday Lunch | | | | ShowEditDestroy |
12:50 ~ 13:10 | 410S01 | 13 ~ Shore connection : Functional Check of the Control Panel, meters, gauges, phase sequence meter prior ship shore connections prior to connection and termination. | C | Caterpillar System | Classroom 1 | ShowEditDestroy |
14:00 ~ 14:30 | 410S01 | 14 ~ Battery sets - Visual inspection and check the terminals tightness. | C | Caterpillar System | Classroom 1 | ShowEditDestroy |
14:30 ~ 14:50 | 410S01 | 15 ~ Battery Sets - Functional check of charging units and check cable any sign of damage. | C | Caterpillar System | Classroom 1 | ShowEditDestroy |
14:50 ~ 15:10 | 410S01 | 16 ~ ransformers - Clean, inspect and check insulation and continuity | C | Caterpillar System | Classroom 1 | ShowEditDestroy |
15:10 ~ 15:30 | 410S01 | 17 ~ Transformers - Clean And Inspect for temperature, noise and vibration. | C | Caterpillar System | Classroom 1 | ShowEditDestroy |
16:00 ~ 16:20 | 410S01 | 18 ~ UPS) for the 230 V systems - Check the ventilation system in the UPS spaces in good operating conditions. | C | Caterpillar System | Classroom 1 | ShowEditDestroy |
16:00 ~ 17:00 | 410S01 | 1 ~ Perform Site Survey and to familirise with the overall system layout examine general conditions including to be acquinted system operating instruction prior to perform the task. | O | Caterpillar System | On Board | ShowEditDestroy |
Group 4 |
09:15 ~ 09:30 | 110F01 | 1 ~ ICAF - Perform maintenance tasks which are specified under “Daily”. | C | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | Classroom 4 | ShowEditDestroy |
09:30 ~ 09:45 | 110F01 | 2 ~ Clean and upkeep the Control Panel and cabinet. | C | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | Classroom 4 | ShowEditDestroy |
09:45 ~ 10:15 | 110F01 | 3 ~ ICAF - Check the condition and functionality of Control Panel Unit and display. | C | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | Classroom 4 | ShowEditDestroy |
10:15 ~ 10:45 | 110F01 | 4 ~ Check cables connection on terminals for tightness and damage. | C | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | Classroom 4 | ShowEditDestroy |
10:45 ~ 11:00 | 000000 | Morning Tea Break | | | | ShowEditDestroy |
11:00 ~ 11:20 | 110F01 | 5 ~ Electrical Checks on Protective devices and safety circuit. | C | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | Classroom 4 | ShowEditDestroy |
11:20 ~ 12:20 | 110F11 | 1 ~ Perform Site Survey and familiarization with the ICAF system layout and operation | O | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | On Board | ShowEditDestroy |
12:20 ~ 14:20 | 000000 | Friday Lunch | | | | ShowEditDestroy |
14:20 ~ 14:50 | 110F11 | 2 ~ Visually check cables inside power controller unit for damage and tightness. | O | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | On Board | ShowEditDestroy |
14:50 ~ 15:50 | 110F11 | 3 ~ Perform checks and inspections and identify fault conditions. | O | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | On Board | ShowEditDestroy |
Mon 17-Jul |
Group 1 |
08:30 ~ 09:00 | 745S01 | 1 ~ Machinery Control (MC) and Propulsion Control Systems (PCS): MC & PCS - Examine the general conditions, and system functional prior to performing any task. | C | Caterpillar System | Classroom 1 | ShowEditDestroy |
09:00 ~ 09:30 | 745S01 | 2 ~ Machinery Control and Propulsion Control Systems (MC & PCS) - Check condition and functionality of Display Panel and Indicating Lights including LED. | C | Caterpillar System | Classroom 1 | ShowEditDestroy |
09:30 ~ 10:00 | 745S01 | 3 ~ AMS workstations - Check fan and ventilation cooling operation. | C | Caterpillar System | Classroom 1 | ShowEditDestroy |
10:00 ~ 10:30 | 745S01 | 4 ~ AMS workstations configuration - Visually inspect the consoles. | C | Caterpillar System | Classroom 1 | ShowEditDestroy |
11:00 ~ 11:30 | 745S01 | 5 ~ AMS workstations: Check Earth Grounding strap to the Hull structures | C | Caterpillar System | Classroom 1 | ShowEditDestroy |
11:30 ~ 12:00 | 745S01 | 6 ~ AMS workstations - Run AMS system self checks or BITE. | C | Caterpillar System | Classroom 1 | ShowEditDestroy |
12:00 ~ 12:30 | 745S01 | 7 ~ AMS Local operation panel (LOP): Check Power Supply AC & DC to the AMS | C | Caterpillar System | Classroom 1 | ShowEditDestroy |
12:30 ~ 13:00 | 745S01 | 8 ~ AMS workstations - Inspect terminal blocks and Inspect circuit breakers MCB & MCCP or sign of corrosion and cleanliness and dust free. | C | Caterpillar System | Classroom 1 | ShowEditDestroy |
14:00 ~ 14:30 | 745S01 | 9 ~ AMS Local operation panel (LOP) - Check fan / cooling operation and air flow. | C | Caterpillar System | Classroom 1 | ShowEditDestroy |
14:30 ~ 15:00 | 745S01 | 10 ~ MC-PCS Safety and Handling - Observe Pre checks, safety procedures and practices, handling of hazardous materials when performing the work before, during and after performing the task. | C | Caterpillar System | Classroom 1 | ShowEditDestroy |
Tue 18-Jul |
Group 3 |
08:30 ~ 08:50 | 212M01 | 4 ~ Check and clean Earth bonding straps tightness and free from dirt and corrosion. | C | Caterpillar 1 | Classroom 3 | ShowEditDestroy |
08:50 ~ 09:10 | 212M01 | 5 ~ Keep all electrical connections and mechanical fastenings tight according to right torque and the fastenings are dry, clean and rust free. | C | Caterpillar 1 | Classroom 3 | ShowEditDestroy |
09:10 ~ 09:30 | 212M01 | 6 ~ Inspect and test the equipment at sufficient intervals to make sure that the equipment is in operating condition. | C | Caterpillar 1 | Classroom 3 | ShowEditDestroy |
09:30 ~ 09:50 | 212M01 | 7 ~ Observe safety precautions, practices and handling of hazardous material in performing the work. | C | Caterpillar 1 | Classroom 3 | ShowEditDestroy |
11:00 ~ 11:15 | 212M01 | 1 ~ Transmission Systems - Clean heat exchanger. | O | Caterpillar 1 | On Board | ShowEditDestroy |
11:15 ~ 11:30 | 212M01 | 2 ~ Transmission Systems - Check threaded connections. | O | Caterpillar 1 | On Board | ShowEditDestroy |
11:30 ~ 11:45 | 212M01 | 3 ~ Transmission System - Perform an oil change and replace oil filter. | O | Caterpillar 1 | On Board | ShowEditDestroy |
11:45 ~ 13:45 | 212M01 | 8 ~ Perform Practical Site Survey and inspection of the system and components onboard. | O | Caterpillar 1 | On Board | ShowEditDestroy |
Group 1 |
10:15 ~ 10:30 | 000000 | Morning Tea Break | | | | ShowEditDestroy |
13:30 ~ 14:30 | 000000 | Lunch Break | C | | Classroom 1 | ShowEditDestroy |
15:30 ~ 15:45 | 000000 | Tea Break | | | | ShowEditDestroy |
Fri 21-Jul |
Group 2 |
11:35 ~ 11:50 | 000000 | Morning Tea Break | | | | ShowEditDestroy |
Group 1 |
12:45 ~ 14:45 | 000000 | Friday Lunch | | | | ShowEditDestroy |
Mon 24-Jul |
Group 1 |
10:30 ~ 10:45 | 000000 | Morning Tea Break | | | | ShowEditDestroy |
13:15 ~ 14:15 | 000000 | Lunch Break | C | | | ShowEditDestroy |
15:45 ~ 16:00 | 000000 | Tea Break | | | | ShowEditDestroy |
Group 2 |
13:30 ~ 14:30 | 000000 | Lunch Break | C | | | ShowEditDestroy |
16:05 ~ 16:20 | 000000 | Tea Break | | | | ShowEditDestroy |
Group 3 |
15:50 ~ 15:50 | 212M01 | 99 ~ 1. Topic Code 212M01 is also 212M02 ~ c) Reduction Gears: Notation: The Transmission and Reduction Gear is same System but by different terminology. | C | Caterpillar 1 | Classroom 3 | ShowEditDestroy |
16:20 ~ 16:35 | 000000 | Tea Break | | | | ShowEditDestroy |
Tue 25-Jul |
Group 1 |
09:15 ~ 09:45 | 800S01 | 26 ~ Internal Communication - Flight Deck Communication Station: Visual inspect and clean wireless station. From ingress of dust and moisture. | C | Morten Jepsen | Classroom 1 | ShowEditDestroy |
09:45 ~ 10:15 | 800S01 | 27 ~ Internal Communication - Flight Deck Communication Station - Carry out self check of BITE on station control panel and portable sets. | C | Morten Jepsen | Classroom 1 | ShowEditDestroy |
10:15 ~ 10:30 | 000000 | Morning Tea Break | | | | ShowEditDestroy |
10:30 ~ 11:00 | 800S01 | 28 ~ External and Internal Communication system networks: Visual check the exposed surface hardware and panel for signs of damage,loose connections and free from dust and moisture. | C | Morten Jepsen | Classroom 1 | ShowEditDestroy |
11:00 ~ 11:30 | 800S01 | 29 ~ System BITE Failures and corrective actions: Using Self check and BITE (Built In Test Equipment) the transmitter or the receiver units able to detects a failure, the Alarm and Alert LED on the front panel. | C | Morten Jepsen | Classroom 1 | ShowEditDestroy |
11:30 ~ 12:00 | 800S01 | 30 ~ System Power Supply - Check and examine power supply input and connections for the network are in good order including Power Back-Up system. | C | Morten Jepsen | Classroom 1 | ShowEditDestroy |
12:00 ~ 12:30 | 800S01 | 31 ~ Communication System which is an Integrated Communication System (ICS) consists of External Communication system and Internal Communication System Networks. | C | Morten Jepsen | Classroom 1 | ShowEditDestroy |
12:30 ~ 13:00 | 800S01 | 32 ~ Power supplies: Check Circuit breakers and fuses of in DB panel for correct operation. | C | Morten Jepsen | Classroom 1 | ShowEditDestroy |
13:00 ~ 13:30 | 800S01 | 33 ~ Power supplies - Check Circuit breakers and fuses of in DB panel for correct operation and fault free. | C | Morten Jepsen | Classroom 1 | ShowEditDestroy |
13:30 ~ 14:30 | 000000 | Lunch Break | C | | | ShowEditDestroy |
14:30 ~ 15:00 | 800S01 | 34 ~ External and Internal Communication System Components - Check Earth bonding straps and connections to ship structure are intact and free from dust and corrosion. | O | Morten Jepsen | On Board | ShowEditDestroy |
15:00 ~ 15:30 | 800S01 | 35 ~ Antennas and coupling unit - Visual check Antenna Units free from obstruction and moisture and salt deposit and corrosion. | C | Morten Jepsen | Classroom 1 | ShowEditDestroy |
15:30 ~ 18:30 | 800S01 | 36 ~ Practical Site survey and inspection on the ICS ( External & Internal Comm. Networks System and components onboard. | O | Morten Jepsen | On Board | ShowEditDestroy |
Group 2 |
09:30 ~ 10:10 | 341M01 | 8 ~ Fresh Water Makers: Daily Checks Reverse Osmosis – Control panel, Filters, differential pressures, Oil level. | C | Damen 1 | Classroom 1 | ShowEditDestroy |
10:10 ~ 10:25 | 341M01 | 9 ~ Fresh Water Makers: Check Filling heights – Deacidification Filter heights | C | Damen 1 | Classroom 1 | ShowEditDestroy |
10:25 ~ 10:40 | 000000 | Morning Tea Break | | | | ShowEditDestroy |
10:40 ~ 10:50 | 341M01 | 10 ~ Fresh Water Makers: Stop Rinse – Module Membrane. | C | Damen 1 | Classroom 1 | ShowEditDestroy |
10:50 ~ 11:00 | 341M01 | 11 ~ Fresh Water Makers: Clean – Module Membrane. | C | Damen 1 | Classroom 1 | ShowEditDestroy |
11:00 ~ 11:10 | 341M01 | 12 ~ Fresh Water Makers: Check Torque – Module Membrane. | C | Damen 1 | Classroom 1 | ShowEditDestroy |
11:10 ~ 11:25 | 341M01 | 13 ~ Fresh Water Makers: RO unit - Change Lub Oil | C | Damen 1 | Classroom 1 | ShowEditDestroy |
11:25 ~ 11:55 | 341M01 | 14 ~ Hot Water Circuit: Run Pump if not in regular use – Pre starting checks, Control panel, check performance, leaks, and abnormalities. | C | Damen 1 | Classroom 1 | ShowEditDestroy |
11:55 ~ 12:15 | 341M01 | 15 ~ Hot Water Circuit: Clean & Inspect – Control Panel, HW Circulating Pump and motors, Valves, cables and terminations | C | Damen 1 | Classroom 1 | ShowEditDestroy |
12:15 ~ 12:25 | 341M01 | 16 ~ Hot Water Circuit: Functional Checks- Control panel | C | Damen 1 | Classroom 1 | ShowEditDestroy |
12:25 ~ 12:35 | 341M01 | 17 ~ Hot Water Circuit: Clean, Inspect and Check Insulation – Motors & Control Panel. | C | Damen 1 | Classroom 1 | ShowEditDestroy |
12:35 ~ 12:40 | 341M01 | 18 ~ Hot Water Circuit: Inspect Earth Bonding – Motors, control Panel. | C | Damen 1 | Classroom 1 | ShowEditDestroy |
12:50 ~ 13:00 | 341M01 | 19 ~ Hot Water Circuit: Clean and Inspect – Pressure Control Switch. | C | Damen 1 | Classroom 1 | ShowEditDestroy |
13:00 ~ 14:00 | 000000 | Lunch Break | C | | | ShowEditDestroy |
14:00 ~ 16:00 | 341M01 | 20 ~ On Board Familiarisation | O | Damen 1 | On Board | ShowEditDestroy |
Thu 27-Jul |
Group 2 |
09:30 ~ 10:00 | 670M01 | 1 ~ Sprinkler System - Clean and inspect: Compressed air pipe coupling, test valves, sprinklers head. | C | Damen 1 | Classroom 1 | ShowEditDestroy |
10:00 ~ 10:20 | 670M01 | 2 ~ Sprinkler System - Check Audibles & Visual Alarm & Water Pressure: Check audibles & visual alarm and water pressure. | C | Damen 1 | Classroom 1 | ShowEditDestroy |
10:20 ~ 11:00 | 670M01 | 3 ~ Water Mist System (Control Panel) - Inspect externally: Control panel, water pump, valve, nozzles. | C | Damen 1 | Classroom 1 | ShowEditDestroy |
11:00 ~ 11:15 | 000000 | Morning Tea Break | | | Classroom 1 | ShowEditDestroy |
11:15 ~ 11:35 | 670M01 | 4 ~ Water Mist System - Clean and inspect water pump and outfit: Clean and inspect water pump and outfit, manual and auto operation. | C | Damen 1 | Classroom 1 | ShowEditDestroy |
11:35 ~ 11:50 | 670M01 | 5 ~ Water Mist System (Control Panel): Clean and inspect internally. | C | Damen 1 | Classroom 1 | ShowEditDestroy |
11:50 ~ 12:05 | 670M01 | 6 ~ Water Mist System - Alarm Checks: Control panel self tests and Alarm activation. | C | Damen 1 | Classroom 1 | ShowEditDestroy |
12:05 ~ 12:45 | 670M01 | 7 ~ Foam System - Clean externally: Foam and fire pumps, valves, monitors, hoses, nozzles. | C | Damen 1 | Classroom 1 | ShowEditDestroy |
12:45 ~ 13:00 | 670M01 | 8 ~ Foam System - Functional Checks: Pre starting checks, procedure when running the fire pump. | C | Damen 1 | Classroom 1 | ShowEditDestroy |
13:00 ~ 13:15 | 670M01 | 9 ~ Foam System - Operational Check: Pre starting check, Operational procedures, performance. | C | Damen 1 | Classroom 1 | ShowEditDestroy |
13:15 ~ 13:55 | 670M01 | 10 ~ CO2 System - Clean & Check Pipes, Nozzles & associated Components, Clean and check pipes, Nozzles and associated components. | C | Damen 1 | Classroom 1 | ShowEditDestroy |
13:55 ~ 14:55 | 000000 | Lunch Break | C | | Classroom 1 | ShowEditDestroy |
14:55 ~ 15:10 | 670M01 | 11 ~ CO2 System - Weight the cylinder: Weight the cylinder. | C | Damen 1 | Classroom 1 | ShowEditDestroy |
15:10 ~ 18:10 | 670M01 | 12 ~ On Board Familiarisation | O | Damen 1 | On Board | ShowEditDestroy |
Group 1 |
10:35 ~ 10:50 | 000000 | Morning Tea Break | | | | ShowEditDestroy |
12:30 ~ 13:30 | 000000 | Lunch Break | C | | | ShowEditDestroy |
Fri 28-Jul |
Group 2 |
09:30 ~ 10:10 | 650P01 | 1 ~ The ship’s Fire Fighting System arrangements – Fire Main line. | C | Damen 1 | Classroom 1 | ShowEditDestroy |
10:10 ~ 10:25 | 650P01 | 2 ~ Fire Hydrants and the Locations. | C | Damen 1 | Classroom 1 | ShowEditDestroy |
10:25 ~ 10:40 | 000000 | Morning Tea Break | | | | ShowEditDestroy |
10:40 ~ 11:40 | 650P01 | 3 ~ Operating the system using the Hoses, Nozzles and sprays. | C | Damen 1 | Classroom 1 | ShowEditDestroy |
11:40 ~ 12:40 | 650P01 | 4 ~ The Sprinkler, CO2, Foam and the Water Mist system-General arrangements, general characteristics and operations. | C | Damen 1 | Classroom 1 | ShowEditDestroy |
12:40 ~ 14:40 | 000000 | Friday Lunch | | | | ShowEditDestroy |
14:40 ~ 15:10 | 650P01 | 5 ~ The External FF system - The general arrangements, general characteristics and operations. | C | Damen 1 | Classroom 1 | ShowEditDestroy |
15:10 ~ 15:50 | 333P01 | 1 ~ Establish the Fresh Water Cooling System. | C | Damen 1 | Classroom 1 | ShowEditDestroy |
15:50 ~ 16:10 | 333P01 | 2 ~ The Circulating Pumps and the Circulating FW. | C | Damen 1 | Classroom 1 | ShowEditDestroy |
16:10 ~ 16:20 | 333P01 | 3 ~ The Heat Exchangers - Cooling process. | C | Damen 1 | Classroom 1 | ShowEditDestroy |
16:20 ~ 16:35 | 000000 | Tea Break | | | | ShowEditDestroy |
16:35 ~ 16:55 | 333P01 | 4 ~ Equipments and systems cooled. | C | Damen 1 | Classroom 1 | ShowEditDestroy |
16:55 ~ 17:05 | 333P01 | 5 ~ Pre-Starting Checks and Safety Procedures. | C | Damen 1 | Classroom 1 | ShowEditDestroy |
17:05 ~ 17:20 | 333P01 | 6 ~ Running the System - verify System Pressures and Temperatures and state of Alarm. | C | Damen 1 | Classroom 1 | ShowEditDestroy |
17:20 ~ 18:20 | 333P01 | 7 ~ On Board Familiarisation. | O | Damen 1 | On Board | ShowEditDestroy |
Mon 31-Jul |
Group 2 |
09:30 ~ 10:30 | 411P01 | 1 ~ Shore Supply: Perform Site Survey and to familirise with the overall system layout examine general conditions including to be acquinted system operating instruction prior to perform the task. | O | Damen 1 | On Board | ShowEditDestroy |
10:30 ~ 10:45 | 000000 | Morning Tea Break | | | | ShowEditDestroy |
10:45 ~ 11:00 | 411P01 | 3 ~ Shore Supply - Check periodically the Phase Sequence Meter. | O | Damen 1 | On Board | ShowEditDestroy |
11:00 ~ 11:30 | 411P01 | 4 ~ Shore Supply - Functional Check of the Control Panel, meters, gauges, phase sequence meter prior ship shore connections prior to connection and termination. | O | Damen 1 | On Board | ShowEditDestroy |
11:30 ~ 12:00 | 411P01 | 6 ~ Shore Supply Safety Handling: Observe safety precaution and practices, handling of hazardous substance in performing the work. | O | Damen 1 | On Board | ShowEditDestroy |
12:00 ~ 12:15 | 411P01 | 5 ~ Visual inspection of Shore supply connection panel and box. | C | Damen 1 | Classroom 1 | ShowEditDestroy |
12:00 ~ 12:30 | 411P01 | 2 ~ Shore Supply -Check and clean Earth bonding straps tightness and free from dirt and corrosion. | C | Damen 1 | Classroom 1 | ShowEditDestroy |
12:30 ~ 13:30 | 411P01 | 7 ~ Shore Supply: Practical Survey and Inspection on the Shore Supply System and Components onboard. | C | Damen 1 | Classroom 1 | ShowEditDestroy |
13:30 ~ 14:30 | 000000 | Lunch Break | C | | | ShowEditDestroy |
14:30 ~ 14:45 | 411P01 | 8 ~ Shore Supply - Visual Inspection the Shore Supply cables and stowage reels. | C | Damen 1 | Classroom 1 | ShowEditDestroy |
14:45 ~ 15:05 | 411P01 | 9 ~ Keep all electrical connections and mechanical fastenings tight according to right torque and the fastenings are dry, clean and rust free. | C | Damen 1 | Classroom 1 | ShowEditDestroy |
15:05 ~ 15:20 | 000000 | Tea Break | | | | ShowEditDestroy |
15:20 ~ 17:20 | 411P01 | 10 ~ Perform Practical Site Survey and inspection of the system and components onboard. | O | Damen 1 | On Board | ShowEditDestroy |
Tue 01-Aug |
Group 2 |
09:30 ~ 09:50 | 400M02 | 1 ~ Transformers: Examine the general conditions of the transformer Units and functional status prior to perform any task. | C | Damen 1 | Classroom 1 | ShowEditDestroy |
09:50 ~ 10:10 | 400M02 | 2 ~ Transformer: Examine for signs of abnormalities, dirt, dust and corrosion. Clean as necessary. | C | Damen 1 | Classroom 1 | ShowEditDestroy |
10:10 ~ 10:30 | 400M02 | 3 ~ Transfomers: Examine and check the input voltage from 415VAC Panels and Output voltage 230VAC at DB panels. | C | Damen 1 | Classroom 1 | ShowEditDestroy |
10:30 ~ 10:45 | 000000 | Morning Tea Break | | | | ShowEditDestroy |
10:45 ~ 11:05 | 400M02 | 4 ~ Transformers: Clean, inspect and check insulation and earthing straps connections for tightness and corrosion. | C | Damen 1 | Classroom 1 | ShowEditDestroy |
11:05 ~ 11:25 | 400M02 | 5 ~ Transformer: Check the ambient temperature and air flow cooling requirements, sign of noise and vibration. | C | Damen 1 | Classroom 1 | ShowEditDestroy |
11:25 ~ 11:45 | 400M02 | 6 ~ Safety and Handling - Observe safety precaution and practices, handling of hazadous materials when performing the work. | C | Damen 1 | Classroom 1 | ShowEditDestroy |
11:45 ~ 12:00 | 400M02 | 8 ~ Battery and Charging Units: :Examine the general conditions of the Units and functional status prior to perform any task. | C | Damen 1 | Classroom 1 | ShowEditDestroy |
12:00 ~ 12:15 | 400M02 | 9 ~ Battery and Charging Units: Check the physical conditions for any sign of defect and damage and check insulation cables and units. | C | Damen 1 | Classroom 1 | ShowEditDestroy |
12:15 ~ 12:30 | 400M02 | 10 ~ Battery and Charging Unit: Measure and record electrolyte SG reading in Battery Log Book. | C | Damen 1 | Classroom 1 | ShowEditDestroy |
12:30 ~ 12:50 | 400M02 | 11 ~ Battery sets and Charging Units : Check and record the overall float voltage at the battery terminals. | C | Damen 1 | Classroom 1 | ShowEditDestroy |
12:50 ~ 13:05 | 400M02 | 12 ~ Battery sets and Charging Units: Check ventilation cooling fan in battery spaces for correct operation. | C | Damen 1 | Classroom 1 | ShowEditDestroy |
13:05 ~ 13:20 | 400M02 | 14 ~ UPS: Visual check the cells cleanliness, cracks, electrolyte leakage and signs of damage. | C | Damen 1 | Classroom 1 | ShowEditDestroy |
13:20 ~ 14:20 | 000000 | Lunch Break | C | | | ShowEditDestroy |
14:20 ~ 14:35 | 400M02 | 16 ~ UPS: Check and record the overall float voltage at the battery terminals. | C | Damen 1 | Classroom 1 | ShowEditDestroy |
14:35 ~ 14:50 | 400M02 | 19 ~ UPS Safety and Handling: Observe safety precaution and practices, handling of hazadous materials when performing the work. | C | Damen 1 | Classroom 1 | ShowEditDestroy |
14:50 ~ 16:20 | 400M02 | 7 ~ Transformers: Practical Site Survey and Inspection on the System and Components onboard. | O | Damen 1 | On Board | ShowEditDestroy |
16:20 ~ 16:35 | 000000 | Tea Break | | | | ShowEditDestroy |
16:35 ~ 16:50 | 400M02 | 13 ~ Uninterrupted Power Supply (UPS) for the 230 V systems: Examine the general conditions of the UPS Units and functional status prior to perform task. | O | Damen 1 | On Board | ShowEditDestroy |
16:50 ~ 17:05 | 400M02 | 15 ~ UPS: Check the ventilation system in the UPS spaces in good operating conditions. | O | Damen 1 | On Board | ShowEditDestroy |
17:05 ~ 17:20 | 400M02 | 17 ~ UPS: Check grounding and earthing straps for tightness and sign of corrosion. | O | Damen 1 | On Board | ShowEditDestroy |
17:20 ~ 17:35 | 400M02 | 18 ~ UPS: Run self Check or BITE and record results. | O | Damen 1 | On Board | ShowEditDestroy |
Wed 02-Aug |
Group 2 |
09:15 ~ 10:15 | 400M02 | 20 ~ UPS: Practical Site Survey and Inspection on the System and Components onboard. | O | Damen 1 | On Board | ShowEditDestroy |
10:15 ~ 10:30 | 000000 | Tea Break | | | Classroom 1 | ShowEditDestroy |
10:30 ~ 11:30 | 430M01 | 1 ~ Perform Site Survey and to familirise with the overall system layout examine general conditions including to be acquainted system operating instruction prior to perform the task. | O | Damen 1 | On Board | ShowEditDestroy |
11:30 ~ 12:00 | 430M01 | 2 ~ Switchboard (415V 50Hz) Panels 230 V 50Hz Switchboard Panels - Perform Inspection on loose electrical connections or mechanical fastenings and tighten them as necessary iaw required torque. | C | Damen 1 | Classroom 1 | ShowEditDestroy |
12:00 ~ 12:10 | 430M01 | 3 ~ Switchboard (415V 50Hz) Panels 230 V 50Hz Switchboard Panels - Check and visual inspection and all bus/ bus are clean and dry. To perform cleaning ensure the Switchboard /panel are de-energised. | C | Damen 1 | Classroom 1 | ShowEditDestroy |
12:10 ~ 12:40 | 430M01 | 4 ~ Switchboard (415V 50Hz) Panels 230 V 50Hz Panel - The front panels of dead front switchboards: Visual inspection of the front panels of dead front switchboards frre from dirt and moiture and corrosion, Clean as necessary without de-energizing (Switch Off). | C | Damen 1 | Classroom 1 | ShowEditDestroy |
12:40 ~ 12:55 | 430M01 | 5 ~ Switchboard (415V 50Hz) Panels 230 V 50Hz Switchboard Panels - Check and examine he front panels of dead front switchboards Instruments and metering display analog pointers and digital are zero(when Static) and calibrated. | C | Damen 1 | Classroom 1 | ShowEditDestroy |
12:55 ~ 13:25 | 430M01 | 6 ~ Run self check on the instrument and display with BITE facilities. | O | Damen 1 | On Board | ShowEditDestroy |
13:25 ~ 14:25 | 000000 | Lunch Break | C | | | ShowEditDestroy |
14:25 ~ 14:55 | 430M01 | 7 ~ Switchboard (415V 50Hz), 230 V 50Hz Panels Protective circuits - Visually check and, over current or reverse current circuits, overload relays, and protective circuit performs its desired functions for fuses. | O | Damen 1 | On Board | ShowEditDestroy |
14:55 ~ 15:25 | 430M01 | 8 ~ Switchboard (415V 50Hz) Panels Bus Transfer Equipment - (Interconnecting Breakers, Supply Breakers,Shore Supply Breakers): Visually check are for operation at desired functions (When testing bus transfer equipment, should follow the safety precautions given for testing circuit breakers). | C | Damen 1 | Classroom 1 | ShowEditDestroy |
15:25 ~ 15:40 | 430M01 | 9 ~ Switchboard (415V 50Hz), 230 V 50Hz Panels Fuses - Check and examine the right size and that they make firm contact with fuse clips. Ensure that lock-in devices (if provided) are properly fitted and that all fuse wiring connections are tight. | C | Damen 1 | Classroom 1 | ShowEditDestroy |
15:40 ~ 16:10 | 430M01 | 10 ~ Switchboard (415V 50Hz), 230 V 50Hz Panels Distribution Boxes - Check the function of wiring distribution boxes (fused), with and without switches, feed circuits fuse clip barrel nuts and terminal connections tightness. | C | Damen 1 | Classroom 1 | ShowEditDestroy |
16:10 ~ 16:25 | 000000 | Tea Break | | | | ShowEditDestroy |
16:25 ~ 16:55 | 430M01 | 11 ~ Emergency Switchboard Panel - Check and examine he front panels of dead front switchboards Instruments and metering display analog pointers and digital are zero (when Static) and calibrated. | C | Damen 1 | Classroom 1 | ShowEditDestroy |
16:50 ~ 17:20 | 430M01 | 12 ~ Emergency Switchboard Panel - Run self check on the instrument and display with BITE facilities and log the result in switchboard log book or computer system. | C | Damen 1 | Classroom 1 | ShowEditDestroy |
Thu 03-Aug |
Group 2 |
09:15 ~ 09:45 | 430M01 | 13 ~ Switchboard (415V 50Hz), 230 V 50Hz Panels Protective circuits - Visually check and, over current or reverse current circuits, overload relays, and protective circuit performs its desired functions for fuses. | C | Damen 1 | Classroom 1 | ShowEditDestroy |
09:45 ~ 10:15 | 430M01 | 14 ~ Transformers - Visual inspection of the external parts are free from dirt and moisture and corrosion, clean as necessary without de-energizing (Switch Off). | C | Damen 1 | Classroom 1 | ShowEditDestroy |
10:15 ~ 10:45 | 430M01 | 15 ~ Transformers check and clean earth bonding straps tightness and free from dirt and corrosion. | C | Damen 1 | Classroom 1 | ShowEditDestroy |
10:45 ~ 11:00 | 000000 | Morning Tea Break | | | | ShowEditDestroy |
11:00 ~ 11:30 | 430M01 | 16 ~ Transformers - Check and examine the electrical properties continuity, insulation are within the acceptable limits. | C | Damen 1 | | ShowEditDestroy |
11:30 ~ 12:00 | 430M01 | 17 ~ Observe safety precautions, practices and handling of hazardous material in performing the work. | C | Damen 1 | | ShowEditDestroy |
12:30 ~ 13:30 | 000000 | Lunch Break | C | | | ShowEditDestroy |
13:30 ~ 15:30 | 430M01 | 18 ~ Perform Practical Site Survey and inspection on the system and components onboard. | O | Damen 1 | On Board | ShowEditDestroy |
Group 1 |
11:35 ~ 12:35 | 110F11 | 1 ~ Perform Site Survey and familiarization with the ICAF system layout and operation | O | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | | ShowEditDestroy |
12:35 ~ 13:05 | 110F11 | 2 ~ Visually check cables inside power controller unit for damage and tightness. | O | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | | ShowEditDestroy |
13:05 ~ 14:05 | 000000 | Lunch Break | C | | | ShowEditDestroy |
14:05 ~ 15:05 | 110F11 | 3 ~ Perform checks and inspections and identify fault conditions. | O | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | | ShowEditDestroy |
16:05 ~ 16:20 | 000000 | Tea Break | | | | ShowEditDestroy |
Fri 04-Aug |
Group 1 |
10:30 ~ 10:45 | 000000 | Morning Tea Break | | | | ShowEditDestroy |
13:00 ~ 14:00 | 000000 | Lunch Break | C | | | ShowEditDestroy |
16:20 ~ 16:35 | 000000 | Tea Break | | | | ShowEditDestroy |
Sun 06-Aug |
Group 2 |
10:30 ~ 10:45 | 000000 | Morning Tea Break | | | | ShowEditDestroy |
11:00 ~ 11:15 | 000000 | Morning Tea Break | | | | ShowEditDestroy |
11:45 ~ 15:45 | 000F12 | 1 ~ Familiarization Onboard. | O | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | On Board | ShowEditDestroy |
12:45 ~ 13:45 | 000000 | Lunch Break | C | | | ShowEditDestroy |
Mon 07-Aug |
Group 2 |
09:15 ~ 09:35 | 810M01 | 1 ~ Navigation Light - Daily User functional check. | O | Damen 1 | On Board | ShowEditDestroy |
09:35 ~ 10:05 | 810M01 | 2 ~ Navigation Light - Check and test BITE functionalities. | O | Damen 1 | On Board | ShowEditDestroy |
10:05 ~ 11:05 | 310S11 | 2 ~ On Board Familiarisation. | O | Khairul Azuadi Bin Ariffin | | ShowEditDestroy |
10:05 ~ 10:25 | 810M01 | 3 ~ Navigation Light - Visual inspection of the control panel free from dust and dirt. | O | Damen 1 | On Board | ShowEditDestroy |
10:25 ~ 10:40 | 000000 | Morning Tea Break | | | | ShowEditDestroy |
10:40 ~ 11:00 | 810M01 | 4 ~ Navigation Light - Clean and inspect the navigation light fitting. | O | Damen 1 | On Board | ShowEditDestroy |
11:00 ~ 11:20 | 810M01 | 5 ~ Navigation Light - Control Panel, Navigation and Signal Light System Check. | O | Damen 1 | On Board | ShowEditDestroy |
11:20 ~ 11:40 | 810M01 | 6 ~ Navigation Light - Clean, inspect and check insulation Control Panel. | O | Damen 1 | On Board | ShowEditDestroy |
11:20 ~ 11:50 | 370S01 | 1 ~ Functional check of various protective and overload devices and type of controllers employed. | C | Ahmad Bin Abdul Rahim | | ShowEditDestroy |
11:40 ~ 12:00 | 810M01 | 7 ~ Searchlight system - Visual and functional check. | O | Damen 1 | On Board | ShowEditDestroy |
11:50 ~ 12:20 | 370S01 | 2 ~ Ventilation Fan Motor: Check Motor conditions such as Air Flow,Temperature, RPM, noise and vibration. | C | Ahmad Bin Abdul Rahim | | ShowEditDestroy |
12:00 ~ 12:20 | 810M01 | 8 ~ Searchlight system - Check the cable connection fittings and continuity and insulation. | O | Damen 1 | On Board | ShowEditDestroy |
12:20 ~ 12:40 | 810M01 | 9 ~ Acoustical signalling equipment - Visual and functional check. | O | Damen 1 | On Board | ShowEditDestroy |
12:20 ~ 12:40 | 370S01 | 3 ~ Vent. Flaps, covers and trunking-inspect - Clean as necessary. | C | Ahmad Bin Abdul Rahim | | ShowEditDestroy |
12:40 ~ 13:10 | 370S01 | 4 ~ Measure Earth Bonding strap and fastenings Continuity and keep the fastenings are tight, clean, dry and free from rust. | C | Ahmad Bin Abdul Rahim | | ShowEditDestroy |
12:40 ~ 13:00 | 810M01 | 10 ~ Acoustical signalling equipment - Clean and inspect the devices for its correct operation. | O | Damen 1 | On Board | ShowEditDestroy |
13:00 ~ 14:00 | 000000 | Lunch Break | C | | | ShowEditDestroy |
Group 3 |
09:45 ~ 10:45 | 000F01 | 5 ~ Emergency Station. | C | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | Classroom 3 | ShowEditDestroy |
10:45 ~ 11:00 | 000000 | Morning Tea Break | | | | ShowEditDestroy |
10:45 ~ 11:00 | 000000 | Morning Tea Break | | | | ShowEditDestroy |
11:00 ~ 12:00 | 000F01 | 6 ~ SOLAS Equipment and Fire Fighting Onboard. | C | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | Classroom 3 | ShowEditDestroy |
12:45 ~ 13:45 | 000000 | Lunch Break | C | | | ShowEditDestroy |
15:00 ~ 15:15 | 000000 | Tea Break | | | | ShowEditDestroy |
15:45 ~ 15:50 | 310M01 | 15 ~ BWS – Inspect earth bonding : Earthing straps, fastenings, continuity tester. | C | Damen 1 | Classroom 3 | ShowEditDestroy |
16:05 ~ 17:05 | 310M01 | 16 ~ GS Pumps & Outfit: Clean and inspect – Pumps, motors, Control Panel, valves, associated fittings. | C | Damen 1 | Classroom 3 | ShowEditDestroy |
17:05 ~ 17:35 | 310M01 | 17 ~ GS Pumps and Outfit: Functional checks – Pre starting checks and safety procedures, performance, bilge and ballast functions. | C | Damen 1 | Classroom 3 | ShowEditDestroy |
17:35 ~ 17:45 | 310M01 | 19 ~ GS Pumps and outfit: Clean, insect and check insulation – Electrical Equipment, Cables and terminations, Insulation Tester. | C | Damen 1 | Classroom 3 | ShowEditDestroy |
17:45 ~ 18:15 | 310M01 | 20 ~ Fire hydrant and spray: Clean and inspect – Hydrant, spray, nozzles, hoses, loose fittings. | C | Damen 1 | Classroom 3 | ShowEditDestroy |
18:15 ~ 18:25 | 310M01 | 12 ~ BWS Pumps and outfit: Clean and Inspect – Pumps, motors, Control Panel, valves. | O | Damen 1 | On Board | ShowEditDestroy |
18:25 ~ 18:35 | 310M01 | 18 ~ Emergency FF pumps: Functional Checks with GS Pumps – Pre starting checks and safety procedures, performance of GS pumps with Emergency FF pumps. | O | Damen 1 | On Board | ShowEditDestroy |
Sat 12-Aug |
Group 4 |
09:30 ~ 10:30 | 000A00 | 1 ~ Training Launch Introduction | C | Caterpillar System | Classroom 4 | ShowEditDestroy |
10:30 ~ 10:45 | 000000 | Morning Tea Break | | Caterpillar System | | ShowEditDestroy |
10:45 ~ 11:45 | 000F01 | 1 ~ Introduction OPV 1800. | C | Caterpillar System | Classroom 4 | ShowEditDestroy |
11:45 ~ 12:45 | 000F01 | 2 ~ Ship's Operational Capabilities. | C | Caterpillar System | Classroom 4 | ShowEditDestroy |
13:30 ~ 14:30 | 000000 | Lunch Break | C | Caterpillar System | | ShowEditDestroy |
14:30 ~ 15:30 | 000F01 | 4 ~ Deck Arrangements. | C | Caterpillar System | Classroom 4 | ShowEditDestroy |
Tue 15-Aug |
Group 4 |
09:15 ~ 09:45 | 371P01 | 1 ~ Administer the Range of Galley Equipment. | C | Staco 1 | Classroom 1 | ShowEditDestroy |
09:45 ~ 09:50 | 371P01 | 2 ~ Establish the Fuse Boxes, Control panel. | C | Staco 1 | Classroom 1 | ShowEditDestroy |
09:50 ~ 10:30 | 371P01 | 3 ~ Switching On Procedures and operating the Range of equipment. | C | Staco 1 | Classroom 1 | ShowEditDestroy |
10:30 ~ 10:45 | 000000 | Morning Tea Break | | | | ShowEditDestroy |
10:45 ~ 11:15 | 371P01 | 4 ~ Establish the ventilation and exhaust system and Switching on procedures. | C | Staco 1 | Classroom 1 | ShowEditDestroy |
11:15 ~ 11:35 | 371P01 | 5 ~ Safety Procedures - operating the Foam and CO2 system before, during and after use. | C | Staco 1 | Classroom 1 | ShowEditDestroy |
11:35 ~ 11:55 | 371P01 | 6 ~ Daily maintenance of equipment after use. | C | Staco 1 | Classroom 1 | ShowEditDestroy |
11:55 ~ 12:55 | 371P01 | 7 ~ On Board Familiarisation | O | Staco 1 | On Board | ShowEditDestroy |
Wed 16-Aug |
Group 4 |
09:15 ~ 10:15 | 570P01 | 1 ~ Perform Site Survey to familirise with the overall system layout and examine general conditions, initiation of the standard operating instruction prior to perform the task. | O | Vestdavit 1 | On Board | ShowEditDestroy |
10:15 ~ 10:35 | 570P01 | 2 ~ Davits - Check hydraulic system for damage and leaks. | C | Vestdavit 1 | Classroom 1 | ShowEditDestroy |
10:35 ~ 10:50 | 000000 | Morning Tea Break | | | | ShowEditDestroy |
10:50 ~ 11:10 | 570P01 | 3 ~ Davits - Check the davit for visible damages free from dirt, rust and damage. | C | Vestdavit 1 | Classroom 1 | ShowEditDestroy |
11:10 ~ 11:25 | 570P01 | 4 ~ Davit - Functional check that the davit can move freely in its operation area. Switch “ON” MCCB on starter panel. | O | Vestdavit 1 | On Board | ShowEditDestroy |
11:25 ~ 11:40 | 570P01 | 5 ~ Davits - Apply grease to necessary points as specified in Operation Manual or PMS. | C | Vestdavit 1 | Classroom 1 | ShowEditDestroy |
11:40 ~ 12:00 | 570P01 | 6 ~ Check hydraulic system clean and dry free from dirt, salt deposit, and corrosion free. | C | Vestdavit 1 | Classroom 1 | ShowEditDestroy |
12:00 ~ 12:20 | 570P01 | 7 ~ Keep all electrical connections and mechanical fastenings tight according to right torque. and the fastenings are dry, clean and rust free. | C | Vestdavit 1 | Classroom 1 | ShowEditDestroy |
12:20 ~ 12:40 | 570P01 | 8 ~ Check and clean Earth bonding straps tightness and free from dirt and corrosion. | C | Vestdavit 1 | Classroom 1 | ShowEditDestroy |
12:40 ~ 13:00 | 570P01 | 9 ~ Inspect and test the equipment at sufficient intervals to make sure that the equipment is in operating condition. | C | Vestdavit 1 | Classroom 1 | ShowEditDestroy |
13:00 ~ 13:20 | 570P01 | 10 ~ Observe cleanliness, corrosion control and preservation at all time when performing the task. | C | Vestdavit 1 | Classroom 1 | ShowEditDestroy |
13:20 ~ 14:20 | 000000 | Lunch Break | C | | | ShowEditDestroy |
14:20 ~ 14:40 | 570P01 | 11 ~ Power Supply Services - Check power ON and Off of the system prior to start operation. | C | Vestdavit 1 | Classroom 1 | ShowEditDestroy |
14:40 ~ 15:00 | 570P01 | 12 ~ Inspect and test the equipment at sufficient intervals to make sure that the equipment is in operating condition. | C | Vestdavit 1 | Classroom 1 | ShowEditDestroy |
15:00 ~ 15:15 | 000000 | Tea Break | | | | ShowEditDestroy |
15:15 ~ 17:15 | 570P01 | 13 ~ Perform Practical Site Survey and inspection of the system and components onboard. | O | Vestdavit 1 | On Board | ShowEditDestroy |
Thu 17-Aug |
Group 4 |
09:15 ~ 09:30 | 570P02 | 1 ~ Rescue Boat - Check and verify the inventory list as fitted. | O | Vestdavit 1 | On Board | ShowEditDestroy |
09:30 ~ 09:45 | 570P02 | 2 ~ Rescue Boat - Check propulsion or outboard engine start and stop function and bilge pump. | O | Vestdavit 1 | On Board | ShowEditDestroy |
09:45 ~ 10:00 | 570P02 | 3 ~ Rescue Boat - Visual condition of stowage and releasing and recovery mechanism. | O | Vestdavit 1 | On Board | ShowEditDestroy |
10:00 ~ 10:15 | 570P02 | 4 ~ Rescue Boat - Condition of hull inside & outside any sign of damage or corrosion. | O | Vestdavit 1 | On Board | ShowEditDestroy |
10:15 ~ 10:30 | 000000 | Morning Tea Break | | | | ShowEditDestroy |
10:30 ~ 10:45 | 570P02 | 5 ~ Rescue Boat - Check the Bilge keel and hull appendages on both sides in good order. | O | Vestdavit 1 | On Board | ShowEditDestroy |
10:45 ~ 11:00 | 570P02 | 6 ~ Davit - Check the davit for visible damages free from dirt, rust and damage. | O | Vestdavit 1 | On Board | ShowEditDestroy |
11:00 ~ 11:15 | 570P02 | 7 ~ Davit - Apply grease to necessary points as specfied in Operation Manual or PMS. | O | Vestdavit 1 | On Board | ShowEditDestroy |
11:15 ~ 11:30 | 570P02 | 8 ~ Davit - Functional check that the davit can move freely in its operation area. Switch “ON” MCCB on starter panel. | O | Vestdavit 1 | On Board | ShowEditDestroy |
11:30 ~ 11:45 | 570P02 | 9 ~ Davit -Check wire rope of the hoist is in perfect condition and good order. | O | Vestdavit 1 | On Board | ShowEditDestroy |
11:45 ~ 12:00 | 570P02 | 10 ~ Life Rafts - Self-protection of with cover from direct heat. | O | Vestdavit 1 | On Board | ShowEditDestroy |
12:00 ~ 12:15 | 570P02 | 11 ~ Life Raft - Keep clean the life raft from salt deposit and moisture. | O | Vestdavit 1 | On Board | ShowEditDestroy |
12:15 ~ 12:30 | 570P02 | 12 ~ Life Raft - Check Condition of stowage and releasing mechanism. | O | Vestdavit 1 | On Board | ShowEditDestroy |
12:30 ~ 12:45 | 570P02 | 13 ~ Life Raft - Visual Inspection the external condition for any sign of damage. | O | Vestdavit 1 | On Board | ShowEditDestroy |
12:45 ~ 13:00 | 570P02 | 14 ~ Life Raft - Check and record the Service interval date and next periodic service. | O | Vestdavit 1 | On Board | ShowEditDestroy |
13:00 ~ 14:00 | 000000 | Lunch Break | C | | | ShowEditDestroy |
Fri 18-Aug |
Group 4 |
10:25 ~ 10:40 | 000000 | Morning Tea Break | | UMW 1 | Classroom 1 | ShowEditDestroy |
12:55 ~ 14:55 | 000000 | Friday Lunch | | | | ShowEditDestroy |
Group 3 |
13:15 ~ 14:15 | 000000 | Lunch Break | C | | | ShowEditDestroy |
Mon 21-Aug |
Group 4 |
09:15 ~ 09:30 | 680M01 | 1 ~ Check Oil Level – PCU Compressor. | O | Staco 1 | On Board | ShowEditDestroy |
09:30 ~ 09:50 | 680M01 | 2 ~ PCU SW Pump - Run pump if not in regular use: Pre starting checks, check performance, leaks and abnormalities. | C | Staco 1 | Classroom 1 | ShowEditDestroy |
09:50 ~ 10:20 | 680M01 | 3 ~ Clean & Inspect – PCU SW Pump, pipes ,couplings, valves mountings, fastenings. | C | Staco 1 | Classroom 1 | ShowEditDestroy |
10:20 ~ 10:35 | 000000 | Morning Tea Break | | | | ShowEditDestroy |
10:35 ~ 10:55 | 680M01 | 4 ~ PCU - Check Refrigerant, Procedure of checks. | C | Staco 1 | Classroom 1 | ShowEditDestroy |
10:55 ~ 11:10 | 680M01 | 5 ~ PCU - Checks for Leaks, Procedure of checks. | C | Staco 1 | Classroom 1 | ShowEditDestroy |
11:10 ~ 11:40 | 680M01 | 6 ~ PCU Compressor Motor - Functional checks: Pre starting checks, check performance and abnormalities. | C | Staco 1 | Classroom 1 | ShowEditDestroy |
11:40 ~ 12:10 | 680M01 | 7 ~ PCU SW Pump Motor - Functional checks: Pre starting checks, performance and abnormalities. | C | Staco 1 | Classroom 1 | ShowEditDestroy |
12:10 ~ 12:40 | 680M01 | 8 ~ PCU Control Panel - Functional checks: Check system operation, performance and abnormalities. | C | Staco 1 | Classroom 1 | ShowEditDestroy |
12:40 ~ 13:00 | 680M01 | 9 ~ Clean & Inspect – PCU Control Panel, switches and indicators, cables and terminations. | C | Staco 1 | Classroom 1 | ShowEditDestroy |
13:00 ~ 13:10 | 680M01 | 10 ~ PCU Compressor Motor - Clean Inspect & Check Insulation Pre starting checks, Cables and terminations, Insulation tester. | C | Staco 1 | Classroom 1 | ShowEditDestroy |
13:10 ~ 13:20 | 680M01 | 11 ~ PCU SW Pump Motor - Clean Inspect & Check Insulation – Pre starting checks, cables and terminations, Insulation tester. | C | Staco 1 | Classroom 1 | ShowEditDestroy |
13:20 ~ 13:25 | 680M01 | 12 ~ Clean Inspect & Check Insulation – Pre starting checks, cables and terminations, Insulation Tester. | C | Staco 1 | Classroom 1 | ShowEditDestroy |
13:25 ~ 13:40 | 680M01 | 13 ~ Check Combined High-Low Pressure Switch – Procedure of setting the Pressure switches. | C | Staco 1 | Classroom 1 | ShowEditDestroy |
13:40 ~ 14:40 | 000000 | Lunch Break | C | | | ShowEditDestroy |
14:40 ~ 14:55 | 680M01 | 14 ~ PCU Compressor - Change LO– Pre starting checks, clean strainers. | C | Staco 1 | Classroom 1 | ShowEditDestroy |
14:55 ~ 15:05 | 680M01 | 15 ~ PCU Compressor Motor - Inspect earth bonding: Earthing straps, fastenings, Continuity Tester. | O | Staco 1 | On Board | ShowEditDestroy |
15:05 ~ 15:10 | 680M01 | 16 ~ PCU SW Pump Motor - Inspect earth bonding: Earthing straps, fastenings, Continuity tester. | C | Staco 1 | Classroom 2 | ShowEditDestroy |
15:10 ~ 15:15 | 680M01 | 17 ~ PCU Control Panel - Inspect earth bonding: Earthing straps, fastenings, Continuity Tester. | C | Staco 1 | Classroom 1 | ShowEditDestroy |
15:15 ~ 15:30 | 000000 | Tea Break | | | | ShowEditDestroy |
15:30 ~ 17:30 | 680M01 | 18 ~ On Board Familiarisation | O | Staco 1 | On Board | ShowEditDestroy |
Tue 22-Aug |
Group 2 |
10:30 ~ 10:45 | 000000 | Morning Tea Break | | | | ShowEditDestroy |
11:35 ~ 12:35 | 110F11 | 1 ~ Perform Site Survey and familiarization with the ICAF system layout and operation | O | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | On Board | ShowEditDestroy |
12:35 ~ 14:35 | 000000 | Friday Lunch | | | | ShowEditDestroy |
14:35 ~ 15:05 | 110F11 | 2 ~ Visually check cables inside power controller unit for damage and tightness. | O | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | On Board | ShowEditDestroy |
15:05 ~ 16:05 | 110F11 | 3 ~ Perform checks and inspections and identify fault conditions. | O | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | On Board | ShowEditDestroy |
16:05 ~ 16:20 | 000000 | Tea Break | | | | ShowEditDestroy |
16:20 ~ 16:50 | 310S01 | 1 ~ Fire Main and the ships FF system-Establish system arrangements. | C | Khairul Azuadi Bin Ariffin | Classroom 2 | ShowEditDestroy |
16:50 ~ 17:30 | 310S01 | 2 ~ Connectivity of the fire Main to the Sprinkler & the Foam system- General characteristics, functions, operations and the utilisation. | C | Khairul Azuadi Bin Ariffin | Classroom 2 | ShowEditDestroy |
17:30 ~ 18:30 | 310S01 | 3 ~ CO2 and the Watermist system- General characteristics, functions, operations, and utilisation. | C | Khairul Azuadi Bin Ariffin | Classroom 2 | ShowEditDestroy |
Fri 25-Aug |
Group 2 |
09:15 ~ 09:45 | 310S01 | 4 ~ Operation of the Bilge System- System arrangements of the bilges. | C | Khairul Azuadi Bin Ariffin | Classroom 2 | ShowEditDestroy |
09:45 ~ 10:15 | 310S01 | 5 ~ Operation of the Ballast system- System arrangements. | C | Khairul Azuadi Bin Ariffin | Classroom 2 | ShowEditDestroy |
10:15 ~ 10:30 | 000000 | Morning Tea Break | | | | ShowEditDestroy |
10:30 ~ 11:30 | 310S01 | 6 ~ Performance of the Ballast pumps- Rate of filling the tanks and tank capacities, the resulting trim. | C | Khairul Azuadi Bin Ariffin | | ShowEditDestroy |
11:30 ~ 11:50 | 310S11 | 1 ~ The FF arrangements – Utilise for Deck Wash, Spray, Flushing and Draining. | O | Khairul Azuadi Bin Ariffin | On Board | ShowEditDestroy |
Group 3 |
09:30 ~ 10:30 | 000A00 | 1 ~ Training Launch Introduction | C | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | Classroom 3 | ShowEditDestroy |
10:30 ~ 10:45 | 000000 | Morning Tea Break | | | | ShowEditDestroy |
10:45 ~ 11:45 | 000F01 | 1 ~ Introduction OPV 1800. | C | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | Classroom 3 | ShowEditDestroy |
11:45 ~ 12:45 | 000F01 | 2 ~ Ship's Operational Capabilities. | C | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | Classroom 3 | ShowEditDestroy |
12:45 ~ 13:45 | 000000 | Lunch Break | C | | | ShowEditDestroy |
13:45 ~ 15:45 | 000F01 | 3 ~ Vessel Layout. | C | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | Classroom 3 | ShowEditDestroy |
15:45 ~ 16:00 | 000000 | Tea Break | | | | ShowEditDestroy |
16:00 ~ 17:00 | 000F01 | 4 ~ Deck Arrangements. | C | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | Classroom 3 | ShowEditDestroy |
Sat 26-Aug |
Group 2 |
12:55 ~ 13:15 | 370S01 | 5 ~ Vent.flaps & covers-inspect perfom chalk test. | C | Ahmad Bin Abdul Rahim | | ShowEditDestroy |
13:15 ~ 13:45 | 370S01 | 6 ~ Functional check the functionalities of various protective and overload devices on mlotor and starters-controllers | C | TP TBD | | ShowEditDestroy |
13:45 ~ 14:45 | 000000 | Lunch Break | C | | | ShowEditDestroy |
14:45 ~ 15:05 | 370S01 | 7 ~ Inspect the earth bonding straps and mechnical fastening are tight free fom dirt, moisture and rust | C | TP TBD | | ShowEditDestroy |
15:05 ~ 15:25 | 370S01 | 8 ~ Inspect and test the equipment at sufficient intervals to make sure that the equipment is in operating condition. | C | TP TBD | | ShowEditDestroy |
15:25 ~ 15:45 | 370S01 | 9 ~ Observe cleanliness, corrosion control and preservation at all time when performing the task | C | TP TBD | | ShowEditDestroy |
15:45 ~ 16:05 | 370S01 | 10 ~ Observe safety precautions, practices and handling of hazadous material in performing the work. | C | TP TBD | | ShowEditDestroy |
Group 1 |
13:15 ~ 13:45 | 370S01 | 1 ~ Functional check of various protective and overload devices and type of controllers employed. | C | TP TBD | Classroom 1 | ShowEditDestroy |
13:45 ~ 14:15 | 370S01 | 2 ~ Ventilation Fan Motor: Check Motor conditions such as Air Flow,Temperature, RPM, noise and vibration. | C | TP TBD | Classroom 1 | ShowEditDestroy |
14:15 ~ 14:35 | 370S01 | 3 ~ Vent. Flaps, covers and trunking-inspect - Clean as necessary. | C | TP TBD | Classroom 1 | ShowEditDestroy |
14:35 ~ 15:05 | 370S01 | 4 ~ Measure Earth Bonding strap and fastenings Continuity and keep the fastenings are tight, clean, dry and free from rust. | C | TP TBD | Classroom 1 | ShowEditDestroy |
15:05 ~ 15:25 | 370S01 | 5 ~ Vent.flaps & covers-inspect perfom chalk test. | C | TP TBD | Classroom 1 | ShowEditDestroy |
15:25 ~ 15:40 | 000000 | Tea Break | | | | ShowEditDestroy |
15:40 ~ 16:10 | 370S01 | 6 ~ Functional check the functionalities of various protective and overload devices on mlotor and starters-controllers | C | TP TBD | Classroom 1 | ShowEditDestroy |
16:10 ~ 16:30 | 370S01 | 7 ~ Inspect the earth bonding straps and mechnical fastening are tight free fom dirt, moisture and rust | C | TP TBD | Classroom 1 | ShowEditDestroy |
16:30 ~ 16:50 | 370S01 | 8 ~ Inspect and test the equipment at sufficient intervals to make sure that the equipment is in operating condition. | C | TP TBD | Classroom 1 | ShowEditDestroy |
16:50 ~ 17:10 | 370S01 | 9 ~ Observe cleanliness, corrosion control and preservation at all time when performing the task | C | TP TBD | Classroom 1 | ShowEditDestroy |
Group 3 |
13:30 ~ 17:30 | 000F11 | 1 ~ Familiarization Onboard. | O | TP TBD | On Board | ShowEditDestroy |
17:30 ~ 17:45 | 000000 | Tea Break | | | | ShowEditDestroy |
Sun 27-Aug |
Group 1 |
09:15 ~ 09:35 | 370S01 | 10 ~ Observe safety precautions, practices and handling of hazadous material in performing the work. | C | TP TBD | Classroom 1 | ShowEditDestroy |
09:35 ~ 10:35 | 370S11 | 1 ~ Initial Walk around: Examine the general conditions and system operationn prior to perform the task. | O | TP TBD | On Board | ShowEditDestroy |
10:35 ~ 10:50 | 000000 | Morning Tea Break | | | | ShowEditDestroy |
10:50 ~ 11:50 | 370S11 | 2 ~ Ensure the filter mat are clean and dry. | O | TP TBD | On Board | ShowEditDestroy |
11:50 ~ 13:50 | 370S11 | 3 ~ Practical Site Survey and inspection on the system and components onboard. | O | TP TBD | On Board | ShowEditDestroy |
13:50 ~ 14:50 | 000000 | Lunch Break | C | | | ShowEditDestroy |
15:20 ~ 15:35 | 000000 | Tea Break | | | | ShowEditDestroy |
Group 2 |
09:30 ~ 10:30 | 370S11 | 1 ~ Initial Walk around: Examine the general conditions and system operationn prior to perform the task. | O | TP TBD | | ShowEditDestroy |
10:45 ~ 11:45 | 370S11 | 2 ~ Ensure the filter mat are clean and dry. | O | TP TBD | | ShowEditDestroy |
13:45 ~ 14:45 | 000000 | Lunch Break | C | | | ShowEditDestroy |
14:45 ~ 16:45 | 370S11 | 3 ~ Practical Site Survey and inspection on the system and components onboard. | O | TP TBD | | ShowEditDestroy |
Group 3 |
09:30 ~ 10:30 | 000F02 | 1 ~ Safety Systems and Lifesaving Equipment. | C | TP TBD | Classroom 3 | ShowEditDestroy |
10:30 ~ 10:45 | 000000 | Morning Tea Break | | | | ShowEditDestroy |
10:45 ~ 12:45 | 000F02 | 2 ~ The Ship's Major System and Equipments. | C | TP TBD | Classroom 3 | ShowEditDestroy |
12:45 ~ 13:45 | 000F02 | 3 ~ The Ship's Auxiliary System. | C | TP TBD | Classroom 3 | ShowEditDestroy |
13:45 ~ 14:45 | 000000 | Lunch Break | C | | | ShowEditDestroy |
14:45 ~ 15:45 | 000F02 | 4 ~ Deck Machineries. | C | TP TBD | Classroom 3 | ShowEditDestroy |
Mon 28-Aug |
Group 3 |
09:30 ~ 10:30 | 000F02 | 5 ~ Other Electronics Equipments and systems Onboard. | C | TP TBD | Classroom 3 | ShowEditDestroy |
10:45 ~ 11:45 | 000F02 | 6 ~ Bilges, Ballast and Internal Fi-Fi System. | C | TP TBD | Classroom 3 | ShowEditDestroy |
12:45 ~ 13:45 | 000000 | Lunch Break | C | | | ShowEditDestroy |
13:45 ~ 17:45 | 000F12 | 1 ~ Familiarization Onboard. | O | TP TBD | On Board | ShowEditDestroy |
Mon 04-Sep |
Group 2 |
13:00 ~ 17:00 | 000F11 | 1 ~ Familiarization Onboard. | O | TP TBD | On Board | ShowEditDestroy |
Thu 07-Sep |
Group 1 |
11:45 ~ 15:45 | 000F11 | 1 ~ Familiarization Onboard. | O | TP TBD | On Board | ShowEditDestroy |
13:30 ~ 17:30 | 000F12 | 1 ~ Familiarization Onboard. | O | TP TBD | On Board | ShowEditDestroy |
Sat 30-Sep |
Group 3 |
09:30 ~ 09:45 | 110F01 | 1 ~ ICAF - Perform maintenance tasks which are specified under “Daily”. | C | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | Classroom 3 | ShowEditDestroy |
09:45 ~ 10:00 | 110F01 | 2 ~ Clean and upkeep the Control Panel and cabinet. | C | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | Classroom 3 | ShowEditDestroy |
10:00 ~ 10:30 | 110F01 | 3 ~ ICAF - Check the condition and functionality of Control Panel Unit and display. | C | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | Classroom 3 | ShowEditDestroy |
10:30 ~ 10:45 | 000000 | Morning Tea Break | | | | ShowEditDestroy |
10:45 ~ 11:15 | 110F01 | 4 ~ Check cables connection on terminals for tightness and damage. | C | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | Classroom 3 | ShowEditDestroy |
11:15 ~ 11:35 | 110F01 | 5 ~ Electrical Checks on Protective devices and safety circuit. | C | Kdr (Rtd) Ir Hj Mohamad Hussin Bin Abdullah | Classroom 3 | ShowEditDestroy |
11:35 ~ 12:35 | 110F11 | 1 ~ Perform Site Survey and familiarization with the ICAF system layout and operation | O | TP TBD | On Board | ShowEditDestroy |
12:35 ~ 14:35 | 000000 | Friday Lunch | | | | ShowEditDestroy |
14:35 ~ 15:05 | 110F11 | 2 ~ Visually check cables inside power controller unit for damage and tightness. | O | TP TBD | On Board | ShowEditDestroy |
15:05 ~ 16:05 | 110F11 | 3 ~ Perform checks and inspections and identify fault conditions. | O | TP TBD | On Board | ShowEditDestroy |