ScheduleBy GroupDaily ScheduleBy TopicsLecturerClass RoomBy StudentNo Lecturer

Listing schedules

   
Group 1
Group 2
Group 3
Group 4
    Group Daily


From ~ ToCourseTopicTypeTrainerClassroomAction
Mon 29-May
Group 1
08:30 ~ 09:30000F011 ~ Introduction OPV 1800.CKdr (Rtd) Ir Hj Mohamad Hussin Bin AbdullahClassroom 4ShowEditDestroy
08:30 ~ 09:30000A001 ~ Training Launch IntroductionCClassroom 4ShowEditDestroy
09:30 ~ 10:30000F012 ~ Ship's Operational Capabilities.CKdr (Rtd) Ir Hj Mohamad Hussin Bin AbdullahClassroom 4ShowEditDestroy
10:30 ~ 10:45000000Morning Tea BreakClassroom 4ShowEditDestroy
11:00 ~ 13:00000F013 ~ Vessel Layout.CKdr (Rtd) Ir Hj Mohamad Hussin Bin AbdullahClassroom 4ShowEditDestroy
11:00 ~ 13:00000F022 ~ The Ship's Major System and Equipments.CKdr (Rtd) Ir Hj Mohamad Hussin Bin AbdullahClassroom 4ShowEditDestroy
13:00 ~ 14:00000000Lunch BreakCClassroom 4ShowEditDestroy
14:00 ~ 15:00000F015 ~ Emergency Station.CKdr (Rtd) Ir Hj Mohamad Hussin Bin AbdullahClassroom 4ShowEditDestroy
14:00 ~ 15:00000F016 ~ SOLAS Equipment and Fire Fighting Onboard.CKdr (Rtd) Ir Hj Mohamad Hussin Bin AbdullahClassroom 4ShowEditDestroy
15:30 ~ 15:45000000Tea BreakClassroom 4ShowEditDestroy
16:00 ~ 17:00000F021 ~ Safety Systems and Lifesaving Equipment.CKdr (Rtd) Ir Hj Mohamad Hussin Bin AbdullahClassroom 4ShowEditDestroy
Tue 30-May
Group 1
08:30 ~ 09:00310S011 ~ Fire Main and the ships FF system-Establish system arrangements.CKhairul Azuadi Bin AriffinClassroom 1ShowEditDestroy
09:00 ~ 09:40310S012 ~ Connectivity of the fire Main to the Sprinkler & the Foam system- General characteristics, functions, operations and the utilisation.CKhairul Azuadi Bin AriffinClassroom 1ShowEditDestroy
09:40 ~ 10:40310S013 ~ CO2 and the Watermist system- General characteristics, functions, operations, and utilisation.CKhairul Azuadi Bin AriffinClassroom 1ShowEditDestroy
09:40 ~ 10:00310S111 ~ The FF arrangements – Utilise for Deck Wash, Spray, Flushing and Draining.OKhairul Azuadi Bin AriffinOn BoardShowEditDestroy
10:30 ~ 10:45000000Morning Tea BreakClassroom 4ShowEditDestroy
11:00 ~ 12:00000F023 ~ The Ship's Auxiliary System.CKdr (Rtd) Ir Hj Mohamad Hussin Bin AbdullahClassroom 4ShowEditDestroy
12:00 ~ 13:00000000Lunch BreakCClassroom 4ShowEditDestroy
14:00 ~ 15:00000F014 ~ Deck Arrangements.CKdr (Rtd) Ir Hj Mohamad Hussin Bin AbdullahClassroom 4ShowEditDestroy
14:00 ~ 15:00000F024 ~ Deck Machineries.CKdr (Rtd) Ir Hj Mohamad Hussin Bin AbdullahClassroom 4ShowEditDestroy
15:00 ~ 15:15110F011 ~ ICAF - Perform maintenance tasks which are specified under “Daily”.CKdr (Rtd) Ir Hj Mohamad Hussin Bin AbdullahClassroom 4ShowEditDestroy
15:00 ~ 15:30110F013 ~ ICAF - Check the condition and functionality of Control Panel Unit and display.CKdr (Rtd) Ir Hj Mohamad Hussin Bin AbdullahClassroom 4ShowEditDestroy
15:15 ~ 15:30110F012 ~ Clean and upkeep the Control Panel and cabinet.CKdr (Rtd) Ir Hj Mohamad Hussin Bin AbdullahClassroom 4ShowEditDestroy
15:30 ~ 15:45000000Tea BreakClassroom 4ShowEditDestroy
16:00 ~ 16:20110F015 ~ Electrical Checks on Protective devices and safety circuit.CKdr (Rtd) Ir Hj Mohamad Hussin Bin AbdullahClassroom 4ShowEditDestroy
16:00 ~ 16:30110F014 ~ Check cables connection on terminals for tightness and damage.CKdr (Rtd) Ir Hj Mohamad Hussin Bin AbdullahClassroom 4ShowEditDestroy
16:00 ~ 17:00000F025 ~ Other Electronics Equipments and systems Onboard.CKdr (Rtd) Ir Hj Mohamad Hussin Bin AbdullahClassroom 4ShowEditDestroy
Wed 31-May
Group 1
08:30 ~ 09:10360S011 ~ The LO Bunker Station and LO Supply System – Establish the system arrangements for the Transfer and Supply of LO to consumers.CKhairul Azuadi Bin AriffinClassroom 1ShowEditDestroy
09:10 ~ 09:30360S012 ~ Process of filling/transfer of LO tanks - Tanks capacities, Flow rate and time period of filling or transfer. CKhairul Azuadi Bin AriffinClassroom 1ShowEditDestroy
09:30 ~ 09:45360S013 ~ Establish the Overflow line and tanks.CKhairul Azuadi Bin AriffinClassroom 1ShowEditDestroy
09:45 ~ 10:00360S014 ~ The High Level Alarm – Activation and height levels.CKhairul Azuadi Bin AriffinClassroom 1ShowEditDestroy
10:30 ~ 10:45000000Morning Tea BreakClassroom 4ShowEditDestroy
11:00 ~ 11:30360S015 ~ The DO and Sludge System – Establish the system arrangements, functions and operations.CKhairul Azuadi Bin AriffinClassroom 1ShowEditDestroy
11:30 ~ 12:00360S016 ~ Suction, Collecting, of DO and Sludge – Transfer into the Sludge Tank or Shore facilities.CKhairul Azuadi Bin AriffinClassroom 1ShowEditDestroy
12:00 ~ 13:00360S111 ~ On Board FamiliarisationOKhairul Azuadi Bin AriffinClassroom 1ShowEditDestroy
12:00 ~ 12:15360S017 ~ Health Safety & Environment ProtectionCKhairul Azuadi Bin AriffinClassroom 1ShowEditDestroy
12:15 ~ 12:35360S018 ~ Administer Oil SamplingCKhairul Azuadi Bin AriffinClassroom 1ShowEditDestroy
13:00 ~ 14:00000000Lunch BreakCClassroom 4ShowEditDestroy
14:00 ~ 14:40320S012 ~ Process of filling/transfer of FO tanks - Tanks capacities, Flow rate and time period of filling or transfer. CKhairul Azuadi Bin AriffinClassroom 1ShowEditDestroy
14:00 ~ 15:30400S112 ~ Perform Practical Site Survey and inspection on the system and components onboard.OAkmal HidayatOn BoardShowEditDestroy
14:00 ~ 14:40320S011 ~ The Fuel Transfer and Supply System – Establish the system arrangements for the Transfer and Supply of fuel.CKhairul Azuadi Bin AriffinClassroom 1ShowEditDestroy
14:40 ~ 14:55320S013 ~ Establish the overflow line and tanks.CKhairul Azuadi Bin AriffinClassroom 1ShowEditDestroy
14:55 ~ 15:15320S014 ~ Utilising the Day Tanks – Rate of consumption.CKhairul Azuadi Bin AriffinClassroom 1ShowEditDestroy
15:15 ~ 15:35400S111 ~ Fuel System Primary Filter - Drain and check conditions OAkmal HidayatOn BoardShowEditDestroy
15:30 ~ 15:45000000Tea BreakClassroom 4ShowEditDestroy
16:00 ~ 16:20320S015 ~ Cargo Handling System for FO – Establish the system arrangements and operations, for the FO Transfer onboard and discharge ashore.CKhairul Azuadi Bin AriffinClassroom 1ShowEditDestroy
Thu 01-Jun
Group 1
10:45 ~ 11:00000000Morning Tea BreakShowEditDestroy
13:00 ~ 14:00000000Lunch BreakCShowEditDestroy
14:00 ~ 14:20320S016 ~ Administer oil sampling.CKhairul Azuadi Bin AriffinClassroom 1ShowEditDestroy
14:20 ~ 14:35320S111 ~ The Low and High Level Alarm – Activation and height levels.OKhairul Azuadi Bin AriffinClassroom 1ShowEditDestroy
14:30 ~ 15:30320S112 ~ On Board Familiarisation.OKhairul Azuadi Bin AriffinClassroom 1ShowEditDestroy
15:15 ~ 15:30000000Tea BreakShowEditDestroy
16:00 ~ 16:30310S014 ~ Operation of the Bilge System- System arrangements of the bilges.CKhairul Azuadi Bin AriffinClassroom 1ShowEditDestroy
16:00 ~ 17:00000F026 ~ Bilges, Ballast and Internal Fi-Fi System.CKhairul Azuadi Bin AriffinClassroom 4ShowEditDestroy
16:00 ~ 16:30310S015 ~ Operation of the Ballast system- System arrangements.CKhairul Azuadi Bin AriffinClassroom 1ShowEditDestroy
16:00 ~ 17:00310S016 ~ Performance of the Ballast pumps- Rate of filling the tanks and tank capacities, the resulting trim.CKhairul Azuadi Bin AriffinClassroom 1ShowEditDestroy
Fri 02-Jun
Group 1
08:30 ~ 09:30620S011 ~ Working and Control Air System – Establish the Compressors and the system arrangements, for Working and Control Air.CKhairul Azuadi Bin AriffinClassroom 1ShowEditDestroy
10:05 ~ 10:20000000Morning Tea BreakClassroom 1ShowEditDestroy
11:00 ~ 11:40620S012 ~ System Operations – The Air Bottles and Driers and Distribution of the Working and the Control Air.CKhairul Azuadi Bin AriffinClassroom 1ShowEditDestroy
11:40 ~ 11:55620S013 ~ Connectivity - Working Air System and Control Air System.CKhairul Azuadi Bin AriffinClassroom 1ShowEditDestroy
11:55 ~ 12:10620S014 ~ System performance – Charging the bottles, the Air pressures.CKhairul Azuadi Bin AriffinClassroom 1ShowEditDestroy
12:00 ~ 14:00000000Friday LunchClassroom 1ShowEditDestroy
14:00 ~ 14:15620S015 ~ Controlling the Air Pressures.CKhairul Azuadi Bin AriffinClassroom 1ShowEditDestroy
14:15 ~ 14:30620S016 ~ Alarm activation – Low pressure.CKhairul Azuadi Bin AriffinClassroom 1ShowEditDestroy
15:30 ~ 15:45000000Tea BreakClassroom 1ShowEditDestroy
16:00 ~ 17:00620S111 ~ On Board FamiliarisationOKhairul Azuadi Bin AriffinClassroom 1ShowEditDestroy
Tue 06-Jun
Group 1
08:30 ~ 08:45400S011 ~ Introduction to Diesel Generation SystemCAkmal HidayatClassroom 1ShowEditDestroy
10:15 ~ 10:30400S018 ~ Shore connection - Shore Supply (SS)cables and stowage reels.CAkmal HidayatClassroom 1ShowEditDestroy
10:30 ~ 10:45000000Morning Tea BreakShowEditDestroy
10:30 ~ 10:45000000Morning Tea BreakShowEditDestroy
11:00 ~ 11:15400S012 ~ Emergency Generators: Daily Checklist CAkmal HidayatClassroom 1ShowEditDestroy
11:15 ~ 11:30400S013 ~ Emergency Generators: Instrument Panel Overview. CAkmal HidayatClassroom 1ShowEditDestroy
11:30 ~ 11:45400S014 ~ Emergency Generators: Oil Sampling CAkmal HidayatClassroom 1ShowEditDestroy
11:45 ~ 12:00400S015 ~ Emergency Generators: Visual Inspection & Troubleshooting CAkmal HidayatClassroom 1ShowEditDestroy
12:00 ~ 12:15400S016 ~ Emergency Generators: Check the function of Protection Panel and check protection device. CAkmal HidayatClassroom 1ShowEditDestroy
12:15 ~ 12:30400S017 ~ Emergency Generators - Inspect Electrical Diesel Engine Instrument Panel.CAkmal HidayatClassroom 1ShowEditDestroy
12:30 ~ 12:45400S019 ~ Shore Connection: SS Panels & Connection Box CAkmal HidayatClassroom 1ShowEditDestroy
12:45 ~ 13:00400S0110 ~ Shore Connection:SOP SS connections ( Before/ After)CAkmal HidayatClassroom 1ShowEditDestroy
13:00 ~ 14:00000000Lunch BreakCShowEditDestroy
14:00 ~ 14:15400S0111 ~ Battery Sets: Visual Inspection & TroubleshootingCAkmal HidayatClassroom 1ShowEditDestroy
14:00 ~ 14:30430S0114 ~ Ships Batteries and UPS - Check battery capacity and charging current ratingCAkmal HidayatClassroom 1ShowEditDestroy
14:10 ~ 14:40430S0117 ~ Batteries and UPS - Check Ventilations layout and arrangement.CAkmal HidayatClassroom 1ShowEditDestroy
14:15 ~ 14:30400S0112 ~ Battery Sets - Functional check of charging units and check cable any sign of damage. CAkmal HidayatClassroom 1ShowEditDestroy
14:30 ~ 14:45400S0113 ~ UPS: Visual Check on ventilation systemCAkmal HidayatClassroom 1ShowEditDestroy
14:30 ~ 14:50430S0115 ~ Ships Batteries and UPS - Visual Inspection and Identifying components and common faultsCAkmal HidayatClassroom 1ShowEditDestroy
14:45 ~ 15:00400S0114 ~ UPS: Run Self Check (BITE)CAkmal HidayatClassroom 1ShowEditDestroy
14:50 ~ 15:10430S0116 ~ Ships Batteries and UPS - Check and clean Earth bonding straps tightness and free from dirt and corrosion.CAkmal HidayatClassroom 1ShowEditDestroy
15:00 ~ 15:15400S0115 ~ UPS: Clean and InspectCAkmal HidayatClassroom 1ShowEditDestroy
15:15 ~ 15:30400S0116 ~ UPS:Check Insulation and earthing.CAkmal HidayatClassroom 1ShowEditDestroy
15:45 ~ 16:00000000Tea BreakShowEditDestroy
16:00 ~ 16:15400S0117 ~ Emergency switchboard: Visual check and cleanCAkmal HidayatClassroom 1ShowEditDestroy
Wed 07-Jun
Group 1
08:30 ~ 08:50430S011 ~ 230V 50Hz Panels : Visual inspection on connectionsCAkmal HidayatClassroom 1ShowEditDestroy
08:50 ~ 09:10430S012 ~ 230V 50Hz Panels : Visual inspection on Bus/Bus LayoutCAkmal HidayatClassroom 1ShowEditDestroy
09:10 ~ 09:30430S013 ~ 230 V 50Hz Panels : Front panels of dead front switchboards: Visual inspection & clean.CAkmal HidayatClassroom 1ShowEditDestroy
09:30 ~ 10:30430S111 ~ Maintain - Propose” Perform Site survey, identify system layout and operating instructions.OAkmal HidayatOn BoardShowEditDestroy
09:45 ~ 10:05430S014 ~ 230 V 50Hz Panels : Check Front panels of dead front switchboards: gauges and display Instruments for correct function and calibrated.CAkmal HidayatClassroom 1ShowEditDestroy
10:05 ~ 10:25430S015 ~ 230 V 50Hz Panels - Run self check on BITE facilities.CAkmal HidayatClassroom 1ShowEditDestroy
10:30 ~ 10:45000000Morning Tea BreakShowEditDestroy
10:45 ~ 12:45430S112 ~ Perform Practical Site Survey and inspection on the system and components onboard.OAkmal HidayatOn BoardShowEditDestroy
11:00 ~ 11:20430S016 ~ 230V 50Hz Panels protective circuits : Visual inspection on all protective devices and relays.CAkmal HidayatClassroom 1ShowEditDestroy
11:20 ~ 11:40430S017 ~ 230 V 50Hz Panels : Check earth bonding connection and conditionsCAkmal HidayatClassroom 1ShowEditDestroy
11:30 ~ 11:45000000Morning Tea BreakShowEditDestroy
11:40 ~ 12:00430S018 ~ 230 V 50Hz Panels - Visual and functional check the protective devices on Distribution BoxesCAkmal HidayatClassroom 1ShowEditDestroy
13:15 ~ 13:30450S013 ~ Transitional Lighting - Visual inspection, check sign of corrosion and moisture. CAkmal HidayatClassroom 1ShowEditDestroy
13:30 ~ 14:30000000Lunch BreakCShowEditDestroy
14:00 ~ 14:15450S113 ~ Emergency lighting - Functional check and inspection.OAkmal HidayatOn BoardShowEditDestroy
14:00 ~ 14:15450S015 ~ Emergency Lighting - Check Emergency Lighting Layout and fittings.CAkmal HidayatClassroom 1ShowEditDestroy
14:15 ~ 14:30450S016 ~ Emergency lighting - Functional check the lighting by compartments and system for normal and alternative supplies.CAkmal HidayatClassroom 1ShowEditDestroy
15:15 ~ 15:30450S017 ~ External Lighting - Visual check on fittings and general layout.CAkmal HidayatClassroom 1ShowEditDestroy
15:30 ~ 15:45000000Tea BreakShowEditDestroy
15:45 ~ 16:00450S018 ~ External lighting - Check watertight integrity at cable entry and cable gland.CAkmal HidayatClassroom 1ShowEditDestroy
16:00 ~ 16:15450S0110 ~ Portable Lighting - Visual check on fittingsCAkmal HidayatClassroom 1ShowEditDestroy
16:00 ~ 16:15450S0111 ~ Portable lighting - Earth Fault Insulation and Continuity Check.CAkmal HidayatClassroom 1ShowEditDestroy
16:00 ~ 16:15450S0112 ~ Portable lighting - Check for watertight integrity at flab entry and switches.CAkmal HidayatClassroom 1ShowEditDestroy
16:00 ~ 17:00450S019 ~ Portable Lighting - Functional check on lighting system and General Layout.CAkmal HidayatClassroom 1ShowEditDestroy
Thu 08-Jun
Group 1
08:30 ~ 08:45450S011 ~ General Lighting - Lighting general layout and functional checks..CAkmal HidayatClassroom 1ShowEditDestroy
08:45 ~ 09:00450S012 ~ General Lighting - Check earth fault and continuity.CAkmal HidayatClassroom 1ShowEditDestroy
09:00 ~ 09:15450S111 ~ General Lighting Visual inspection and general Layout: and arrangementOAkmal HidayatOn BoardShowEditDestroy
10:15 ~ 10:30000000Morning Tea BreakShowEditDestroy
10:45 ~ 11:00450S112 ~ Transitional lighting - Functional check and inspection.OAkmal HidayatOn BoardShowEditDestroy
11:15 ~ 11:30450S114 ~ External lighting - Functional check and inspection.OAkmal HidayatOn BoardShowEditDestroy
11:30 ~ 12:30450S115 ~ Perform Practical Site Survey and inspection on the system and components onboard of Power Distribution and Lighting Systems.OAkmal HidayatOn BoardShowEditDestroy
12:30 ~ 13:30000000Lunch BreakCShowEditDestroy
14:00 ~ 14:15400S0118 ~ Transformers:: Visual check and cleanCAkmal HidayatClassroom 1ShowEditDestroy
14:15 ~ 14:45430S0111 ~ Transformers - Check and clean Earth bonding straps tightness and free from dirt and corrosion.CAkmal HidayatClassroom 1ShowEditDestroy
14:15 ~ 14:30400S0119 ~ Transformers: Visual and functional check.CAkmal HidayatClassroom 1ShowEditDestroy
14:30 ~ 15:00430S019 ~ Transformers -, Visual Inspection and check for corrosion and cleanliness.CAkmal HidayatClassroom 1ShowEditDestroy
16:00 ~ 16:30430S0112 ~ Transformers - Check and examine the electrical properties continuity, insulation are within the acceptable limits.CAkmal HidayatClassroom 1ShowEditDestroy
16:00 ~ 16:20430S0110 ~ Transformers - Electrical checks and troubleshootingCAkmal HidayatClassroom 1ShowEditDestroy
16:00 ~ 16:30430S0113 ~ Transformers - Keep all electrical connections and mechanical fastenings tight according to right torque and the fastenings are dry, clean and rust free.CAkmal HidayatClassroom 1ShowEditDestroy
Fri 09-Jun
Group 1
10:40 ~ 10:55000000Morning Tea BreakShowEditDestroy
12:30 ~ 14:30000000Friday LunchShowEditDestroy
16:00 ~ 16:15000000Tea BreakShowEditDestroy
16:35 ~ 17:35310S112 ~ On Board Familiarisation.OKhairul Azuadi Bin AriffinShowEditDestroy
Mon 12-Jun
Group 1
13:00 ~ 14:00000000Lunch BreakCShowEditDestroy
15:30 ~ 15:45000000Tea BreakShowEditDestroy
Tue 13-Jun
Group 1
10:30 ~ 10:45000000Morning Tea BreakCaterpillar SystemShowEditDestroy
12:45 ~ 13:45000000Lunch BreakCCaterpillar SystemShowEditDestroy
Wed 14-Jun
Group 1
10:40 ~ 10:55000000Morning Tea BreakShowEditDestroy
11:00 ~ 11:30340S011 ~ The FW Supply & FW Supply System Accommodation – Establish the system arrangements.CDamen 1On BoardShowEditDestroy
11:30 ~ 12:00340S012 ~ Process of filling/Supply to FW tanks – The FW Cargo Handling system, the Reverse Osmosis Systems and the Hydrophore, their functions and operations.CDamen 1On BoardShowEditDestroy
12:00 ~ 12:30340S013 ~ RO systems – Production rate, managing the Chemicals and the Backwash.CDamen 1On BoardShowEditDestroy
12:30 ~ 12:40340S014 ~ Administer water sampling.CDamen 1On BoardShowEditDestroy
12:40 ~ 13:00340S015 ~ FW Supply System Accommodation – FW circulation and pumps, Distribution to consumers and Equipment on boardCDamen 1On BoardShowEditDestroy
13:25 ~ 14:25000000Lunch BreakCShowEditDestroy
16:00 ~ 16:20340S016 ~ Establish Tanks capacities, Flow rate and time period of filling or transfer. ODamen 1On BoardShowEditDestroy
16:15 ~ 16:30000000Tea BreakShowEditDestroy
16:20 ~ 16:50340S017 ~ The Hot Water System – Production, circulation, temperature control and distribution to consumers.CDamen 1On BoardShowEditDestroy
16:50 ~ 17:50340S018 ~ On Board Familiarisation.ODamen 1On BoardShowEditDestroy
Thu 15-Jun
Group 1
08:30 ~ 09:50734S011 ~ Daily users check: ILS modules and configurations, Password and Data entry. CEnigma 1Classroom 1ShowEditDestroy
09:50 ~ 10:10734S012 ~ Data Cleansing.CEnigma 1Classroom 1ShowEditDestroy
10:10 ~ 10:25734S013 ~ Clean and Inspect: Monitor, keyboard, server, UPS, power plugs.CEnigma 1Classroom 1ShowEditDestroy
10:45 ~ 11:00000000Morning Tea BreakShowEditDestroy
11:00 ~ 11:40734S014 ~ Types of templates, Data Generation, Data Analysis.CEnigma 1Classroom 1ShowEditDestroy
11:40 ~ 11:50734S015 ~ Clean, inspect and check insulation: Insulation properties, Set up Insulation testing, Insulation tester.CEnigma 1Classroom 1ShowEditDestroy
12:30 ~ 14:30000000Friday LunchShowEditDestroy
14:00 ~ 15:00734S016 ~ On Board FamiliarisationOEnigma 1On BoardShowEditDestroy
16:30 ~ 16:45000000Tea BreakShowEditDestroy
Mon 19-Jun
Group 1
08:30 ~ 09:00691S011 ~ Fin Stabilizer - Examine the general conditions, and system functional prior to performing the task.CKongsberg 1Classroom 1ShowEditDestroy
09:00 ~ 09:30691S012 ~ Fin Stabilizer - Check Fluid Levels are in acceptable limits and utilise correct grade of fluids.CKongsberg 1Classroom 1ShowEditDestroy
09:30 ~ 10:00691S013 ~ Fin Stabilizer - Perform Lubricating Oil Test using test kit and hydraulic fluids crackle and cleanliness test.CKongsberg 1Classroom 1ShowEditDestroy
10:00 ~ 10:30691S014 ~ Fin Stabilizer - Inspect Fins Stabiliser System operation and functions.CKongsberg 1Classroom 1ShowEditDestroy
11:00 ~ 12:00691S016 ~ Fin Stabilizer - Visual check and Inspections of the electrical components of Steering Gear HPU motor and controller.CKongsberg 1Classroom 1ShowEditDestroy
12:00 ~ 12:30691S017 ~ Fin Stabilizer - Visual inspection on Control valves and instruments for sign of defects and abnormalities.CKongsberg 1Classroom 1ShowEditDestroy
12:30 ~ 13:00691S018 ~ Fin Stabilizer - Obtain Lubricating Oil Sample for analysis and diagnostic - for CBM.CKongsberg 1Classroom 1ShowEditDestroy
14:00 ~ 14:30691S015 ~ Fin Stabilizer - Perform Functional test and operation using of manual hand pump for maintenance and emergency.OKongsberg 1On BoardShowEditDestroy
14:30 ~ 15:00691S019 ~ Fin Stabilizer - Safety and Handling - Observe safety precaution and practices, handling of hazardous materials when performing the work.OKongsberg 1On BoardShowEditDestroy
16:00 ~ 17:30691S0110 ~ Fin Stabilizer - Practical Site Survey and Inspection on the System and Components onboard.OKongsberg 1On BoardShowEditDestroy
Thu 22-Jun
Group 1
14:30 ~ 14:45450S014 ~ Transitional Lighting - Functional check the lighting by compartments and system.CAkmal HidayatClassroom 1ShowEditDestroy
Mon 26-Jun
Group 1
10:30 ~ 10:45000000Morning Tea BreakShowEditDestroy
12:35 ~ 13:35000000Lunch BreakCShowEditDestroy
15:30 ~ 15:45000000Tea BreakShowEditDestroy
Tue 27-Jun
Group 1
08:30 ~ 09:00800S011 ~ Examine the general conditions and of SAAB Integrated Communication System (ICS) - TactiCall system networks functional status prior to perform the tasks ( Physical and dynamic).CMorten JepsenClassroom 1ShowEditDestroy
09:00 ~ 09:30800S012 ~ Functional check of the overall External Communication system networks and sub-system.CMorten JepsenClassroom 1ShowEditDestroy
09:30 ~ 10:00800S013 ~ HF Radio System - Functional check of the from Local (Communication Room) and various remote positions.CMorten JepsenClassroom 1ShowEditDestroy
10:00 ~ 10:15000000Morning Tea BreakClassroom 1ShowEditDestroy
10:00 ~ 10:30800S014 ~ Fleet Broadband FFB - Functional check both Local (Communication Room) and various remote positions.CMorten JepsenClassroom 1ShowEditDestroy
10:30 ~ 10:45000000Morning Tea BreakShowEditDestroy
11:00 ~ 11:30800S015 ~ V/UHF Radio System - Functional check of the from Local (Communication Room) and various remote positions.CMorten JepsenClassroom 1ShowEditDestroy
11:30 ~ 12:00800S016 ~ V/HF Radio System - Perform Routine test with BITE (Built In Test Equipment) without radiating signals in Transmitter TX, Receiver, Power and Antennas modules accordance with relevant IMO circulars.CMorten JepsenClassroom 1ShowEditDestroy
12:00 ~ 12:30800S017 ~ HF Transceiver System - Perform Weekly routine check on The Antenna Tuning Unit.OMorten JepsenOn BoardShowEditDestroy
12:15 ~ 13:15000000Lunch BreakCShowEditDestroy
12:30 ~ 13:00800S018 ~ MF/HF radio’s display - GPS is connected, check the position and time in the MF/HF radio’s display. CMorten JepsenClassroom 1ShowEditDestroy
13:15 ~ 13:45870S011 ~ Barometer/hermometer/hygrometer - Examine the general conditions and system functional prior to performing the task.CDamen 1On BoardShowEditDestroy
13:45 ~ 14:15870S012 ~ Barometer/hermometer/hygrometer - Visual inspection of the unit and clean as necessary. CDamen 1On BoardShowEditDestroy
14:00 ~ 14:30800S019 ~ MF/HF DSC Live test call with a Maritime Communications Station Send a DSC call to the appropriate coast station. The acknowledgement from the coast station is received by the 2187.5 kHz watch receiver if the call was sent on that frequency. If the call is sent on HF only the audio signal output from the 2187.5 kHz watch receiver should be checked.CMorten JepsenClassroom 1ShowEditDestroy
14:15 ~ 14:45870S013 ~ Barometer/hermometer/hygrometer - Check and clean the exposed part and sight glass as necessary.ODamen 1On BoardShowEditDestroy
14:30 ~ 15:00800S0110 ~ DSC routine testing - Check the DSC function regularly. Verify the complete DSC installation, with antennas, by transmitting a Safety Test call to another station (coast or ship). The test call is generated using the DSC call flow via menu. CMorten JepsenClassroom 1ShowEditDestroy
14:45 ~ 15:15870S014 ~ Barometer/hermometer/hygrometer - Check and clean the station annually. ODamen 1On BoardShowEditDestroy
15:00 ~ 15:30800S0111 ~ Internal Communication - Intercom: Visual Check the terminal and display. Free from dirt and dust.CMorten JepsenClassroom 1ShowEditDestroy
15:15 ~ 15:45870S015 ~ Barometer/hermometer/hygrometer - Visual inspection of the unit and clean as necessary.ODamen 1On BoardShowEditDestroy
15:30 ~ 15:45000000Tea BreakShowEditDestroy
15:45 ~ 16:00000000Tea BreakShowEditDestroy
16:00 ~ 16:30870S016 ~ Anemometer - Check cabling and cable support for any sign of damage and corrosion.ODamen 1On BoardShowEditDestroy
16:00 ~ 16:30800S0112 ~ Internal Communication Intercom - User level system Check for functionality.CMorten JepsenClassroom 1ShowEditDestroy
16:30 ~ 17:00800S0113 ~ Internal Communication - Public Address system: Visual Check and Cleaning of Units.CMorten JepsenClassroom 1ShowEditDestroy
16:30 ~ 17:00870S017 ~ Anemometer - Check mounting conditions and earthing strap connection, re tighten if necessary.CDamen 1On BoardShowEditDestroy
17:00 ~ 17:30870S019 ~ Anemometer - Check mounting for sign of corrosion and re tighten fasteners if necessary.CDamen 1On BoardShowEditDestroy
17:30 ~ 18:00870S018 ~ Anemometer - Run self test or BITE for normal operation.CDamen 1On BoardShowEditDestroy
Wed 28-Jun
Group 1
08:30 ~ 09:00800S0114 ~ Internal Communication - Public Address system (PAGA - Visual Check, Inspect earth bonding Units and clean as necessary.OMorten JepsenOn BoardShowEditDestroy
09:00 ~ 09:30800S0115 ~ Internal Communication - Public Address system:- Inspect earth bondingand straps, fasterners tightness and corrosion free.CMorten JepsenClassroom 1ShowEditDestroy
09:30 ~ 10:00870S0110 ~ Weather fax - Functional check power supply connection in good working order. ODamen 1On BoardShowEditDestroy
09:30 ~ 10:00800S0116 ~ Internal Communication - Wireless VHF Communication: Check the system visually and check correct function of charger unit.CMorten JepsenClassroom 1ShowEditDestroy
10:00 ~ 10:30870S0111 ~ Weather fax - Check above deck unit -pre- amp is clean and free form dirt and salt deposit.CDamen 1On BoardShowEditDestroy
10:00 ~ 10:30800S0117 ~ Internal Communication - Wireless VHF Communication: Visual Check RBS Panel and clean as necessary.CMorten JepsenClassroom 1ShowEditDestroy
10:30 ~ 10:45000000Morning Tea BreakShowEditDestroy
10:45 ~ 11:15870S0112 ~ Weather fax - Run system check using BITE facility or self test. ODamen 1On BoardShowEditDestroy
11:00 ~ 11:30800S0118 ~ Internal Communication - Wireless VHF Communication: Check Earth bonding at RBS.CMorten JepsenClassroom 1ShowEditDestroy
11:15 ~ 11:45870S0113 ~ Weather fax - Ensure the cable interconnection between receiver unit, pre-amp and connection hub are correctly terminated.ODamen 1On BoardShowEditDestroy
11:30 ~ 12:00800S0119 ~ Internal Communication - Internal telephone system: Visually Check control panel / Front panel free from dirt and moisture and corrosion.CMorten JepsenClassroom 1ShowEditDestroy
11:45 ~ 13:45870S0114 ~ Wind & Meteorological System - Practical Site Survey and inspection on the system and components onboard.ODamen 1On BoardShowEditDestroy
12:00 ~ 12:30800S0120 ~ Internal Communication - Internal telephone system - Visual Check for loose connection and free from dirt.CMorten JepsenClassroom 1ShowEditDestroy
12:30 ~ 13:00800S0121 ~ Internal Communication - CCTV system: Visual Check and free from dust and ingress of water.CMorten JepsenClassroom 1ShowEditDestroy
13:45 ~ 14:45000000Lunch BreakCShowEditDestroy
14:00 ~ 14:30800S0122 ~ Internal Communication - CCTV system: Check earth bonding and cable gland.CMorten JepsenClassroom 1ShowEditDestroy
14:30 ~ 15:00800S0123 ~ Internal Communication - Sound Powered Telephone: Check the installation completeness and functional check.CMorten JepsenClassroom 1ShowEditDestroy
14:45 ~ 15:25333S011 ~ SW Cooling System – Establish system arrangements, the suction and overboard discharge.CDamen 1On BoardShowEditDestroy
15:00 ~ 15:30800S0124 ~ Internal Communication - Sound Powered Telephone: Check earth bonding and cable gland watertightness integrity.CMorten JepsenClassroom 1ShowEditDestroy
15:25 ~ 15:40333S012 ~ Operation of the SW Cooling and the Heat Exchangers, the Low Temp and High Temp Coolers.CDamen 1On BoardShowEditDestroy
15:40 ~ 15:55000000Morning Tea BreakShowEditDestroy
15:55 ~ 16:05333S013 ~ System Performance – Temperature and Pressures.CDamen 1On BoardShowEditDestroy
16:05 ~ 16:35333S014 ~ Fresh Cooling Water System – Establish system arrangements, the FW circulation and Heat Exchangers.CDamen 1On BoardShowEditDestroy
16:30 ~ 17:00800S0125 ~ Internal Communication - Homing Beacon: Visual inspection and clean and inspect externally.CMorten JepsenClassroom 1ShowEditDestroy
16:35 ~ 16:50333S015 ~ System Operation - The Circulation Pumps and the system operation. CDamen 1On BoardShowEditDestroy
16:50 ~ 17:00333S016 ~ Circulating Pumps – Controlling the pumps.CDamen 1On BoardShowEditDestroy
17:00 ~ 17:10333S017 ~ System performance – Temperature and pressures. CDamen 1On BoardShowEditDestroy
Mon 10-Jul
Group 1
08:30 ~ 08:50821S016 ~ Keep equipment and console panels are clean and dry free from dirt, salt deposit, and corrosion.CSinor Marine Technologies 1Classroom 1ShowEditDestroy
08:50 ~ 09:10821S017 ~ Power Supply - Check the condition of power supplies input AC and DC supplies quality are available and connected to the IBS system.CSinor Marine Technologies 1Classroom 1ShowEditDestroy
09:10 ~ 09:40821S018 ~ IBS - Inspect and test the system and equipment at sufficient intervals to make sure that the equipment is in operating conditions.CSinor Marine Technologies 1Classroom 1ShowEditDestroy
09:40 ~ 10:10821S019 ~ Keep earthing straps connections and mechanical fastenings tight according to right torque. Measure the insulation and continuity.CSinor Marine Technologies 1Classroom 1ShowEditDestroy
10:10 ~ 10:40821S0110 ~ IBS - Check and examine the IBS components and peripherals connectivity/ interface between IBS to other sub- system are functioning seamlessly.CSinor Marine Technologies 1Classroom 1ShowEditDestroy
11:00 ~ 11:30821S0111 ~ IBS - Check and examine the Power Back supply AC and DC thourg back-up battery bank and UPS are in good working order.CSinor Marine Technologies 1Classroom 1ShowEditDestroy
14:00 ~ 16:00821S0112 ~ IBS - Practical Site Survey and Inspection on the System and Components onboard.OSinor Marine Technologies 1On BoardShowEditDestroy
14:00 ~ 15:30821S011 ~ Perform Site Survey and to familiarise with the overall system layout examine general conditions including to be acquinted system operating instruction prior to perform the task.OSinor Marine Technologies 1On BoardShowEditDestroy
16:00 ~ 16:20821S012 ~ Integrated navigation system - Visual Check on loose connection on workstations and interfacing units.OSinor Marine Technologies 1On BoardShowEditDestroy
16:20 ~ 16:40821S013 ~ Integrated navigation system - Visual check on control panel - terminal block.OSinor Marine Technologies 1On BoardShowEditDestroy
16:40 ~ 17:00821S014 ~ Integrated navigation system - All electrical connections and mechanical fastenings tight according to right torque and the fastenings are dry, clean and rust free.OSinor Marine Technologies 1On BoardShowEditDestroy
17:00 ~ 17:30821S015 ~ Integrated navigation system - IBS System check at User Level with BITE facilities.OSinor Marine Technologies 1On BoardShowEditDestroy
Tue 11-Jul
Group 1
10:45 ~ 11:00000000Morning Tea BreakShowEditDestroy
13:20 ~ 14:20000000Lunch BreakCShowEditDestroy
14:20 ~ 14:40340S021 ~ The Sanitary Discharge Grey Water System - System arrangements, functions and operations.CDamen 1On BoardShowEditDestroy
14:40 ~ 14:55340S022 ~ Sewage collecting Tank 16, Sewage tank 17 - Arrangement, Functions.CDamen 1On BoardShowEditDestroy
14:55 ~ 15:25340S023 ~ STP: Clean and Inspect- External Feed Pump, vacuum pumps, valves, Local operator panel, ventilation lines – functions, operations.CDamen 1On BoardShowEditDestroy
15:25 ~ 15:40000000Morning Tea BreakShowEditDestroy
15:40 ~ 16:00340S024 ~ STP: Functional Checks- The LOP- Health checks, auto start/stop. Alarms, pre starting checks, safety procedures, operation and Performance.CDamen 1On BoardShowEditDestroy
16:00 ~ 16:15340S025 ~ STP: Replenish disinfectant- Procedures when handling disinfectant, Safety precautions.ODamen 1On BoardShowEditDestroy
16:15 ~ 16:25340S026 ~ Discharge of Sanitary Grey and Black Water.CDamen 1On BoardShowEditDestroy
16:25 ~ 17:25340S027 ~ On Board Familiarisation.ODamen 1On BoardShowEditDestroy
Wed 12-Jul
Group 1
12:30 ~ 13:30000000Lunch BreakCShowEditDestroy
13:30 ~ 15:40333S018 ~ On Board FamiliarisationODamen 1On BoardShowEditDestroy
Thu 13-Jul
Group 1
08:30 ~ 08:45210S011 ~ Propulsion engine - Perform Daily Checks.OCaterpillar SystemShowEditDestroy
08:45 ~ 09:00210S012 ~ Propulsion Diesel Engines (PDE) - Inspect PDE Instrument Panel.OCaterpillar SystemShowEditDestroy
09:00 ~ 09:15210S013 ~ PDE - Inspect for leaks and loose connection. OCaterpillar SystemShowEditDestroy
09:15 ~ 09:45210S014 ~ PDE- Engine Oil Filter - Change. OCaterpillar SystemShowEditDestroy
09:45 ~ 10:15210S015 ~ Reduction gear system-Perform an oil change and replace oil filter. OCaterpillar SystemShowEditDestroy
10:15 ~ 10:30210S016 ~ Reduction gear system - Clean heat exchanger. OCaterpillar SystemShowEditDestroy
11:00 ~ 11:15210S017 ~ Clean heat exchanger. OCaterpillar SystemShowEditDestroy
11:15 ~ 11:30210S018 ~ Flexible couplings - Visual inspection for sign of damage and vulcanised. OCaterpillar SystemShowEditDestroy
11:30 ~ 11:45210S019 ~ Propeller Shaft - Check lubrication system and temperature.OCaterpillar SystemShowEditDestroy
11:45 ~ 12:00210S0110 ~ Propeller shaft sealing - Visual check for leaking.OCaterpillar SystemShowEditDestroy
12:00 ~ 12:15210S0111 ~ Propeller shaft Bearing - Check propeller shaft lubrication operation and bearing temperature (when shaft is turning).OCaterpillar SystemShowEditDestroy
12:15 ~ 12:30210S0112 ~ Control system propulsion - Check cooling fan operation. OCaterpillar SystemShowEditDestroy
12:30 ~ 13:00210S0113 ~ Propulsion Control - Check condition of Electronic devices and LRUs.OCaterpillar SystemShowEditDestroy
14:00 ~ 14:15210S0114 ~ Propulsion Control - Check cooling fan operation. OCaterpillar SystemShowEditDestroy
14:15 ~ 14:30210S0115 ~ Propulsion Control - Visually inspect the Circuit Board (Line Replaceable Unit - LRU. OCaterpillar SystemShowEditDestroy
14:30 ~ 14:45210S0116 ~ Propulsion Control - Check condition and functionality of Display Panel and Indicating Lights including LED. OCaterpillar SystemShowEditDestroy
14:45 ~ 15:00210S0117 ~ Propulsion control- Inspect terminal blocks. Inspect circuit breakers. OCaterpillar SystemShowEditDestroy
15:00 ~ 15:15210S0118 ~ Propulsion Control - Check fan operation.OCaterpillar SystemShowEditDestroy
Fri 14-Jul
Group 1
08:30 ~ 08:50410S012 ~ HP & LP Power Generation -CCaterpillar SystemClassroom 1ShowEditDestroy
08:50 ~ 09:10410S013 ~ Diesel Generators and Emergency Generators - Perform Daily Checks.CCaterpillar SystemClassroom 1ShowEditDestroy
09:10 ~ 09:30410S014 ~ Diesel Generators and Emergency Generators - Inspect DE Instrument Panel. CCaterpillar SystemClassroom 1ShowEditDestroy
09:30 ~ 09:50410S015 ~ Diesel Generators and Emergency Generators - Inspect for leaks and loose connection.CCaterpillar SystemClassroom 1ShowEditDestroy
09:50 ~ 10:10410S016 ~ Emergency Generators - Inspect Electrical component Diesel Engine Instrument Panel.CCaterpillar SystemClassroom 1ShowEditDestroy
10:10 ~ 10:30410S017 ~ Diesel Generators and Emergency Generators - Protection devices - Check.CCaterpillar SystemClassroom 1ShowEditDestroy
10:45 ~ 11:00000000Morning Tea BreakClassroom 1ShowEditDestroy
11:00 ~ 11:20410S018 ~ Main Switchboard (MSB) and Emergency switchboard (ESB) 415V Panels - Clean, inspect and check insulation and continuity.CCaterpillar SystemClassroom 1ShowEditDestroy
11:20 ~ 11:40410S019 ~ Main Switchboard (MSB) and Emergency switchboard (ESB) 415V Panels Inspect earth bonding.CCaterpillar SystemClassroom 1ShowEditDestroy
11:40 ~ 12:10410S0110 ~ Main Switchboard (MSB) and Emergency switchboard (ESB) 415V Panels - Clean And Inspect Front end panel free from dirt, moisture and corrosion free.CCaterpillar SystemClassroom 1ShowEditDestroy
12:10 ~ 12:30410S0111 ~ Shore connection - Visual inspection of Shore supply connection panel and box.CCaterpillar SystemClassroom 1ShowEditDestroy
12:30 ~ 14:30000000Friday LunchShowEditDestroy
12:30 ~ 12:50410S0112 ~ Shore connection - Visual Inspection the Shore Supply cables and stowage reels.CCaterpillar SystemClassroom 1ShowEditDestroy
12:50 ~ 13:10410S0113 ~ Shore connection : Functional Check of the Control Panel, meters, gauges, phase sequence meter prior ship shore connections prior to connection and termination.CCaterpillar SystemClassroom 1ShowEditDestroy
14:00 ~ 14:30410S0114 ~ Battery sets - Visual inspection and check the terminals tightness.CCaterpillar SystemClassroom 1ShowEditDestroy
14:30 ~ 14:50410S0115 ~ Battery Sets - Functional check of charging units and check cable any sign of damage.CCaterpillar SystemClassroom 1ShowEditDestroy
14:50 ~ 15:10410S0116 ~ ransformers - Clean, inspect and check insulation and continuityCCaterpillar SystemClassroom 1ShowEditDestroy
15:10 ~ 15:30410S0117 ~ Transformers - Clean And Inspect for temperature, noise and vibration.CCaterpillar SystemClassroom 1ShowEditDestroy
16:00 ~ 16:20410S0118 ~ UPS) for the 230 V systems - Check the ventilation system in the UPS spaces in good operating conditions.CCaterpillar SystemClassroom 1ShowEditDestroy
16:00 ~ 17:00410S011 ~ Perform Site Survey and to familirise with the overall system layout examine general conditions including to be acquinted system operating instruction prior to perform the task.OCaterpillar SystemOn BoardShowEditDestroy
Mon 17-Jul
Group 1
08:30 ~ 09:00745S011 ~ Machinery Control (MC) and Propulsion Control Systems (PCS): MC & PCS - Examine the general conditions, and system functional prior to performing any task.CCaterpillar SystemClassroom 1ShowEditDestroy
09:00 ~ 09:30745S012 ~ Machinery Control and Propulsion Control Systems (MC & PCS) - Check condition and functionality of Display Panel and Indicating Lights including LED. CCaterpillar SystemClassroom 1ShowEditDestroy
09:30 ~ 10:00745S013 ~ AMS workstations - Check fan and ventilation cooling operation. CCaterpillar SystemClassroom 1ShowEditDestroy
10:00 ~ 10:30745S014 ~ AMS workstations configuration - Visually inspect the consoles.CCaterpillar SystemClassroom 1ShowEditDestroy
11:00 ~ 11:30745S015 ~ AMS workstations: Check Earth Grounding strap to the Hull structures CCaterpillar SystemClassroom 1ShowEditDestroy
11:30 ~ 12:00745S016 ~ AMS workstations - Run AMS system self checks or BITE.CCaterpillar SystemClassroom 1ShowEditDestroy
12:00 ~ 12:30745S017 ~ AMS Local operation panel (LOP): Check Power Supply AC & DC to the AMS CCaterpillar SystemClassroom 1ShowEditDestroy
12:30 ~ 13:00745S018 ~ AMS workstations - Inspect terminal blocks and Inspect circuit breakers MCB & MCCP or sign of corrosion and cleanliness and dust free.CCaterpillar SystemClassroom 1ShowEditDestroy
14:00 ~ 14:30745S019 ~ AMS Local operation panel (LOP) - Check fan / cooling operation and air flow.CCaterpillar SystemClassroom 1ShowEditDestroy
14:30 ~ 15:00745S0110 ~ MC-PCS Safety and Handling - Observe Pre checks, safety procedures and practices, handling of hazardous materials when performing the work before, during and after performing the task.CCaterpillar SystemClassroom 1ShowEditDestroy
Tue 18-Jul
Group 1
10:15 ~ 10:30000000Morning Tea BreakShowEditDestroy
13:30 ~ 14:30000000Lunch BreakCClassroom 1ShowEditDestroy
15:30 ~ 15:45000000Tea BreakShowEditDestroy
Fri 21-Jul
Group 1
12:45 ~ 14:45000000Friday LunchShowEditDestroy
Mon 24-Jul
Group 1
10:30 ~ 10:45000000Morning Tea BreakShowEditDestroy
13:15 ~ 14:15000000Lunch BreakCShowEditDestroy
15:45 ~ 16:00000000Tea BreakShowEditDestroy
Tue 25-Jul
Group 1
09:15 ~ 09:45800S0126 ~ Internal Communication - Flight Deck Communication Station: Visual inspect and clean wireless station. From ingress of dust and moisture.CMorten JepsenClassroom 1ShowEditDestroy
09:45 ~ 10:15800S0127 ~ Internal Communication - Flight Deck Communication Station - Carry out self check of BITE on station control panel and portable sets.CMorten JepsenClassroom 1ShowEditDestroy
10:15 ~ 10:30000000Morning Tea BreakShowEditDestroy
10:30 ~ 11:00800S0128 ~ External and Internal Communication system networks: Visual check the exposed surface hardware and panel for signs of damage,loose connections and free from dust and moisture.CMorten JepsenClassroom 1ShowEditDestroy
11:00 ~ 11:30800S0129 ~ System BITE Failures and corrective actions: Using Self check and BITE (Built In Test Equipment) the transmitter or the receiver units able to detects a failure, the Alarm and Alert LED on the front panel. CMorten JepsenClassroom 1ShowEditDestroy
11:30 ~ 12:00800S0130 ~ System Power Supply - Check and examine power supply input and connections for the network are in good order including Power Back-Up system.CMorten JepsenClassroom 1ShowEditDestroy
12:00 ~ 12:30800S0131 ~ Communication System which is an Integrated Communication System (ICS) consists of External Communication system and Internal Communication System Networks.CMorten JepsenClassroom 1ShowEditDestroy
12:30 ~ 13:00800S0132 ~ Power supplies: Check Circuit breakers and fuses of in DB panel for correct operation.CMorten JepsenClassroom 1ShowEditDestroy
13:00 ~ 13:30800S0133 ~ Power supplies - Check Circuit breakers and fuses of in DB panel for correct operation and fault free.CMorten JepsenClassroom 1ShowEditDestroy
13:30 ~ 14:30000000Lunch BreakCShowEditDestroy
14:30 ~ 15:00800S0134 ~ External and Internal Communication System Components - Check Earth bonding straps and connections to ship structure are intact and free from dust and corrosion.OMorten JepsenOn BoardShowEditDestroy
15:00 ~ 15:30800S0135 ~ Antennas and coupling unit - Visual check Antenna Units free from obstruction and moisture and salt deposit and corrosion.CMorten JepsenClassroom 1ShowEditDestroy
15:30 ~ 18:30800S0136 ~ Practical Site survey and inspection on the ICS ( External & Internal Comm. Networks System and components onboard.OMorten JepsenOn BoardShowEditDestroy
Thu 27-Jul
Group 1
10:35 ~ 10:50000000Morning Tea BreakShowEditDestroy
12:30 ~ 13:30000000Lunch BreakCShowEditDestroy
Thu 03-Aug
Group 1
11:35 ~ 12:35110F111 ~ Perform Site Survey and familiarization with the ICAF system layout and operationOKdr (Rtd) Ir Hj Mohamad Hussin Bin AbdullahShowEditDestroy
12:35 ~ 13:05110F112 ~ Visually check cables inside power controller unit for damage and tightness.OKdr (Rtd) Ir Hj Mohamad Hussin Bin AbdullahShowEditDestroy
13:05 ~ 14:05000000Lunch BreakCShowEditDestroy
14:05 ~ 15:05110F113 ~ Perform checks and inspections and identify fault conditions.OKdr (Rtd) Ir Hj Mohamad Hussin Bin AbdullahShowEditDestroy
16:05 ~ 16:20000000Tea BreakShowEditDestroy
Fri 04-Aug
Group 1
10:30 ~ 10:45000000Morning Tea BreakShowEditDestroy
13:00 ~ 14:00000000Lunch BreakCShowEditDestroy
16:20 ~ 16:35000000Tea BreakShowEditDestroy
Sat 26-Aug
Group 1
13:15 ~ 13:45370S011 ~ Functional check of various protective and overload devices and type of controllers employed. CTP TBDClassroom 1ShowEditDestroy
13:45 ~ 14:15370S012 ~ Ventilation Fan Motor: Check Motor conditions such as Air Flow,Temperature, RPM, noise and vibration.CTP TBDClassroom 1ShowEditDestroy
14:15 ~ 14:35370S013 ~ Vent. Flaps, covers and trunking-inspect - Clean as necessary.CTP TBDClassroom 1ShowEditDestroy
14:35 ~ 15:05370S014 ~ Measure Earth Bonding strap and fastenings Continuity and keep the fastenings are tight, clean, dry and free from rust.CTP TBDClassroom 1ShowEditDestroy
15:05 ~ 15:25370S015 ~ Vent.flaps & covers-inspect perfom chalk test.CTP TBDClassroom 1ShowEditDestroy
15:25 ~ 15:40000000Tea BreakShowEditDestroy
15:40 ~ 16:10370S016 ~ Functional check the functionalities of various protective and overload devices on mlotor and starters-controllersCTP TBDClassroom 1ShowEditDestroy
16:10 ~ 16:30370S017 ~ Inspect the earth bonding straps and mechnical fastening are tight free fom dirt, moisture and rustCTP TBDClassroom 1ShowEditDestroy
16:30 ~ 16:50370S018 ~ Inspect and test the equipment at sufficient intervals to make sure that the equipment is in operating condition.CTP TBDClassroom 1ShowEditDestroy
16:50 ~ 17:10370S019 ~ Observe cleanliness, corrosion control and preservation at all time when performing the taskCTP TBDClassroom 1ShowEditDestroy
Sun 27-Aug
Group 1
09:15 ~ 09:35370S0110 ~ Observe safety precautions, practices and handling of hazadous material in performing the work.CTP TBDClassroom 1ShowEditDestroy
09:35 ~ 10:35370S111 ~ Initial Walk around: Examine the general conditions and system operationn prior to perform the task.OTP TBDOn BoardShowEditDestroy
10:35 ~ 10:50000000Morning Tea BreakShowEditDestroy
10:50 ~ 11:50370S112 ~ Ensure the filter mat are clean and dry.OTP TBDOn BoardShowEditDestroy
11:50 ~ 13:50370S113 ~ Practical Site Survey and inspection on the system and components onboard.OTP TBDOn BoardShowEditDestroy
13:50 ~ 14:50000000Lunch BreakCShowEditDestroy
15:20 ~ 15:35000000Tea BreakShowEditDestroy
Thu 07-Sep
Group 1
11:45 ~ 15:45000F111 ~ Familiarization Onboard.OTP TBDOn BoardShowEditDestroy
13:30 ~ 17:30000F121 ~ Familiarization Onboard.OTP TBDOn BoardShowEditDestroy